Aisle 24
135 m away · 88 Erskine Ave · Don Valley West
Approved 16 Sep 2025
Opening this block
Home · Don Valley West · Erskine Ave
55 Erskine Ave · Don Valley West. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
135 m away · 88 Erskine Ave · Don Valley West
Approved 16 Sep 2025
182 m away · 2433 Yonge St · Don Valley West
Approved 18 Mar 2026
183 m away · 2469 Yonge St · Don Valley West
Approved 21 Jul 2026
183 m away · 2439 Yonge St · Don Valley West
Approved 19 Nov 2025
184 m away · 2447 Yonge St · Don Valley West
Approved 23 Jun 2026
184 m away · 2429 Yonge St · Don Valley West
Approved 20 Oct 2026
192 m away · 2415 Yonge St · Don Valley West
Approved 22 Aug 2025
199 m away · 2481 Yonge St · Don Valley West
Approved 31 Oct 2026
202 m away · 2409 Yonge St · Don Valley West
Approved 30 May 2026
207 m away · 2487 Yonge St · Don Valley West
Approved 15 Sep 2026
211 m away · 2499 Yonge St · Don Valley West
Approved 14 Nov 2025
212 m away · 2497 Yonge St · Don Valley West
Approved 25 May 2026
220 m away · 2393 Yonge St · Don Valley West
Approved 1 Jul 2025
231 m away · 12 Keewatin Ave · Don Valley West
Approved 22 Aug 2026
268 m away · 2525 Yonge St · Don Valley West
Approved 18 Apr 2026
270 m away · 2529 Yonge St · Don Valley West
Approved 21 May 2026
281 m away · 140 Erskine Ave · Don Valley West
Approved 24 Apr 2026
286 m away · 2537 Yonge St · Don Valley West
Approved 13 Oct 2026
291 m away · 2355 Yonge St · Toronto-St. Paul's
Approved 6 Sep 2025
303 m away · 2528 Yonge St · Eglinton-Lawrence
Approved 27 Oct 2026
304 m away · 2545 Yonge St · Don Valley West
Approved 1 Sep 2026
321 m away · 2335 Yonge St · Toronto-St. Paul's
Approved 12 Apr 2026
321 m away · 2335 Yonge St · Toronto-St. Paul's
Approved 3 Jun 2026
324 m away · 2555 Yonge St · Don Valley West
Approved 23 Mar 2026
A permit application that names a shop. It is not a licence and not an opening day.
317 m away · 2551 Yonge St · Don Valley West
Applied 8 Aug 2025
Inspection
Interior renovation - NEW "SPIN STUDIO"
The city has allowed these. Work may not have started. The permits in this area list 1705 homes.
161 m away · 109 Erskine Ave · Don Valley West
Approved 28 Oct 2025
Rev 02 Revision 01: To units on floors A208, A211, A212, A215, A217, A218, A220 - Gym area on the 2nd floor has been revised - Bike locker room configurations on the parking levels have been revised.Construct 22-storey…
193 m away · 65 Broadway Ave · Toronto-St. Paul's
Approved 23 Jan 2025
Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.
212 m away · 38 Keewatin Ave · Don Valley West
Approved 20 Aug 2026
1 new home
The permit lists 1 homes.
Proposed 2 storey garden suite
233 m away · 241 Redpath Ave · Don Valley West
Approved 10 Jul 2026
Part Permit - Proposal to demolish existing apartment building and construct a 38 storey apartment building containing 356 units of which 310 condominium apartments, 46 rental-replacement apartments interior and…
239 m away · 2472 Yonge St · Eglinton-Lawrence
Approved 7 Aug 2026
Revison to basement layout changes, ground floor washroom changes, duct shaft detailProposed interior alterations to create 3 units (2 restaurants and 1 retail store) in existing 2 storeys 1 unit commercial building
253 m away · 100 Broadway Ave · Don Valley West
Approved 5 May 2026
Proposal for interior alterations to fit new tenant
269 m away · 2400 Yonge St · Eglinton-Lawrence
Approved 22 Oct 2025
Conditional Permit - Part Permit - To construct 27 Storey - South Tower mixed use residential (rental) with shared podium, two levels below grade parking for total of 385 rental units.
288 m away · 110 Broadway Ave · Don Valley West
Approved 2 Feb 2026
869 new homes
The permit lists 869 homes.
Proposed construction of 26 Storey North Tower consisting of 352 Units & 37 Storey South Tower consisting of 506 Units with 2 Levels of U/G Parking. See permit 2020 201517 BLD 00 NB for 100 Broadway Ave for underground…
323 m away · 170 Roehampton Ave · Toronto-St. Paul's
Approved 28 Jul 2026
599 new homes
The permit lists 599 homes.
Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.
341 m away · 117 Broadway Ave · Toronto-St. Paul's
Approved 12 Dec 2025
Proposed construction of exterior raised wood deck platform c/w wood trellis & wood screen along with exterior counter feed from existing exterior base building services.
441 m away · 83 Sheldrake Blvd · Don Valley West
Approved 25 Apr 2025
Georgina Myers
Revision # 1 to - architectural and structural revisions to the cabanaProposal to construct a new three storey SFD-Detached and a rear cabana.
462 m away · 176 Eglinton Ave E · Toronto-St. Paul's
Approved 9 Oct 2026
1 new home
The permit lists 1 homes.
Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.
468 m away · 8 Eglinton Ave E · Toronto-St. Paul's
Approved 19 Oct 2026
Proposal for interior alterations to vacant unit RU05 into a Group E (Acai Shop).
496 m away · 2300 Yonge St · Eglinton-Lawrence
Approved 6 Aug 2026
proposal for localized concrete repairs and waterproofing renewal at the parking garage helical ramp
497 m away · 4 Brynhurst Crt · Don Valley West
Approved 9 Sep 2025
1 new home
The permit lists 1 homes.
Proposal to demolish the existing dwelling and construct a new 3 storey dwelling
503 m away · 89 Dunfield Ave · Toronto-St. Paul's
Approved 5 Mar 2026
Proposal for waterproofing and concrete repairs
535 m away · 75 Castlefield Ave · Eglinton-Lawrence
Approved 31 Mar 2025
1 new home
The permit lists 1 homes.
Proposed new construction of two-storey detached dwelling with an integral garage, front porch, rear deck and rear basement walkout, rear balcony.
539 m away · 100 Briar Hill Ave · Eglinton-Lawrence
Approved 6 Oct 2025
1 new home · John Mcnain
The permit lists 1 homes.
Proposed 3 storey detached dwelling
602 m away · 2200 Yonge St · Toronto-St. Paul's
Approved 27 May 2026
Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage
609 m away · 98 Castlefield Ave · Eglinton-Lawrence
Approved 29 Jul 2025
1 new home
The permit lists 1 homes.
Propose demolishing 1 storey dwelling to construct new 3 storey dwelling
627 m away · 2191 Yonge St · Toronto-St. Paul's
Approved 1 May 2026
Proposal for interior alterations to first floor and third floor amenities area
651 m away · 129 Blythwood Rd · Don Valley West
Approved 14 Jan 2026
1 new home
The permit lists 1 homes.
Proposal to convert existing garage into garden suite
682 m away · 172 Briar Hill Ave · Eglinton-Lawrence
Approved 1 Apr 2026
1 new home · Edward Dominic Sopko
The permit lists 1 homes.
Proposal to construct a new 2-storey detached single family dwelling with integral at grade garage. demolish existing detached dwelling and garage
698 m away · 291 Sheldrake Blvd · Don Valley West
Approved 3 Jun 2026
Antonio Della Sciucca
REV 01: PROPOSED REVISION TO EXISTING BUILDING PERMIT- NEW PROPOSAL IS A COMPLETE REDESIGN TO THE FLOOR PLANS, ELEVATIONS, HEIGHT, REDUCED LENGTH, FRONT YARD PARKING- ALL APPROVED VARIANCES REMAIN AS APPROVED DURING…
The city has allowed these buildings to come down. They may still be standing.
320 m away · 34 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
325 m away · 36 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
331 m away · 40 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
336 m away · 42 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
342 m away · 46 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
346 m away · 48 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
354 m away · 52 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
360 m away · 39 Montgomery Ave · Eglinton-Lawrence
Approved 4 Mar 2026
Proposal to demolish existing SFD with no replacement building for future Park Development
360 m away · 54 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
367 m away · 58 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
372 m away · 60 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
380 m away · 64 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
383 m away · 66 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
389 m away · 70 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
398 m away · 55 Montgomery Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Proposal to demolish the existing 2 storey SFD-detached dwelling.
404 m away · 57 Montgomery Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Proposal to demolish the existing 2 storey SFD-semi dwelling.See also 23 176474 NNY 08 OZ
615 m away · 29 Henning Ave · Eglinton-Lawrence
Approved 25 Aug 2025
Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.
615 m away · 31 Henning Ave · Eglinton-Lawrence
Approved 25 Aug 2025
Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.
622 m away · 25 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
624 m away · 27 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
624 m away · 23 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
628 m away · 21 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
635 m away · 17 Henning Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
637 m away · 19 Henning Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
Hours the city has already allowed.
233 m away · 241 Redpath Ave · Don Valley West
Allowed 9 Sep 2026 – 31 Mar 2027
Hours from 7:00 p.m.
Bluescape 241 Redpath Inc.
233 m away · 241 Redpath Ave · Don Valley West
Allowed 16 Oct 2026 – 26 Oct 2026
Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.
Bluescape 241 Redpath Inc.
233 m away · 241 Redpath Ave · Don Valley West
Allowed 2 Nov 2026 – 18 Nov 2026
Hours 7:00 a.m.–10:00 p.m.
Bluescape 241 Redpath Inc.
269 m away · 2400 Yonge St · Eglinton-Lawrence
Allowed 1 Jan 2026 – 31 Dec 2026
Hours 6:00 a.m.–10:00 p.m.
Skygrid Construction Inc
306 m away · 20 Castlefield Ave · Eglinton-Lawrence
Allowed 31 Oct 2026
Hours 10:00 a.m.–3:00 p.m.
Setup 31 Oct 2026, 6:00 a.m.–10:00 a.m.
Tear down 31 Oct 2026, 3:00 p.m.–6:00 p.m.
Uptown Yonge Bia
323 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 7 Aug 2026 – 7 Feb 2027
Hours from 7:00 p.m.
Clark Construction Management Inc.
323 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 21 Oct 2026 – 21 Jan 2027
Hours from 6:00 a.m.
Clark Construction Management Inc.
352 m away · 14 St Clements Ave · Eglinton-Lawrence
Allowed 20 Nov 2026
Hours 5:00 p.m.–8:00 p.m.
Setup 20 Nov 2026, 4:30 p.m.–5:00 p.m.
Tear down 20 Nov 2026, 8:00 p.m.–8:15 p.m.
Uptown Yonge Bia
741 m away · 8 Brownlow Ave · Toronto-St. Paul's
Allowed 1 May 2026 – 30 Oct 2026
Hours 7:00 a.m.–12:30 a.m.
Soudan-brownlow Properties
749 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 10 Jul 2026 – 31 Oct 2026
Hours 7:00 p.m.–11:00 p.m.
Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.
Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.
Ellisdon Corporation
749 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 1 Nov 2026 – 30 Jun 2027
Hours from 7:00 p.m.
Ellisdon Corporation
On the city's calendar. Check before you go.
678 m away · 35 Lytton Blvd · Eglinton-Lawrence
On 2 Dec 2026 – 5 Dec 2026
Listed days only
Celebrate the season in grand style with the timeless sound of brass, organ and choir. Glorious carols, rich harmonies a
Event pageAdd to calendar856 m away · 200 Eglinton Ave W · Eglinton-Lawrence
On 21 Nov 2026
Free
Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle
Add to calendarSomeone has asked the city for a change. Nothing here is a decision.
0 m away · 55 Erskine Ave · Don Valley West
Asked 18 Apr 2017
NOAC Issued
LPAT settlement and revised proposal for an 11-storey rental residential building, fronting onto Broadway Avenue which steps down in height towards Broadway Avenue. The site includes a new public park (284.2 sq. m in size). The proposed building will have a gross floor area of 9,226 sq. m resulting in an overall…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
58 m away · 77 Erskine Ave · Don Valley West
Asked 19 Sep 2022
Under Review
Proposal to demolish the existing 4-storey rental apartment and construct a new 35-storey residential building containing 377 residential units, including 36 replacement rental dwelling units. The proposal consists of 23,973.0 sq. m of residential gross floor area (GFA) which results in a total Floor Space Index (FSI)…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
69 m away · 44 Broadway Ave · Don Valley West
Asked 31 Oct 2021
Under Review
Draft Plan of Subdivision for 4 stratified development blocks. Related to File No. 19 194902 NNY 15 OZ.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.
Write Diane Pi · [email protected].
69 m away · 44 Broadway Ave · Don Valley West
Asked 8 Apr 2022
Under Review
Site Plan Approval application for a mixed-use building which includes the replacement of the existing place of worship (St. Monica's Church) with a new church building and constructs a 39-storey residential tower behind (north of) the new church containing 412 dwelling units. The proposed development consists of…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Diane Pi · [email protected].
144 m away · 14 Broadway Ave · Don Valley West
Asked 4 Apr 2025
Under Review
Site Plan Control contemplates a 5 storey Catholic Elementary School with 88 pupil place childcare and a 45 space underground parking to replace existing Catholic Elementary School.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Diane Pi · [email protected].
224 m away · 133 Erskine Ave · Don Valley West
Asked 6 Apr 2022
Under Review
Proposed Development consists of a new 31-storey (102 metres in height) residential building with 296 new condominium units and 26 rental replacement units for a total of 322 dwelling units. The total residential gross floor area (GFA) is 22,243 square metres (15.3 FSI). A total of 89 associated parking spaces and 322…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
233 m away · 241 Redpath Ave · Don Valley West
Asked 3 Feb 2026
NOAC Issued
Site Plan Amendment Application in response to the additional 5-storeys approved at the North York Committee of Adjustment on June 12, 2025, approving additional height and density among other performance standards.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
302 m away · 2345 Yonge St · Toronto-St. Paul's
Asked 1 Oct 2021
Under Review
Draft Plan of Subdivision to create 3 development blocks.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
Write Kai Zhou · [email protected].
302 m away · 2345 Yonge St · Toronto-St. Paul's
Asked 1 Oct 2021
OMB Appeal
Zoning By-law and Official Plan Amendment application to permit the redevelopment of the site with 54 and 56-storey towers, joined by a 10-storey residential podium with ground floor retail. The proposed buildings will include approximately 510 square metres of retail space and 80,416 square metres of residential GFA,…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
Write Kai Zhou · [email protected].
325 m away · 36 Montgomery Ave · Eglinton-Lawrence
Asked 30 Jun 2022
Under Review
Proposal for a redevelopment of a 27-storey mixed-use building with 314 residential dwelling units, 88 vehicular parking spaces, 146 bicycle parking spaces, and one loading space.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
341 m away · 124 Broadway Ave · Don Valley West
Asked 11 Jun 2021
Under Review
Site Plan Control application for two residential towers with shared podium and facilities, at 36 storeys on 124 Broadway Avenue and 30 storeys on 136 Broadway Avenue. 860 dwelling units are proposed, including 206 units in the purpose built rental tower at 136 Broadway Ave to replace rental units from 124 and 136…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
341 m away · 124 Broadway Ave · Don Valley West
Asked 19 Oct 2021
Under Review
*** Draft Plan of Condominium for 459 condominium units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
354 m away · 2323 Yonge St · Toronto-St. Paul's
Asked 29 Sep 2021
Under Review
Draft plan of subdivision for 3 development blocks.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
Write Kai Zhou · [email protected].
354 m away · 2323 Yonge St · Toronto-St. Paul's
Asked 29 Sep 2021
Under Review
Site Plan Approval for a 34 storey mixed-use building
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
354 m away · 77 Roehampton Ave · Toronto-St. Paul's
Asked 27 Apr 2022
Under Review
Site Plan Approval application to facilitate the redevelopment of the site for a 50-storey residential building having a gross floor area of 35,867 square metres. 623 residential dwelling units are proposed, of which, 81 are rental replacement dwelling units.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
362 m away · 2352 Yonge St · Eglinton-Lawrence
Asked 13 Jul 2022
OMB Appeal
Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential space. (see 21-144988 NNY 8 PAC)
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
363 m away · 2350 Yonge St · Eglinton-Lawrence
Asked 13 Jul 2022
Under Review
Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential space. (see 21-144988 NNY 8 PAC)
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
364 m away · 141 Roehampton Ave · Toronto-St. Paul's
Asked 28 Jun 2022
Appeal Received
Rezoning Application resubmission for a 58-storey residential building containing 762 residential dwelling units. A total gross floor area of 47,675.3 square metres is proposed, with an overall density equivalent to 16.12 times the area of the lot.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
Write Kai Zhou · [email protected].
364 m away · 141 Roehampton Ave · Toronto-St. Paul's
Asked 28 Jun 2022
Under Review
Site Plan Application for a 48-storey residential building. The building would consist of a 6-storey podium and 42-storey tower element containing 614 residential dwelling units. A total gross floor area of 36,849 square metres is proposed, with an overall density equivalent to 12.46 times the area of the subject site.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
378 m away · 2346 Yonge St · Eglinton-Lawrence
Asked 10 May 2024
OMB Appeal
Application for a 56-storey mixed-use building containing 407 residential units and 272.2 square-meters of commercial space at-grade. The building will feature a 3-storey podium with outdoor amenity space above, and a 53-storey tower. It will contain a combined Gross Floor Area (GFA) of 36,656.0 square-meters, and…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
378 m away · 2346 Yonge St · Eglinton-Lawrence
Asked 2 Dec 2024
Under Review
Site Plan Control Application proposing a 56-storey mixed-use building containing 407 residential units, with a combined Gross Floor Area of 36,656 square-meters including 272 square-meters of commercial space at-grade.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
380 m away · 64 Montgomery Ave · Eglinton-Lawrence
Asked 30 Jun 2022
Under Review
Proposal for a redevelopment of a 24-storey mixed-use building with 306 residential dwelling units, 525 square metres of grade-related retail space fronting onto Montgomery Avenue, 124 vehicular parking spaces, 348 bicycle parking spaces, and one loading space.
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.
382 m away · 136 Broadway Ave · Don Valley West
Asked 4 Nov 2021
Under Review
*** Draft plan of condominium for 72 units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
405 m away · 110 Eglinton Ave E · Toronto-St. Paul's
Asked 15 Aug 2022
Under Review
The proposed development consists of a 9-storey podium topped with two residential towers that are 57 and 59 storeys in height and a 3-level underground garage. The total GFA is approximately 95,000 square metres, comprising of approximately 77,000 square metres of residential GFA, and approximately 18,000 square…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.