Opening this block

Home

What's new on Bloor St W

293 city records on Bloor St W.

See one address on this street.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 17 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Shoppers Drug Mart

958 Bloor St W · Davenport

Applied 12 Jun 2026

Revision Issued

REVISION - SECURITY GATES LAYOUT REVISIONProposal for interior alterations to install new security gates in existing retail store - "Shoppers Drug Mart"

Being built

The city has allowed these. Work may not have started.

Mixed Use/res W Non Res

1 Bloor St W

1 Bloor St W · University-Rosedale

Approved 23 Oct 2026

Revision 05: Permit revisions on Levels 39-56 for applications 19 106142 for the construction of a 85-storey mixed use residential with non-residential buildingProposal to construct an 86 storey mixed use apartment…

Multiple Unit Building

1290 Bloor St W

1290 Bloor St W · Davenport

Approved 8 Oct 2026

Revision No.3: Proposed steel metal fire escape to replace existing wood stairs and landingRev 2: Exit door and rebuilding existing stairProposal for interior alterations to the ground and basement levels to convert…

Multiple Unit Building

1062 Bloor St W

1062 Bloor St W · Davenport

Approved 7 Oct 2026

REV: Adding flexiglass panels to approved wood structureProposal for roof top covered terrace.

Show 17 moreShow fewer
Multiple Unit Building

100 Bloor St W

100 Bloor St W · University-Rosedale

Approved 9 Sep 2026

Remove, relocate and reconfigure interior non loading partitions, adjust hvac, lighting and plumbing to suit new layout.

Multiple Unit Building

1286 Bloor St W

1286 Bloor St W · Davenport

Approved 31 Aug 2026

REV 01: Proposed new exit stair will be added on the north side of the building.Proposal for demolition of partition walls on the second and the third floor in preparation of further renovation.The space will be…

1 homes

2888 Bloor St W

2888 Bloor St W · Etobicoke-Lakeshore

Approved 14 Aug 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new two-storey slab-on-grade mixed-use commercial building with residential occupancy on the second floor. The proposed ground floor commercial tenant space is intended for use as a fitness studio

Multiple Unit Building

1660 Bloor St W

1660 Bloor St W · Parkdale-High Park

Approved 13 Aug 2026

Proposal for interior alterations to convert vacant commercial space to a dental office - UNITS 3 & 4Convenience address is 1662-1664 Bloor St W.

Multiple Unit Building

834 Bloor St W

834 Bloor St W · University-Rosedale

Approved 7 Aug 2026

Revision 02: Revision to permit (as bubbled)Proposal to construct rear two storey addition and two storey addition to exisiting commercial residential building, interior alterations throughout building and second…

Multiple Unit Building

598 Bloor St W

598 Bloor St W · University-Rosedale

Approved 31 Jul 2026

Proposal for interior alterations to existing ground floor for new takeout restaurant.

Multiple Unit Building

492 Bloor St W

492 Bloor St W · University-Rosedale

Approved 16 Jul 2026

Proposal to construct interior alterations to commercial space on ground & basement floors for a new 'A2' restaurant w/ 60 patrons in total.

Multiple Unit Building

581 Bloor St W

581 Bloor St W · University-Rosedale

Approved 8 Jul 2026

Rev 03 - Revisions made to P1, First Floor, Mezzanine Level, and other areasRev 02 - P1 - added dish washing & storage units on level 1; commissary kitchen will not be cooking any food 1st Floor- open food stalls…

Apartment

300 Bloor St W

300 Bloor St W · University-Rosedale

Approved 2 Jul 2026

339 new homes

The permit lists 339 homes.

Proposal for the construction of a 34 storey tower containing 20,055 square metres of residential space and 6,509 square metres of non-residential space. Application is in conjunction with Facade Retention permit 21…

2 homes

699 Bloor St W

699 Bloor St W · University-Rosedale

Approved 9 Jun 2026

2 new homes

The permit lists 2 homes.

Proposal for rebuilding existing rear addition.

Mixed Use/res W Non Res

597 Bloor St W

597 Bloor St W · University-Rosedale

Approved 6 May 2026

Part Permit - Proposal to construct a new 8 storey mixed use building plus mechanical penthouse and 2 levels of below grade parking. New building includes ground floor retail and 68 residential units. See also 17 187476…

5 homes

883 Bloor St W

883 Bloor St W · University-Rosedale

Approved 27 Apr 2026

5 new homes

The permit lists 5 homes.

Proposal to construct interior alterations to convert existing vacant art studio space into 5 1-bedroom suites, convert existing unused public washroom and storage into laundry room, janitor room and bike room

Multiple Unit Building

3050 Bloor St W

3050 Bloor St W · Etobicoke-Lakeshore

Approved 19 Jan 2026

Proposal to remove the existing front glazing and install a new assembly enclosing the front area within the current footprint

Multiple Unit Building

110 Bloor St W

110 Bloor St W · University-Rosedale

Approved 13 Jan 2026

Proposal for interior alterations to security office, new privacy room and new partition at cash desk (Winners Homesense)

Laneway suite

4240 Bloor St W

4240 Bloor St W · Etobicoke Centre

Approved 24 Dec 2025

1 new home

The permit lists 1 homes.

Proposed new Laneway Suite in Rear of Property over existing garage

Coming down

The city has allowed these buildings to come down. They may still be standing.

Show 5 moreShow fewer

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

Annual Lantern Parade

3216 Bloor St W · Etobicoke-Lakeshore

Allowed 13 Nov 2026

Hours 5:00 p.m.–7:00 p.m.

Setup 13 Nov 2026, 4:30 p.m.–5:00 p.m.

Tear down 13 Nov 2026, 7:00 p.m.–7:30 p.m.

Deutsche Schule Toronto

Amplified And/or Instrument Sound

Bloorcourt Halloween Block Party

927 Bloor St W · Davenport

Allowed 25 Oct 2026

Hours 11:00 a.m.–4:00 p.m.

Setup 25 Oct 2026, 8:00 a.m.–11:00 a.m.

Tear down 25 Oct 2026, 4:00 p.m.–7:00 p.m.

Bloorcourt Village Bia

Amplified And/or Instrument Sound

Christie Cross

750 Bloor St W · University-Rosedale

Allowed 25 Oct 2026

Hours 9:00 a.m.–4:00 p.m.

Setup 24 Oct 2026, 12:00 p.m.–10:00 p.m.

Tear down 25 Oct 2026, 4:00 p.m.–7:00 p.m.

16359493 Canada Association (christie Cross)

Show 3 moreShow fewer
Construction

Bloor Street West And Croatia Street, Dufferin St.

1141 Bloor St W · Davenport

Allowed 19 Mar 2026 – 30 Nov 2026

Hours 7:00 a.m.–9:00 p.m.

Deltera Contracting Inc

Construction

Manulife Centre Parking Garage Rehabilitation

55 Bloor St W · University-Rosedale

Allowed 5 Mar 2026 – 30 Oct 2026

Hours 10:00 p.m.–8:00 a.m.

Manulife Financial

Events

On the city's calendar. Check before you go.

Show 17 moreShow fewer
Live PerformancesMusic

The Robert W. and G. Ann Corcoran Concerto Competition Finals

273 Bloor St W · University-Rosedale

On 20 Jan 2027

Free

Students of The Glenn Gould School compete for the opportunity to perform a concerto with the Royal Conservatory Orchest

Event pageAdd to calendar
Live PerformancesMusic

Mayumi Seiler, violin, Min‑Jeong Koh, viola and Daniel Hamin Go, cello

273 Bloor St W · University-Rosedale

On 10 Jan 2027

Celebrated RCM faculty members and a rising star alumnus unite for an exquisite trio recital of works by Beethoven, Ernő

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

3838 Bloor St W

3838 Bloor St W · Etobicoke Centre

Asked 3 Nov 2026

Application Received

Proposed scope of work consists of the conversion of, and addition to, an existing nursing home to accommodate a municipal shelter with 60 beds. The project includes net-zero building retrofits, building envelope upgrades and barrier-free renovations.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stefano Bellissimo · [email protected].

Rezoning

208 Bloor St W

208 Bloor St W · University-Rosedale

Asked 26 Aug 2026

Under Review

Proposed redevelopment of the lands with a 36-storey Private Student Residence (112.58 metres in height, including the mechanical penthouse) with 426 dwelling units.27,742 square metres of residential GFA and 220 square metres of non-residential GFA are proposed.4 visitor parking spaces (including 1 accessible space)…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Esha Biddanda Pavan · [email protected].

Site plan

3925 Bloor St W

3925 Bloor St W · Etobicoke-Lakeshore

Asked 29 Dec 2025

Under Review

Proposal to demolish the existing two-storey dwellings on each lot, and to consolidate the lots to construct a six-storey (19.5 metres), 3,613.5 square-metre, purpose-built rental building containing 52 residential units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Alyssa Hawley · [email protected].

Show 17 moreShow fewer
Site plan

4209 Bloor St W

4209 Bloor St W · Etobicoke Centre

Asked 22 Oct 2025

Under Review

Proposed new 6-storey (19 meters plus mechanical penthouse space) apartment building. The 1,707-square-meter building will consist of 28 units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Berardo Mascioli · [email protected].

Site plan

1938 Bloor St W

1938 Bloor St W · Parkdale-High Park

Asked 14 Aug 2025

Under Review

Proposed 19-storey mixed-use building comprised of 137 dwelling units (including 12 rental replacement units) and 300 square metres of ground floor retail with a total gross floor area of 12,970.6 square metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Camryn Chin · [email protected].

Site plan

3825 Bloor St W

3825 Bloor St W · Etobicoke-Lakeshore

Asked 4 Jul 2024

NOAC Issued

The Site Plan Control application is proposing a 36-storey mixed-used building with a six-to-eight-storey base building. The proposal contains 525 units, 1,811 square metres of non-residential gross floor area on the ground floor and three levels of underground parking.This application is Phase 1 of the larger…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dominik Matusik · [email protected].

Site plan

82 Bloor St W

82 Bloor St W · University-Rosedale

Asked 11 Aug 2023

Under Review

78-storey mixed-use building with 952 square metres of retail space on the ground floor, 8,767 square metres of office space on second through fifth floors and 1,716 dwelling units above.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jason Tsang · [email protected].

Site plan

19 Bloor St W

19 Bloor St W · University-Rosedale

Asked 6 Mar 2023

Under Review

Site Plan Approval for a 94-storey mixed-use building containing retail uses at-grade fronting onto Bloor Street West, and residential uses above (1262 residential units) with access provided on Balmuto Street. The proposed development provides 4 levels of underground parking for a total of 70 parking spaces including…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Hector Alonso · [email protected].

Site plan

1728 Bloor St W

1728 Bloor St W · Parkdale-High Park

Asked 3 Mar 2023

Under Review

Site Plan Approval for a 19-storey mixed use building with a total of 99 new dwelling units. The building will have a total gross floor area (GFA) of 6860 square metres, including a retail gross floor area of 86.8 square metres, resulting in a total density of 15.27 FSI. The total building height is 61.6 metres,…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Pavel Kopec · [email protected].

Site plan

425 Bloor St W

425 Bloor St W · University-Rosedale

Asked 12 Oct 2022

Under Review

Proposal for a 30-storey building with retail units at grade along Bloor Street West. Overall, the proposal will introduce 472 residential units and 798 square metres of retail gross floor area.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Aviva Pelt · [email protected].

Site plan

1293 Bloor St W

1293 Bloor St W · Davenport

Asked 9 Aug 2022

Under Review

The Site is proposed to be redeveloped with a new 28-storey (plus mechanical penthouse) mixed-use building. A total gross floor area of 18,392 square metres is proposed, consisting of 18,145 square metres of residential uses and 247 square metres of grade-related retail uses.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Doris Ho · [email protected].

Rezoning

1293 Bloor St W

1293 Bloor St W · Davenport

Asked 9 Aug 2022

Under Review

The Site is proposed to be redeveloped with a new 28-storey (plus mechanical penthouse) mixed-use building. A total gross floor area of 18,392 square metres is proposed, consisting of 18,145 square metres of residential uses and 247 square metres of grade-related retail uses.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Doris Ho · [email protected].

Site plan

334 Bloor St W

334 Bloor St W · University-Rosedale

Asked 27 Apr 2022

Under Review

Site Plan Approval for a 36-storey mixed-use building containing 431 residential dwelling units (including 24 rental dwelling replacement units), retail at-grade and in the concourse levels and 2 levels of office space. The site includes a TTC entrance to Spadina Station, as well as 470 square metres of office space…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Aviva Pelt · [email protected].

Site plan

1540 Bloor St W

1540 Bloor St W · Parkdale-High Park

Asked 26 Apr 2022

Under Review

INACTIVE Proposal for a 27 storey mixed use building.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Doris Ho · [email protected].

Site plan

85 Bloor St W

85 Bloor St W · University-Rosedale

Asked 17 Dec 2021

Appeal Received

Site Plan Approval for a 80-storey mixed-use building having a non-residential gross floor area of 1,650 square metres, and a residential gross floor area of 69,722 square metres. 1144 residential dwelling units are proposed.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Cole Solish · [email protected].

Subdivision

3326 Bloor St W

3326 Bloor St W · Etobicoke-Lakeshore

Asked 16 Dec 2021

Under Review

Bloor Kipling Housing Now: Draft Plan of Subdivision to create two mixed-use development blocks and a new public road connecting Green Lanes and Aberfoyle Crescent.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Write Dominik Matusik · [email protected].

Site plan

2 Bloor St W

2 Bloor St W · University-Rosedale

Asked 14 Dec 2021

NOAC Issued

Site plan approval for a 75-storey mixed-use building having a non-residential of 1398 square metres and a residential gross floor area of 47929 square metres. 725 residential dwelling units are proposed. (NOTE: This is phase 2 of the development, and is the east side of the site)

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Esha Biddanda Pavan · [email protected].

Site plan

328 Bloor St W

328 Bloor St W · University-Rosedale

Asked 7 Dec 2021

Under Review

Site Plan Approval for a 37-storey mixed-use building atop an 8-storey base building, having a non-residential gross floor area of 627.9 square metres and a residential gross floor area of 31,231.27 square metres. A total of 366 residential units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Aviva Pelt · [email protected].

Condominium plan

1405 Bloor St W

1405 Bloor St W · Davenport

Asked 8 Nov 2021

Under Review

*** Draft Plan of Condo for 326 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Bruna Nigro · [email protected].