Opening this block

Home · Toronto Centre · Jarvis St

What's new around 134 Jarvis St

134 Jarvis St · Toronto Centre. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Publicis Re:Sources

145 m away · 99 Queen St E · Toronto Centre

Applied 27 Aug 2025

Inspection

Proposal for interior alterations to existing office space - FLOOR 4, "PUBLICIS RE:SOURCES"Convenience address is 111 Queen St E

Permit application

Zara

509 m away · 220 Yonge St · Toronto Centre

Applied 22 Sep 2025

Inspection

Proposed interior fit-out for an existing retail suite-fitting room. This scope of works includes new interior walls, fixtures and finishes, new lighting and power 'ZARA'.

Permit application

The Gap

509 m away · 220 Yonge St · Toronto Centre

Applied 2 Jul 2026

Permit Issued

Proposal for Interior Alterations to existing retail store to reconfigure change rooms and painting 'THE GAP'.

Show 11 moreShow fewer
Permit application

Foot Locker

509 m away · 220 Yonge St · Toronto Centre

Applied 24 Jul 2026

Inspection

Proposal for Interior Alterations - 'Foot Locker'

Permit application

Acumetis Toronto

589 m away · 18 King St E · Toronto Centre

Applied 14 Sep 2026

Permit Issued

Proposal for interior alterations to existing office suite for new tenant and install two (2) electromagnetic locks - "Acumetis Toronto"

Permit application

McDonalds

599 m away · 121 Front St E · Toronto Centre

Applied 6 Jan 2026

Permit Issued

Proposal for interior alterations to exisiting restaurant with 7 seats - "McDonalds"

Permit application

Kfc

647 m away · 1 Dundas St W · Toronto Centre

Applied 15 May 2026

Inspection

Proposal for interior alterations to existing restaurant - "KFC"

Permit application

Equitable Bank

657 m away · 25 Ontario St · Toronto Centre

Applied 23 Jan 2026

Revision Issued

Rev 05 - Remove slab opening and associated stairs from level 23.REV: ADD FLOOR 12 AND 13 BACK INTO INITIAL PERMIT 22-115404, PER BUILDING INSPECTOR REQUEST, SEE COVER LETTER IN BLD DWGS.Proposal for interior…

Permit application

Scotia Bank

759 m away · 351 King St E · Toronto Centre

Applied 16 Jan 2026

Inspection

Proposal to construct a demising wall in existing office space - UNIT 301, "Scotia Bank"

Permit application

Gerstein Crisis Centre

774 m away · 355 Church St · Toronto Centre

Applied 30 Oct 2026

Not Started

REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

Permit application

Brother Joseph Dooley Apartments

935 m away · 412 Queen St E · Toronto Centre

Applied 7 Jul 2026

Permit Issued

Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance…

Permit application

Stifel Canada

949 m away · 161 Bay St · Toronto Centre

Applied 23 Apr 2026

Permit Issued

Proposed interior alterations for 'Stifel Canada'.

Permit application

Fidelity Investments

1.0 km away · 77 King St W · Spadina-Fort York

Applied 28 Apr 2026

Permit Issued

Proposed interior alterations for tenant - "Fidelity Investments".

Being built

The city has allowed these. Work may not have started. The permits in this area list 2801 homes.

Mixed Use/res W Non Res

60 Queen St E

178 m away · 60 Queen St E · Toronto Centre

Approved 28 Jun 2026

Conditional Permit - Part Permit - Proposal to construct a new 57 storey mixed use building with 445 residential units, ground floor retail and 4 levels underground parking. See also 22 164002 DEM and 21 152905 STE 13…

Mixed Use/res W Non Res

125 George St

268 m away · 125 George St · Toronto Centre

Approved 30 Oct 2026

REV 01: Revision to permit for updates to ground floor, 2nd and 3rd floor, refer to memoProposal to construct a new 39 storey mixed use building with 516 residential dwelling units, ground floor retail and 4 levels…

Apartment

120 Church St

278 m away · 120 Church St · Toronto Centre

Approved 14 Aug 2025

34 new homes

The permit lists 34 homes.

Proposal to add 3 additional floors to the existing plans Construct a 45 storey residential tower and podium with retail at grade and 4 level underground parking garagePB# 21-223105

Show 21 moreShow fewer
Mixed Use/res W Non Res

120 Church St

278 m away · 120 Church St · Toronto Centre

Approved 16 Oct 2026

REV 02: Removal of two surplus 2-bedroom suites (411 and 511), refer to correspondenceREV 01:Proposal to add 3 additional floors to the existing plans Construct a 45 storey residential tower and podium with retail at…

Transit Station,subway, Bus Terminal

150 Sherbourne St

303 m away · 150 Sherbourne St · Toronto Centre

Approved 2 Feb 2026

Conditional Permit - Part Permit - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter

Multiple Unit Building

154 Shuter St

327 m away · 154 Shuter St · Toronto Centre

Approved 14 Sep 2026

Proposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes…

Multiple Unit Building

33 Lombard St

343 m away · 33 Lombard St · Toronto Centre

Approved 17 Feb 2026

Proposed interior alterations to combine condo units 707 & 708.

Multiple Unit Building

25 Richmond St E

371 m away · 25 Richmond St E · Toronto Centre

Approved 13 Mar 2026

Creating an opening from mail room to parcel room and adding a door from bike storage to same parcel room.

Mixed Use/res W Non Res

241 Church St

375 m away · 241 Church St · Toronto Centre

Approved 6 Oct 2025

Conditional Permit - Drain - Proposal to construct a new 53 storey mixed use building with 591 dwelling units, 4 levels of below grade parking garage and retail on the ground floor. See also 22 195181 DEM and 21 206338…

Apartment

241 Church St

375 m away · 241 Church St · Toronto Centre

Approved 30 Sep 2026

591 new homes

The permit lists 591 homes.

Proposal to construct a new 53 storey mixed use building with 591 dwelling units, 2 levels of below grade parking garage and retail on the ground floor. See also 22 195181 DEM and 21 206338 STE 13 SA

Multiple Unit Building

261 Jarvis St

410 m away · 261 Jarvis St · Toronto Centre

Approved 28 Apr 2026

Proposed underground garage isolated repairs

Multiple Unit Building

200 Victoria St

426 m away · 200 Victoria St · Toronto Centre

Approved 15 Sep 2026

Proposal to remove 2 Fluid Coolers, and replace with 4 Fluid Coolers, Heat Exchangers, Pumps, Expansion Tanks.

Industrial

2 Queen St E

438 m away · 2 Queen St E · Toronto Centre

Approved 18 Jun 2025

A temporary noise shelter for the construction of the Queen Station of the Ontario Line subway project.

Multiple Unit Building

54 Church St

460 m away · 54 Church St · Toronto Centre

Approved 14 Oct 2026

Proposal for interior alterations for a pharmacy and medical clinic fit-up

Student Residence

100 Bond St

465 m away · 100 Bond St · Toronto Centre

Approved 17 Sep 2026

Part Permit - Proposed construction of a new 21 storey student residence including 1 level of basement (Assembly School) Toronto Metropolitan University.

Multiple Unit Building

171 King St E

473 m away · 171 King St E · Toronto Centre

Approved 2 Sep 2026

Proposal to remove a load bearing wall and replacing it with a steel beam.

Multiple Unit Building

1 Toronto St

501 m away · 1 Toronto St · Toronto Centre

Approved 10 Aug 2026

Localized concrete repairs, waterproofing repairs and drain installation

Multiple Unit Building

197 King St E

508 m away · 197 King St E · Toronto Centre

Approved 6 Aug 2025

Revision 03 - Revised access to the7th floor terrace to make it barrier free accessible - (stairs at door D705 removed and BF ramp added on the terrace), added elevator machine room on 7th floorRevision 02 - Revised…

Multiple Unit Building

277 Victoria St

510 m away · 277 Victoria St · Toronto Centre

Approved 24 Apr 2026

Installation of a new EIFS system on the south elevation of the building.

Transit Station,subway, Bus Terminal

176 Yonge St

591 m away · 176 Yonge St · Toronto Centre

Approved 29 Sep 2026

Part Permit - To construct new Ontario Line transit - Queen/Yonge Transit Station

Multiple Unit Building

275 King St E

616 m away · 275 King St E · Toronto Centre

Approved 23 Sep 2025

REV 01: Revision to second floor washroom area.INTERIOR ALTERATION TO GROUP D OCCUPANCY: - 2ND FLR INTERIOR OFFICE RENOVATION - REFRESH EXISTING WASHROOMS

Office

50 Queen St W

637 m away · 50 Queen St W · Toronto Centre

Approved 3 Mar 2026

Proposal for 3 stacked modules creating a temporary site office for use by construction personnel.

Apartment

49 Ontario St

638 m away · 49 Ontario St · Toronto Centre

Approved 14 Oct 2026

1226 new homes

The permit lists 1226 homes.

Construction of two buildings of 46 and 50 storeys with underground parking garage (245 affordable housing units) and townhouses

Multiple Unit Building

483 Bay St

663 m away · 483 Bay St · Toronto Centre

Approved 9 Oct 2026

Localized concrete repairs, podium deck waterproofing repairs, and piping repairs

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

212 Dundas St E

385 m away · 212 Dundas St E · Toronto Centre

Approved 6 Jul 2026

Proposal to demolish the existing 4 storey commercial building with the retention of the exterior street facing facade of the Filmore Hotel building.See 20 151363 STE 13 SA for future proposal.

Demolition

74 Dundas St E

444 m away · 74 Dundas St E · Toronto Centre

Approved 3 Feb 2026

Proposal to demolish existing two storey building.

Demolition

64 Dundas St E

450 m away · 64 Dundas St E · Toronto Centre

Approved 2 Mar 2026

Proposal to demolish existing 3 storey mixed use building in relation to new 21 storey student residence development

Show 8 moreShow fewer
Demolition

60 Dundas St E

451 m away · 60 Dundas St E · Toronto Centre

Approved 2 Mar 2026

Proposal to demolish existing 3 storey mixed use building in relation to new 21 storey student residence development

Demolition

100 Bond St

465 m away · 100 Bond St · Toronto Centre

Approved 30 Jan 2026

Demolition of existing 3 Storey commercial building

Demolition

104 Bond St

474 m away · 104 Bond St · Toronto Centre

Approved 2 Feb 2026

Demolition of existing 4 storey commercial building

Demolition

110 Bond St

488 m away · 110 Bond St · Toronto Centre

Approved 30 Jan 2026

Demolition of existing 3 Storey commercial building

Demolition

55 Yonge St

708 m away · 55 Yonge St · Toronto Centre

Approved 20 Aug 2025

Complete Demolition to Ground Level - All Exterior Foundation Walls & SOG to Remain

Demolition

53 Yonge St

723 m away · 53 Yonge St · Toronto Centre

Approved 20 Aug 2025

Complete Demolition to Ground Level - All Exterior Foundation Walls & SOG to Remain

Demolition

604 Bay St

871 m away · 604 Bay St · University-Rosedale

Approved 27 Mar 2026

Proposal for partial demolition of existing building for future developments.

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

Residences Of Queen Church Inc.

178 m away · 60 Queen St E · Toronto Centre

Allowed 9 Jun 2026 – 31 Dec 2026

Hours from 7:00 a.m.

Residences Of Queen Church Inc.

Large Crane Work

30 Bond St.

317 m away · 30 Bond St · Toronto Centre

Allowed 30 Oct 2026 – 1 Nov 2026

Hours 7:00 a.m.–11:30 p.m.

Sarens Canada Inc.

Construction

6 Adelaide St E

532 m away · 6 Adelaide St E · Toronto Centre

Allowed 14 Apr 2026 – 31 Dec 2026

Hours 8:00 a.m.–11:59 p.m.

Palmark Construction Limited

Show 21 moreShow fewer
Amplified And/or Instrument Sound

St Patrick's Parade

536 m away · 250 Yonge St · Toronto Centre

Allowed 14 Mar 2027

Hours 12:00 p.m.–2:00 p.m.

Setup 14 Mar 2027, 9:00 a.m.–12:00 p.m.

Tear down 14 Mar 2027, 2:00 p.m.–2:30 p.m.

St Patrick's Parade Society

Construction

Tmu Student Wellbeing Centre

556 m away · 137 Bond St · Toronto Centre

Allowed 30 Aug 2026 – 31 Dec 2026

Hours 6:00 a.m.–9:00 p.m.

Pomerleau

Construction

Tmu Student Wellbeing Centre

556 m away · 137 Bond St · Toronto Centre

Allowed 5 Oct 2026 – 31 Dec 2026

Hours 6:00 a.m.–11:00 p.m.

Pomerleau

Amplified And/or Instrument Sound

I Hear Market Street / Winter Market On Market St

559 m away · 92 Front St E · Toronto Centre

Allowed 10 May 2026 – 9 Jan 2027

Hours 9:00 a.m.–11:00 p.m.

Tear down 10 May 2026 – 9 Jan 2027, 9:00 a.m.–11:00 p.m.

Old Town Toronto / St Lawrence Market

Amplified And/or Instrument Sound

Halloween Spooktacular

572 m away · 1 Dundas St E · Toronto Centre

Allowed 31 Oct 2026

Hours 12:00 p.m.–5:00 p.m.

Setup 31 Oct 2026, 8:00 a.m.–12:00 p.m.

Tear down 31 Oct 2026, 5:00 p.m.–10:00 p.m.

Downtown Yonge Business Improvement Area

Amplified And/or Instrument Sound

November 5th Walk-out For Education

605 m away · 25 Gould St · Toronto Centre

Allowed 5 Nov 2026

Hours 12:00 p.m.–3:00 p.m.

Setup 5 Nov 2026, 11:30 p.m.–12:00 p.m.

Tear down 5 Nov 2026, 3:00 p.m.–3:30 p.m.

Ryerson Students' Union

Continuous Concrete Pour

49 Ontario

638 m away · 49 Ontario St · Toronto Centre

Allowed 12 May 2026 – 12 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Dcc 49 Ontario East Inc.

Construction

Construction

638 m away · 49 Ontario St · Toronto Centre

Allowed 30 Sep 2026 – 5 Sep 2027

Hours 7:00 a.m.–10:00 p.m.

Dcc 49 Ontario East Inc.

Amplified And/or Instrument Sound

City Of Toronto Remembrance Day At Old City Hall

680 m away · 60 Queen St W · Toronto Centre

Allowed 11 Nov 2026

Hours 10:45 a.m.–11:45 a.m.

Setup 11 Nov 2026, 4:00 a.m.–10:45 a.m.

Tear down 11 Nov 2026, 11:45 a.m.–1:00 p.m.

City Of Toronto

Amplified And/or Instrument Sound

Berczy Park In Motion

694 m away · 35 Wellington St E · Toronto Centre

Allowed 15 Oct 2026 – 25 Oct 2026

Hours 6:30 p.m.–7:15 p.m., 1:00 p.m.–1:45 p.m.

Setup 7 Oct 2026, 5:30 p.m.–9:00 p.m.; 8 Oct 2026, 5:30 p.m.–9:00 p.m.…

Tear down 15 Oct 2026, 7:15 p.m.–8:30 p.m.; 16 Oct 2026, 7:15 p.m.–8:30 p.m.…

Fall For Dance North Festival Inc.

Amplified And/or Instrument Sound

Old Town Toronto Cavalcade Of Lights

694 m away · 35 Wellington St E · Toronto Centre

Allowed 27 Nov 2026

Hours 5:30 p.m.–6:30 p.m.

Setup 27 Nov 2026, 4:00 p.m.–5:30 p.m.

Tear down 27 Nov 2026, 6:30 p.m.–7:30 p.m.

Old Town Toronto Bia

Amplified And/or Instrument Sound

55th Annual Chariot Fest

695 m away · 4 Edward St · University-Rosedale

Allowed 10 Jul 2027

Hours 10:00 a.m.–1:00 p.m.

Setup 10 Jul 2027, 6:00 a.m.–10:00 a.m.

Tear down 10 Jul 2027, 1:00 p.m.–3:00 p.m.

Iskcon Toronto

Construction

Hoem2

708 m away · 300 Sherbourne St · Toronto Centre

Allowed 2 Sep 2026 – 31 Dec 2026

Hours 7:00 a.m.–7:00 p.m.

Reliance Construction Inc.

Construction

8 Elm Condos

785 m away · 8 Elm St · University-Rosedale

Allowed 1 Jul 2026 – 31 Dec 2026

Hours 6:00 a.m.–9:00 p.m.

8elm Development Limited Partnership

Continuous Concrete Pour

8 Elm Condos

785 m away · 8 Elm St · University-Rosedale

Allowed 1 Jul 2026 – 31 Dec 2026

Hours 7:00 a.m.–11:00 p.m.

8elm Development Limited Partnership

Construction

8 Elm

785 m away · 8 Elm St · University-Rosedale

Allowed 6 Sep 2026 – 25 Oct 2026

Hours 9:00 a.m.–5:00 p.m.

8elm Development Limited Partnership

Construction

8 Elm

785 m away · 8 Elm St · University-Rosedale

Allowed 10 Sep 2026 – 12 Nov 2026

Hours 7:00 p.m.–11:00 p.m.

8elm Development Limited Partnership

Construction

8 Elm Street

785 m away · 8 Elm St · University-Rosedale

Allowed 1 Nov 2026 – 27 Dec 2026

Hours 9:00 a.m.–5:00 p.m.

8elm Development Limited Partnership

Construction

Construction

785 m away · 8 Elm St · University-Rosedale

Allowed 19 Nov 2026 – 31 Dec 2026

Hours 7:00 p.m.–11:00 p.m.

8elm Development Limited Partnership

Amplified And/or Instrument Sound

Long Winter To At Allan Gardens

798 m away · 19 Horticultural Ave · Toronto Centre

Allowed 6 Nov 2026

Hours 6:00 p.m.–12:00 p.m.

Setup 6 Nov 2026, 2:00 p.m.–6:00 p.m.

Tear down 7 Nov 2026, from 1:00 a.m.

Friends Of Allan Gardens

Amplified And/or Instrument Sound

Diwali: Festival Of Lights

819 m away · 100 Queen St W · Spadina-Fort York

Allowed 24 Oct 2026 – 25 Oct 2026

Hours 12:30 p.m.–11:00 p.m.

Setup 22 Oct 2026 – 23 Oct 2026, 9:30 a.m.–9:00 p.m.

Tear down 25 Oct 2026 – 26 Oct 2026, 11:00 p.m.–3:00 a.m.

Global Arts Culture & Heritage Foundation

Events

On the city's calendar. Check before you go.

Arts/ExhibitsHistory

Card Printing on the Historic Press: Holiday Season at Mackenzie House

393 m away · 82 Bond St · Toronto Centre

On 25 Nov 2026 – 31 Dec 2026

Free · Listed days only

Step back in time and experience the magic of card-making in a 19th-century printshop. Learn about the fascinating histo

Add to calendar
HistoryMuseum

Rebellion Talks: Riots & the Rebel Mayor

393 m away · 82 Bond St · Toronto Centre

On 30 Jan 2027

Free

Learn about the riots that shook Toronto to its core in the years before and after the Rebellion of 1837 in the rebel ma

Event pageAdd to calendar
DanceLive Performances

Duende International Flamenco Festival: Flamenco and the World

400 m away · 178 Victoria St · Toronto Centre

On 18 Nov 2026 – 22 Nov 2026

Celebrate flamenco’s global transformation! Experience the vibrant evolution of flamenco, from its regional roots in An

Event pageAdd to calendar
Show 21 moreShow fewer
ComedyFamily/Children

Cinderella

452 m away · 189 Yonge St · Toronto Centre

On 5 Dec 2026 – 3 Jan 2027

Listed days only

The classic story, turned on its heel. Think you’ve outgrown the panto? Think again. Our new take on Cinderella delive

Event pageAdd to calendar
Theatre

887 by Robert Lepage

452 m away · 189 Yonge St · Toronto Centre

On 10 Dec 2026 – 13 Dec 2026

A journey into the realm of memory. Lepage plunges into the depths of memory and questions the relevance of certain rec

Event pageAdd to calendar
Arts/ExhibitsCultural

A Black History of Photography: A Short Introduction with Drew Thompson

537 m away · 80 Gould St · Toronto Centre

On 1 Dec 2026

Free

In this keynote lecture, Dr. Drew Thompson introduces the questions and themes that guide the Black History of Photograp

Event pageAdd to calendar
Arts/ExhibitsCultural

Symposium: A Black History of Photography

548 m away · 122 Bond St · Toronto Centre

On 1 Dec 2026

Free

Join us for a day of talks by international scholars and artists examining photography through the lens of Black history

Event pageAdd to calendar
Food/Culinary

Saturday Farmers' Market

559 m away · 92 Front St E · Toronto Centre

On 14 Nov 2026 – 2 Jan 2027

Free · Listed days only

Visit the Saturday Farmers' Market in the newly redeveloped St. Lawrence Market North building. Discover seasonal produc

Event pageAdd to calendar
Consumer Show/ConventionSeminars/Workshops

Small Business Forum

559 m away · 92 Front St E · Toronto Centre

On 17 Nov 2026

Free

Experience the City of Toronto’s free signature event in support of small businesses. 2026 has been a year of rapid econ

Event pageAdd to calendar
ArtisanFarmers' Market

Winter Market Thursdays

559 m away · 92 Front St E · Toronto Centre

On 19 Nov 2026 – 17 Dec 2026

Free · Listed days only

Discover the magic of the St. Lawrence Winter Market! This free outdoor event transforms the heart of the city into a fe

Event pageAdd to calendar
Arts/ExhibitsFarmers' Market

Winter Market Fridays

559 m away · 92 Front St E · Toronto Centre

On 20 Nov 2026 – 18 Dec 2026

Free · Listed days only

Kick off the weekend at the St. Lawrence Winter Market! This free outdoor event brings holiday magic to the heart of the

Event pageAdd to calendar
Live PerformancesMusic

Friday Night Jazz

559 m away · 92 Front St E · Toronto Centre

On 20 Nov 2026 – 18 Dec 2026

Free · Listed days only

Ease into the weekend with the smooth sounds of live jazz. Join us at the Santa Hut for an evening of music, holiday che

Event pageAdd to calendar
CelebrationsFamily/Children

Ferris Wheel Rides

559 m away · 92 Front St E · Toronto Centre

On 20 Nov 2026 – 22 Nov 2026

Free

Take in the sights of the St. Lawrence Winter Market from above. Enjoy a festive spin on the Ferris Wheel and soak up th

Event pageAdd to calendar
CelebrationsFamily/Children

Weekend Santa Photos

559 m away · 92 Front St E · Toronto Centre

On 21 Nov 2026 – 20 Dec 2026

Free · Listed days only

Make a holiday memory at the St. Lawrence Winter Market with a visit to Santa. Stop by the Santa Hut, share your Christm

Event pageAdd to calendar
Arts/ExhibitsCelebrations

Weekend Photo Bus

559 m away · 92 Front St E · Toronto Centre

On 21 Nov 2026 – 20 Dec 2026

Free · Listed days only

Step aboard the photo bus on Market St. and capture a little holiday magic. Gather your friends and family for a fun, fe

Event pageAdd to calendar
CelebrationsDance

The Alpine Merry Sheep Choir

559 m away · 92 Front St E · Toronto Centre

On 21 Nov 2026 – 20 Dec 2026

Free · Listed days only

Get ready for a baa-rilliant holiday performance! Keep your ears open as the Alpine Merry Sheep Choir roams the market,

Event pageAdd to calendar
ArtisanFarmers' Market

Winter Market Saturdays

559 m away · 92 Front St E · Toronto Centre

On 21 Nov 2026 – 19 Dec 2026

Free · Listed days only

Make a day of holiday fun at the St. Lawrence Winter Market! This free outdoor event transforms the heart of the city in

Event pageAdd to calendar
ArtisanFarmers' Market

Winter Market Sundays

559 m away · 92 Front St E · Toronto Centre

On 22 Nov 2026 – 20 Dec 2026

Free · Listed days only

Spend a festive Sunday at the St. Lawrence Winter Market! Enjoy this free outdoor celebration in the heart of the city,

Event pageAdd to calendar
CelebrationsFamily/Children

Public Skating

559 m away · 92 Front St E · Toronto Centre

On 26 Nov 2026 – 13 Dec 2026

Free · Listed days only

Lace up and embrace the winter season. Enjoy a festive skate and live performances surrounded by the sights, sounds and

Event pageAdd to calendar
CelebrationsFilm

Movie Screenings

559 m away · 92 Front St E · Toronto Centre

On 4 Dec 2026 – 6 Dec 2026

Free

Enjoy a little movie magic at the St. Lawrence Winter Market with the Toronto Outdoor Picture Show. Gather with friends

Event pageAdd to calendar
Arts/ExhibitsArtisan

Antique Market Sundays

559 m away · 92 Front St E · Toronto Centre

On 6 Dec 2026 – 20 Dec 2026

Free · Listed days only

Looking for a gift with a story? Discover unique vintage finds, antique jewellery, beautiful ceramics, collectibles and

Event pageAdd to calendar
CelebrationsFamily/Children

Carousel Rides

559 m away · 92 Front St E · Toronto Centre

On 18 Dec 2026 – 20 Dec 2026

Free

Add a little extra magic to your market visit with a ride on the holiday Carousel. A festive favourite for visitors of a

Event pageAdd to calendar
ArtisanFarmers' Market

Winter Market Monday

559 m away · 92 Front St E · Toronto Centre

On 21 Dec 2026

Free

Keep the holiday spirit going at the St. Lawrence Winter Market! This free outdoor event transforms the heart of the cit

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

134 Jarvis St

0 m away · 134 Jarvis St · Toronto Centre

Asked 2 Sep 2026

Under Review

Proposed 11-space surface commercial parking lot.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Site plan

45 Mutual St

82 m away · 45 Mutual St · Toronto Centre

Asked 1 Apr 2022

Under Review

Site Plan Approval for a 4-storey addition, having a non-residential gross floor area of 779.6 square metres, above the existing 5-storey hotel. The proposed non-residential gross floor area is 1727.2 square metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

139 Church St

169 m away · 139 Church St · Toronto Centre

Asked 21 Sep 2021

Under Review

Site plan approval for a 53-storey mixed-use building having a non-residential gross floor area of 293 square metres, and a residential gross floor area of 30947 square metres. A total of 463 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derek Waltho · [email protected].

Show 21 moreShow fewer
Rezoning

211 Jarvis St

180 m away · 211 Jarvis St · Toronto Centre

Asked 31 Mar 2026

Under Review

This application proposes to amend the Official Plan and Zoning By-law to permit a 32-storey mixed-use building, containing 315 dwelling units (including 38 replacement rental units), approximately 377 sq. m. of non-residential gross floor area and 22,153 sq.m of residential GFA, resulting in a Floor Space Index of…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Abraham Plunkett-Latimer · [email protected].

Rezoning

100 Lombard St

213 m away · 100 Lombard St · Toronto Centre

Asked 18 Aug 2022

OMB Appeal

Zoning By-law Amendment application to permit a 59-storey mixed-use building containing 480 dwelling units, 4,321 square metres of office space, and 616 square metres of retail space.. A Site Plan Application (22 192721 STE 13 SA) has been submitted concurrently with the application.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

86 Lombard St

220 m away · 86 Lombard St · Toronto Centre

Asked 18 Aug 2022

Under Review

Site Plan Control application to permit a 59-storey mixed-use building containing 480 dwelling units, 4,321 square metres of office space, and 616 square metres of retail space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

225 Jarvis St

243 m away · 225 Jarvis St · Toronto Centre

Asked 16 Oct 2020

NOAC Issued

Proposal for a 49-storey mixed-use building comprised of 215 hotel suites, 580 residential dwelling units, and ground floor non-residential uses. The total residential gross floor area is 42,780 square metres, and the total non-residential gross floor area is 13,095 square metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Rezoning

110 Adelaide St E

287 m away · 110 Adelaide St E · Toronto Centre

Asked 28 Feb 2020

OMB Appeal

The application proposes to amend Zoning By-law 569-2013 to permit a 65-storey mixed use building containing 600 residential dwelling units, 330 square metres of office space, and 400 square metres of retail space.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

110 Adelaide St E

287 m away · 110 Adelaide St E · Toronto Centre

Asked 4 Aug 2022

Appeal Received

The Site Plan application to permit a 65-storey mixed use building containing 600 residential dwelling units, 330 square metres of office space, and 400 square metres of retail space.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

150 Sherbourne St

303 m away · 150 Sherbourne St · Toronto Centre

Asked 17 Mar 2023

Under Review

Proposed underground transit station for the Ontario Line at Moss Park.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Vanessa Opassinis · [email protected].

Site plan

150 Sherbourne St

303 m away · 150 Sherbourne St · Toronto Centre

Asked 19 Jan 2024

Under Review

Site Plan Control application for a 7,544.3 square metres City of Toronto community centre to replace the existing John Innes Community Centre.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Site plan

225 Queen St E

324 m away · 225 Queen St E · Toronto Centre

Asked 7 Nov 2021

Appeal Received

Proposed 38-storey mixed-use building containing 355 dwelling units and 455 square metres of retail space.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

66 Bond St

352 m away · 66 Bond St · Toronto Centre

Asked 1 Dec 2021

Under Review

Site Plan Approval for a 6-storey school having a non-residential gross floor area of 7230 square metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derek Waltho · [email protected].

Rezoning

61 Adelaide St E

399 m away · 61 Adelaide St E · Toronto Centre

Asked 28 Nov 2025

Under Review

Combined Official Plan & Zoning By-law Amendment for a new 63-storey mixed-use building, containing approximately 370 dwelling units.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Site plan

239 Dundas St E

400 m away · 239 Dundas St E · Toronto Centre

Asked 18 Mar 2022

Under Review

Site Plan Approval application to facilitate the redevelopment of the site for a 49-storey mixed-use building having a non-residential gross floor area of 198.40 square metres, and a residential gross floor area of 41,363.20 square metres. 678 residential dwelling units are proposed, of which, 8 are rental replacement…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Site plan

218 Dundas St E

421 m away · 218 Dundas St E · Toronto Centre

Asked 28 Sep 2021

Under Review

Site Plan Approval application for a 44-storey mixed-use building comprised of 32,829 square metres of gross floor area including 542 residential dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Condominium plan

218 Dundas St E

421 m away · 218 Dundas St E · Toronto Centre

Asked 25 Oct 2021

Under Review

*** Draft Plan of Condominium for 495 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

214 Sherbourne St

423 m away · 214 Sherbourne St · Toronto Centre

Asked 16 Sep 2022

Under Review

Site Plan Control application to construct a 47-storey tower with a 6-storey prodium containing 66 parking spaces in two levels of below grade parking, 619 dwelling units and a total gross floor area of 41,195.99 square metres, including 481 square metres of community space. The proposal will retain in-situ the…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derek Waltho · [email protected].

Site plan

348 Richmond St E

434 m away · 348 Richmond St E · Toronto Centre

Asked 11 Jun 2021

Under Review

Site Plan Approval for a 25-storey mixed-use building having a non-residential gross floor area of 24,936 square metres, and a residential gross floor area of 35,803 square metres. A total of 446 residential dwelling units, and 180 vehicle parking spaces are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Christy Chow · [email protected].

Rezoning

15 Richmond St E

436 m away · 15 Richmond St E · Toronto Centre

Asked 16 Sep 2022

Appeal Received

Official Plan and Zoning By-law Amendment application to permit a 71-storey mixed-use building containing 126 square metres of retail space on the ground floor and 565 residential dwelling units above.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Christy Chow · [email protected].

Site plan

15 Richmond St E

436 m away · 15 Richmond St E · Toronto Centre

Asked 16 Sep 2022

Under Review

Official Plan and Zoning By-law Amendment application to permit a 71-storey mixed-use building containing 126 square metres of retail space on the ground floor and 565 residential dwelling units above.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Christy Chow · [email protected].

Site plan

237 Victoria St

437 m away · 237 Victoria St · Toronto Centre

Asked 1 Sep 2022

Under Review

Site Plan Approval application for a 24 storey tower with a total of 256 residential dwelling units and a total gross floor area of approximately 17,826 square metres, including 17,410 square metres of residential GFA and 416 square metres of at grade retail GFA fronting onto Victoria Street.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derek Waltho · [email protected].

Rezoning

237 Victoria St

437 m away · 237 Victoria St · Toronto Centre

Asked 1 Sep 2022

Appeal Received

Official Plan Amendment and Zoning By-Law Amendment applications for a 24 storey tower with a total of 256 residential dwelling units and a total gross floor area of approximately 17,826 square metres, including 17,410 square metres of residential GFA and 416 square metres of at grade retail GFA fronting onto Victoria…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Derek Waltho · [email protected].

Site plan

23 Toronto St

447 m away · 23 Toronto St · Toronto Centre

Asked 26 Apr 2023

Under Review

Site Plan Control application to permit a 80 storey mixed use building containing 816 residential dwelling units, 1,599 square metres of retail space, 2,620 square metres of office, and 49 car parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].