Proposal to demolish existing dwelling and construct a two-storey single family dwelling with basement walk-out, rear deck and integral garage.See also 26-133350 ZAP 00 ZR & 26-148056 NNY 018 MV
FOURPLEX Proposal to construct a new three storey fourplex residential building complete with a rear yard deck, four balconies and stairs with a railing.
Proposal to demolish existing dwelling and construct a new three-storey single family dwelling with front porch, basement walk-out, rear patio, and second and third-floor terraces.See also 24-144001 ZAP & 24-176312 NNY
Proposal to demolish existing dwelling and construct a new three-storey single family dwelling with front porch, basement walkout, rear patio, and second and third-floor balconies.See also 24-143998 ZAP & 24-176285 NNY
Revision 01: Changes to garage concrete slab, new walkout stairs and detailsPropose new two storey detached dwelling with finished basement,with basement walkout, rear deck front porch and second floor balcony.
Coming down
The city has allowed these buildings to come down. They may still be standing.
Proposal to demolish existing one-storey dwelling and construct a new three-storey single family dwelling. See also 24-248859 BLD 00 NH & 24-143998 ZAP
Plans you can answer
Someone has asked the city for a change. Nothing here is a decision.
Site Plan application to permit a 12-storey mixed use building with 206 residential units, 897 sqaure metres of non-residential space, and 311 vehicular parking spaces.
How to respond
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
Site Plan Control Application proposes the redevelopment of the existing Petro Canada gasstation. The proposed development includes the construction of a new gas station with an integrated convenience store, a quick service restaurant, outdoor patio seating, pedestrian sidewalk connections linking the site to the…
How to respond
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Draft plan of subdivision application to permit six two-storey detached dwellings on six lots fronting on a new private street. In addition to the new private street and residential lots, the proposal also will create an open space block. Related zoning by-law amendment application (20 234713 NNY 17 OZ) is currently…
How to respond
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.
Site Plan Control Application proposes the redevelopment of the existing site for six new two-storey detached dwellings fronting on a new private street.
How to respond
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
INACTIVE Two blocks of 3 storey townhouses containing a total of 18 dwelling units.
How to respond
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Proposal for a four-storey townhouse development within eight units, with two blocks each containing four units each.
How to respond
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.
Site Plan Control Application for redevelopment of the subject site with four (4) 6-8 storey purpose built rental buildings, inclusive of an interim surface parking lot, and a new public park. The proposed development includes 363 residential units, 29% of which will be affordable rental units to be maintained in…
How to respond
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Rezoning Application proposes to demolish the existing single detached buildings on site and replace with fifty (50) 4-storey townhomes on a private lane/driveway. The east row of townhouses will be designed to face the internal lane as well as to provide a main entrance appearance facing Bayview Ave. The proposal…
How to respond
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.