Opening this block

Home · Spadina-Fort York · Eireann Quay

What's new around 3 Eireann Quay

3 Eireann Quay · Spadina-Fort York. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Take out Restaurant

538 m away · 24 Bathurst St · Spadina-Fort York

Applied 20 Aug 2026

Revision Issued

Revision 01: Revision from "Take out Restaurant" to "Seated restaurant with max 6 customer seats" Proposal for revised universal washroom, new seats, bar and prep area renovation.

Being built

The city has allowed these. Work may not have started.

Multiple Unit Building

545 Lake Shore Blvd W

284 m away · 545 Lake Shore Blvd W · Spadina-Fort York

Approved 30 Jul 2025

PROPOSAL FOR SECURITY GATES INSTALL FOR EXISTING SHOPPERS DRUG MART.

Multiple Unit Building

38 Dan Leckie Way

363 m away · 38 Dan Leckie Way · Spadina-Fort York

Approved 19 Dec 2025

Proposal for interior alterations to convert office unit into a pet grooming store.

Multiple Unit Building

20 Bruyeres Mews

482 m away · 20 Bruyeres Mews · Spadina-Fort York

Approved 10 Jul 2026

Localized repairs of suspended concrete slabs in the underground parking garage affected by deteriorated waterproofing. Work includes minor (20 mm depth) and major (>20 mm depth) concrete repairs. No through-slab…

Show 7 moreShow fewer
Multiple Unit Building

115 Fort York Blvd

533 m away · 115 Fort York Blvd · Spadina-Fort York

Approved 20 Aug 2026

Proposal for interior alterations to revise layout of an existing exercise studio

Multiple Unit Building

370 Queens Quay W

734 m away · 370 Queens Quay W · Spadina-Fort York

Approved 4 Dec 2025

Proposed interior alterations to ground floor retail to include the addition of demising walls and adding 3 entrances to existing curtain wall

Mixed Use/res W Non Res

350 Queens Quay W

775 m away · 350 Queens Quay W · Spadina-Fort York

Approved 2 Apr 2025

Rec 05 - Revision to the washroom exhaust due to the site conditions.REV 04 - Revisions to the architectural and mechanical consultant drawings REVISION #3 - Rooftop washroom, a second, barrier-free washroom, changes to…

Multiple Unit Building

23 Spadina Ave

830 m away · 23 Spadina Ave · Spadina-Fort York

Approved 14 May 2025

Proposal for interior alterations to existing office space on the first and second floors.

Multiple Unit Building

38 Niagara St

949 m away · 38 Niagara St · Spadina-Fort York

Approved 10 Dec 2025

Proposal for interior alterations to condo unit.

Transit Station,subway, Bus Terminal

10R Ordnance St

1.0 km away · 10R Ordnance St · Spadina-Fort York

Approved 9 Apr 2026

New emergency egress building for the Ontario Line South Subway

Multiple Unit Building

74 Niagara St

1.0 km away · 74 Niagara St · Spadina-Fort York

Approved 1 Aug 2025

REV 01: Demolition of existing wall aswell as structural reinforcement of existing block wall.Proposal for a rear 2nd floor addition, new 3rd floor addition, interior alterations to the ground floor and a 2nd floor rear…

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

New Year's Eve

749 m away · 339 Queens Quay W · Spadina-Fort York

Allowed 31 Dec 2026 – 1 Jan 2027

Hours 10:00 p.m.–1:00 a.m.

Setup 27 Dec 2026 – 31 Dec 2026, 8:00 a.m.–10:00 p.m.; 30 Dec 2026, 8:00 a.m.–11:00 p.m.

Tear down 1 Jan 2027 – 3 Jan 2027, 10:00 a.m.–7:00 p.m.

City Of Toronto

Amplified And/or Instrument Sound

Bold & Cold 5k

758 m away · 711 Lake Shore Blvd W · Spadina-Fort York

Allowed 28 Nov 2026

Hours 10:00 a.m.–1:00 p.m.

Setup 28 Nov 2026, 7:30 a.m.–10:00 a.m.

Tear down 28 Nov 2026, 1:00 p.m.–2:00 p.m.

Team Unbreakable

Amplified And/or Instrument Sound

Day Of The Dead Celebration

851 m away · 28 Bathurst St · Spadina-Fort York

Allowed 1 Nov 2026

Hours 11:00 a.m.–10:00 p.m.

Setup 1 Nov 2026, 10:00 a.m.–11:00 a.m.

Tear down 1 Nov 2026, 8:00 p.m.–11:00 p.m.

Stackt Properties Lp

Show 2 moreShow fewer
Amplified And/or Instrument Sound

Toronto Art Crawl Christmas Market

863 m away · 250 Fort York Blvd · Spadina-Fort York

Allowed 7 Nov 2026

Hours 11:00 a.m.–6:00 p.m.

Setup 7 Nov 2026, 9:00 a.m.–11:00 a.m.

Tear down 7 Nov 2026, 6:00 p.m.–7:30 p.m.

Amplified And/or Instrument Sound

The Bentway Conservancy Winter Skating Season

863 m away · 250 Fort York Blvd · Spadina-Fort York

Allowed 12 Dec 2026 – 28 Feb 2027

Hours 12:00 p.m.–9:00 p.m.

Setup 1 Dec 2026 – 11 Dec 2026, 9:00 a.m.–9:00 p.m.

Tear down 1 Mar 2027 – 13 Mar 2027, 9:00 a.m.–7:00 p.m.

The Bentway Conservancy

Events

On the city's calendar. Check before you go.

CulturalLive Performances

Endgame

0 m away · 3 Eireann Quay · Spadina-Fort York

On 18 Nov 2026 – 28 Nov 2026

Listed days only

Samuel Beckett’s Endgame is the tragicomic tale of a man living with his parents and his servant in a world beyond time

Event pageAdd to calendar
Arts/ExhibitsFamily/Children

Kreate Market — Holiday Market at STACKT Market

851 m away · 28 Bathurst St · Spadina-Fort York

On 21 Nov 2026 – 22 Nov 2026

Free

Join us for two days of festive holiday shopping! Discover handmade gifts, artisan creations, home décor, candles, app

Event pageAdd to calendar
CelebrationsCultural

Mocktail Masterclass with Blend Society | Kreate Market at STACKT

851 m away · 28 Bathurst St · Spadina-Fort York

On 22 Nov 2026

Join us for a hands-on mocktail masterclass! Guided by mixologist Kays Samadi, discover new flavours, sample house-mad

Event pageAdd to calendar
Show 5 moreShow fewer
Public SquareTrivia

Come Play Werewolf

860 m away · 486 Front St W · Spadina-Fort York

On 22 Nov 2026

Free

Join us for the social deduction game, Werewolf. Whether you are a seasoned player or a newbie, this event is perfect

Add to calendar
HistoryMuseum

They Walked These Streets... and Answered the Call: Remembrance Installation at Fort York

863 m away · 250 Fort York Blvd · Spadina-Fort York

On 14 Nov 2026 – 22 Nov 2026

Free · Listed days only

Torontonians answered the call to war by enlisting in the armed forces, producing munitions and equipment and by helping

Event pageAdd to calendar
HistoryMuseum

Fort York Integrated Operations and Heritage Stewardship Study Community Engagement Session

863 m away · 250 Fort York Blvd · Spadina-Fort York

On 19 Nov 2026 – 24 Nov 2026

Free · Listed days only

Help shape the future of Fort York National Historic Site by sharing your perspectives on heritage stewardship, programm

Event pageAdd to calendar
Food/CulinaryHistory

Historic Gingerbread Workshop: Holiday Season at Fort York

863 m away · 250 Fort York Blvd · Spadina-Fort York

On 19 Dec 2026 – 3 Jan 2027

Listed days only

Experience the warmth of the holiday season through a hands-on baking workshop in the historic Officers' Mess Kitchen.

Event pageAdd to calendar
ArtisanHistory

Winter Fair & Market: Holiday Season at Fort York

895 m away · 100 Garrison Rd · Spadina-Fort York

On 4 Dec 2026 – 6 Dec 2026

Free

Browse one-of-a-kind gifts, enjoy festive activities and tasty treats within the beautiful backdrop of a historic fort.

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

5 Eireann Quay

63 m away · 5 Eireann Quay · Spadina-Fort York

Asked 4 Mar 2019

NOAC Issued

Site Plan Control Application to redesign the taxi pick-up and drop-off area for the Billy Bishop Toronto City Airport and the parking area at 5 Eireann Quay with associated landscape improvements. Transportation improvements are also proposed along Eireaan Quay.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Susan McAlpine · [email protected].

Site plan

545 Lake Shore Blvd W

284 m away · 545 Lake Shore Blvd W · Spadina-Fort York

Asked 17 Sep 2021

NOAC Issued

Block A contemplates a dedicated commercial development that maintains the heritage component of the existing building. An additional 2 storeys is proposed to the portion of the building adjacent to the hexagon building. The hexagon building will be maintained and restored as outlined in the Heritage report provided.…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Susan McAlpine · [email protected].

Show 12 moreShow fewer
Condominium plan

545 Lake Shore Blvd W

284 m away · 545 Lake Shore Blvd W · Spadina-Fort York

Asked 2 Nov 2021

Under Review

*** Draft Plan of Condominium for 419 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Bruna Nigro · [email protected].

Rezoning

470R Lake Shore Blvd W

403 m away · 470R Lake Shore Blvd W · Spadina-Fort York

Asked 29 Jul 2021

Under Review

Zoning by-law amendment application to facilitate the development of 5,509 square metres of non-residential retail space located below the Gardiner Expressway.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Susan McAlpine · [email protected].

Site plan

10 Lower Spadina Ave

515 m away · 10 Lower Spadina Ave · Spadina-Fort York

Asked 18 Oct 2024

Under Review

Site Plan Application for a 49-storey mixed use building (not including mechanical penthouse), containing approximately 128 square metres of non-residential floor area at grade, and 511 apartment dwelling units.The proposed development has a gross floor area of approximately 32,363.6 square metres and a floor space…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Benjamin Waters · [email protected].

Rezoning

10 Lower Spadina Ave

515 m away · 10 Lower Spadina Ave · Spadina-Fort York

Asked 18 Oct 2024

Under Review

Zoning By-law Amendment application for a 49-storey mixed use building (not including mechanical penthouse), containing approximately 128 square metres of non-residential floor area at grade, and 511 apartment dwelling units.The proposed development has a gross floor area of approximately 32,363.6 square metres and a…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Benjamin Waters · [email protected].

Site plan

150 Queens Wharf Rd

668 m away · 150 Queens Wharf Rd · Spadina-Fort York

Asked 9 Mar 2026

Application Received

The 2025 Proposal is a 37-storey tower with a total of 268 units and ~350m2 of ground floor non-residential GFA. Of the 268 units, over 50% of the units are larger two- and three-bedroom units and 30% of the total units are planned to be affordable.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Willie Macrae · [email protected].

Rezoning

595 Front St W

772 m away · 595 Front St W · Spadina-Fort York

Asked 3 May 2022

Under Review

Official Plan and Zoning By-law Amendment application to permit development above the Union Station rail corridor between Blue Jays Way and Bathurst Street. The revised proposal includes 9 mixed-use towers ranging in height from 36 to 72-storeys, a new City park and publicly accessible open spaces. The proposed gross…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write George Pantazis · [email protected].

Site plan

18 Portland St

881 m away · 18 Portland St · Spadina-Fort York

Asked 8 Sep 2022

Under Review

Proposal to permit the redevelopment of the site with a 22-storey mixed-use building, having a non-residential gross floor area of 2,770.5 square metres and a residential gross floor area of 13,765.5 square metres. A total of 182 residential dwelling units are proposed. Related applications: 21 232793 STE 10 OZ; 21…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patricia Cho · [email protected].

Site plan

701 Fleet St

0.9 km away · 701 Fleet St · Spadina-Fort York

Asked 17 Jun 2026

Under Review

Site Plan Approval for a three-storey athletic training facility proposed by the Tempo Basketball Club Inc. (the "Toronto Tempo"). This proposal is located on land that is owned by the City and will be subject to a long-term lease between the City and the Toronto Tempo to develop the training facility as well as new…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write George Pantazis · [email protected].

Rezoning

701 Fleet St

0.9 km away · 701 Fleet St · Spadina-Fort York

Asked 20 Oct 2026

Under Review

Zoning By-law Amendment - Lifting of the H Symbol to By-law 992-2026

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write George Pantazis · [email protected].

Site plan

489 Wellington St W

1.0 km away · 489 Wellington St W · Spadina-Fort York

Asked 26 Apr 2019

NOAC Issued

Site Plan Approval application for a 17-storey mixed-use building (60 metres including mechnical penthouse), with retail at grade and 162 residential units above.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patricia Cho · [email protected].

Condominium plan

489 Wellington St W

1.0 km away · 489 Wellington St W · Spadina-Fort York

Asked 4 Nov 2021

Under Review

*** Draft Plan of Condominium for 117 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Bruna Nigro · [email protected].

Site plan

467 Wellington St W

1.0 km away · 467 Wellington St W · Spadina-Fort York

Asked 20 Jul 2022

Under Review

Site Plan Application to facilitate the redevelopment of the site with a 23-storey mixed-use building with retail at-grade and residential above. 225 residential units are proposed. This application is being reviewed in conjunction with the associated Site Plan Application File No. 22 179828 STE 10 OZ.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write George Pantazis · [email protected].