Being built

The city has allowed these. Work may not have started. The permits in this area list 567 homes.

Multiple Unit Building

140 Merton St

143 m away · 140 Merton St · Toronto-St. Paul's

Approved 18 Jun 2026

Rev 01: Revision to Architectural floor assemblies, Structural and Heritage Drawings.Interior/Exterior alteration for retained heritage component of existing building

Apartment

140 Merton St

143 m away · 140 Merton St · Toronto-St. Paul's

Approved 22 Jul 2026

Part Permit - The Indigenous organization, the Missanabie Cree First Nation, will be developing the site at 140 Merton Street, dedicating the project to housing options for Indigenous elders and other seniors.It will…

Show 21 moreShow fewer
Apartment

289 Balliol St

297 m away · 289 Balliol St · Toronto-St. Paul's

Approved 17 Apr 2026

REV 01: Proposed to alter approved shoring design to include tiebacks into municipal right of wayPart Permit - Proposal to construct 32-Storey rental residential apartment building with level of underground parking

New house

12 Cuthbert Cres

353 m away · 12 Cuthbert Cres · Toronto-St. Paul's

Approved 20 May 2025

2 new homes

The permit lists 2 homes.

Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH

Apartment

30 Merton St

385 m away · 30 Merton St · Toronto-St. Paul's

Approved 6 Oct 2025

322 new homes

The permit lists 322 homes.

37 storey mixed use building containing commercial uses on the ground floor, 322 dwelling units, two level mechanical penthouse, indoor and outdoor amenity areas and three levels of underground parking.

Mixed Use/res W Non Res

30 Merton St

385 m away · 30 Merton St · Toronto-St. Paul's

Approved 16 Mar 2026

Revision 01: Proposal to revision transformer room and elevator level - see letters for details37 storey mixed use building containing commercial uses on the ground floor, 322 dwelling units, two level mechanical…

New house

11 Oswald Cres

422 m away · 11 Oswald Cres · Toronto-St. Paul's

Approved 11 Sep 2026

2 new homes · 16230288 Canada Inc

The permit lists 2 homes.

TO CONSTRUCT A NEW TWO STOREY DUPLEX

Multiple Unit Building

1951 Yonge St

428 m away · 1951 Yonge St · Toronto-St. Paul's

Approved 21 May 2026

Shoring and excavation for remediation purposes

Laneway suite

281 Davisville Ave

472 m away · 281 Davisville Ave · Don Valley West

Approved 1 Dec 2025

1 new home

The permit lists 1 homes.

Proposed rear 2 storey laneway suite

4 homes

281 Davisville Ave

472 m away · 281 Davisville Ave · Don Valley West

Approved 31 Dec 2025

4 new homes · Modcity Construction Ltd

The permit lists 4 homes.

Proposed new construction of 4 unit detached dwelling (fourplex)

Multiple Unit Building

1920 Yonge St

489 m away · 1920 Yonge St · Toronto-St. Paul's

Approved 20 Apr 2026

Proposal for interior alterations to existing office space - UNIT 500

Multiple Unit Building

1995 Yonge St

496 m away · 1995 Yonge St · Toronto-St. Paul's

Approved 20 Mar 2026

Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.

Multiple Unit Building

598 Mount Pleasant Rd

582 m away · 598 Mount Pleasant Rd · Toronto-St. Paul's

Approved 24 Jul 2026

Rear addition. Commercial building. Ground floor medical office; second storey office

New house

131 Hillsdale Ave E

616 m away · 131 Hillsdale Ave E · Toronto-St. Paul's

Approved 23 Jul 2026

Nikan Sharif-zadeh

REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…

Laneway suite

34 Hadley Rd

623 m away · 34 Hadley Rd · Don Valley West

Approved 17 Dec 2025

1 new home

The permit lists 1 homes.

Proposal to construct a new detached laneway suite.

New house

52 Imperial St

630 m away · 52 Imperial St · Toronto-St. Paul's

Approved 21 Jan 2025

1 new home · Haddington Developments Inc

The permit lists 1 homes.

REV 01 - Revision for 1 - washroom added in lower basement level.2 - increased size of mech. space in attic.3 - ground floor FFE was slightly raised. All other floor heights are unchanged.4 - grading plan has been…

New house

19 Colin Ave

664 m away · 19 Colin Ave · Toronto-St. Paul's

Approved 9 Oct 2025

1 new home · Sierra Custom Homes

The permit lists 1 homes.

Proposal to demolish existing dwelling and construct a new 2 storey dwelling.

Multiple Unit Building

2150 Yonge St

775 m away · 2150 Yonge St · Toronto-St. Paul's

Approved 3 Sep 2026

Revision 1: Revision to the building permit illustrating the pre-fire and post-repair ceiling height at the base of the basement staircaseProposed fire damage repairs. Scope includes removal and replacement of gypsum,…

Multiple Unit Building

688 Mount Pleasant Rd

791 m away · 688 Mount Pleasant Rd · Toronto-St. Paul's

Approved 6 Nov 2026

Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty…

Apartment

2161 Yonge St

839 m away · 2161 Yonge St · Toronto-St. Paul's

Approved 22 Jul 2025

31 new homes

The permit lists 31 homes.

REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA

New house

12 Walmsley Blvd

846 m away · 12 Walmsley Blvd · Toronto-St. Paul's

Approved 15 Apr 2026

1 new home

The permit lists 1 homes.

Rev 01 - 2nd unit in basement and a change from a metal structure to an all-wood structure.Proposal to demolish existing and construct a new 3 storey single family dwelling.

New house

88 Colin Ave

846 m away · 88 Colin Ave · Toronto-St. Paul's

Approved 1 Jun 2026

1 new home · Georgina Myers

The permit lists 1 homes.

To construct a new single family dwelling

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

140 Merton St

143 m away · 140 Merton St · Toronto-St. Paul's

Approved 16 Mar 2026

The proposed development involves the demolition of the existing building and parking lot, and the construction of a 28-storey mixed use building with underground parking, outdoor amenity spaces, pedestrian walkways, a…

Demolition

180 Merton St

146 m away · 180 Merton St · Toronto-St. Paul's

Approved 4 Jun 2026

Proposed demolition of row of townhouses/buildings to accommodate proposed project for 45-storey mixed-use residential building - Re: 170/180 Merton St

Demolition

295 Balliol St

312 m away · 295 Balliol St · Toronto-St. Paul's

Approved 7 Mar 2025

Demolish an existing 2-storey semi-detached building on the lands municipally known as 293-295 Balliol Street. The lands will be later improved with the construction of a residential apartment building as noted in the…

Show 12 moreShow fewer
Demolition

21 Imperial St

511 m away · 21 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.

Demolition

25 Imperial St

525 m away · 25 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposed demolition of the existing 5-storey commercial building.

Demolition

68 Soudan Ave

776 m away · 68 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

66 Soudan Ave

777 m away · 66 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

64 Soudan Ave

778 m away · 64 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

62 Soudan Ave

779 m away · 62 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

60 Soudan Ave

780 m away · 60 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey dwelling for City Parkland Dedication

Demolition

88 Colin Ave

846 m away · 88 Colin Ave · Toronto-St. Paul's

Approved 2 Jun 2026

Rl Urban Innovations Inc

Proposal to demolish existing single family dwelling.

Demolition

38 Walmsley Blvd

874 m away · 38 Walmsley Blvd · Toronto-St. Paul's

Approved 16 Oct 2026

Madeline Louise Cole

Proposal to demolish the existing 2 storey SFD-detached dwelling.

Demolition

61 Brownlow Ave

932 m away · 61 Brownlow Ave · Toronto-St. Paul's

Approved 24 Sep 2025

Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)

Demolition

39 Heath St E

1.0 km away · 39 Heath St E · Toronto-St. Paul's

Approved 27 Jul 2026

Sarah Phillips

Proposal to demolish existing two-storey single family dwelling and sever lot property into three residential lots.See also 25-250343 00 BLD NH , 25-250400 00 BLD NH , 25-250434 BLD 00 NH ,

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

140 Merton Street Development

143 m away · 140 Merton St · Toronto-St. Paul's

Allowed 17 Nov 2026 – 17 May 2027

Hours 7:00 a.m.–11:59 p.m.

Ellisdon Residential Inc.

Continuous Concrete Pour

30 Merton

385 m away · 30 Merton St · Toronto-St. Paul's

Allowed 2 Jul 2026 – 31 Dec 2026

Hours 7:00 a.m.–11:59 p.m.

Skygrid Construction Inc.

Continuous Concrete Pour

8 Brownlow Avenue (northwest Of Brownlow And Souda

816 m away · 8 Brownlow Ave · Toronto-St. Paul's

Allowed 1 May 2026 – 30 Oct 2026

Hours 7:00 a.m.–12:30 a.m.

Soudan-brownlow Properties

Show 2 moreShow fewer
Construction

Canada Square Office Retrofit

864 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 10 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:00 p.m.

Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.

Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.

Ellisdon Corporation

Construction

Canada Square Office Retrofit

864 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 1 Nov 2026 – 30 Jun 2027

Hours from 7:00 p.m.

Ellisdon Corporation

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

141 Davisville Ave

0 m away · 141 Davisville Ave · Toronto-St. Paul's

Asked 22 Jun 2022

Under Review

Proposed 32-storey infill tower. The existing 20-storey. 313-unit rental apartment building currently on site will be retained. The proposed building will include approximately 423 new dwelling units (in a mix of studio, one-bedroom, two-bedroom, and three-bedroom units) across 24,026 square metres of residential…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Site plan

185 Balliol St

55 m away · 185 Balliol St · Toronto-St. Paul's

Asked 15 Sep 2020

Under Review

INACTIVE Application for Site Plan Approval of a proposed 35-storey mixed rental residential building, with retail at-grade along Pailton Cres, approximately 437 (previously 449 units) and 32.017.60m2 of GFA (previosuly 33,395m2 of GFA)

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Subdivision

155 Balliol St

118 m away · 155 Balliol St · Toronto-St. Paul's

Asked 14 Oct 2021

Under Review

Draft Plan of Subdivision for 3 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Show 21 moreShow fewer
Site plan

155 Balliol St

118 m away · 155 Balliol St · Toronto-St. Paul's

Asked 14 Oct 2021

NOAC Issued

Site Plan Approval for a 37-storey mixed-use building having a non-residential gross floor area of 137 square metres and a residential gross floor area of 31095square metres. A total of 442 new residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

180 Merton St

146 m away · 180 Merton St · Toronto-St. Paul's

Asked 14 Mar 2025

Under Review

Site Plan Approval for a 36-storey mixed-use residential building, which includes the partial retention of the existing heritage building at 170 Merton Street. Overall, the proposal includes a total of 400 residential dwelling units and approximately 31,954 square metres of gross floor area, including 198.4 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Site plan

218 Merton St

177 m away · 218 Merton St · Toronto-St. Paul's

Asked 28 Apr 2022

Under Review

Site Plan Approval for a 40-storey mixed-use building having a non-residential gross floor area of 347.1 square metres, and a residential gross floor area of 28,700 square metres. 434 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

276 Merton St

284 m away · 276 Merton St · Toronto-St. Paul's

Asked 16 Sep 2020

Under Review

INACTIVE Site Plan application to permit a 13-storey building (49.65 metres to the top of the mechanical penthouse). The proposal includes 91 residential units as well as 58 parking spaces (reduced from 92) in a two- level underground parking garage (reduced from 3-levels).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

33 Davisville Ave

303 m away · 33 Davisville Ave · Toronto-St. Paul's

Asked 14 Jun 2022

Under Review

Site Plan Approval for proposed 6-storey (22.5 metre) base building and 33-storey tower element, which will have a total height of 125.0 metres to the top of the roof and 132.0 metres to the top of the mechanical penthouse. The building will contain total of 526 residential dwelling units and 30,786 square metres of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Site plan

275 Merton St

308 m away · 275 Merton St · Toronto-St. Paul's

Asked 20 May 2025

NOAC Issued

Site Plan for a 40-storey mixed use purpose built rental building with 494 dwelling units, of which 30% will be affordable rental units. A total gross floor area (GFA) of 31,321 m2 is proposed, including 132 m2 of ground floor non-residential GFA.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

64 Merton St

323 m away · 64 Merton St · Toronto-St. Paul's

Asked 22 Apr 2022

Under Review

Site Plan Approval application to permit a 40-storey mixed use building with 505 residential units. One of two existing buidlings on the site would be demolished. Heritage retention is involved.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Site plan

45 Balliol St

341 m away · 45 Balliol St · Toronto-St. Paul's

Asked 8 Nov 2021

Under Review

Site Plan approval application for a 40-storey residential building having a gross floor area of 34,000 square metres, and containing 477 residential dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Subdivision

45 Balliol St

341 m away · 45 Balliol St · Toronto-St. Paul's

Asked 8 Nov 2021

Under Review

3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Condominium plan

50 Merton St

353 m away · 50 Merton St · Toronto-St. Paul's

Asked 3 Nov 2021

Under Review

*** Draft plan of condominium for 443 units.There is a concurrent Zoning By-law Amendment application which is currently under review

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Cameron Williamson · [email protected].

Rezoning

50 Merton St

353 m away · 50 Merton St · Toronto-St. Paul's

Asked 31 Aug 2022

Appeal Received

Official Plan Amendment application to permit a 46-storey mixed use building with 581residential units, with site-specific relief from office replacement policy requirements of Yonge-Eglinton Seciondary Plan.Related File: 21 233897 STE 12

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Holli Butrimas · [email protected].

Subdivision

22 Balliol St

362 m away · 22 Balliol St · Toronto-St. Paul's

Asked 2 Nov 2021

Under Review

Draft Plan of Subdivision for 3 stratified development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Site plan

22 Balliol St

362 m away · 22 Balliol St · Toronto-St. Paul's

Asked 19 Apr 2022

Under Review

Site Plan Approval for a 40-storey mixed-use building having a non-residential gross floor area of 1111 square metres, and a residential gross floor area of 27,761 square metres. 414 rental residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Site plan

1951 Yonge St

428 m away · 1951 Yonge St · Toronto-St. Paul's

Asked 1 Aug 2023

NOAC Issued

Proposed 38 and 45 storey towers, plus MPH, totaling 59,998.22 sq.m. residential GFA and 5,873.08 sq.m. non-residential for an FSI of 11.47. 818 units are proposed and 336 parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

1910 Yonge St

467 m away · 1910 Yonge St · Toronto-St. Paul's

Asked 5 Nov 2021

Under Review

Zoning By-law Amendment application to facilitate the redevelopment of the site for a mixed-use building comprised of two towers having heights of 53 and 48-storeys, inclusive of a 10-storey podium. The proposed non-residential gross floor area is 15,796.29 square metres, and the proposed residential gross floor area…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Subdivision

1910 Yonge St

467 m away · 1910 Yonge St · Toronto-St. Paul's

Asked 5 Nov 2021

Under Review

Draft Plan of Subdivision for 1 block.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Rezoning

1962 Yonge St

490 m away · 1962 Yonge St · Toronto-St. Paul's

Asked 27 Feb 2026

Under Review

Zoning By-law Amendment for a 45-storey mixed-use building. The building will contain 379 residential units, 9 of which are rental replacement units, with commercial at grade.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Cameron Williamson · [email protected].

Site plan

1984 Yonge St

511 m away · 1984 Yonge St · Toronto-St. Paul's

Asked 22 Dec 2016

NOAC Issued

Site Plan Approval for a mixed-use building: 9 storeys, retail at-grade, 1032 square metres of non-residential (office) gross floor area, and 20 rental dwelling units. Two surface car-parking spaces are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Site plan

21 Imperial St

511 m away · 21 Imperial St · Toronto-St. Paul's

Asked 8 Oct 2021

Under Review

Site Plan Application for a 19-storey mixed-use building containing 228 residential dwelling units, 56 square metres of ground floor retail space, and two levels of underground parking. Two ground level units will have expanded home occupation (live/work) permissions.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Site plan

551 Mount Pleasant Rd

553 m away · 551 Mount Pleasant Rd · Don Valley West

Asked 3 Feb 2023

Under Review

Proposal to fully renovate and partially reconstruct the existing theatre. The existing historic front (west) facade fronting on Mount Pleasant Road will be retained. Construction plans include a new roof, full/new excavated basement, replacing the north, east and south walls, and full interior renovation. A new, 3…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Diane Pi · [email protected].

Rezoning

2010 Yonge St

561 m away · 2010 Yonge St · Toronto-St. Paul's

Asked 8 Nov 2021

Appeal Received

Zoning By-law amendment for a 14-storey mixed-use building having a non-residential gross floor area of 1,453 square metres, and a residential gross floor area of 21,757 square metres. 274 residential units are proposed.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].