Opening this block

Home · Toronto-St. Paul's · Oakwood Ave

What's new around 507 Oakwood Ave

507 Oakwood Ave · Toronto-St. Paul's. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 125 homes.

1 homes

540 Oakwood Ave

63 m away · 540 Oakwood Ave · Toronto-St. Paul's

Approved 5 Oct 2026

1 new home

The permit lists 1 homes.

Interior renovation of the existing Level 2, converting non-conforming dwelling units to a single 2-bed unit, within an existing two-storey mixed-use building: reconfiguration of interior partitions, kitchen and…

New house

61 Clovelly Ave

210 m away · 61 Clovelly Ave · Toronto-St. Paul's

Approved 3 Sep 2026

1 new home · Maria Eugenia Lazarte Acomata

The permit lists 1 homes.

PROPOSED NEW 3 STOREY SEMI DETACHED SINGLE FAMILY DWELLING

Laneway suite

118 Bude St

217 m away · 118 Bude St · Toronto-St. Paul's

Approved 28 Aug 2026

1 new home

The permit lists 1 homes.

Proposal to construct a two storey garden suite with basement.

Show 21 moreShow fewer
Laneway suite

490 Oakwood Ave

231 m away · 490 Oakwood Ave · Toronto-St. Paul's

Approved 10 Dec 2025

1 new home

The permit lists 1 homes.

Proposal to construct a rear yard laneway suite

New house

327 Robina Ave

248 m away · 327 Robina Ave · Toronto-St. Paul's

Approved 11 Jul 2025

1 new home · Tyler Tran-ma

The permit lists 1 homes.

To construct a new two-storey detached dwelling with a covered front porch, an integral garage, a front second storey balcony, a rear ground floor deck with stairs, and a rear basement walkout.

Sixplex

571 Oakwood Ave

275 m away · 571 Oakwood Ave · Toronto-St. Paul's

Approved 3 Sep 2026

6 new homes · Globizen Flats Lp

The permit lists 6 homes.

Proposed demolition of existing SFD detached for new construction of 3 storey sixplex

Laneway suite

571 Oakwood Ave

275 m away · 571 Oakwood Ave · Toronto-St. Paul's

Approved 22 Oct 2026

1 new home

The permit lists 1 homes.

Proposal for a 2 storey garden suite in the rear yard. Main Dwelling a 6 plex.

4 homes

48 Bude St

278 m away · 48 Bude St · Toronto-St. Paul's

Approved 4 Apr 2025

4 new homes · 486 Northcliffe Tp Corp

The permit lists 4 homes.

Proposal to construct a new three-storey multiplex (4 units). Existing detached garage to remain in rear yard.

Laneway suite

48 Bude St

278 m away · 48 Bude St · Toronto-St. Paul's

Approved 10 Sep 2025

1 new home

The permit lists 1 homes.

Proposal to demolish the rear detached garage and construct a new 2 storey garden suite.See also 25 163303 WNP.

4 homes

113 Alameda Ave

282 m away · 113 Alameda Ave · Toronto-St. Paul's

Approved 14 Jan 2026

4 new homes · Cascade Construction Inc

The permit lists 4 homes.

PROPOSED NEW FOURPLEX, 3 STOREYS WITH 3 BALCONIES, A REAR WALKOUT, AND A SMALL FRONT PORCH

Sixplex

108 Clovelly Ave

315 m away · 108 Clovelly Ave · Toronto-St. Paul's

Approved 17 Sep 2026

6 new homes

The permit lists 6 homes.

Proposal to construct a new 4 storey housplex with 6 units.See also 26 211646 DEM. 25 268252 ZAP and 26 111826 MV

Laneway suite

108 Clovelly Ave

315 m away · 108 Clovelly Ave · Toronto-St. Paul's

Approved 21 Sep 2026

1 new home

The permit lists 1 homes.

Construction of new 2-storey garden suite.

3 homes

110 Clovelly Ave

319 m away · 110 Clovelly Ave · Toronto-St. Paul's

Approved 19 Feb 2025

3 new homes

The permit lists 3 homes.

Proposed New 3 storey infill fourplex.

1 homes

535 Vaughan Rd

322 m away · 535 Vaughan Rd · Toronto-St. Paul's

Approved 12 Nov 2025

1 new home · Parma Developments Inc

The permit lists 1 homes.

REVISION 01 - Proposal for finished unit in the basement as addition to the permit has been issued for a Triplex; number of residential units in the building will be total of 4 Units (Fourplex). ORIGINAL Permit has been…

Laneway suite

60 Ashbury Ave

349 m away · 60 Ashbury Ave · Toronto-St. Paul's

Approved 26 Mar 2025

1 new home

The permit lists 1 homes.

Proposed 2-storey laneway suite

New house

388 Winnett Ave

419 m away · 388 Winnett Ave · Toronto-St. Paul's

Approved 20 Apr 2026

1 new home · Shenglin Lyu

The permit lists 1 homes.

Proposal to demolish existing dwelling and construct a new three-storey single family dwelling with basement walk-out, rear deck, and front & rear third-floor balconies.See also 25-151844 ZAP 00 ZR and 25-1934804 STE 12…

New house

287 Robina Ave

441 m away · 287 Robina Ave · Toronto-St. Paul's

Approved 18 Feb 2025

Gueli Property Investments Ltd

REVISION - changes due to on site conditionsTo demolish ground floor and detached garage and construct 3 storey dwelling with detached two car garage for two unit dwelling

2 homes

1555 Eglinton Ave W

479 m away · 1555 Eglinton Ave W · Toronto-St. Paul's

Approved 21 May 2026

2 new homes

The permit lists 2 homes.

Proposal for interior alterations to the 2nd floor to convert the existing 4 residential units to 6 residential units. See also 24 171650 ZAP.

2 homes

1557 Eglinton Ave W

480 m away · 1557 Eglinton Ave W · Toronto-St. Paul's

Approved 22 May 2026

2 new homes

The permit lists 2 homes.

Proposal for interior alterations to the 2nd floor to convert the existing 4 residential units to 6 residential units. See also 24 171662 ZAP.

Laneway suite

355 Atlas Ave

482 m away · 355 Atlas Ave · Toronto-St. Paul's

Approved 18 Jun 2025

1 new home

The permit lists 1 homes.

To convert existing garage to garden suite (40.72m2).

New house

3 Hanson Rd

486 m away · 3 Hanson Rd · Toronto-St. Paul's

Approved 25 Mar 2026

1 new home

The permit lists 1 homes.

Proposed new construction of 3 storey single family dwelling (old dwelling to be demolished)

New house

61 Gloucester Grv

490 m away · 61 Gloucester Grv · Toronto-St. Paul's

Approved 13 Oct 2026

1 new home · Vivienne Yvette Hollis

The permit lists 1 homes.

NEW 3-STOREY DETACHED SFD WITH INTEGRAL GARAGE (22.74 SQM) AND FINISHED BASEMENT (15.81SQM)

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

61 Clovelly Ave

210 m away · 61 Clovelly Ave · Toronto-St. Paul's

Approved 10 Sep 2026

Proposed demolition to construct two new 3 storey semi-detached dwellings on sever lot

Demolition

327 Robina Ave

248 m away · 327 Robina Ave · Toronto-St. Paul's

Approved 23 Sep 2025

Tyler Tran-ma

proposal to demolish exisiting one storey, detached single family dwelling.

Demolition

48 Bude St

278 m away · 48 Bude St · Toronto-St. Paul's

Approved 4 Apr 2025

486 Northcliffe Tp Corp

Proposal to demolish the building.

Show 12 moreShow fewer
Demolition

388 Winnett Ave

419 m away · 388 Winnett Ave · Toronto-St. Paul's

Approved 8 Jun 2026

Shenglin Lyu

Proposal to dmeolish existing single family dwelling and construct a new three-storey dwelling.See also 26-104475 BLD 00 NH & 25-194804 STE 12 MV

Demolition

206 Cedric Ave

441 m away · 206 Cedric Ave · Toronto-St. Paul's

Approved 7 Feb 2025

Jean Carla Delgadillo

Proposal to demolish the existing two-storey dwelling and construct a new three-storey single family dwelling.See also 22-139661 STE 12 MV & 24-149290 BLD 00 NH

Demolition

560 Atlas Ave

527 m away · 560 Atlas Ave · Toronto-St. Paul's

Approved 26 May 2026

Demolition of existing house and construction of a new three storey sixplex

Demolition

65 Livingstone Ave

572 m away · 65 Livingstone Ave · Eglinton-Lawrence

Approved 28 Jan 2026

Modcity Construction Ltd

Proposal to demolish existing 1 storey SFD, construct new 3 storey Fourplex

Demolition

39 Kirknewton Rd

821 m away · 39 Kirknewton Rd · Davenport

Approved 12 Nov 2026

Proposal for demolishing the existing dwelling and proposing a new sixplex.

Demolition

5 Dynevor Rd

892 m away · 5 Dynevor Rd · Davenport

Approved 20 Oct 2026

Susan Claire Dowson

To demolish existing fire damaged frame/above grade structure and exterior cladding and restoring home to livable condition while retaining existing foundation footings, walls, and service laterals.

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

505 Oakwood Ave

4 m away · 505 Oakwood Ave · Toronto-St. Paul's

Asked 6 Jun 2025

Under Review

Combined Official Plan and Zoning By-law Amendment for a 13-storey mixed-use building, containing 161 residential dwelling units, 84 vehicle parking spaces, 184 bicycle parking spaces, and 360.2 square metres of commercial-retail space at ground level.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Chantal Lee · [email protected].

Site plan

603 Oakwood Ave

453 m away · 603 Oakwood Ave · Toronto-St. Paul's

Asked 21 Dec 2017

Under Review

INACTIVE Proposed 4 storey mixed use building with 30 residential apartment units and ground floor retail. 12 stacked parking spaces would be located at the rear of the building, with access from adjacent laneway. Rear landscape open space and roof-top amenity area. Concurrent rezoning application.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Chantal Lee · [email protected].

Rezoning

603 Oakwood Ave

453 m away · 603 Oakwood Ave · Toronto-St. Paul's

Asked 21 Dec 2017

Appeal Received

Proposed 5 storey mixed use building with 30 residential apartment units and ground floor retail. 12 stacked parking spaces would be located at the rear of the building, with access from adjacent laneway. Rear landscape open space and roof-top amenity area. Concurrent site plan application.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Sipo Maphangoh · [email protected].

Show 17 moreShow fewer
Site plan

632 Northcliffe Blvd

547 m away · 632 Northcliffe Blvd · Toronto-St. Paul's

Asked 23 Sep 2022

Under Review

June 2024 Proposal: a 40-storey (129.4 metres plus mech. penthouse) residential Building containing 442 dwellin units.Proposed development of a new 36-storey (116.35 metres) mixed use building with a 5-storey podium

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Chantal Lee · [email protected].

Rezoning

645 Northcliffe Blvd

568 m away · 645 Northcliffe Blvd · Toronto-St. Paul's

Asked 9 Nov 2021

Appeal Received

Nov 2025 Resubmission reflecting the Council-adopted Settlement Offer proposal: for a 42-storey mixed-use building, with a total of 24,052.8 square metres, including 131 square metres of retail on the ground floor at the northwest corner fronting onto Northcliffe Blvd., and 336 dwelling units.Appealed to the Ontario…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Catherine Jung · [email protected].

Site plan

647 Northcliffe Blvd

573 m away · 647 Northcliffe Blvd · Toronto-St. Paul's

Asked 22 Dec 2021

Under Review

Site Plan Approval-15-storey residential building having a residential gross floor area of 11037.1 square metres

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Catherine Jung · [email protected].

Rezoning

464 Winona Dr

576 m away · 464 Winona Dr · Toronto-St. Paul's

Asked 26 Oct 2026

Under Review

Combined Official Plan & Zoning By-law Amendment for a 10-storey rental building including 200 dwelling units, of which 60 are to be affordable.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Janani Mahendran · [email protected].

Site plan

777 Vaughan Rd

580 m away · 777 Vaughan Rd · Toronto-St. Paul's

Asked 27 Apr 2023

Under Review

Feb 2025 Submission - Site Plan resubmission for a proposed 124.73 m (39-storey excluding Mech. Penthouse) purpose built rental, mixed-use building with commercial retail at-grade, 498 residential units (including 14 rental replacement units) above, and three levels of below grade parking containing 78 vehicle parking…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Catherine Jung · [email protected].

Rezoning

1410 Eglinton Ave W

598 m away · 1410 Eglinton Ave W · Eglinton-Lawrence

Asked 4 Oct 2024

Appeal Received

Rezoning Application to redevelop the site with a 43-storey mixed-use building with a total net FSI of 24.77 and a lot coverage of approximately 71%. The Proposal includes a 6-storey podium building, which would include retail and residential lobby on the Ground Floor, indoor amenity space on the 2nd Floor, indoor…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Marty Rokos · [email protected].

Site plan

1445 Eglinton Ave W

608 m away · 1445 Eglinton Ave W · Toronto-St. Paul's

Asked 22 May 2020

Under Review

INACTIVE Site Plan approval for proposed renovations and additions to the existing place of worship. The proposed addition will be approximately 719 square metres, for a total gross floor area of 5038 square metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jason Tsang · [email protected].

Rezoning

5 Park Hill Rd

713 m away · 5 Park Hill Rd · Eglinton-Lawrence

Asked 15 Aug 2025

OMB Appeal

OPA & Rezoning Application proposes the development of an 48-storey residential building. The building will provide a total of 505 residential units, being a mix of studio, 1-bedroom, 1-bedroom + den, 2-bedroom, 2-bedroom + den, and 3-bedroom units. A paved access from Park Hill Road along the southern property line…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Marty Rokos · [email protected].

Site plan

5 Park Hill Rd

713 m away · 5 Park Hill Rd · Eglinton-Lawrence

Asked 18 Aug 2025

Under Review

Site Plan Control Application proposes the development of an 48-storey residential building. The building will provide a total of 505 residential units, being a mix of studio, 1-bedroom, 1-bedroom + den, 2-bedroom, 2-bedroom + den, and 3-bedroom units. A paved access from Park Hill Road along the southern property…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Marty Rokos · [email protected].

Site plan

1801 Eglinton Ave W

735 m away · 1801 Eglinton Ave W · Toronto-St. Paul's

Asked 24 Aug 2021

Under Review

Site Plan Approval for a 41-storey mixed-use building having a non-residential gross floor area of 880 square metres, and a residential gross floor area of 31,616 square metres. A total of 485 units are proposed, of which 47 are rental replacement units. Proposal include a community agency space on the ground and…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Catherine Jung · [email protected].

Site plan

443 Arlington Ave

754 m away · 443 Arlington Ave · Toronto-St. Paul's

Asked 15 Jul 2025

Under Review

Site Plan Approval for a new one-storey above-grade concrete structure extending east of the existing fan room and replacement of existing fans to the subway ventilation plant at Markdale ESB.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Cameron Williamson · [email protected].

Rezoning

1812 Eglinton Ave W

805 m away · 1812 Eglinton Ave W · Eglinton-Lawrence

Asked 16 Mar 2021

Under Review

Zoning By Law Amendment Application to permit the proposal for a 50-storey mixed-use building including commercial units fronting onto Eglinton Avenue West and proposed townhouses fronting onto Livingstone Avenue. The total proposed gross floor area is 43,151 square metres, with a total of 687 dwelling units including…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.

Write Richard Martin · [email protected].

Site plan

1812 Eglinton Ave W

805 m away · 1812 Eglinton Ave W · Eglinton-Lawrence

Asked 8 May 2023

Under Review

Zoning By Law Amendment Application to permit the proposal for a 35-storey mixed-use building including commercial units fronting onto Eglinton Avenue West and proposed townhouses fronting onto Livingstone Avenue. The total proposed gross floor area is 31,488 square metres, with a total of 503 dwelling units and 320…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Richard Martin · [email protected].

Site plan

1890 Eglinton Ave W

945 m away · 1890 Eglinton Ave W · Eglinton-Lawrence

Asked 26 Aug 2020

NOAC Issued

Site Plan application to permit the proposal for a 9 storey mixed use building. The proposal has a total gross floor area of 14,207.5 square metres. 194 residential units and 1,201 square metres of ground-floor retail are proposed. The proposal includes 87 underground vehicle parking spaces and 235 bicycle spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Andrew Kim · [email protected].

Rezoning

2402 Dufferin St

949 m away · 2402 Dufferin St · Eglinton-Lawrence

Asked 8 Nov 2021

OMB Appeal

Zoning by-law amendment to facilitate the redevelopment of the site for a 24-storey mixed use building and a 9-storey apartment building. the proposed total non-residential gross floor area is 883 square metres, and the proposed residential gross floor area is 29053. A total of 405 units are proposed.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Caia Yeung · [email protected].

Site plan

2402 Dufferin St

949 m away · 2402 Dufferin St · Eglinton-Lawrence

Asked 8 Nov 2021

Under Review

Site Plan approval to facilitate the redevelopment of the site for a 24-storey mixed use building and a 9-storey apartment building. the proposed total non-residential gross floor area is 883 square metres, and the proposed residential gross floor area is 29053. A total of 405 units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Caia Yeung · [email protected].

Subdivision

2402 Dufferin St

949 m away · 2402 Dufferin St · Eglinton-Lawrence

Asked 8 Nov 2021

Under Review

Draft plan of subdivision for 5 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.

Write Caia Yeung · [email protected].