Pizza Pizza
886 m away · 140 La Rose Ave · Etobicoke Centre
Approved 6 Aug 2025
Opening this block
Home · Etobicoke Centre · Edenvale Cres
71 Edenvale Cres · Etobicoke Centre. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
886 m away · 140 La Rose Ave · Etobicoke Centre
Approved 6 Aug 2025
886 m away · 140 La Rose Ave · Etobicoke Centre
Approved 25 Jun 2026
1.0 km away · 1451 Royal York Rd · Etobicoke Centre
Approved 26 Nov 2025
The city has allowed these. Work may not have started. The permits in this area list 6 homes.
0 m away · 71 Edenvale Cres · Etobicoke Centre
Approved 31 Mar 2026
1 new home · Maddalena Liotino
The permit lists 1 homes.
Proposed 2-storey single-family detached dwelling
406 m away · 98 North Dr · Etobicoke Centre
Approved 12 May 2026
1 new home · Walden Homes
The permit lists 1 homes.
Proposed demolishing existing dwelling and new construction of SFD detached with integrated garage
511 m away · 10 Woodmere Crt · Etobicoke Centre
Approved 2 Apr 2026
1 new home · Georgina Myers
The permit lists 1 homes.
Proposed the construction of a new one-storey detached single-family dwelling with an attached two-car garage. The proposal also includes an elevated rear terrace providing outdoor amenity space accessible from the main…
520 m away · 4200 Eglinton Ave W · Etobicoke Centre
Approved 12 Nov 2025
Driving of piles to construct continuous caisson wall in preparation for excavation of Station Boxes. Support of Excavation will be secured using a combination of internal bracing and tiebacks.Building Permit #25 159310…
580 m away · 88 Valecrest Dr · Etobicoke Centre
Approved 15 Apr 2026
1 new home · Domenic Staltari
The permit lists 1 homes.
PROPOSED NEW TWO STOREY DWELLING WITH INTEGRAL GARAGE
665 m away · 67 North Dr · Etobicoke Centre
Approved 11 Jul 2025
Jonathan Angelucci
Rev 01 - Revision for structural during construction.Proposal for New Three Storey SFD
708 m away · 4000 Eglinton Ave W · Etobicoke Centre
Approved 28 May 2025
Conditional Permit - Proposal to construct two mixed use residential towers with a shared podium connection -Refer to permit# 21 144453 BLD 00 NB for shoring and below grade levels.
918 m away · 8 Princess Margaret Blvd · Etobicoke Centre
Approved 5 Feb 2025
1 new home · Erum Kibriya
The permit lists 1 homes.
Proposal to demolish existing dwelling and construct a new 2-storey dwelling.
1.0 km away · 88 Edenbridge Dr · Etobicoke Centre
Approved 13 Feb 2025
1 new home · T Gornik Build Design Ltd
The permit lists 1 homes.
The construction of a 2 storey stone dwelling with a 3 car garage, an outdoor 3 Season Room, and anExisting Pool to be retained
The city has allowed these buildings to come down. They may still be standing.
0 m away · 71 Edenvale Cres · Etobicoke Centre
Approved 17 Apr 2026
Proposed 2-storey single-family detached dwelling
406 m away · 98 North Dr · Etobicoke Centre
Approved 12 May 2026
Proposed demolition of SFD detached to construct new SFD detached
511 m away · 10 Woodmere Crt · Etobicoke Centre
Approved 2 Apr 2026
Cor Rural Holdings Inc
Proposal to demolish existing two-storey dwelling and construct a new single family dwelling.See also 26-130700 BLD 00 NH & 25-203900 WET 02 MV
580 m away · 88 Valecrest Dr · Etobicoke Centre
Approved 15 Apr 2026
PROPOSAL TO DEMOLISH THE EXISTING DWELLING AND CONSTRUCT A NEW TWO STOREY SINGLE FAMILY DWELLING
918 m away · 8 Princess Margaret Blvd · Etobicoke Centre
Approved 5 Feb 2025
Erum Kibriya
Proposal to demolish existing dwelling and construct a new 2-storey dwelling.
Someone has asked the city for a change. Nothing here is a decision.
520 m away · 4200 Eglinton Ave W · Etobicoke Centre
Asked 27 Jul 2026
Under Review
Proposed two separate above grade buildings with a combined gross floor area of 8330 m2.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
708 m away · 4000 Eglinton Ave W · Etobicoke Centre
Asked 10 Jun 2020
NOAC Issued
Proposal for a mixed use development which includes three 25-storey towers, one 21-storey tower, grade-related retail, and a new public park.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.