Opening this block

Home · Etobicoke-Lakeshore · Van Dusen Blvd

What's new around 211 Van Dusen Blvd

211 Van Dusen Blvd · Etobicoke-Lakeshore. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 1505 homes.

New house

211 Van Dusen Blvd

0 m away · 211 Van Dusen Blvd · Etobicoke-Lakeshore

Approved 19 Nov 2025

1 new home · Sofia Oliveira

The permit lists 1 homes.

PROP. TWO STOREY SINGLE DETACHED DWELLING

New house

176 Van Dusen Blvd

260 m away · 176 Van Dusen Blvd · Etobicoke-Lakeshore

Approved 20 Jan 2025

1 new home

The permit lists 1 homes.

Proposal for a rear addition, new 2nd floor addition, interior alterations, rear convered porch and a front covered porch to an existing SFD-detached dwelling. New House, more than 50% walls demolished.See also 24…

New house

11 Graystone Gdns

310 m away · 11 Graystone Gdns · Etobicoke-Lakeshore

Approved 29 Oct 2026

1 new home · Taha Aziz

The permit lists 1 homes.

Proposal to construct 2 storey SFD with attached garage, finished basement and walkout

Show 21 moreShow fewer
Laneway suite

211 Bering Ave

419 m away · 211 Bering Ave · Etobicoke-Lakeshore

Approved 21 Sep 2026

1 new home

The permit lists 1 homes.

NEW CONSTRUCTION GARDEN SUITE (Unit # GS)

New house

1205 Islington Ave

484 m away · 1205 Islington Ave · Etobicoke-Lakeshore

Approved 2 Nov 2026

2 new homes · Yindy Leon

The permit lists 2 homes.

Proposal for a second storey addition, two storey rear and side additions, a rear deck, and conversion from a single family dwelling to a two family dwelling. New house by renovation due to the demolition of more than…

Apartment

5207 Dundas St W

538 m away · 5207 Dundas St W · Etobicoke-Lakeshore

Approved 27 Feb 2026

725 new homes

The permit lists 725 homes.

Proposal to construct a two-tower 725-unit purpose built-rental apartment community (including 218 affordable housing units).The first tower will have 25 floors while the second will have 29 floors. There will be two…

Laneway suite

29 Monkton Ave

556 m away · 29 Monkton Ave · Etobicoke-Lakeshore

Approved 12 Aug 2026

Proposal to construct a one-storey garden suite, pre-approved plan # GSF-0

Multiple Unit Building

78 Advance Rd

574 m away · 78 Advance Rd · Etobicoke-Lakeshore

Approved 2 Sep 2025

Interior alterations and addition for Office fit-out, scope of work includes HVAC, Plumbing, Structural and Site workAs per the applicant's request scope of work was changed to interior alterations and change of use to…

Multiple Unit Building

15 Summerland Ter

611 m away · 15 Summerland Ter · Etobicoke-Lakeshore

Approved 14 May 2026

REV 01: PROPOSED REMOVE HAIR SALON FROM SCOPEProposal for interior alterations to the main and second floors, including relocation of hair salon space and addition of a servery within the existing lounge

New house

65 Lothian Ave

631 m away · 65 Lothian Ave · Etobicoke-Lakeshore

Approved 28 May 2026

2 new homes · Juraj Slugen

The permit lists 2 homes.

proposal for demolishing the existing 1 1/2-storey single-family detached house and construct a new two storey, two unit dwelling with integral garage, basement walkout, first floor rear deck and a front porch.

New house

70 Eagle Rd

682 m away · 70 Eagle Rd · Etobicoke-Lakeshore

Approved 4 May 2026

2 new homes · Tpm Custom Homes

The permit lists 2 homes.

CONSTRUCT NEW 2-STOREY SFD WITH SECONDARY SUITE

New house

28 Eagle Rd

696 m away · 28 Eagle Rd · Etobicoke-Lakeshore

Approved 19 Feb 2025

1 new home · Properties Unfolded Inc

The permit lists 1 homes.

Proposal to demolish existing dwelling and construct a new two storey single family dwelling with integral garage.

Multiple Unit Building

970 Kipling Ave

726 m away · 970 Kipling Ave · Etobicoke-Lakeshore

Approved 9 Oct 2026

Stand-alone shoring and excavation permit in order to remediate the soil as needed, prior to start of construction of future apartments.

New house

48 Gardenvale Rd

762 m away · 48 Gardenvale Rd · Etobicoke-Lakeshore

Approved 27 Apr 2026

1 new home · Nicks Development Inc

The permit lists 1 homes.

Proposal to demolish existing dwelling and construct a new two storey single family dwelling.

Laneway suite

1081 Islington Ave

767 m away · 1081 Islington Ave · Etobicoke-Lakeshore

Approved 3 Jul 2026

1 new home · 1081 Islington Inc

The permit lists 1 homes.

Proposal to construct a new 2-storey garden suite in the rear(see 26 184328 BLD for main Building - Fourplex)

4 homes

1081 Islington Ave

767 m away · 1081 Islington Ave · Etobicoke-Lakeshore

Approved 14 Jul 2026

4 new homes · 1081 Islington Inc

The permit lists 4 homes.

Proposed new construction of detached 3-storey Houseplex (4 units).(see 26 184353 BLD for Garden suite)

Apartment

12 Cordova Ave

903 m away · 12 Cordova Ave · Etobicoke-Lakeshore

Approved 6 Oct 2026

Part Permit - 24-storey residential building located south of the intersection of Dundas Street West and CordovaAvenue with a total of 325 residential dwelling units and 4 levels of below grade parking and a mix of…

Apartment

15 Cordova Ave

905 m away · 15 Cordova Ave · Etobicoke-Lakeshore

Approved 26 Sep 2025

Rev. 1 - See Cover LetterProposal for the construction of a 27-storey residential condominium (South Tower) with 355 units, being constructed above a foundation belonging to the North Tower

New house

49 Cardigan Rd

912 m away · 49 Cardigan Rd · Etobicoke-Lakeshore

Approved 13 Mar 2026

1 new home · Neff Beautiful Living Inc

The permit lists 1 homes.

Proposal to construct a single family dwelling w/ integral garage

Apartment

5251 Dundas St W

926 m away · 5251 Dundas St W · Etobicoke-Lakeshore

Approved 13 May 2025

552 new homes

The permit lists 552 homes.

Proposed to construct a 50 storey mixed use building

Mixed Use/res W Non Res

5251 Dundas St W

926 m away · 5251 Dundas St W · Etobicoke-Lakeshore

Approved 8 Oct 2026

REV01: Proposed revision green roof has been removed and replaced with a ballasted roof assembly and paversProposed to construct a 50 storey mixed use building

Apartment

4916 Dundas St W

1.0 km away · 4916 Dundas St W · Etobicoke-Lakeshore

Approved 19 Oct 2026

204 new homes

The permit lists 204 homes.

PROPOSED: The construction of a new 9-storey building with underground parking is proposed to be developed over 1 parcel of land. See SPA application 22 139 883 WET 03 SA - 4916-4946 Dundas Street West. The proposed…

Coming down

The city has allowed these buildings to come down. They may still be standing.

Show 11 moreShow fewer
Demolition

159 Van Dusen Blvd

450 m away · 159 Van Dusen Blvd · Etobicoke-Lakeshore

Approved 27 Mar 2025

Distinctively Designed Interiors Inc

Proposed demolition of existing one storey single family dwelling

Demolition

65 Lothian Ave

631 m away · 65 Lothian Ave · Etobicoke-Lakeshore

Approved 28 May 2026

Demolish the existing 1 1/2-storey single-family detached house and construct a new two storey, two unit dwelling

Demolition

70 Eagle Rd

682 m away · 70 Eagle Rd · Etobicoke-Lakeshore

Approved 4 May 2026

DEMOLISH EXISTING 1-STOREY SFD. CONSTRUCT NEW 2-STOREY SFD WITH SECONDARY SUITE

Demolition

28 Eagle Rd

696 m away · 28 Eagle Rd · Etobicoke-Lakeshore

Approved 19 Feb 2025

Proposal to demolish existing detached single family dwelling and replace with two storey single family dwelling with integral garage.

Demolition

49 Cardigan Rd

912 m away · 49 Cardigan Rd · Etobicoke-Lakeshore

Approved 13 Mar 2026

Neff Beautiful Living Inc

Proposal to demolish the existing one storey single family dwelling

Demolition

9 Durban Rd

927 m away · 9 Durban Rd · Etobicoke-Lakeshore

Approved 14 Jan 2025

DEMOLITION OF EXISTING SFD- DETACHED AND ROPOSED A NEW 2 STOREY SFD

Demolition

69 Royalavon Cres

1.0 km away · 69 Royalavon Cres · Etobicoke-Lakeshore

Approved 2 Oct 2026

Proposal to demolish existing building and construct a new two-storey, single family detached dwelling.

Loud nights

Hours the city has already allowed.

Construction

970 Kipling Ave

726 m away · 970 Kipling Ave · Etobicoke-Lakeshore

Allowed 16 Oct 2026 – 16 Apr 2027

Hours 8:00 a.m.–4:00 p.m.

Ellisdon Residential Inc.

Continuous Concrete Pour

Continuous Concrete Pour

903 m away · 12 Cordova Ave · Etobicoke-Lakeshore

Allowed 4 Sep 2026 – 28 Feb 2027

Hours 7:00 a.m.–10:00 p.m.

Minto (cordova) Lp

Show 3 moreShow fewer
Amplified And/or Instrument Sound

Annual Lantern Parade

1.0 km away · 3216 Bloor St W · Etobicoke-Lakeshore

Allowed 13 Nov 2026

Hours 5:00 p.m.–7:00 p.m.

Setup 13 Nov 2026, 4:30 p.m.–5:00 p.m.

Tear down 13 Nov 2026, 7:00 p.m.–7:30 p.m.

Deutsche Schule Toronto

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Condominium plan

36 Fieldway Rd

237 m away · 36 Fieldway Rd · Etobicoke-Lakeshore

Asked 22 Oct 2021

Under Review

*** To permit a 10-storey residential building that contains 123 dwelling units and two below-ground parking levels. The redevelopment proposes 9,791.10 sq. m of total gross floor area (GFA), 247 sq. m of indoor amenity space and 302 sq. m of outdoor amenity space with a Floor Space Index (FSI) of 4.39 times the area…

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Berardo Mascioli · [email protected].

Site plan

36 Fieldway Rd

237 m away · 36 Fieldway Rd · Etobicoke-Lakeshore

Asked 22 Apr 2022

NOAC Issued

Current SPA resubmission proposes 8,060.9 square metres of total gross floor area (GFA), a Floor Space Index (FSI) of 3.62 times the area of the lot, a mix of 135 residential units, 101 vehicle parking spaces, and 102 bicycle parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Subdivision

58 Fieldway Rd

345 m away · 58 Fieldway Rd · Etobicoke-Lakeshore

Asked 8 Oct 2021

Under Review

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Etobicoke York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, Etobicoke Civic Centre.

Write Dominik Matusik · [email protected].

Show 17 moreShow fewer
Site plan

58 Fieldway Rd

345 m away · 58 Fieldway Rd · Etobicoke-Lakeshore

Asked 28 Mar 2023

Under Review

Site Plan application proposing to redevelop the site into a mixed-use community comprised of four tall buildings at 12, 23, 34 and 42 storeys. The proposal introduces a total of 1,340 new residential units and 1,536 square metres of non-residential space. The total gross floor area of the development is 92,466 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dominik Matusik · [email protected].

Site plan

3429 Bloor St W

424 m away · 3429 Bloor St W · Etobicoke-Lakeshore

Asked 17 Jun 2021

NOAC Issued

Site Plan Control application for a new 18-storey (65.08 metre-tall, including mechanical penthouse), 168-unit retirement residence, with a total Gross Floor Area of 16,578 square metres and 71 parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Subdivision

3326 Bloor St W

489 m away · 3326 Bloor St W · Etobicoke-Lakeshore

Asked 16 Dec 2021

Under Review

Bloor Kipling Housing Now: Draft Plan of Subdivision to create two mixed-use development blocks and a new public road connecting Green Lanes and Aberfoyle Crescent.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Etobicoke York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, Etobicoke Civic Centre.

Write Dominik Matusik · [email protected].

Site plan

25 Mabelle Ave

587 m away · 25 Mabelle Ave · Etobicoke-Lakeshore

Asked 21 Sep 2022

OMB Appeal

Proposal to redevelop the site with a 49 storey mixed use building containing 79 square metres of retail gross floor area, 580 residential condominium units and 5 levels of below grade parking. The new building is proposed to be constructed to the west of the existing residential building at 25 Mabelle Avenue.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Anjelica Tzortzos · [email protected].

Site plan

1243 Islington Ave

678 m away · 1243 Islington Ave · Etobicoke-Lakeshore

Asked 14 Sep 2026

Under Review

Proposed 61-storey mixed use building.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Site plan

5134 Dundas St W

685 m away · 5134 Dundas St W · Etobicoke-Lakeshore

Asked 28 Apr 2021

NOAC Issued

Proposal to construct a 5-storey mixed-use building, with a main floor retail/commercial component fronting Dundas Street W. The proposed 30 purpose-built rental units development would provide a mix of 1, 2, and 3-bedroom units. The gross floor area (GFA) of the new building is 2,315 sq m (24,918 sq ft).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Cameron Rose · [email protected].

Site plan

970 Kipling Ave

726 m away · 970 Kipling Ave · Etobicoke-Lakeshore

Asked 2 Jun 2026

NOAC Issued

Proposed 43-storey tower and a 28-storey tower. The Subject Site will include 839 purpose-built rental apartments comprised of 198 affordable units and 641 market units as well as approximately 13,560 SF of retail space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dominik Matusik · [email protected].

Site plan

37 Advance Rd

759 m away · 37 Advance Rd · Etobicoke-Lakeshore

Asked 10 Dec 2015

NOAC Issued

Proposed site/building modifications including parking and landscaping along with building entrance enhancements to provide for non-residential mixed uses (restaurant, office, manufacturing).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Site plan

1276 Islington Ave

835 m away · 1276 Islington Ave · Etobicoke-Lakeshore

Asked 9 Jan 2026

Under Review

Proposed infill development of a 35-storey, 25,700.63 square-metre, purpose-built rental building containing 375 residential units, and 262 parking spaces provided between four levels of underground parking. The existing 12-storey residential building will be retained. The site will have a total gross floor area (GFA)…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Alyssa Hawley · [email protected].

Site plan

4 Beamish Dr

854 m away · 4 Beamish Dr · Etobicoke-Lakeshore

Asked 19 Aug 2025

NOAC Issued

Proposal to develop a 44-storey mixed use building with 530 dwelling units and 240 square metres of non-residential GFA at grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dominik Matusik · [email protected].

Site plan

3825 Bloor St W

881 m away · 3825 Bloor St W · Etobicoke-Lakeshore

Asked 4 Jul 2024

NOAC Issued

The Site Plan Control application is proposing a 36-storey mixed-used building with a six-to-eight-storey base building. The proposal contains 525 units, 1,811 square metres of non-residential gross floor area on the ground floor and three levels of underground parking.This application is Phase 1 of the larger…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dominik Matusik · [email protected].

Condominium plan

12 Cordova Ave

903 m away · 12 Cordova Ave · Etobicoke-Lakeshore

Asked 22 Oct 2021

Under Review

*** Proposed 27 storey building containing 325 residential units and 179 parking spaces in a below-grade parking structure.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Berardo Mascioli · [email protected].

Subdivision

5230 Dundas St W

919 m away · 5230 Dundas St W · Etobicoke-Lakeshore

Asked 4 Nov 2021

Under Review

Proposed development into 4 development blocks, buildings ranging from 10 storeys to 45 storeys, mixed use and containing 2,130 residential apartment units.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Etobicoke York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, Etobicoke Civic Centre.

Write Dominik Matusik · [email protected].

Site plan

1006 Kipling Ave

921 m away · 1006 Kipling Ave · Etobicoke Centre

Asked 24 Dec 2025

Under Review

The proposed development comprises a 7-storey (23.55 metre), 46-unit apartment building, containing 2 studio units (4%), 21 one-bedroom units (46%), and 23 two-bedroom units (50%). A single-storey residential accessory building is proposed in the rear that contains 4 additional studio units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Cameron Rose · [email protected].

Site plan

5238 Dundas St W

946 m away · 5238 Dundas St W · Etobicoke-Lakeshore

Asked 15 Oct 2021

NOAC Issued

Site Plan Control application for a 41 storey mixed-use residential building, comprised of 521 residential units, 421 square metres of at-grade commercial space and a 300 square metre off-site parkland dedication.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Site plan

7 Jopling Ave S

1.0 km away · 7 Jopling Ave S · Etobicoke-Lakeshore

Asked 27 Apr 2023

Under Review

Site Plan Control application for a 39-storey mixed-use building (128.00 m-tall incl. MPH, 25,947 sqm total GFA - 210 sqm non-res GFA) with 438 dwelling units (110 - 2bd, 44 -3bd), 1752 sqm of amenity space and 32 parking spaces (6 visitor, 26 residential).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Site plan

3838 Bloor St W

1.0 km away · 3838 Bloor St W · Etobicoke Centre

Asked 3 Nov 2026

Application Received

Proposed scope of work consists of the conversion of, and addition to, an existing nursing home to accommodate a municipal shelter with 60 beds. The project includes net-zero building retrofits, building envelope upgrades and barrier-free renovations.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stefano Bellissimo · [email protected].