Opening this block

Home · Don Valley East · Grenoble Dr

What's new around 165 Grenoble Dr

165 Grenoble Dr · Don Valley East. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Being built

The city has allowed these. Work may not have started. The permits in this area list 408 homes.

Apartment

25 St Dennis Dr

619 m away · 25 St Dennis Dr · Don Valley East

Approved 16 Apr 2025

405 new homes

The permit lists 405 homes.

37 storey residential building containing 405 dwelling units and 3 levels of underground parking - South Tower

1 homes

25 St Dennis Dr

619 m away · 25 St Dennis Dr · Don Valley East

Approved 9 Jan 2026

1 new home

The permit lists 1 homes.

Three storey townhouse with rooftop terrace, Unit W3

Apartment

7 St Dennis Dr

760 m away · 7 St Dennis Dr · Don Valley East

Approved 28 Oct 2026

Conditional Permit - Part Permit - Proposal to construct a new 38 storey Rental apartment building with 474 residential units and 3 levels of underground parking.

Show 4 moreShow fewer
New house

10 Longspur Rd

944 m away · 10 Longspur Rd · Beaches-East York

Approved 2 Jul 2026

1 new home

The permit lists 1 homes.

REVISION 01: Proposed revision includes revised roof design, ground floor ceiling height with new bachelor apartment in basement. (Duplex)Proposal to construct a new three storey single family dwelling with integral…

Transit Station,subway, Bus Terminal

770 Don Mills Rd

948 m away · 770 Don Mills Rd · Don Valley East

Approved 21 Apr 2026

Conditional Permit - Part Permit - The proposed Flemingdon Park Station is located approximately 0.6 km south of the proposed Science Centre station. It isconstrained by Don Mills Road to the east and by a private road…

New house

34 Presteign Ave

1.0 km away · 34 Presteign Ave · Beaches-East York

Approved 29 Aug 2025

1 new home · Dj Construction

The permit lists 1 homes.

To construct a new two-storey detached dwelling with an integral garage, a widened driveway, a covered front porch, a rear first storey deck with a second storey balcony above.

Multiple Unit Building

789 Don Mills Rd

1.0 km away · 789 Don Mills Rd · Don Valley East

Approved 1 Sep 2026

Proposed parking garage structural concrete repairs and podium deck leaking crack injection.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

770 Don Mills Rd

948 m away · 770 Don Mills Rd · Don Valley East

Approved 22 Apr 2026

The work consists of localized demolition and removal of specific sections of the retaining wall located within the property limits of 770 Don Mills Rd, and not in the right-of-way (ROW), The sections of the wall are…

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

Continuous Concrete Pour

649 m away · 27 St Dennis Dr · Don Valley East

Allowed 13 May 2026 – 30 Nov 2026

Hours from 7:00 a.m.

27 St Dennis Lp

Construction

9 St Dennis

761 m away · 9 St Dennis Dr · Don Valley East

Allowed 24 Aug 2026 – 31 Dec 2026

Hours 6:00 a.m.–11:59 p.m.

Crownstone Construction Inc

Construction

9 St Dennis

761 m away · 9 St Dennis Dr · Don Valley East

Allowed 16 Nov 2026 – 30 Jun 2027

Hours 6:00 a.m.–7:00 a.m.

Crownstone Construction Inc

Events

On the city's calendar. Check before you go.

EnvironmentalTalks

Flemingdon Park Library Talk: Our Urban Forest

621 m away · 29 St Dennis Dr · Don Valley East

On 18 Nov 2026

Free

Toronto has one of the largest urban forests in the world. Join the City of Toronto for an in-library presentation on th

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

165 Grenoble Dr

0 m away · 165 Grenoble Dr · Don Valley East

Asked 3 Sep 2026

Application Received

Site Plan Control Application proposes a 2-storey (12m) Fire Hall on behalf of the City of Toronto (Toronto Fire Services).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derrick Wong · [email protected].

Rezoning

1 Deauville Lane

471 m away · 1 Deauville Lane · Don Valley East

Asked 19 Sep 2024

OMB Appeal

Revise proposal to phase the development that will eventually demolish the existing 7-storey rental building to permit 3 residential buildings heights ranging from 44, 47, 49 storeys with a total residential gross floor area of 112,946 square metres. Phase 1 will include maintaining the existing 7-storey rental…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Dan Tovey · [email protected].

Subdivision

1 Deauville Lane

471 m away · 1 Deauville Lane · Don Valley East

Asked 23 Sep 2024

Under Review

Proposed Draft Plan of Subdivision contains 4 blocks including one public street and public park.The file is associated with a Zoning By-law Amendment file 2024 215137 NNY 16 OZ anda Rental Housing File 24 216641 NNY 16 RH.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.

Write Dan Tovey · [email protected].

Show 8 moreShow fewer
Site plan

1 Deauville Lane

471 m away · 1 Deauville Lane · Don Valley East

Asked 29 Jan 2025

Under Review

The Proposed Development seeks to demolish the existing 7-storey building on-site to facilitate the construction of three towers at heights of 44, 47 and 49 storeys sitting atop a 5-storey podium (Tower A) and a connecting 6-storey podium (Tower B and C). Tower A will be 44-storeys and will sit atop a 5-storey podium.…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jenny Choi · [email protected].

Site plan

48 Grenoble Dr

496 m away · 48 Grenoble Dr · Don Valley East

Asked 25 Mar 2022

Under Review

Proposal for development includes 43- and 41-storey towers connected by a 6 storey podium, with on-site parkland dedication and a privately-owned publicly-accessible space. The towers and podium contain 993 residential units, comprised of 109 replacement rental units and 884 newresidential units. Total GFA is 67,941…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derrick Wong · [email protected].

Site plan

7 St Dennis Dr

760 m away · 7 St Dennis Dr · Don Valley East

Asked 22 Mar 2023

NOAC Issued

Site Plan Application in relation to (OPA), Zoning By-Law Amendment (ZBA), and Draft Plan of Subdivision (SUB) applications (22 187482 NNY 16 OZ and 22 188139 NNY.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Mina Rahimi · [email protected].

Site plan

250 Ferrand Dr

798 m away · 250 Ferrand Dr · Don Valley East

Asked 21 May 2026

Under Review

Site Plan Control Application proposes to retrofit and adaptive reuse of the existing 15-storey office building to create a rental apartment development. The project will accommodate 331 loft-style rental apartment units, primarily family-sized, along with approximately 111.77 m² of ground-floor commercial space…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Mina Rahimi · [email protected].

Site plan

10 Ferrand Dr

900 m away · 10 Ferrand Dr · Don Valley East

Asked 29 Jul 2022

Under Review

Proposed development consists of three (3) phases. Phase One is - privately Owned Publicly Accessible Open Space (POPS) with below grade parking in the existing conference centre. Phase Two - proposes two towers of 56 and 49 storeys (Buildings A and B, respectively) connected with a 4-11 storeys podium. Phase Three-…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Marian Prejel · [email protected].

Subdivision

770 Don Mills Rd

948 m away · 770 Don Mills Rd · Don Valley East

Asked 28 Jul 2021

Application Received

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.

Write Marian Prejel · [email protected].

Site plan

770 Don Mills Rd

948 m away · 770 Don Mills Rd · Don Valley East

Asked 20 Dec 2024

Under Review

Site Plan Control Placeholder for Flemingdon Park Station, one of the stations included in the Ontario Line Elevated Guideway and Stations contract.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Vanessa Opassinis · [email protected].

Site plan

25 Waterman Ave

1.0 km away · 25 Waterman Ave · Beaches-East York

Asked 11 Jul 2017

Under Review

INACTIVE Site Plan Approval to redevelop the subject lands with seven industrial condominium buildings, ranging in size from approximately 1,000 sq. m. to approximately 2,350 sq. m. In total, the proposal has a total gross floor area of 9,814.37 sq. metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Sean Guenther · [email protected].