Coming down
The city has allowed these buildings to come down. They may still be standing.
Demolition
27 Grosvenor St
27 Grosvenor St · Toronto Centre
Approved 22 Sep 2026
The scope includes the demolition of a non-operational morgue at 26 Grenville Street and an existing above- and below-grade parking garage at 27 Grosvenor Street, located in the City of Toronto. The demolition will…
Plans you can answer
Someone has asked the city for a change. Nothing here is a decision.
Site plan
27 Grosvenor St
27 Grosvenor St · Toronto Centre
Asked 19 Mar 2019
Site Plan Control application to permit a mixed-use building with two towers, 32 and 46 storeys (113.3 metres and 155.2 metres) in height, connected by an 11-storey podium. The existing buildings on the site would be demolished. The proposed development includes 770 rental units (of which 231 will be affordable), a…
How to respond
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Abraham Plunkett-Latimer · [email protected].