Opening this block

Home

What's new on Gerrard St E

86 city records on Gerrard St E.

See one address on this street.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 17 moreShow fewer

Being built

The city has allowed these. Work may not have started.

Multiple Unit Building

1926 Gerrard St E

1926 Gerrard St E · Beaches-East York

Approved 23 Sep 2026

Proposal for interior alterations to ground floor for new takeout bakery.

Multiple Unit Building

1401 Gerrard St E

1401 Gerrard St E · Toronto-Danforth

Approved 13 Jul 2026

Rev 01: Revision to include as-built drawings for the existing building Proposal for interior alterations to existing ground floor and basement level for new medical and massage clinic/office.

Multiple Unit Building

1416 Gerrard St E

1416 Gerrard St E · Toronto-Danforth

Approved 7 Jul 2026

Revision 1: Revision to change 2nd floor to 5 hotel rooms and 2 hotel rooms in basementinterior alterations on ground floor for new cafe, alterations to existing restaurant, alterations to basement.

Show 8 moreShow fewer
Multiple Unit Building

1392 Gerrard St E

1392 Gerrard St E · Toronto-Danforth

Approved 1 Jun 2026

Proposal for interior alterations to convert exisiting rental unit to a six bedroom multi tenant unit.

2 homes

1616 Gerrard St E

1616 Gerrard St E · Toronto-Danforth

Approved 28 May 2026

2 new homes

The permit lists 2 homes.

Proposed l addition at rear of existing building.

Multiple Unit Building

222 Gerrard St E

222 Gerrard St E · Toronto Centre

Approved 16 Jan 2026

Rev 01: changes to add underpinning of basement stair and structural changes due to site conditionsProposal for interior and exterior alterations to construct a new dental clinic on the basement and ground floor and a…

Apartment

227 Gerrard St E

227 Gerrard St E · Toronto Centre

Approved 27 Oct 2025

116 new homes

The permit lists 116 homes.

Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage

1 homes

261 Gerrard St E

261 Gerrard St E · Toronto Centre

Approved 27 Jun 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations.

Multiple Unit Building

718 Gerrard St E

718 Gerrard St E · Toronto-Danforth

Approved 3 Jun 2025

Revision 01 - to add bedroom in basement and laundry and sink in commercial portionREV 01- Changes as per bubbled drawings. Reconfigure the size and location of the residential and non-residential units. Existing mixed…

Multiple Unit Building

237 Gerrard St E

237 Gerrard St E · Toronto Centre

Approved 4 Feb 2025

Proposal for administrative party wall permit for work on first, second, and thirdfloor party wall adjacent to work pursuant next door for 24137315 BLD 00 BA (391 ONTARIO ST)

6 homes

1409 Gerrard St E

1409 Gerrard St E · Toronto-Danforth

Approved 28 Jan 2025

6 new homes

The permit lists 6 homes.

To construct a new five-storey mixed use building comprising of a six unit residential and one unit commercial .

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

361 Gerrard St E

361 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Show 3 moreShow fewer
Demolition

855 Gerrard St E

855 Gerrard St E · Toronto-Danforth

Approved 28 Jan 2026

Proposal for the demolition and removal of the south wing wall located on the southwest side of the Gerrard and Carlaw. Thewall is being removed because its current alignment conflicts with the approved design and…

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

Annual Diwali Celebration

1432 Gerrard St E · Toronto-Danforth

Allowed 7 Nov 2026

Hours 5:00 p.m.–10:00 p.m.

Setup 7 Nov 2026, 4:00 p.m.–5:00 p.m.

Tear down 7 Nov 2026, 10:00 p.m.–10:30 p.m.

Gerrard India Bazaar Bia

Continuous Concrete Pour

Regent Park Tower 4a

325 Gerrard St E · Toronto Centre

Allowed 24 Aug 2026 – 28 Feb 2027

Hours from 6:00 a.m.

Deltera Contracting Inc

Construction

Tchc Rental Building 4a

325 Gerrard St E · Toronto Centre

Allowed 1 Apr 2026 – 1 Apr 2027

Hours 6:00 a.m.–11:00 p.m.

Metro Toronto Housing Corporation

Events

On the city's calendar. Check before you go.

2SLGBTQ+Live Performances

The Other Reindeer, A Choral Panto Show, Singing Out’s Holiday concert

43 Gerrard St E · Toronto Centre

On 12 Dec 2026

Toronto’s Largest 2SLGBTQQIA+ choir presents a one-of-a-kind choral panto show! When the North Pole’s most famous flye

Event pageAdd to calendar
Show 2 moreShow fewer
Arts/ExhibitsMuseum

The possibility of viewing the world differently: Autumn Edition

80 Gerrard St E · Toronto Centre

On 14 Nov 2026 – 28 Nov 2026

Free · Listed days only

A show from curator Deborah Harris, who has gathered artists' works including several drawings by E.J. Gold. Voyage thr

Event pageAdd to calendar
Arts/ExhibitsCultural

"Natural Selection 2.0" An Exhibition by Stephen Perry

1326 Gerrard St E · Toronto-Danforth

On 14 Nov 2026 – 28 Nov 2026

Free

Based in Ottawa, Stephen Perry creates imaginative oil paintings that blend humour, social commentary, symbolism, and dr

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

306 Gerrard St E

306 Gerrard St E · Toronto Centre

Asked 26 May 2026

Under Review

Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

213 Gerrard St E

213 Gerrard St E · Toronto Centre

Asked 4 Jul 2025

Under Review

Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Site plan

325 Gerrard St E

325 Gerrard St E · Toronto Centre

Asked 13 Jan 2025

NOAC Issued

Building 4A Proposal to construct a 26-storey tower, 10 storey mid-rise podium TCHC social housing building with 271 units, retail at grade along Gerrard Street East, community space on the ground floor and mezzanine, with one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Show 3 moreShow fewer
Site plan

1291 Gerrard St E

1291 Gerrard St E · Toronto-Danforth

Asked 4 May 2023

Under Review

Proposal for a 12-storey mixed-use building comprised of 289 residential units and 1271 square metres of retail GFA.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Alexa Legge · [email protected].

Site plan

1400 Gerrard St E

1400 Gerrard St E · Toronto-Danforth

Asked 2 May 2022

Under Review

Site Plan Application to construct a 7 storey (27.2 metres including mechanical penthouse) mixed-use building with 19 rental dwelling units and two commercial units. A total of gross floor area of 1,522.3 square metres is proposed, consisting of 1,400.5 square metres of residential and 121.8 square metres of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Simon Lacoste · [email protected].

Rezoning

325 Gerrard St E

325 Gerrard St E · Toronto Centre

Asked 20 Apr 2022

OMB Appeal

Zoning By-law Amendment application for Phases 4 & 5 of the Regent Park redevelopment. The Phases 4 & 5 lands are generally bounded by Gerrard Street to the north, River Street to the east, Oak Street to the south, and Dreamers Way to the west. The proposal consists of a total gross floor area (GFA) of 320,064 m2…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].