Opening this block

Home · Spadina-Fort York · Lower Spadina Ave

What's new around 10 Lower Spadina Ave

10 Lower Spadina Ave · Spadina-Fort York. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Take out Restaurant

669 m away · 24 Bathurst St · Spadina-Fort York

Applied 20 Aug 2026

Revision Issued

Revision 01: Revision from "Take out Restaurant" to "Seated restaurant with max 6 customer seats" Proposal for revised universal washroom, new seats, bar and prep area renovation.

Permit application

Baskin Robbins

855 m away · 51 Lower Simcoe St · Spadina-Fort York

Applied 4 Dec 2025

Inspection

Proposal for interior alterations to an existing restaurant for a new ice cream shop - "Baskin Robbins". Note: 135 BREMNER BLVD IS AN ENTRANCE ADDRESS FOR 51 LOWER SIMCOE ST.

Permit application

Tim Hortons

1.0 km away · 200 Wellington St W · Spadina-Fort York

Applied 29 Dec 2025

Inspection

Proposal for interior alterations to existing take-out restaurant - "Tim Hortons"

Show 4 moreShow fewer
Permit application

Life Labs

1.0 km away · 200 Wellington St W · Spadina-Fort York

Applied 18 Jun 2026

Permit Issued

Proposal for interior alterations to existing office space for new medical lab - "Life Labs"

Permit application

Z-Teca

1.0 km away · 200 Wellington St W · Spadina-Fort York

Applied 2 Jul 2026

Permit Issued

Proposal for interior alterations to existing take-out restaurant (including remote storage room) for new tenant - "Z-TECA"

Permit application

Egg Club

1.0 km away · 200 Wellington St W · Spadina-Fort York

Applied 13 Aug 2026

Inspection

Proposal for interior alterations to existing take-out restaurant - "Egg Club"

Permit application

Zen Kyoto

1.0 km away · 200 Wellington St W · Spadina-Fort York

Applied 26 Aug 2026

Inspection

Proposal for interior alterations for a restaurant - "Zen Kyoto" - UNIT 255

Being built

The city has allowed these. Work may not have started. The permits in this area list 64 homes.

Multiple Unit Building

370 Queens Quay W

230 m away · 370 Queens Quay W · Spadina-Fort York

Approved 4 Dec 2025

Proposed interior alterations to ground floor retail to include the addition of demising walls and adding 3 entrances to existing curtain wall

Mixed Use/res W Non Res

350 Queens Quay W

282 m away · 350 Queens Quay W · Spadina-Fort York

Approved 2 Apr 2025

Rec 05 - Revision to the washroom exhaust due to the site conditions.REV 04 - Revisions to the architectural and mechanical consultant drawings REVISION #3 - Rooftop washroom, a second, barrier-free washroom, changes to…

Multiple Unit Building

23 Spadina Ave

372 m away · 23 Spadina Ave · Spadina-Fort York

Approved 14 May 2025

Proposal for interior alterations to existing office space on the first and second floors.

Show 19 moreShow fewer
Multiple Unit Building

38 Dan Leckie Way

457 m away · 38 Dan Leckie Way · Spadina-Fort York

Approved 19 Dec 2025

Proposal for interior alterations to convert office unit into a pet grooming store.

Multiple Unit Building

115 Fort York Blvd

487 m away · 115 Fort York Blvd · Spadina-Fort York

Approved 20 Aug 2026

Proposal for interior alterations to revise layout of an existing exercise studio

Multiple Unit Building

545 Lake Shore Blvd W

528 m away · 545 Lake Shore Blvd W · Spadina-Fort York

Approved 30 Jul 2025

PROPOSAL FOR SECURITY GATES INSTALL FOR EXISTING SHOPPERS DRUG MART.

Multiple Unit Building

20 Bruyeres Mews

673 m away · 20 Bruyeres Mews · Spadina-Fort York

Approved 10 Jul 2026

Localized repairs of suspended concrete slabs in the underground parking garage affected by deteriorated waterproofing. Work includes minor (20 mm depth) and major (>20 mm depth) concrete repairs. No through-slab…

Multiple Unit Building

235 Queens Quay W

768 m away · 235 Queens Quay W · Spadina-Fort York

Approved 7 Oct 2026

Installation of two sets of doors within a public corridor

Mixed Use/res W Non Res

462 Wellington St W

773 m away · 462 Wellington St W · Spadina-Fort York

Approved 26 Mar 2026

Conditional Permit - Part Permit - Proposal for 10 storey retirement home above 5 storey's of office with some retail/restaurant. Retention of existing heritage building.

Apartment

500 Wellington St W

806 m away · 500 Wellington St W · Spadina-Fort York

Approved 3 Dec 2025

REV : The proposed revision work is clarifying that access from the parking area (ground floor) to the interior space is no longer barrier free.

Apartment

57 Spadina Ave

809 m away · 57 Spadina Ave · Spadina-Fort York

Approved 16 Apr 2026

46 new homes

The permit lists 46 homes.

Proposal to convert non-residential area to residential on the 2nd, 3rd, and 4th floors of an existing mixed use building. See also 25 167185 MV.

Multiple Unit Building

393 King St W

865 m away · 393 King St W · Spadina-Fort York

Approved 10 Mar 2025

Proposal for the addition of a service freight elevator to the main and second floor.

Mixed Use/res W Non Res

15 Mercer St

872 m away · 15 Mercer St · Spadina-Fort York

Approved 9 Apr 2025

Rev 02 - Revisions to the current BLD, HVAC, and PLB permits for the updated hotel suites on floors 41-45 in the West Tower.REV 01: The window sprinklers on the south elevation are relocated to avoid an operable window…

Multiple Unit Building

383 King St W

872 m away · 383 King St W · Spadina-Fort York

Approved 7 Mar 2025

Proposal to perform interior alterations PARTITION ALTERATIONS AND INTERIOR FINISHES ONLY(food preparation area) existing A2 bar/lounge.place of amusement.

Multiple Unit Building

38 Niagara St

879 m away · 38 Niagara St · Spadina-Fort York

Approved 10 Dec 2025

Proposal for interior alterations to condo unit.

Mixed Use/res W Non Res

200 Queens Quay W

911 m away · 200 Queens Quay W · Spadina-Fort York

Approved 22 May 2026

Conditional Permit - Site Services - Proposal to construct a new 58 storey mixed use building with 4 underground parking levels.906 Residential Condo Units and 78 Affordable Rental units

18 homes

400 King St W

921 m away · 400 King St W · Spadina-Fort York

Approved 14 Nov 2025

18 new homes

The permit lists 18 homes.

Revision 1: in connection for Permit No. 20 233050 BLD, HVA,PLBProposal to construct a 49 storey building containing 612 residential units, 2 commercial levels, and 3 levels of below grade parking.

Multiple Unit Building

230 Front St W

922 m away · 230 Front St W · Spadina-Fort York

Approved 20 Apr 2026

Proposal for interior demolition to return existing office space back to base building condition - FLOORS 2-8 (one tenant) - RBCConvenience address is 200 Front St W

Multiple Unit Building

200 Front St W

1.0 km away · 200 Front St W · Spadina-Fort York

Approved 20 Aug 2026

Proposed interior alterations and change of use for tenant fit up - EZ Eyecare.

Multiple Unit Building

200 Wellington St W

1.0 km away · 200 Wellington St W · Spadina-Fort York

Approved 29 Jul 2026

Proposal for the re-demising of the existing concourse level tenant/owner spaces for a future tenant - back to base

Multiple Unit Building

74 Niagara St

1.0 km away · 74 Niagara St · Spadina-Fort York

Approved 1 Aug 2025

REV 01: Demolition of existing wall aswell as structural reinforcement of existing block wall.Proposal for a rear 2nd floor addition, new 3rd floor addition, interior alterations to the ground floor and a 2nd floor rear…

Multiple Unit Building

345 Adelaide St W

1.0 km away · 345 Adelaide St W · Spadina-Fort York

Approved 7 Jan 2026

Interior Alteration and Change of Use on the Ground Floor, including the removal of interior partition walls, while maintaining existing plumbing and sprinkler system as-is.

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

New Year's Eve

309 m away · 339 Queens Quay W · Spadina-Fort York

Allowed 31 Dec 2026 – 1 Jan 2027

Hours 10:00 p.m.–1:00 a.m.

Setup 27 Dec 2026 – 31 Dec 2026, 8:00 a.m.–10:00 p.m.; 30 Dec 2026, 8:00 a.m.–11:00 p.m.

Tear down 1 Jan 2027 – 3 Jan 2027, 10:00 a.m.–7:00 p.m.

City Of Toronto

Amplified And/or Instrument Sound

Skip × (partner) Brand Pop-up Activation

599 m away · 400 Front St W · Spadina-Fort York

Allowed 7 Nov 2026

Hours 12:00 p.m.–3:00 p.m.

Setup 6 Nov 2026, 3:00 p.m.–6:00 p.m.

Tear down 7 Nov 2026, 3:00 p.m.–6:00 p.m.

The·team: Sports, Music & Entertainment

Other

Move Out Of Display Vehicles

831 m away · 255 Front St W · Spadina-Fort York

Allowed 21 Feb 2027 – 22 Feb 2027

Hours 6:00 p.m.–5:00 a.m.

Setup 21 Feb 2027, 4:00 p.m.–6:00 p.m.

Tear down 22 Feb 2027, 3:00 a.m.–5:00 a.m.

Canadian International Auto Show (cias)

Show 3 moreShow fewer
Amplified And/or Instrument Sound

Day Of The Dead Celebration

856 m away · 28 Bathurst St · Spadina-Fort York

Allowed 1 Nov 2026

Hours 11:00 a.m.–10:00 p.m.

Setup 1 Nov 2026, 10:00 a.m.–11:00 a.m.

Tear down 1 Nov 2026, 8:00 p.m.–11:00 p.m.

Stackt Properties Lp

Continuous Concrete Pour

Q Tower

911 m away · 200 Queens Quay W · Spadina-Fort York

Allowed 28 Aug 2026 – 27 Feb 2027

Hours from 7:00 a.m.

Rockwell Toronto Construction Inc.

Construction

Q Tower

911 m away · 200 Queens Quay W · Spadina-Fort York

Allowed 9 Oct 2026 – 27 Feb 2027

Hours 6:00 a.m.–5:00 p.m.

Rockwell Toronto Construction Inc.

Events

On the city's calendar. Check before you go.

CulturalLive Performances

Endgame

515 m away · 3 Eireann Quay · Spadina-Fort York

On 18 Nov 2026 – 28 Nov 2026

Listed days only

Samuel Beckett’s Endgame is the tragicomic tale of a man living with his parents and his servant in a world beyond time

Event pageAdd to calendar
Public SquareTrivia

Come Play Werewolf

606 m away · 486 Front St W · Spadina-Fort York

On 22 Nov 2026

Free

Join us for the social deduction game, Werewolf. Whether you are a seasoned player or a newbie, this event is perfect

Add to calendar
Other

East Coast Kitchen Party at Ripley’s Aquarium of Canada

723 m away · 288 Bremner Blvd · Spadina-Fort York

On 22 Jan 2027 – 23 Jan 2027

Shake off the winter chill, come in from the cold and experience Atlantic Canada's warm hospitality as the aquarium open

Event pageAdd to calendar
Show 8 moreShow fewer
CelebrationsFamily/Children

Miracle on Harbourfront - All-ages Christmas destination

768 m away · 235 Queens Quay W · Spadina-Fort York

On 20 Nov 2026 – 1 Jan 2027

Free · Listed days only

A must-visit all-ages Christmas destination that sets stage for cheer-filled moments and memories for families, friends,

Event pageAdd to calendar
Live PerformancesTheatre

2026 Grand Slam: The Inspirational Speaking Finals

826 m away · 250 Front St W · Spadina-Fort York

On 21 Nov 2026

The top speakers from this season's competitions return for one night, each delivering a brand new five-minute speech on

Event pageAdd to calendar
LiteraryLive Performances

A Christmas Carol

833 m away · 231 Queens Quay W · Spadina-Fort York

On 14 Nov 2026 – 23 Dec 2026

Listed days only

Dickens’s timeless holiday story of transformation, kindness and human connection. This fresh adaptation by Tim Carroll

Event pageAdd to calendar
Arts/ExhibitsFamily/Children

Kreate Market — Holiday Market at STACKT Market

856 m away · 28 Bathurst St · Spadina-Fort York

On 21 Nov 2026 – 22 Nov 2026

Free

Join us for two days of festive holiday shopping! Discover handmade gifts, artisan creations, home décor, candles, app

Event pageAdd to calendar
CelebrationsCultural

Mocktail Masterclass with Blend Society | Kreate Market at STACKT

856 m away · 28 Bathurst St · Spadina-Fort York

On 22 Nov 2026

Join us for a hands-on mocktail masterclass! Guided by mixologist Kays Samadi, discover new flavours, sample house-mad

Event pageAdd to calendar
Family/ChildrenFilm

The Sound of Music Sing Along at TIFF Lightbox

1.0 km away · 350 King St W · Spadina-Fort York

On 12 Dec 2026 – 17 Dec 2026

Listed days only

TIFF Lightbox is alive with the sound of music! Impress everyone with your best Julie Andrews impersonation and frolic

Event pageAdd to calendar
Family/ChildrenFilm

The Greatest Showman Sing Along at TIFF Lightbox

1.0 km away · 350 King St W · Spadina-Fort York

On 19 Dec 2026

Calling all dreamers, join us for a night of dancing, singing and wonder. Hosted by comedian and ringleader Martha Chave

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

10 Lower Spadina Ave

0 m away · 10 Lower Spadina Ave · Spadina-Fort York

Asked 18 Oct 2024

Under Review

Site Plan Application for a 49-storey mixed use building (not including mechanical penthouse), containing approximately 128 square metres of non-residential floor area at grade, and 511 apartment dwelling units.The proposed development has a gross floor area of approximately 32,363.6 square metres and a floor space…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Benjamin Waters · [email protected].

Rezoning

10 Lower Spadina Ave

0 m away · 10 Lower Spadina Ave · Spadina-Fort York

Asked 18 Oct 2024

Under Review

Zoning By-law Amendment application for a 49-storey mixed use building (not including mechanical penthouse), containing approximately 128 square metres of non-residential floor area at grade, and 511 apartment dwelling units.The proposed development has a gross floor area of approximately 32,363.6 square metres and a…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Benjamin Waters · [email protected].

Site plan

5 Eireann Quay

457 m away · 5 Eireann Quay · Spadina-Fort York

Asked 4 Mar 2019

NOAC Issued

Site Plan Control Application to redesign the taxi pick-up and drop-off area for the Billy Bishop Toronto City Airport and the parking area at 5 Eireann Quay with associated landscape improvements. Transportation improvements are also proposed along Eireaan Quay.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Susan McAlpine · [email protected].

Show 21 moreShow fewer
Rezoning

470R Lake Shore Blvd W

490 m away · 470R Lake Shore Blvd W · Spadina-Fort York

Asked 29 Jul 2021

Under Review

Zoning by-law amendment application to facilitate the development of 5,509 square metres of non-residential retail space located below the Gardiner Expressway.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Susan McAlpine · [email protected].

Site plan

545 Lake Shore Blvd W

528 m away · 545 Lake Shore Blvd W · Spadina-Fort York

Asked 17 Sep 2021

NOAC Issued

Block A contemplates a dedicated commercial development that maintains the heritage component of the existing building. An additional 2 storeys is proposed to the portion of the building adjacent to the hexagon building. The hexagon building will be maintained and restored as outlined in the Heritage report provided.…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Susan McAlpine · [email protected].

Condominium plan

545 Lake Shore Blvd W

528 m away · 545 Lake Shore Blvd W · Spadina-Fort York

Asked 2 Nov 2021

Under Review

*** Draft Plan of Condominium for 419 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Bruna Nigro · [email protected].

Site plan

400 Front St W

599 m away · 400 Front St W · Spadina-Fort York

Asked 22 Dec 2020

Under Review

INACTIVE Site Plan Control Application for 3 new buildings; Building A (28 storeys, mixed-use), Building B-C (2 towers, 61 and 63 storeys, atop mixed-use connecting podium); Building D (Retail, 2 storeys)

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patricia Cho · [email protected].

Subdivision

400 Front St W

599 m away · 400 Front St W · Spadina-Fort York

Asked 7 Nov 2021

Under Review

Draft Plan of Subdivision for 4 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patricia Cho · [email protected].

Site plan

325 Front St W

641 m away · 325 Front St W · Spadina-Fort York

Asked 12 May 2025

Under Review

Site Plan Approval Application for Phase 1 of a three phase development at 315-325 Front Street West. The Phase 1 site plan includes two primarily residential towers (50 storeys), containing 74,000 square metres of residentail floor area and 830 square metres of retail floor area. A total of 905 residential units are…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Susan McAlpine · [email protected].

Site plan

150 Queens Wharf Rd

680 m away · 150 Queens Wharf Rd · Spadina-Fort York

Asked 9 Mar 2026

Application Received

The 2025 Proposal is a 37-storey tower with a total of 268 units and ~350m2 of ground floor non-residential GFA. Of the 268 units, over 50% of the units are larger two- and three-bedroom units and 30% of the total units are planned to be affordable.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Willie Macrae · [email protected].

Site plan

301 Front St W

682 m away · 301 Front St W · Spadina-Fort York

Asked 16 Apr 2012

Under Review

INACTIVE Revision to existing site plan agreement for changes to the exterior elevations, site details including gate and fencing work. Phase 1 of CN Tower lands re development - for new entertainment complex containing 3 storey Ripleys Aquarium Phase 1 consists of easterly portion of lands and construction of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Simon Lacoste · [email protected].

Site plan

320 Front St W

694 m away · 320 Front St W · Spadina-Fort York

Asked 27 Apr 2022

Under Review

Site Plan approval demolish the existing building situated at the southeast corner of the block at 310, 320 and 330 Front Street West and to redevelop this portion of the block with a 69-storey mixed-use building containing a 10-storey base building and 59-storey tower above.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shaylyn Costello · [email protected].

Rezoning

320 Front St W

694 m away · 320 Front St W · Spadina-Fort York

Asked 10 Oct 2024

Under Review

Official Plan and Zoning By-law Amendment application to redevelop the southeast and southwest corners of the site at 310-330 Front Street West with two new mixed-use buildings. The proposed 70-storey tower to be located at the southeast corner (310 Front St. W.) would contain 929 residential units, 440 square metres…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shaylyn Costello · [email protected].

Site plan

255 Bremner Blvd

715 m away · 255 Bremner Blvd · Spadina-Fort York

Asked 21 Dec 2018

Under Review

Proposed amendment to the approved site plan application for the Hydro Station (File No. 11 229840 STE 20 SA) to make the temporary driveway access from Lower Simcoe into a permanent access for the site.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Susan McAlpine · [email protected].

Site plan

467 Wellington St W

720 m away · 467 Wellington St W · Spadina-Fort York

Asked 20 Jul 2022

Under Review

Site Plan Application to facilitate the redevelopment of the site with a 23-storey mixed-use building with retail at-grade and residential above. 225 residential units are proposed. This application is being reviewed in conjunction with the associated Site Plan Application File No. 22 179828 STE 10 OZ.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write George Pantazis · [email protected].

Site plan

18 Portland St

731 m away · 18 Portland St · Spadina-Fort York

Asked 8 Sep 2022

Under Review

Proposal to permit the redevelopment of the site with a 22-storey mixed-use building, having a non-residential gross floor area of 2,770.5 square metres and a residential gross floor area of 13,765.5 square metres. A total of 182 residential dwelling units are proposed. Related applications: 21 232793 STE 10 OZ; 21…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patricia Cho · [email protected].

Rezoning

595 Front St W

732 m away · 595 Front St W · Spadina-Fort York

Asked 3 May 2022

Under Review

Official Plan and Zoning By-law Amendment application to permit development above the Union Station rail corridor between Blue Jays Way and Bathurst Street. The revised proposal includes 9 mixed-use towers ranging in height from 36 to 72-storeys, a new City park and publicly accessible open spaces. The proposed gross…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write George Pantazis · [email protected].

Site plan

489 Wellington St W

749 m away · 489 Wellington St W · Spadina-Fort York

Asked 26 Apr 2019

NOAC Issued

Site Plan Approval application for a 17-storey mixed-use building (60 metres including mechnical penthouse), with retail at grade and 162 residential units above.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patricia Cho · [email protected].

Condominium plan

489 Wellington St W

749 m away · 489 Wellington St W · Spadina-Fort York

Asked 4 Nov 2021

Under Review

*** Draft Plan of Condominium for 117 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Bruna Nigro · [email protected].

Site plan

277 Wellington St W

752 m away · 277 Wellington St W · Spadina-Fort York

Asked 23 Dec 2020

Under Review

Site Plan Control application for a new 66-storey mixed use building (residential with office and retail).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shaylyn Costello · [email protected].

Condominium plan

277 Wellington St W

752 m away · 277 Wellington St W · Spadina-Fort York

Asked 27 Sep 2021

Under Review

*** Draft Plan of Condominium for 645 residential dwelling units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Bruna Nigro · [email protected].

Rezoning

40 Spadina Ave

767 m away · 40 Spadina Ave · Spadina-Fort York

Asked 10 Aug 2022

Appeal Received

Official Plan and Zoning By-law Amendment applications to permit the redevelopment of the site with a 30-storey mixed-use building with retail at-grade along Spadina Avenue and 550 dwelling units above. The Official Plan Amendment is required to redesignate a portion of the site from Mixed Use Areas 2 to Mixed Use…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Patricia Cho · [email protected].

Site plan

462 Wellington St W

773 m away · 462 Wellington St W · Spadina-Fort York

Asked 17 Dec 2021

NOAC Issued

Site Plan Application for a mixed-use development including a retirement home, office and retail uses. The development proposes a 15 storey building and retains the heritage building on the site. Overall the development proposes 22,349square metres of space include 6,411 square metres of office space and 1,176 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Susan McAlpine · [email protected].