Opening this block

Home · University-Rosedale · Heath St E

What's new around 235 Heath St E

235 Heath St E · University-Rosedale. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 11 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 381 homes.

New house

235 Heath St E

0 m away · 235 Heath St E · University-Rosedale

Approved 10 Dec 2025

Yachun Liu

REV: Proposed structural alterations - fromt stair pier & beam; steel beams & posts for trimmer joists in 1st floor; conbination beam i 2nd floorProposed a new Single Family Dwelling Three Storey Detached House with a…

Laneway suite

235 Heath St E

0 m away · 235 Heath St E · University-Rosedale

Approved 6 Feb 2026

1 new home

The permit lists 1 homes.

proposal for two storey garden suite with integral garage

New house

56 Garfield Ave

510 m away · 56 Garfield Ave · University-Rosedale

Approved 7 Jan 2026

Sherwood Custom Homes Inc

Rev 01: changes to rear yard pool and cabanaProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 24 204295 DEM, 24 100962 ZAP and 24 120538 MV.

Show 14 moreShow fewer
New house

256 Glenrose Ave

600 m away · 256 Glenrose Ave · University-Rosedale

Approved 14 Feb 2025

Agostino Dicenso

REV02: Proposed revision to add cold room under front porchProposal to construct a New 2-Storey Single Family Dwelling Detached House.Existing house will be demolished.

New house

16 Burnham Rd

676 m away · 16 Burnham Rd · Don Valley West

Approved 21 Sep 2026

2 new homes · Alfa Landmark Developments Inc

The permit lists 2 homes.

proposed two-storey detached houseplex (duplex) with an integral garage, a partially covered front porch, a covered rear deck, and front and rear basement walkouts

New house

39 Heath St E

721 m away · 39 Heath St E · Toronto-St. Paul's

Approved 27 Jul 2026

Sarah Phillips

Part Permit - Proposal to construct a new semi-detached duplex with covered parking space (26.66 m2) and finished basement (99.15 m2).See also 25-250323 DEM 00 DM, 22-129695 ZAP 00 ZR, 23-201328 STE 12 MV

New house

2 Garden Crcl

805 m away · 2 Garden Crcl · Don Valley West

Approved 2 Sep 2025

1 new home · Barry Sambrook

The permit lists 1 homes.

Proposed demolition of existing 2 storey dwelling and new construction of 2 storey dwelling with attached garage and rear covered patio

Apartment

289 Balliol St

815 m away · 289 Balliol St · Toronto-St. Paul's

Approved 17 Apr 2026

REV 01: Proposed to alter approved shoring design to include tiebacks into municipal right of wayPart Permit - Proposal to construct 32-Storey rental residential apartment building with level of underground parking

Multiple Unit Building

140 Merton St

858 m away · 140 Merton St · Toronto-St. Paul's

Approved 18 Jun 2026

Rev 01: Revision to Architectural floor assemblies, Structural and Heritage Drawings.Interior/Exterior alteration for retained heritage component of existing building

Apartment

140 Merton St

858 m away · 140 Merton St · Toronto-St. Paul's

Approved 22 Jul 2026

Part Permit - The Indigenous organization, the Missanabie Cree First Nation, will be developing the site at 140 Merton Street, dedicating the project to housing options for Indigenous elders and other seniors.It will…

Apartment

44 Jackes Ave

887 m away · 44 Jackes Ave · Toronto-St. Paul's

Approved 22 Apr 2025

REV 01: Changes to P1 and P2 parking levels. Relocated electrical room, and extened the elevator lobby. Proposal to construct a 31 storey residential building with 2 levels of below grade parking.

Apartment

1 Delisle Ave

911 m away · 1 Delisle Ave · Toronto-St. Paul's

Approved 15 Sep 2025

371 new homes

The permit lists 371 homes.

Proposal to construct a new 44 storey mixed use building with 371 residential units, 3 levels of non residential uses and 4 levels of below grade parking. The proposal includes the retention of the facade of 1496-1500…

Laneway suite

281 Davisville Ave

939 m away · 281 Davisville Ave · Don Valley West

Approved 1 Dec 2025

1 new home

The permit lists 1 homes.

Proposed rear 2 storey laneway suite

4 homes

281 Davisville Ave

939 m away · 281 Davisville Ave · Don Valley West

Approved 31 Dec 2025

4 new homes · Modcity Construction Ltd

The permit lists 4 homes.

Proposed new construction of 4 unit detached dwelling (fourplex)

New house

15 Heathbridge Park

1.0 km away · 15 Heathbridge Park · Don Valley West

Approved 9 Jul 2025

1 new home

The permit lists 1 homes.

Proposal for 2 Storey Single Family Residential Dwelling

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

16 Burnham Rd

676 m away · 16 Burnham Rd · Don Valley West

Approved 21 Sep 2026

Alfa Landmark Developments Inc

DEMOLITION / NEW DETACHED DUPLEX DWELLING / 172 SQUARE METERS OF FINISH BASEMENT / PLUMBING / DRAIN

Demolition

39 Heath St E

721 m away · 39 Heath St E · Toronto-St. Paul's

Approved 27 Jul 2026

Sarah Phillips

Proposal to demolish existing two-storey single family dwelling and sever lot property into three residential lots.See also 25-250343 00 BLD NH , 25-250400 00 BLD NH , 25-250434 BLD 00 NH ,

Demolition

180 Merton St

801 m away · 180 Merton St · Toronto-St. Paul's

Approved 4 Jun 2026

Proposed demolition of row of townhouses/buildings to accommodate proposed project for 45-storey mixed-use residential building - Re: 170/180 Merton St

Show 5 moreShow fewer
Demolition

295 Balliol St

814 m away · 295 Balliol St · Toronto-St. Paul's

Approved 7 Mar 2025

Demolish an existing 2-storey semi-detached building on the lands municipally known as 293-295 Balliol Street. The lands will be later improved with the construction of a residential apartment building as noted in the…

Demolition

140 Merton St

858 m away · 140 Merton St · Toronto-St. Paul's

Approved 16 Mar 2026

The proposed development involves the demolition of the existing building and parking lot, and the construction of a 28-storey mixed use building with underground parking, outdoor amenity spaces, pedestrian walkways, a…

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

140 Merton Street Development

858 m away · 140 Merton St · Toronto-St. Paul's

Allowed 17 Nov 2026 – 17 May 2027

Hours 7:00 a.m.–11:59 p.m.

Ellisdon Residential Inc.

Events

On the city's calendar. Check before you go.

CelebrationsLive Performances

A Winter's Gathering: Carols, Candles, and Song

948 m away · 1570 Yonge St · Toronto-St. Paul's

On 19 Dec 2026

Join us for an evening of choral music rooted in the Christmas, Hanukkah and winter solstice traditions. Featuring Marc-

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

275 Merton St

684 m away · 275 Merton St · Toronto-St. Paul's

Asked 20 May 2025

NOAC Issued

Site Plan for a 40-storey mixed use purpose built rental building with 494 dwelling units, of which 30% will be affordable rental units. A total gross floor area (GFA) of 31,321 m2 is proposed, including 132 m2 of ground floor non-residential GFA.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

276 Merton St

736 m away · 276 Merton St · Toronto-St. Paul's

Asked 16 Sep 2020

Under Review

INACTIVE Site Plan application to permit a 13-storey building (49.65 metres to the top of the mechanical penthouse). The proposal includes 91 residential units as well as 58 parking spaces (reduced from 92) in a two- level underground parking garage (reduced from 3-levels).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

218 Merton St

762 m away · 218 Merton St · Toronto-St. Paul's

Asked 28 Apr 2022

Under Review

Site Plan Approval for a 40-storey mixed-use building having a non-residential gross floor area of 347.1 square metres, and a residential gross floor area of 28,700 square metres. 434 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Show 21 moreShow fewer
Site plan

180 Merton St

801 m away · 180 Merton St · Toronto-St. Paul's

Asked 14 Mar 2025

Under Review

Site Plan Approval for a 36-storey mixed-use residential building, which includes the partial retention of the existing heritage building at 170 Merton Street. Overall, the proposal includes a total of 400 residential dwelling units and approximately 31,954 square metres of gross floor area, including 198.4 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Subdivision

29 Pleasant Blvd

839 m away · 29 Pleasant Blvd · Toronto-St. Paul's

Asked 19 Oct 2021

Under Review

Draft Plan of Subdivision to create two development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Cameron Williamson · [email protected].

Site plan

1 Heath St E

857 m away · 1 Heath St E · Toronto-St. Paul's

Asked 16 Jun 2026

Under Review

Mixed use development consisting of three towers organized around a central publicly accessible open space (POPS), along with a new 1,560 m² public park at the northwest corner of the site. The development would include 661 residential units, approximately 15,627 m² of retail, restaurant, wellness and other…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dylan Dewsbury · [email protected].

Rezoning

1497 Yonge St

865 m away · 1497 Yonge St · Toronto-St. Paul's

Asked 3 Apr 2019

OMB Appeal

Application to amend the Official Plan and Zoning By-law to permit a mixed-use development consisting of four residential buildings 44, 39, 27, and 13-storeys, a new park at the northwest corner of the site, a courtyard privately owned publicly-accessible space, and a mid-block connection. The buildings will contain…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Dylan Dewsbury · [email protected].

Subdivision

1485 Yonge St

866 m away · 1485 Yonge St · Toronto-St. Paul's

Asked 15 Oct 2021

Under Review

Draft Plan of Subdivision for 4 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Dylan Dewsbury · [email protected].

Rezoning

1 St Clair Ave E

876 m away · 1 St Clair Ave E · Toronto-St. Paul's

Asked 24 Mar 2017

Appeal Received

An Official Plan Amendment (OPA) for the block bound by Yonge Street, St. Clair Avenue East, Pleasant Boulevard and Tamblyn Lane (properties include 1 St. Clair Avenue East and 1407-1431 Yonge Street). The OPA amends the Yonge-St. Clair Secondary Plan to permit 2 towers with a minimum tower separation of 20 metres and…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Jason Tsang · [email protected].

Site plan

185 Balliol St

884 m away · 185 Balliol St · Toronto-St. Paul's

Asked 15 Sep 2020

Under Review

INACTIVE Application for Site Plan Approval of a proposed 35-storey mixed rental residential building, with retail at-grade along Pailton Cres, approximately 437 (previously 449 units) and 32.017.60m2 of GFA (previosuly 33,395m2 of GFA)

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

49 Jackes Ave

888 m away · 49 Jackes Ave · University-Rosedale

Asked 25 Oct 2021

Under Review

Site plan approval for a 19-storey residential building. Related Zoning By-law Amendment application approved at the Ontario Land Tribunal on November 26, 2024, final order pending fulfillment of conditions.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Aviva Pelt · [email protected].

Condominium plan

49 Jackes Ave

888 m away · 49 Jackes Ave · University-Rosedale

Asked 4 Nov 2021

Under Review

*** Draft Plan of Condominium for 217 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

1421 Yonge St

898 m away · 1421 Yonge St · Toronto-St. Paul's

Asked 17 May 2019

Under Review

INACTIVE To construct a 34 storey mixed-use building (height 128 metres including mechanical penthouse).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dylan Dewsbury · [email protected].

Condominium plan

1421 Yonge St

898 m away · 1421 Yonge St · Toronto-St. Paul's

Asked 4 Nov 2021

Under Review

*** Draft Plan of Condominium for 242 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

1560 Yonge St

910 m away · 1560 Yonge St · Toronto-St. Paul's

Asked 25 Sep 2026

Under Review

Proposed four storey community centre with a gross floor area of 6,166sqm.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dylan Dewsbury · [email protected].

Subdivision

155 Balliol St

915 m away · 155 Balliol St · Toronto-St. Paul's

Asked 14 Oct 2021

Under Review

Draft Plan of Subdivision for 3 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Site plan

155 Balliol St

915 m away · 155 Balliol St · Toronto-St. Paul's

Asked 14 Oct 2021

NOAC Issued

Site Plan Approval for a 37-storey mixed-use building having a non-residential gross floor area of 137 square metres and a residential gross floor area of 31095square metres. A total of 442 new residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

59 Lawton Blvd

925 m away · 59 Lawton Blvd · Toronto-St. Paul's

Asked 25 Feb 2025

Under Review

Site Plan Approval for two new 38 and 43-storey residential buildings. The proposed development will be comprised of 706 residential units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Cameron Williamson · [email protected].

Rezoning

61 Lawton Blvd

932 m away · 61 Lawton Blvd · Toronto-St. Paul's

Asked 25 Feb 2025

OMB Appeal

OLT Interim Order for Approval of two new 37 and 38-storey residential buildings subject to fulfillment of conditions.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Cameron Williamson · [email protected].

Site plan

1365 Yonge St

935 m away · 1365 Yonge St · Toronto-St. Paul's

Asked 30 Jun 2020

Under Review

The City has received a revised Site Plan Control application for a 50-storey mixed-use building containing 655 dwelling units with a residential gross floor area of 45,535 square metres, and 385 square metres of commercial GFA. A previous OPA and rezoning application for a 17-storey mixed-use building was approved in…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Dylan Dewsbury · [email protected].

Site plan

141 Davisville Ave

936 m away · 141 Davisville Ave · Toronto-St. Paul's

Asked 22 Jun 2022

Under Review

Proposed 32-storey infill tower. The existing 20-storey. 313-unit rental apartment building currently on site will be retained. The proposed building will include approximately 423 new dwelling units (in a mix of studio, one-bedroom, two-bedroom, and three-bedroom units) across 24,026 square metres of residential…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Rezoning

1 St Clair Ave W

937 m away · 1 St Clair Ave W · Toronto-St. Paul's

Asked 17 Dec 2021

OMB Appeal

Zoning By-law Amendment application to permit a 49-storey mixed use building with 340 residential units.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Dylan Dewsbury · [email protected].