Opening this block

Home · Toronto-Danforth · Danforth Ave

What's new around 888 Danforth Ave

888 Danforth Ave · Toronto-Danforth. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 more

36 more are not listed on this page.

Being built

The city has allowed these. Work may not have started. The permits in this area list 42 homes.

Multiple Unit Building

950 Danforth Ave

124 m away · 950 Danforth Ave · Toronto-Danforth

Approved 9 Dec 2025

Rev 01 - interior alterations.Proposed rear yard addition to the residential unit, second, third, fourth floor and mechanical room addition( fifth floor).

Multiple Unit Building

804 Danforth Ave

153 m away · 804 Danforth Ave · Toronto-Danforth

Approved 19 May 2026

Repair and restoration of a fire-damaged existing mixed-use building, including architectural, structural, and mechanical work for a restaurant (ground floor and basement) and two residential dwelling units on the…

Multiple Unit Building

1063 Danforth Ave

317 m away · 1063 Danforth Ave · Toronto-Danforth

Approved 16 Oct 2026

Fire damage repairs to the commercial/residential building.

Show 21 more
4 homes

75 Eaton Ave

364 m away · 75 Eaton Ave · Toronto-Danforth

Approved 14 Apr 2025

4 new homes · Torontoluxuryhomez Inc

The permit lists 4 homes.

Proposal to construct a new 3 storey detached dwelling with 4 units.See also 24 240961 DEM, 23 203878 ZAP and 23 217451 MV.

Laneway suite

75 Eaton Ave

364 m away · 75 Eaton Ave · Toronto-Danforth

Approved 2 Oct 2025

1 new home

The permit lists 1 homes.

Proposal to construct a laneway suite.

Transit Station,subway, Bus Terminal

680 Danforth Ave

377 m away · 680 Danforth Ave · Toronto-Danforth

Approved 26 Jun 2025

Conditional Permit - Part Permit - Construction work in association with Pape Station, the PTUS Contract (North Civil Core Contract 2);Designing and boring the running tunnel, Underpinning at Pape Station, Designing and…

Multiple Unit Building

1095 Danforth Ave

400 m away · 1095 Danforth Ave · Toronto-Danforth

Approved 18 Feb 2026

Proposed partial shoring and excavation for the purposes of soil remediation.

New house

477 Jones Ave

430 m away · 477 Jones Ave · Toronto-Danforth

Approved 16 Apr 2025

2 new homes

The permit lists 2 homes.

PROPOSED NEW CONSTRUCTION OF 3 STOREY DUPLEX

Laneway suite

477 Jones Ave

430 m away · 477 Jones Ave · Toronto-Danforth

Approved 24 Jun 2025

1 new home

The permit lists 1 homes.

Proposed consctrution of 2 storey laneway suite in rear yard of 3 storey duplex

New house

9 Dawson Ave

509 m away · 9 Dawson Ave · Toronto-Danforth

Approved 1 Apr 2026

1 new home · Christopher Kortschot

The permit lists 1 homes.

Revision 01: Revision to permit for layout changes to the third-floor closet, relocation of a skylight and ductwork supply, and an increase in the proposed garage heightProposed new three storey single family detached…

Laneway suite

130 Eaton Ave

524 m away · 130 Eaton Ave · Toronto-Danforth

Approved 22 Apr 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations to convert an existing 2storey rear yard detached garage into a habitable garden suite

Multiple Unit Building

821 Pape Ave

535 m away · 821 Pape Ave · Toronto-Danforth

Approved 29 Jul 2025

Interior alteraions at basement to replace existing beam an footings with new ones. Install new partitions at the ground floor and demolish one storey portion of the building at the rear.

Multiple Unit Building

1178 Danforth Ave

576 m away · 1178 Danforth Ave · Toronto-Danforth

Approved 14 Apr 2026

Proposed ADMIN permit as it relates to the proposed work at 1180 Danforth Ave - LOCALIZED FOUNDATION REPAIR IN BASEMENT

New house

59 Condor Ave

597 m away · 59 Condor Ave · Toronto-Danforth

Approved 12 Jun 2025

2 new homes · Donald Macpherson

The permit lists 2 homes.

Proposal to construct a new 2 story detached house with basement secondary suite, front walkout and rear deck

Laneway suite

31 Shudell Ave

604 m away · 31 Shudell Ave · Toronto-Danforth

Approved 14 Sep 2026

1 new home

The permit lists 1 homes.

REVISION 01: Change to stair location, post and beam, and recess corner.Proposal to construct a new two storey rear yard Laneway Suite.

New house

2 Frankdale Ave

636 m away · 2 Frankdale Ave · Toronto-Danforth

Approved 25 May 2026

1 new home · Sarah Papathanasakis

The permit lists 1 homes.

Proposal to replace existing bungalow with a 2 storey SFD on newly severed lot PART 1.

Laneway suite

84 Kings Park Blvd

711 m away · 84 Kings Park Blvd · Toronto-Danforth

Approved 23 Oct 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new 2 storey garden suite.

Sixplex

84 Kings Park Blvd

711 m away · 84 Kings Park Blvd · Toronto-Danforth

Approved 28 Oct 2026

6 new homes

The permit lists 6 homes.

Proposal to demolish existing dwelling and construct new 3 storey sixplex.

4 homes

42 Frankdale Ave

728 m away · 42 Frankdale Ave · Toronto-Danforth

Approved 26 Mar 2025

4 new homes · Frankdale Landmark Inc

The permit lists 4 homes.

Proposal to construct a new 3 storey fourplex.See also 24 146649 ZAP and 24 191192 MV.

5 homes

17 Boothroyd Ave

731 m away · 17 Boothroyd Ave · Toronto-Danforth

Approved 4 Nov 2026

5 new homes

The permit lists 5 homes.

Proposal to construct a new 3 storey detached dweling with 5 units.See also 23 202802 ZAP and 24 159201 TLAB<< Scope has changed to 5-plex>> M.I

Laneway suite

17 Boothroyd Ave

731 m away · 17 Boothroyd Ave · Toronto-Danforth

Approved 4 Nov 2026

1 new home

The permit lists 1 homes.

New Garden SuiteSee also 23 202775 ZAP

Laneway suite

203 Browning Ave

740 m away · 203 Browning Ave · Toronto-Danforth

Approved 31 Jul 2026

1 new home

The permit lists 1 homes.

To construct new garden suite and demolish detached garage

Industrial

497 Pape Ave

814 m away · 497 Pape Ave · Toronto-Danforth

Approved 28 Oct 2026

Construction of an Emergency Egress Building at 497 Pape Ave to support the Ontario Line.

Laneway suite

80 Lamb Ave

878 m away · 80 Lamb Ave · Toronto-Danforth

Approved 14 Apr 2026

1 new home

The permit lists 1 homes.

Proposal to ocnstruct a new 2 storey laneway suite.

7 more are not listed on this page.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

1117 Danforth Ave

456 m away · 1117 Danforth Ave · Toronto-Danforth

Approved 17 Apr 2025

Demolition of existing building at 1117 Danforth contains 27 rental units.

Demolition

2 Frankdale Ave

636 m away · 2 Frankdale Ave · Toronto-Danforth

Approved 8 Jun 2026

Sarah Papathanasakis

Proposal to demo existing SFD to sever lot and construct 2, 2 Storey SFD on each new lot.

Demolition

84 Kings Park Blvd

711 m away · 84 Kings Park Blvd · Toronto-Danforth

Approved 28 Oct 2026

Proposal to demolish existing dwelling and construct new 3 storey sixplex.

Show 2 more
Demolition

255 Bain Ave

919 m away · 255 Bain Ave · Toronto-Danforth

Approved 18 Aug 2025

Derek Nicholson Inc

Proposal to demolish existing single family dwelling and construct a new dwelling.See also 25-166110 BLD 00 NH & 24-253883 STE 14 MV

Demolition

22 Ivy Ave

1.0 km away · 22 Ivy Ave · Toronto-Danforth

Approved 21 Apr 2026

PROPOSED TO DEMOLISH EXISTING SFD DETACHED AND NEW CONSTRUCTION OF 3 STOREY (2 UNIT) DUPLEX DWELLING

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

Oxi Day Parade

538 m away · 800 Greenwood Ave · Toronto-Danforth

Allowed 25 Oct 2026

Hours 1:30 p.m.–3:30 p.m.

Setup 25 Oct 2026, 9:00 a.m.–1:30 p.m.

Tear down 25 Oct 2026, 3:30 p.m.–5:00 p.m.

Greek Community Of Toronto

Amplified And/or Instrument Sound

Fall In Greektown

801 m away · 484 Danforth Ave · Toronto-Danforth

Allowed 24 Oct 2026

Hours 6:00 p.m.–8:30 p.m.

Setup 24 Oct 2026, 4:30 p.m.–6:00 p.m.

Tear down 24 Oct 2026, 8:00 p.m.–9:00 p.m.

City Of Toronto

Events

On the city's calendar. Check before you go.

DanceMusic

Pro-Hibition: A Burlesque Opera Noir

498 m away · 627 Danforth Ave · Toronto-Danforth

On 22 Nov 2026

Step into 1920s film noir, pour yourself a little trouble, and leave your inhibitions at the door. Opera Revue and Cake

Event page

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

975 Danforth Ave

183 m away · 975 Danforth Ave · Toronto-Danforth

Asked 12 May 2022

Under Review

Site Plan Approval for proposed 10-storey mixed-use building having a non-residential gross floor area of 3,985.89 square metres, and a residential gross floor area of 3,273 square metres. 57 rental residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Seanna Kerr · [email protected].

Rezoning

975 Danforth Ave

183 m away · 975 Danforth Ave · Toronto-Danforth

Asked 12 May 2022

OMB Appeal

Rezoning for proposed 10-storey mixed-use building having a non-residential gross floor area of 423.63 square metres, and a residential gross floor area of 4,076 square metres. 57 rental residential dwelling units are proposed.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Seanna Kerr · [email protected].

Site plan

1030 Danforth Ave

280 m away · 1030 Danforth Ave · Toronto-Danforth

Asked 5 Aug 2020

Under Review

INACTIVE The proposal is a site plan approval for an 8-storey mixed-use building, containing 53 residential dwelling units, and 2 non-residential units. Three levels of underground parking are proposed. The proposal will be comprised of 4,343.60 square metres of residential gross floor area and 325.60 square metres of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].

Show 5 more
Site plan

680 Danforth Ave

377 m away · 680 Danforth Ave · Toronto-Danforth

Asked 25 Oct 2024

Under Review

Site Plan Approval for the Pape Station as part of the Ontario Line Subway

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Vanessa Opassinis · [email protected].

Site plan

184 Chatham Ave

436 m away · 184 Chatham Ave · Toronto-Danforth

Asked 25 Jun 2024

NOAC Issued

Site Plan Approval for a 4-storey residential building with a height of 12.3 meters (excluding stair and elevator overruns) and 42 condominium dwelling units, seven vehicular parking spaces and 41 bicycle parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Simon Lacoste · [email protected].

Site plan

1111 Danforth Ave

437 m away · 1111 Danforth Ave · Toronto-Danforth

Asked 24 Mar 2022

NOAC Issued

Site Plan Control application to permit a 13-storey mixed-use building with 297 purpose-built residential rental units and 1,646 square metres of non-residential gross floor area.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Alexa Legge · [email protected].

Site plan

1117 Danforth Ave

456 m away · 1117 Danforth Ave · Toronto-Danforth

Asked 1 Oct 2024

NOAC Issued

Site Plan Amendment for a 14-storey mixed use, purpose-built rental building. The proposed development contemplates the replacement of the existing 27 rental units and addition of 81 new rental units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Doris Ho · [email protected].

Site plan

885 Pape Ave

689 m away · 885 Pape Ave · Toronto-Danforth

Asked 14 Feb 2025

Under Review

Site Plan Placeholder Application for the Sammon Emergency Services Building (ESB) and Crossover as part of the Ontario Line Subway

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Vanessa Opassinis · [email protected].