What's new around 835 Kipling Ave

835 Kipling Ave · Etobicoke-Lakeshore. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 17 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 1283 homes.

Multiple Unit Building

78 Advance Rd

609 m away · 78 Advance Rd · Etobicoke-Lakeshore

Approved 2 Sep 2025

Interior alterations and addition for Office fit-out, scope of work includes HVAC, Plumbing, Structural and Site workAs per the applicant's request scope of work was changed to interior alterations and change of use to…

Apartment

5251 Dundas St W

793 m away · 5251 Dundas St W · Etobicoke-Lakeshore

Approved 13 May 2025

552 new homes

The permit lists 552 homes.

Proposed to construct a 50 storey mixed use building

Mixed Use/res W Non Res

5251 Dundas St W

793 m away · 5251 Dundas St W · Etobicoke-Lakeshore

Approved 8 Oct 2026

REV01: Proposed revision green roof has been removed and replaced with a ballasted roof assembly and paversProposed to construct a 50 storey mixed use building

Show 7 moreShow fewer
Apartment

5207 Dundas St W

817 m away · 5207 Dundas St W · Etobicoke-Lakeshore

Approved 27 Feb 2026

725 new homes

The permit lists 725 homes.

Proposal to construct a two-tower 725-unit purpose built-rental apartment community (including 218 affordable housing units).The first tower will have 25 floors while the second will have 29 floors. There will be two…

Industrial

66 Jutland Rd

866 m away · 66 Jutland Rd · Etobicoke-Lakeshore

Approved 23 May 2025

Revision 05 - layout changes for Block A Rev 04 - Structural changes related to the submitted building with repairs/changes see structural, architectural and electrical drawingsREVISION 03 : stuctural changes for block…

New house

211 Van Dusen Blvd

889 m away · 211 Van Dusen Blvd · Etobicoke-Lakeshore

Approved 19 Nov 2025

1 new home · Sofia Oliveira

The permit lists 1 homes.

PROP. TWO STOREY SINGLE DETACHED DWELLING

Transit Station,subway, Bus Terminal

36 North Queen St

929 m away · 36 North Queen St · Etobicoke-Lakeshore

Approved 25 May 2026

Proposal for site trailers with the elevated walkway and canopy roof structure (143.98 sqm) serve as field offices for staff working on the GO Expansion On-Corridor project.

Multiple Unit Building

970 Kipling Ave

940 m away · 970 Kipling Ave · Etobicoke-Lakeshore

Approved 9 Oct 2026

Stand-alone shoring and excavation permit in order to remediate the soil as needed, prior to start of construction of future apartments.

Laneway suite

1081 Islington Ave

1.0 km away · 1081 Islington Ave · Etobicoke-Lakeshore

Approved 3 Jul 2026

1 new home · 1081 Islington Inc

The permit lists 1 homes.

Proposal to construct a new 2-storey garden suite in the rear(see 26 184328 BLD for main Building - Fourplex)

4 homes

1081 Islington Ave

1.0 km away · 1081 Islington Ave · Etobicoke-Lakeshore

Approved 14 Jul 2026

4 new homes · 1081 Islington Inc

The permit lists 4 homes.

Proposed new construction of detached 3-storey Houseplex (4 units).(see 26 184353 BLD for Garden suite)

Coming down

The city has allowed these buildings to come down. They may still be standing.

Loud nights

Hours the city has already allowed.

Construction

970 Kipling Ave

940 m away · 970 Kipling Ave · Etobicoke-Lakeshore

Allowed 16 Oct 2026 – 16 Apr 2027

Hours 8:00 a.m.–4:00 p.m.

Ellisdon Residential Inc.

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

37 Advance Rd

283 m away · 37 Advance Rd · Etobicoke-Lakeshore

Asked 10 Dec 2015

NOAC Issued

Proposed site/building modifications including parking and landscaping along with building entrance enhancements to provide for non-residential mixed uses (restaurant, office, manufacturing).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Subdivision

58 Fieldway Rd

765 m away · 58 Fieldway Rd · Etobicoke-Lakeshore

Asked 8 Oct 2021

Under Review

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Etobicoke York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, Etobicoke Civic Centre.

Write Dominik Matusik · [email protected].

Site plan

58 Fieldway Rd

765 m away · 58 Fieldway Rd · Etobicoke-Lakeshore

Asked 28 Mar 2023

Under Review

Site Plan application proposing to redevelop the site into a mixed-use community comprised of four tall buildings at 12, 23, 34 and 42 storeys. The proposal introduces a total of 1,340 new residential units and 1,536 square metres of non-residential space. The total gross floor area of the development is 92,466 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dominik Matusik · [email protected].

Show 6 moreShow fewer
Site plan

5359 Dundas St W

776 m away · 5359 Dundas St W · Etobicoke-Lakeshore

Asked 28 Apr 2023

NOAC Issued

50-storey mixed-use building, 156.6 metres tall (excluding MPH), with 571 residential units (139 2-bedroom and 57 3-bedroom units), 37,725 square metres of Gross Floor Area, 252 vehicular parking spaces and 439 bicycle parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Site plan

5415 Dundas St W

829 m away · 5415 Dundas St W · Etobicoke-Lakeshore

Asked 27 Dec 2018

NOAC Issued

Site Plan application for Phase 2 of a larger multi-phased development at Dundas Street West and Shorncliffee Road. This application is proposing two towers of 44 and 40-storeys connected by a six storey base building fronting onto a private street. A total of 843 dwelling units, 775 parking spaces, and 845 bicycle…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dominik Matusik · [email protected].

Site plan

5280 Dundas St W

857 m away · 5280 Dundas St W · Etobicoke-Lakeshore

Asked 6 Mar 2025

Under Review

Proposed demolition of the existing building on the subject site and its redevelopment with a 49-storey residential building, inclusive of a 4-storey podium. This proposal comprises 541 residential dwelling units, 47 vehicular parking spacesand 406 bicycle parking spaces, resulting in a total gross floor area of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Site plan

5238 Dundas St W

881 m away · 5238 Dundas St W · Etobicoke-Lakeshore

Asked 15 Oct 2021

NOAC Issued

Site Plan Control application for a 41 storey mixed-use residential building, comprised of 521 residential units, 421 square metres of at-grade commercial space and a 300 square metre off-site parkland dedication.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Anthony Soscia · [email protected].

Site plan

970 Kipling Ave

940 m away · 970 Kipling Ave · Etobicoke-Lakeshore

Asked 2 Jun 2026

NOAC Issued

Proposed 43-storey tower and a 28-storey tower. The Subject Site will include 839 purpose-built rental apartments comprised of 198 affordable units and 641 market units as well as approximately 13,560 SF of retail space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dominik Matusik · [email protected].

Subdivision

5230 Dundas St W

1.0 km away · 5230 Dundas St W · Etobicoke-Lakeshore

Asked 4 Nov 2021

Under Review

Proposed development into 4 development blocks, buildings ranging from 10 storeys to 45 storeys, mixed use and containing 2,130 residential apartment units.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Etobicoke York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, Etobicoke Civic Centre.

Write Dominik Matusik · [email protected].