Opening this block

Home · Scarborough Centre · Ellesmere Rd

What's new around 209 Ellesmere Rd

209 Ellesmere Rd · Scarborough Centre. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 10 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 6 homes.

Laneway suite

26 Budea Cres

183 m away · 26 Budea Cres · Scarborough Centre

Approved 19 Aug 2026

Revision 01 - Revision to approved energy efficiency package (A4 to C4) and associated wall insulation details.Proposal to demolish existing detached garage in rear yard and construct new 2 storey Garden Suite with…

New house

24 Dewey Dr

627 m away · 24 Dewey Dr · Scarborough Centre

Approved 13 Jan 2026

1 new home · Gul Abdullah Mohammad

The permit lists 1 homes.

Proposal for a new 2 storey SFD-Detached.

Laneway suite

170 Tower Dr

719 m away · 170 Tower Dr · Scarborough Centre

Approved 9 Jan 2025

1 new home

The permit lists 1 homes.

Proposing Garden Suite at the rear of the House.

Show 3 moreShow fewer
3 homes

2 Willowhurst Cres

771 m away · 2 Willowhurst Cres · Scarborough Centre

Approved 15 Aug 2025

3 new homes · Mazhar Kaif

The permit lists 3 homes.

Proposed demolition of an existing dwelling and construction of a new Single Family Dwelling with 2 Secondary Suites

Laneway suite

36 Willowhurst Cres

880 m away · 36 Willowhurst Cres · Scarborough Centre

Approved 10 Feb 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new 2 storey garden suite in the rear yardSee also 25 195269 ZAP

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

24 Dewey Dr

627 m away · 24 Dewey Dr · Scarborough Centre

Approved 13 Jan 2026

Gul Abdullah Mohammad

Proposal for demolition existing SFD-Detached.

Demolition

2 Willowhurst Cres

771 m away · 2 Willowhurst Cres · Scarborough Centre

Approved 19 Aug 2025

Mazhar Kaif

Proposed demolition of an existing dwelling and construction of a new 2-storey triplex.

Demolition

32 Rossford Rd

871 m away · 32 Rossford Rd · Scarborough Centre

Approved 25 Jun 2025

Jeyamalini Jeyakumar

Proposal to demolish existing dwelling and construction of a new single detached family dwelling

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

1411 Warden Ave

433 m away · 1411 Warden Ave · Scarborough Centre

Asked 31 Jan 2025

Under Review

Site Plan Control Amendment. This application intends to formalize the current interim condition of the gas bar queue and adjacent parking area which have resolved circulation concerns raised by neighbouring property owners and the local Councillor. The proposed final condition will maintain the functional layoutof…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Andrew Castaneda · [email protected].

Site plan

85 Ellesmere Rd

797 m away · 85 Ellesmere Rd · Scarborough Centre

Asked 8 Jun 2026

Under Review

Site Plan Amendment. seeking to amend a previous Site Plan Approval to reflect the existing conditions of Parkway Mall. The changes uncludes: 1.New commercial/retail pad buildings along the Victoria Park frontage (CRU D-1, and CRU E);2.The demolition of the southwest and southeast portions of the existing mall;3.…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write John Lyon · [email protected].

Subdivision

20 Metropolitan Rd

873 m away · 20 Metropolitan Rd · Scarborough Centre

Asked 30 Jun 2025

Under Review

Draft Plan of Subdivision Application to create seven lots to facilitate the development of five buildings ranging in height between 26- to 46-storeys, an 11-storey mid-rise building, public roads and a new public park. It is associated with the Official Plan Amendment Application File No. 23 128433 ESC 21 OZ.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Scarborough Community Council, 25 Nov 2026, 9:30 a.m., Council Chamber, Scarborough Civic Centre.

Write Tyler Hughes · [email protected].

Show 3 moreShow fewer
Rezoning

20 Metropolitan Rd

873 m away · 20 Metropolitan Rd · Scarborough Centre

Asked 7 Jul 2025

Application Received

Proposed a mixed-use development comprised of five towers ranging in height between 26- to 46-storeys and an 11-storey mid-rise building. Overall 1,881 new residential units, including 165 purpose-built rental units and 341 units for seniors, a new daycare space that is proposed to be integrated at the base of a…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Scarborough Community Council, 25 Nov 2026, 9:30 a.m., Council Chamber, Scarborough Civic Centre.

Write Janani Mahendran · [email protected].

Site plan

36 Ellesmere Rd

948 m away · 36 Ellesmere Rd · Scarborough Centre

Asked 23 Nov 2021

Under Review

Site Plan application to permit a 11-storey residential building with 187 dwelling units and three levels of below-grade parking containing 218 vehicular parking spaces. The proposed total gross floor area is 14, 794 square metres, resulting in a floor space index of 3.5 times the area of the lot.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tyler Hughes · [email protected].

Site plan

20 Ellesmere Rd

1.0 km away · 20 Ellesmere Rd · Scarborough Centre

Asked 26 Sep 2025

Under Review

Proposal to demolish the existing gas station. The redevelopment includes the construction of a new gas canopy, a new car wash, a new convenience store/quick-service restaurant with an associated drive-through facility, a patio area.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Andrew Castaneda · [email protected].