Bawara
0 m away · 750 Oakdale Rd · Humber River-Black Creek
Approved 8 Jun 2026
Opening this block
Home · Humber River-Black Creek · Oakdale Rd
750 Oakdale Rd · Humber River-Black Creek. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
0 m away · 750 Oakdale Rd · Humber River-Black Creek
Approved 8 Jun 2026
0 m away · 750 Oakdale Rd · Humber River-Black Creek
Approved 27 Jul 2026
601 m away · 276 Eddystone Ave · Humber River-Black Creek
Approved 25 Nov 2025
911 m away · 1961 Finch Ave W · Humber River-Black Creek
Approved 1 Apr 2026
1.0 km away · 2853 Jane St · Humber River-Black Creek
Approved 12 Feb 2026
The city has allowed these. Work may not have started. The permits in this area list 191 homes.
546 m away · 720 Arrow Rd · Humber River-Black Creek
Approved 3 Mar 2026
REVISION - due to minor changes that have come up due to the sales trailer specificationsProposed to install a sales trailer on a vacant industrial site, as a permanent structure.
923 m away · 11 Fenmar Dr · Humber River-Black Creek
Approved 3 Sep 2025
PROPOSAL FOR CONSTRUCTION OF A PREFABRICATED STEEL BUILDING ON CONCRETE FOUNDATION ADJACENT TO EXISTING 11 Fenmar Building.
924 m away · 113 Snowood Crt · Humber River-Black Creek
Approved 19 Aug 2025
1 new home
The permit lists 1 homes.
Proposal to construct a 2nd floor addition and convert the existing detached garage to garden suite.See also 24 150310 ZAP.
1.0 km away · 2839 Jane St · Humber River-Black Creek
Approved 20 Jan 2025
190 new homes
The permit lists 190 homes.
Proposal to construct a 12 storey mixed use building with 3 levels of underground parking.
Someone has asked the city for a change. Nothing here is a decision.
546 m away · 720 Arrow Rd · Humber River-Black Creek
Asked 7 Feb 2025
Under Review
Proposed low-rise multi-tenanted industrial building.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
871 m away · 15 Fenmar Dr · Humber River-Black Creek
Asked 20 Jun 2022
Under Review
Phase 2 of the application to construct a 2-storey industrial building for a data centre (file no. 21 210103 WET 07 SA, Phase 1). Phase 2 is to accomodate additional generators and relocate an existing city easement. No changes to the approved data centre in Phase 1 is contemplated.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
1.0 km away · 149 Rivalda Rd · Humber River-Black Creek
Asked 18 Jun 2024
Under Review
The proposed redevelopment replaces 5 separate buildings with a one-storey industrial building 7,508.09 sq.m in size with 504.15 sq. m devoted to an ancillary office component. An existing fabrication building, with a GFA of 2,301.95 sq.m, located on the east side of the site, is to remain. Altogether, the total GFA…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.