Mr Souvlaki
439 m away · 250 The East Mall · Etobicoke-Lakeshore
Approved 4 Oct 2025
Opening this block
Home · Etobicoke-Lakeshore · Redcar Ave
5 Redcar Ave · Etobicoke-Lakeshore. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
439 m away · 250 The East Mall · Etobicoke-Lakeshore
Approved 4 Oct 2025
534 m away · 225 The East Mall · Etobicoke-Lakeshore
Approved 22 Jul 2026
659 m away · 1 Eva Rd · Etobicoke Centre
Approved 4 Oct 2025
838 m away · 362 The East Mall · Etobicoke Centre
Approved 5 Sep 2025
925 m away · 195 The West Mall · Etobicoke-Lakeshore
Approved 19 Feb 2026
A permit application that names a shop. It is not a licence and not an opening day.
439 m away · 250 The East Mall · Etobicoke-Lakeshore
Applied 1 Oct 2025
Inspection
Proposal for interior alterations to vacant retail unit for new retail tenant - "Hearing Solutions"
925 m away · 195 The West Mall · Etobicoke-Lakeshore
Applied 7 Oct 2025
Inspection
The proposed scope of work involves interior alterations to a building with a 'Group D - Office' occupancy classification. These alterations are to be carried out on both the ground floor and second floor, and include…
The city has allowed these. Work may not have started. The permits in this area list 7 homes.
0 m away · 5 Redcar Ave · Etobicoke-Lakeshore
Approved 30 Oct 2026
Proposal for construction of new 3 storey replacement elementary school and childcare center, complete with associated underground parking, site servicing, play areas and landscaping.
518 m away · 160 Silverhill Dr · Etobicoke-Lakeshore
Approved 10 Nov 2026
Part Permit - Proposal to construct a new 3 storey elementary school with a 5 room child care centre.
727 m away · 17 Cronin Dr · Etobicoke Centre
Approved 7 Apr 2025
1 new home · Rebecca Middleton
The permit lists 1 homes.
proposal to construct a new two storey detached SFD with a finished basement, front porch, rear deck, rear basement walkout and an integral garage.
778 m away · 42 Blaketon Rd · Etobicoke Centre
Approved 24 Mar 2026
2 new homes · William Nunez
The permit lists 2 homes.
Proposal for a two-story duplex with an integral garage, basement walkout, two rear decks, and a front porch>>>More than 50% of the exterior walls of existing house were removed during construction per Inspector¿s notes…
779 m away · 11 Billingham Rd · Etobicoke-Lakeshore
Approved 23 Sep 2025
Revision 01: Proposal to revise grading plan.Proposal to demolish the existing single unit dwelling and construct a two unit dwelling. (Detached House w/ Secondary Suite)
788 m away · 4240 Bloor St W · Etobicoke Centre
Approved 24 Dec 2025
1 new home
The permit lists 1 homes.
Proposed new Laneway Suite in Rear of Property over existing garage
902 m away · 25 Vickers Rd · Etobicoke-Lakeshore
Approved 14 Jan 2026
Revision 01: Removal of 1 level of the parking structure due to site conditions
938 m away · 40 Ovida Ave · Etobicoke-Lakeshore
Approved 16 Jun 2025
1 new home
The permit lists 1 homes.
Proposal to construct new 2 storey dwelling.
1.0 km away · 58 Shaver Ave N · Etobicoke Centre
Approved 2 Jun 2026
1 new home · Christopher Sitarz
The permit lists 1 homes.
proposed two-storey single family detached dwelling with an integral garage, front covered porch, rear covered deck, and side basement walkout.
1.0 km away · 58 Shaver Ave N · Etobicoke Centre
Approved 9 Sep 2026
1 new home
The permit lists 1 homes.
Proposal for a rear yard garden suite.
The city has allowed these buildings to come down. They may still be standing.
0 m away · 5 Redcar Ave · Etobicoke-Lakeshore
Approved 21 May 2025
Proposal to demolish existing 2 storey brick school.
518 m away · 160 Silverhill Dr · Etobicoke-Lakeshore
Approved 30 Sep 2026
Demolish existing 2239m2 school.
778 m away · 42 Blaketon Rd · Etobicoke Centre
Approved 24 Mar 2026
William Nunez
Demolition of a two-storey single-family dwelling
938 m away · 40 Ovida Ave · Etobicoke-Lakeshore
Approved 22 Jan 2026
Proposal to demolish existing 1 storey dwelling.
Someone has asked the city for a change. Nothing here is a decision.
360 m away · 2 Gibbs Rd · Etobicoke Centre
Asked 30 Dec 2019
Under Review
Site Plan application for Phase 2 of the mixed-use development at 2 Gibbs Road. Phase 2 includes the proposed development of Building D, a 40-storey (115 m) tower and Building E, a 44-storey (126.5 m) tower, both above a 4-storey (13 m) podium. The total proposed gross floor area is 57,280 m², of which 550 m² is…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
367 m away · 255 The West Mall · Etobicoke Centre
Asked 12 Jul 2022
Appeal Received
Proposal to permit the development of three 13-storey residential buildings on the subject lands. The proposed development will result in a total of 47,432.2m2 GFA which includes 1,632.2 m2 of below grade residential GFA and 2,269.5m2 of amenity space.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
386 m away · 251 The West Mall · Etobicoke Centre
Asked 12 Jul 2022
Under Review
Site Plan Approval - Proposal to permit the development of three 13-storey residential buildings on the subject lands.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
439 m away · 250 The East Mall · Etobicoke-Lakeshore
Asked 23 Aug 2023
Under Review
The proposed Draft Plan of Subdivision establishes blocks, public parks, and public roads to allow for a mixed-use development.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Etobicoke York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, Etobicoke Civic Centre.
531 m away · 4209 Bloor St W · Etobicoke Centre
Asked 22 Oct 2025
Under Review
Proposed new 6-storey (19 meters plus mechanical penthouse space) apartment building. The 1,707-square-meter building will consist of 28 units.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
659 m away · 1 Eva Rd · Etobicoke Centre
Asked 6 Nov 2024
Under Review
Proposed application to permit the redevelopment of the Subject Site with a new mixed-use development consisting of three residential towers atop a shared building podium. Community uses are proposed at grade along a north-south private road. The three towers, 28, 28, and 44 storeys in height, would sit atop a shared,…
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Etobicoke York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, Etobicoke Civic Centre.
709 m away · 2 East Mall Cres · Etobicoke-Lakeshore
Asked 16 Sep 2021
Under Review
The proposal features a 33-storey tall buiding and a 9-storey mid-rise building component, both connected by a 4-storey base building. It also includes a total gross floor area of 40,550 square metres including 350 square metres of retail at grade, 606 residential units, and a floor space index of 4.3 times the lot…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.