Opening this block

Home · Don Valley East · Bermondsey Rd

What's new around 197 Bermondsey Rd

197 Bermondsey Rd · Don Valley East. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 6 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 3 homes.

Other

197 Bermondsey Rd

0 m away · 197 Bermondsey Rd · Don Valley East

Approved 10 Jan 2025

Proposal to legalize existing multiple accessory buildings (temporary prefabricated structures) on the lot

New house

18 Trophy Dr

393 m away · 18 Trophy Dr · Don Valley East

Approved 18 Jun 2026

1 new home · Carter R Kent

The permit lists 1 homes.

Proposal to demolish existing dwelling and construct a new two-storey single family dwelling. See also 26-152122 DEM 00 DM

New house

62 Saddle Ridge Dr

655 m away · 62 Saddle Ridge Dr · Don Valley East

Approved 10 Mar 2025

2 new homes · Salim Manesiya

The permit lists 2 homes.

Proposal to demolish and construct a new 2 storey detached dwelling unit with one secondary suite at the basement. (Duplex)

Show 1 moreShow fewer
Apartment

1648 Victoria Park Ave

915 m away · 1648 Victoria Park Ave · Don Valley East

Approved 7 Aug 2026

Revision 1: Replace installed doors and sidelights for Building A some ground floor units as per attached revised ground floor plan.Four storey apartment building (stacked and back to back condominium townhomes)…

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

62 Saddle Ridge Dr

655 m away · 62 Saddle Ridge Dr · Don Valley East

Approved 10 Mar 2025

Salim Manesiya

Proposal to demolish and construct a new 2 storey triplex, with integral garage.

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

Bachata Canada Festival

501 m away · 4 Credit Union Dr · Don Valley East

Allowed 26 Nov 2026 – 30 Nov 2026

Hours 8:00 p.m.–2:00 a.m., 10:00 a.m.–4:00 a.m., 9:00 a.m.–5:00 a.m.…

Setup 26 Nov 2026, 6:00 p.m.–8:00 p.m.

Tear down 30 Nov 2026, 3:00 a.m.–6:00 a.m.

1001543936 Ontario Inc.

Amplified And/or Instrument Sound

The Special Bazaar Event

858 m away · 1527 Victoria Park Ave · Scarborough Centre

Allowed 20 Nov 2026 – 21 Nov 2026

Hours 1:00 p.m.–8:00 p.m., 11:00 a.m.–8:00 p.m.

Setup 20 Nov 2026, 10:00 a.m.–1:00 p.m.

Tear down 21 Nov 2026, 8:00 p.m.–9:00 p.m.

Family Service Toronto

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

40 Sloane Ave

280 m away · 40 Sloane Ave · Don Valley East

Asked 27 Oct 2026

Application Received

Site Plan Control Application proposes a six-storey residential apartment building containing28 rental units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Nolan Tipping · [email protected].

Site plan

100 Tisdale Ave

394 m away · 100 Tisdale Ave · Don Valley East

Asked 24 Dec 2010

Under Review

To amend the previous site plan control application for revised GFA. See OZ file for documents

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derrick Wong · [email protected].

Subdivision

100 Tisdale Ave

394 m away · 100 Tisdale Ave · Don Valley East

Asked 7 Feb 2011

Under Review

This application is a revision to the previous draft plan of subdivision file 05 - 114052 this proposal is for an additional 16 lots. Appealled to OLT case file no.: OLT-22-004682 after notice of draft approval issued.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.

Write Derrick Wong · [email protected].

Show 4 moreShow fewer
Site plan

155 Bermondsey Rd

444 m away · 155 Bermondsey Rd · Don Valley East

Asked 19 Aug 2026

Under Review

Site Plan Control Amendment to 24 253875 NNY 16 SA to reduce the number of parking spaces and alter the building footprint.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Amie Chung · [email protected].

Site plan

3 Swift Dr

455 m away · 3 Swift Dr · Don Valley East

Asked 24 Dec 2021

Under Review

Site Plan approval Application for a 39 and 28-storey residential building having a gross floor area of 58,686 square metres. 824 residential units are proposed, of which, 61 are rental replacement units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derrick Wong · [email protected].

Site plan

88 Sunrise Ave

703 m away · 88 Sunrise Ave · Don Valley East

Asked 3 Aug 2011

NOAC Issued

To construct a one-storey building with surface parking. The building will include an area of worship, office space, library, gym and recreation area. The existing one-storey building (the Afghan Islamic Community Centre) will be maintained. This proposed building is an expansion of the existing use.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Angela Zhao · [email protected].

Rezoning

1871 O'Connor Dr

818 m away · 1871 O'Connor Dr · Don Valley East

Asked 20 Dec 2024

Appeal Received

City-Initiated Official Plan Amendment for the properties at 1871, 1875, 1880, 1885, and 1888 O'Connor Drive, and 1460, 1468 and 1474 Victoria Park Avenue, to implement the preferred alignment for the O'Connor Drive Reconfiguration, which is being recommended through the ReNew Golden Mile Municipal Class Environmental…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Emily Caldwell · [email protected].