Opening this block

Home · This week

What's new in Toronto Centre

649 records in Toronto Centre.

Yonge St · Front St E · Church St · Dundas St E · Bay St · Parliament St · King St E · Gerrard St E · Sherbourne St · Queen St E · Carlton St · Wellesley St E · Jarvis St · Bond St · Victoria St · River St · Richmond St E · Berkeley St · Isabella St · Adelaide St E · Ontario St · Howard St · Gould St · Wellesley St W

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 9 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Taco Bell

650 Dundas St E · Toronto Centre

Applied 10 Nov 2026

Not Started

REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

Permit application

Acumetis Toronto

18 King St E · Toronto Centre

Applied 14 Sep 2026

Permit Issued

Proposal for interior alterations to existing office suite for new tenant and install two (2) electromagnetic locks - "Acumetis Toronto"

Show 9 moreShow fewer
Permit application

Brother Joseph Dooley Apartments

412 Queen St E · Toronto Centre

Applied 7 Jul 2026

Permit Issued

Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance…

Permit application

The Gap

220 Yonge St · Toronto Centre

Applied 2 Jul 2026

Permit Issued

Proposal for Interior Alterations to existing retail store to reconfigure change rooms and painting 'THE GAP'.

Permit application

Kfc

1 Dundas St W · Toronto Centre

Applied 15 May 2026

Inspection

Proposal for interior alterations to existing restaurant - "KFC"

Permit application

Equitable Bank

25 Ontario St · Toronto Centre

Applied 23 Jan 2026

Revision Issued

Rev 05 - Remove slab opening and associated stairs from level 23.REV: ADD FLOOR 12 AND 13 BACK INTO INITIAL PERMIT 22-115404, PER BUILDING INSPECTOR REQUEST, SEE COVER LETTER IN BLD DWGS.Proposal for interior…

Permit application

Zara

220 Yonge St · Toronto Centre

Applied 22 Sep 2025

Inspection

Proposed interior fit-out for an existing retail suite-fitting room. This scope of works includes new interior walls, fixtures and finishes, new lighting and power 'ZARA'.

Being built

The city has allowed these. Work may not have started.

Apartment

393 Dundas St E

393 Dundas St E · Toronto Centre

Approved 12 Nov 2026

Conditional Permit - Site Service - Proposing to construct a slab-on-grade, 4-storey plus mechanical penthouse and roof deck, 12 unit affordable housing residential building

Laneway suite

9 Spruce St

9 Spruce St · Toronto Centre

Approved 12 Nov 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new laneway suite (Unit # R)

Student Residence

294 Sherbourne St

294 Sherbourne St · Toronto Centre

Approved 30 Oct 2026

REV 03: Revised sprinkler drawings.REV 02: Revision to permit, changes related to basement level, revised exit sign, added pull station to east door, added enter phone to east door, and added pull station to east door…

Show 9 moreShow fewer
Mixed Use/res W Non Res

125 George St

125 George St · Toronto Centre

Approved 30 Oct 2026

REV 01: Revision to permit for updates to ground floor, 2nd and 3rd floor, refer to memoProposal to construct a new 39 storey mixed use building with 516 residential dwelling units, ground floor retail and 4 levels…

Other

300 Bayview Ave

300 Bayview Ave · Toronto Centre

Approved 30 Oct 2026

Part Permit - Proposal for an addition to exisiting car dealership consisting of a 4 Storey building elevated on columns with roof top parking, for same purposes.

Multiple Unit Building

549 Parliament St

549 Parliament St · Toronto Centre

Approved 20 Oct 2026

Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator…

Mixed Use/res W Non Res

120 Church St

120 Church St · Toronto Centre

Approved 16 Oct 2026

REV 02: Removal of two surplus 2-bedroom suites (411 and 511), refer to correspondenceREV 01:Proposal to add 3 additional floors to the existing plans Construct a 45 storey residential tower and podium with retail at…

Multiple Unit Building

54 Church St

54 Church St · Toronto Centre

Approved 14 Oct 2026

Proposal for interior alterations for a pharmacy and medical clinic fit-up

Apartment

49 Ontario St

49 Ontario St · Toronto Centre

Approved 14 Oct 2026

1226 new homes

The permit lists 1226 homes.

Construction of two buildings of 46 and 50 storeys with underground parking garage (245 affordable housing units) and townhouses

Apartment

83 River St

83 River St · Toronto Centre

Approved 13 Oct 2026

Conditional Permit - Part Permit - Proposal to construct a 37 Storey residential condominium with 3 levels of underground parking, retail on grade, and various amenity spaces.

Multiple Unit Building

483 Bay St

483 Bay St · Toronto Centre

Approved 9 Oct 2026

Localized concrete repairs, podium deck waterproofing repairs, and piping repairs

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

27 Grosvenor St

27 Grosvenor St · Toronto Centre

Approved 22 Sep 2026

The scope includes the demolition of a non-operational morgue at 26 Grenville Street and an existing above- and below-grade parking garage at 27 Grosvenor Street, located in the City of Toronto. The demolition will…

Demolition

1075 Bay St

1075 Bay St · Toronto Centre

Approved 18 Aug 2026

Proposal to demolish existing office building down to grade. See also 25-213516 STE 13 OZ

Demolition

212 Dundas St E

212 Dundas St E · Toronto Centre

Approved 6 Jul 2026

Proposal to demolish the existing 4 storey commercial building with the retention of the exterior street facing facade of the Filmore Hotel building.See 20 151363 STE 13 SA for future proposal.

Show 9 moreShow fewer
Demolition

260 Sumach St

260 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

266 Sumach St

266 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

361 Gerrard St E

361 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

123 River St

123 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing 2 storey single family dwelling containing one (1) three-bedroom rental dwelling unit.See 21 236273 BLD for future development (mixed use condo).

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

St Patrick's Parade

250 Yonge St · Toronto Centre

Allowed 14 Mar 2027

Hours 12:00 p.m.–2:00 p.m.

Setup 14 Mar 2027, 9:00 a.m.–12:00 p.m.

Tear down 14 Mar 2027, 2:00 p.m.–2:30 p.m.

St Patrick's Parade Society

Amplified And/or Instrument Sound

Old Town Toronto Cavalcade Of Lights

35 Wellington St E · Toronto Centre

Allowed 27 Nov 2026

Hours 5:30 p.m.–6:30 p.m.

Setup 27 Nov 2026, 4:00 p.m.–5:30 p.m.

Tear down 27 Nov 2026, 6:30 p.m.–7:30 p.m.

Old Town Toronto Bia

Construction

Charles Transformer Station

83 Charles St E · Toronto Centre

Allowed 12 Nov 2026 – 3 Dec 2026

Hours from 11:59 p.m.

Hydro One Networks Inc.

Show 9 moreShow fewer
Amplified And/or Instrument Sound

City Of Toronto Remembrance Day At Old City Hall

60 Queen St W · Toronto Centre

Allowed 11 Nov 2026

Hours 10:45 a.m.–11:45 a.m.

Setup 11 Nov 2026, 4:00 a.m.–10:45 a.m.

Tear down 11 Nov 2026, 11:45 a.m.–1:00 p.m.

City Of Toronto

Amplified And/or Instrument Sound

Long Winter To At Allan Gardens

19 Horticultural Ave · Toronto Centre

Allowed 6 Nov 2026

Hours 6:00 p.m.–12:00 p.m.

Setup 6 Nov 2026, 2:00 p.m.–6:00 p.m.

Tear down 7 Nov 2026, from 1:00 a.m.

Friends Of Allan Gardens

Amplified And/or Instrument Sound

November 5th Walk-out For Education

25 Gould St · Toronto Centre

Allowed 5 Nov 2026

Hours 12:00 p.m.–3:00 p.m.

Setup 5 Nov 2026, 11:30 p.m.–12:00 p.m.

Tear down 5 Nov 2026, 3:00 p.m.–3:30 p.m.

Ryerson Students' Union

Amplified And/or Instrument Sound

Halloween Spooktacular

1 Dundas St E · Toronto Centre

Allowed 31 Oct 2026

Hours 12:00 p.m.–5:00 p.m.

Setup 31 Oct 2026, 8:00 a.m.–12:00 p.m.

Tear down 31 Oct 2026, 5:00 p.m.–10:00 p.m.

Downtown Yonge Business Improvement Area

Amplified And/or Instrument Sound

Halloween At The Manor

580 Church St · Toronto Centre

Allowed 30 Oct 2026 – 31 Oct 2026

Hours from 7:00 p.m.

Setup 30 Oct 2026, 6:00 p.m.–7:00 p.m.

Tear down 31 Oct 2026, from 2:00 a.m.

Storm Crow Manor Llt

Amplified And/or Instrument Sound

Halloween On Church

512 Church St · Toronto Centre

Allowed 30 Oct 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:59 p.m., 6:30 p.m.–11:59 p.m.

Setup 30 Oct 2026, 7:00 a.m.–6:30 p.m.

Tear down 31 Oct 2026 – 1 Nov 2026, 11:59 p.m.–6:30 a.m.

Church Wellesley Village Bia

Large Crane Work

30 Bond St.

30 Bond St · Toronto Centre

Allowed 30 Oct 2026 – 1 Nov 2026

Hours 7:00 a.m.–11:30 p.m.

Sarens Canada Inc.

Other

Oil-filling Transformer Unit

83 Charles St E · Toronto Centre

Allowed 26 Oct 2026 – 9 Nov 2026

Hours from 11:59 p.m.

Hydro One Networks Inc.

Amplified And/or Instrument Sound

October Funfest

620 Dundas St E · Toronto Centre

Allowed 24 Oct 2026

Hours 1:00 p.m.–3:00 p.m.

Setup 24 Oct 2026, 10:00 a.m.–12:59 p.m.

Tear down 24 Oct 2026, 3:01 p.m.–5:00 p.m.

Fred Victor Centre

Events

On the city's calendar. Check before you go.

HistoryMuseum

Rebellion Talks: Riots & the Rebel Mayor

82 Bond St · Toronto Centre

On 30 Jan 2027

Free

Learn about the riots that shook Toronto to its core in the years before and after the Rebellion of 1837 in the rebel ma

Event pageAdd to calendar
CulturalLive Performances

Music Toronto - What Makes It Great with Rob Kapilow and Meagan Milatz

27 Front St E · Toronto Centre

On 17 Jan 2027

Master communicator Rob Kapilow and brilliant Canadian pianist Meagan Milatz explore Beethoven’s electrifying Appassiona

Event pageAdd to calendar
Show 9 moreShow fewer
CelebrationsFamily/Children

Carousel Rides

92 Front St E · Toronto Centre

On 18 Dec 2026 – 20 Dec 2026

Free

Add a little extra magic to your market visit with a ride on the holiday Carousel. A festive favourite for visitors of a

Event pageAdd to calendar
2SLGBTQ+Live Performances

The Other Reindeer, A Choral Panto Show, Singing Out’s Holiday concert

43 Gerrard St E · Toronto Centre

On 12 Dec 2026

Toronto’s Largest 2SLGBTQQIA+ choir presents a one-of-a-kind choral panto show! When the North Pole’s most famous flye

Event pageAdd to calendar
CulturalLive Performances

Music Toronto - Gryphon Trio with James Campbell

27 Front St E · Toronto Centre

On 10 Dec 2026

In its early years as a Music Toronto ensemble-in-residence, the Gryphon Trio first performed Olivier Messiaen’s visiona

Event pageAdd to calendar
ArtisanCharity/Cause

Holiday Fair in Sankofa Square

1 Dundas St E · Toronto Centre

On 10 Dec 2026 – 20 Dec 2026

Free · Listed days only

Celebrate the Holiday season right in the heart of downtown Toronto! Enjoy twinkling lights, a Holiday Market featurin

Add to calendar
Family/ChildrenLive Performances

‘Twas the Night Before...by Cirque du Soleil

1 Front St E · Toronto Centre

On 10 Dec 2026 – 2 Jan 2027

Listed days only

Get ready to be swept into a magical, upside-down world inspired by the timeless poem “A Visit from St. Nicholas” by Cle

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

7 Labatt Ave

7 Labatt Ave · Toronto Centre

Asked 30 Sep 2026

Under Review

Official Plan and Zoning By-law Amendment application for two 46-storey residential buildings containing approximately 1,170 dwelling units and a 2-storey non-residential building containing 1,111 square metres of non-residential space.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Allsun Campbell · [email protected].

Rezoning

1 Sumach St

1 Sumach St · Toronto Centre

Asked 18 Sep 2026

Under Review

Lift the (H)

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Katherine Bailey · [email protected].

Site plan

69 Yonge St

69 Yonge St · Toronto Centre

Asked 2 Sep 2026

Application Received

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kyle Strik · [email protected].

Show 9 moreShow fewer
Site plan

134 Jarvis St

134 Jarvis St · Toronto Centre

Asked 2 Sep 2026

Under Review

Proposed 11-space surface commercial parking lot.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Site plan

306 Gerrard St E

306 Gerrard St E · Toronto Centre

Asked 26 May 2026

Under Review

Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

21 McGill St

21 McGill St · Toronto Centre

Asked 25 May 2026

Under Review

Site Plan Approval for a 7-storey addition to the existing Covenant House Toronto. The proposal would increase its youth crisis and supportive housing capacity with 158 beds (provided across a mix of dwelling rooms and dwelling units).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Rezoning

281 Front St E

281 Front St E · Toronto Centre

Asked 20 May 2026

Under Review

The application proposes to amend the Official Plan and Zoning By-law to permit a mixed-used building consisting of two residential towers (54- and 50-storeys), 1,065 residential dwelling units, 643 square metres of retail space on the ground floor, and a public open space along Front Street East.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Christy Chow · [email protected].

Site plan

4 Gilead Pl

4 Gilead Pl · Toronto Centre

Asked 16 Apr 2026

Application Received

Site Plan Approval for a 20-storey purpose built rental residential building, containing 297 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kyle Strik · [email protected].

Rezoning

4 Gilead Pl

4 Gilead Pl · Toronto Centre

Asked 9 Apr 2026

OMB Appeal

The application proposes to amend the Official Plan and Zoning By-law to permit a 20 storey residential building containing 297 residential dwelling units.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Christy Chow · [email protected].

Rezoning

211 Jarvis St

211 Jarvis St · Toronto Centre

Asked 31 Mar 2026

Under Review

This application proposes to amend the Official Plan and Zoning By-law to permit a 32-storey mixed-use building, containing 315 dwelling units (including 38 replacement rental units), approximately 377 sq. m. of non-residential gross floor area and 22,153 sq.m of residential GFA, resulting in a Floor Space Index of…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Abraham Plunkett-Latimer · [email protected].

Rezoning

55 Isabella St

55 Isabella St · Toronto Centre

Asked 17 Mar 2026

Under Review

The application proposes to amend the Zoning By-law to permit a 75-storey mixed-use building (250.5 metres including mechanical penthouse) containing 92 square metres of ground floor retail space, 1,064 square metres of office space, and 843 dwelling units, including the replacement of 83 existing rental dwelling…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Christy Chow · [email protected].

Site plan

405 Sherbourne St

405 Sherbourne St · Toronto Centre

Asked 9 Mar 2026

Application Received

Site Plan Control Application for a 35-storey (112.6) metre building (excluding mechanical penthouse) 25,069 square metres of residential gross floor area and 388 square metres of non-residential gross floor area and a landscaped mid-block connection between Sherbourne and Bleecker Streets.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].