Ped N Nails
383 m away · 45 Abraham Welsh Rd · Humber River-Black Creek
Approved 15 Jun 2026
Opening this block
Home · Humber River-Black Creek · Arrow Rd
24 Arrow Rd · Humber River-Black Creek. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
383 m away · 45 Abraham Welsh Rd · Humber River-Black Creek
Approved 15 Jun 2026
The city has allowed these. Work may not have started. The permits in this area list 1 homes.
0 m away · 24 Arrow Rd · Humber River-Black Creek
Approved 12 Jun 2026
Conditional Permit - Drain - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors,…
690 m away · 3191 Weston Rd · Humber River-Black Creek
Approved 23 Mar 2026
1 new home
The permit lists 1 homes.
Revision 1: 2 storey garden suite revision.Proposed construction of Garden Suite at rear of dwelling
The city has allowed these buildings to come down. They may still be standing.
0 m away · 24 Arrow Rd · Humber River-Black Creek
Approved 27 Feb 2026
Demolition of one-storey steel-clad workshop located at 30 Arrow Road and one-storey brick building located at 24 Arrow Road. Demolition includes removal of building envelope, structural framing, slabs, foundations, and…
On the city's calendar. Check before you go.
657 m away · 65 Mary Chapman Blvd · Humber River-Black Creek
On 13 Dec 2026
Free
Try something new, get moving and connect through sport, Play Mobile is a free touring sports program for all ages and s
Event pageSomeone has asked the city for a change. Nothing here is a decision.
0 m away · 24 Arrow Rd · Humber River-Black Creek
Asked 14 Apr 2025
NOAC Issued
Phased Site Plan Control application to construct a two-storey warehouse addition to the existing industrial building. Phase 1 will have a GFA of 2,410m² and Phase 2 will have a GFA of 3,294m². The total GFA, including the existing industrial building, will be 10,780m².
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
798 m away · 3100 Weston Rd · Humber River-Black Creek
Asked 7 Jul 2025
OMB Appeal
Proposed Development comprising of three (3) blocks of 4-storey stacked townhouses. The Proposed Development contains 125 dwelling units.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.