Opening this block

Home · Eglinton-Lawrence · Henning Ave

What's new around 29 Henning Ave

29 Henning Ave · Eglinton-Lawrence. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Spin Studio

733 m away · 2551 Yonge St · Don Valley West

Applied 8 Aug 2025

Inspection

Interior renovation - NEW "SPIN STUDIO"

Being built

The city has allowed these. Work may not have started. The permits in this area list 1710 homes.

Multiple Unit Building

2300 Yonge St

192 m away · 2300 Yonge St · Eglinton-Lawrence

Approved 6 Aug 2026

proposal for localized concrete repairs and waterproofing renewal at the parking garage helical ramp

Multiple Unit Building

2200 Yonge St

253 m away · 2200 Yonge St · Toronto-St. Paul's

Approved 27 May 2026

Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage

Multiple Unit Building

8 Eglinton Ave E

302 m away · 8 Eglinton Ave E · Toronto-St. Paul's

Approved 19 Oct 2026

Proposal for interior alterations to vacant unit RU05 into a Group E (Acai Shop).

Show 21 moreShow fewer
Multiple Unit Building

2191 Yonge St

355 m away · 2191 Yonge St · Toronto-St. Paul's

Approved 1 May 2026

Proposal for interior alterations to first floor and third floor amenities area

Mixed Use/res W Non Res

2400 Yonge St

373 m away · 2400 Yonge St · Eglinton-Lawrence

Approved 22 Oct 2025

Conditional Permit - Part Permit - To construct 27 Storey - South Tower mixed use residential (rental) with shared podium, two levels below grade parking for total of 385 rental units.

Apartment

2161 Yonge St

392 m away · 2161 Yonge St · Toronto-St. Paul's

Approved 22 Jul 2025

31 new homes

The permit lists 31 homes.

REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA

Multiple Unit Building

2150 Yonge St

452 m away · 2150 Yonge St · Toronto-St. Paul's

Approved 3 Sep 2026

Revision 1: Revision to the building permit illustrating the pre-fire and post-repair ceiling height at the base of the basement staircaseProposed fire damage repairs. Scope includes removal and replacement of gypsum,…

New house

75 Castlefield Ave

461 m away · 75 Castlefield Ave · Eglinton-Lawrence

Approved 31 Mar 2025

1 new home

The permit lists 1 homes.

Proposed new construction of two-storey detached dwelling with an integral garage, front porch, rear deck and rear basement walkout, rear balcony.

Multiple Unit Building

272 Eglinton Ave W

502 m away · 272 Eglinton Ave W · Eglinton-Lawrence

Approved 1 May 2026

Proposed interior alterations for butcher shop to include HVAC- 10ft commercial kitchen exhaust, upgrade air conditioning from 2 ton to 4 ton, gas lines from basement up to main floor for kitchen equipment.Plumbing-…

New house

98 Castlefield Ave

514 m away · 98 Castlefield Ave · Eglinton-Lawrence

Approved 29 Jul 2025

1 new home

The permit lists 1 homes.

Propose demolishing 1 storey dwelling to construct new 3 storey dwelling

Multiple Unit Building

2472 Yonge St

516 m away · 2472 Yonge St · Eglinton-Lawrence

Approved 7 Aug 2026

Revison to basement layout changes, ground floor washroom changes, duct shaft detailProposed interior alterations to create 3 units (2 restaurants and 1 retail store) in existing 2 storeys 1 unit commercial building

Mixed Use/res W Non Res

65 Broadway Ave

598 m away · 65 Broadway Ave · Toronto-St. Paul's

Approved 23 Jan 2025

Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.

New house

88 Colin Ave

606 m away · 88 Colin Ave · Toronto-St. Paul's

Approved 1 Jun 2026

1 new home · Georgina Myers

The permit lists 1 homes.

To construct a new single family dwelling

New house

243 St Clements Ave

625 m away · 243 St Clements Ave · Eglinton-Lawrence

Approved 12 Feb 2026

1 new home · Jayseejay Holdings Limited

The permit lists 1 homes.

Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a fnished basement.See also 26 107945 DEM, 25 241459 ZAP and 25 242648 MV.

Apartment

170 Roehampton Ave

666 m away · 170 Roehampton Ave · Toronto-St. Paul's

Approved 28 Jul 2026

599 new homes

The permit lists 599 homes.

Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.

1 homes

176 Eglinton Ave E

683 m away · 176 Eglinton Ave E · Toronto-St. Paul's

Approved 9 Oct 2026

1 new home

The permit lists 1 homes.

Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.

Laneway suite

38 Keewatin Ave

691 m away · 38 Keewatin Ave · Don Valley West

Approved 20 Aug 2026

1 new home

The permit lists 1 homes.

Proposed 2 storey garden suite

New house

131 Hillsdale Ave E

699 m away · 131 Hillsdale Ave E · Toronto-St. Paul's

Approved 23 Jul 2026

Nikan Sharif-zadeh

REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…

New house

172 Briar Hill Ave

711 m away · 172 Briar Hill Ave · Eglinton-Lawrence

Approved 1 Apr 2026

1 new home · Edward Dominic Sopko

The permit lists 1 homes.

Proposal to construct a new 2-storey detached single family dwelling with integral at grade garage. demolish existing detached dwelling and garage

New house

100 Briar Hill Ave

712 m away · 100 Briar Hill Ave · Eglinton-Lawrence

Approved 6 Oct 2025

1 new home · John Mcnain

The permit lists 1 homes.

Proposed 3 storey detached dwelling

New house

122 Highbourne Rd

715 m away · 122 Highbourne Rd · Toronto-St. Paul's

Approved 13 Feb 2026

Renu Gupta

REVISION 01 REVISION: ADDED 2ND MECHANICAL ROOM IN ATTIC ACCESSED BY HATCH Construct a New 2-Storey Single Family Detached House with an integral garage.

Apartment

109 Erskine Ave

749 m away · 109 Erskine Ave · Don Valley West

Approved 28 Oct 2025

Rev 02 Revision 01: To units on floors A208, A211, A212, A215, A217, A218, A220 - Gym area on the 2nd floor has been revised - Bike locker room configurations on the parking levels have been revised.Construct 22-storey…

Multiple Unit Building

100 Broadway Ave

766 m away · 100 Broadway Ave · Don Valley West

Approved 5 May 2026

Proposal for interior alterations to fit new tenant

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

29 Henning Ave

0 m away · 29 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

31 Henning Ave

5 m away · 31 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

27 Henning Ave

9 m away · 27 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Show 21 moreShow fewer
Demolition

25 Henning Ave

10 m away · 25 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

23 Henning Ave

15 m away · 23 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

21 Henning Ave

19 m away · 21 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

19 Henning Ave

29 m away · 19 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

17 Henning Ave

32 m away · 17 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

57 Montgomery Ave

247 m away · 57 Montgomery Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Proposal to demolish the existing 2 storey SFD-semi dwelling.See also 23 176474 NNY 08 OZ

Demolition

55 Montgomery Ave

250 m away · 55 Montgomery Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Proposal to demolish the existing 2 storey SFD-detached dwelling.

Demolition

39 Montgomery Ave

274 m away · 39 Montgomery Ave · Eglinton-Lawrence

Approved 4 Mar 2026

Proposal to demolish existing SFD with no replacement building for future Park Development

Demolition

70 Montgomery Ave

281 m away · 70 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

64 Montgomery Ave

283 m away · 64 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

66 Montgomery Ave

286 m away · 66 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

60 Montgomery Ave

290 m away · 60 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

58 Montgomery Ave

292 m away · 58 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

54 Montgomery Ave

294 m away · 54 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

52 Montgomery Ave

298 m away · 52 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

48 Montgomery Ave

303 m away · 48 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

46 Montgomery Ave

306 m away · 46 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

42 Montgomery Ave

309 m away · 42 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

40 Montgomery Ave

312 m away · 40 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

36 Montgomery Ave

316 m away · 36 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

34 Montgomery Ave

319 m away · 34 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Loud nights

Hours the city has already allowed.

Construction

Canada Square Office Retrofit

361 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 10 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:00 p.m.

Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.

Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.

Ellisdon Corporation

Construction

Canada Square Office Retrofit

361 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 1 Nov 2026 – 30 Jun 2027

Hours from 7:00 p.m.

Ellisdon Corporation

Construction

Yonge And Roselawn Project

373 m away · 2400 Yonge St · Eglinton-Lawrence

Allowed 1 Jan 2026 – 31 Dec 2026

Hours 6:00 a.m.–10:00 p.m.

Skygrid Construction Inc

Show 8 moreShow fewer
Amplified And/or Instrument Sound

5th Halloween Hauntup 2026

556 m away · 20 Castlefield Ave · Eglinton-Lawrence

Allowed 31 Oct 2026

Hours 10:00 a.m.–3:00 p.m.

Setup 31 Oct 2026, 6:00 a.m.–10:00 a.m.

Tear down 31 Oct 2026, 3:00 p.m.–6:00 p.m.

Uptown Yonge Bia

Continuous Concrete Pour

The One Seventy

666 m away · 170 Roehampton Ave · Toronto-St. Paul's

Allowed 7 Aug 2026 – 7 Feb 2027

Hours from 7:00 p.m.

Clark Construction Management Inc.

Amplified And/or Instrument Sound

Holiday Tree Lighting

691 m away · 14 St Clements Ave · Eglinton-Lawrence

Allowed 20 Nov 2026

Hours 5:00 p.m.–8:00 p.m.

Setup 20 Nov 2026, 4:30 p.m.–5:00 p.m.

Tear down 20 Nov 2026, 8:00 p.m.–8:15 p.m.

Uptown Yonge Bia

Continuous Concrete Pour

241 Redpath

793 m away · 241 Redpath Ave · Don Valley West

Allowed 9 Sep 2026 – 31 Mar 2027

Hours from 7:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath

793 m away · 241 Redpath Ave · Don Valley West

Allowed 16 Oct 2026 – 26 Oct 2026

Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath Ave

793 m away · 241 Redpath Ave · Don Valley West

Allowed 2 Nov 2026 – 18 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

8 Brownlow Avenue (northwest Of Brownlow And Souda

849 m away · 8 Brownlow Ave · Toronto-St. Paul's

Allowed 1 May 2026 – 30 Oct 2026

Hours 7:00 a.m.–12:30 a.m.

Soudan-brownlow Properties

Events

On the city's calendar. Check before you go.

Environmental

Seed-to-Habitat Workshop: Hands-on Seed Processing Workshop

271 m away · 200 Eglinton Ave W · Eglinton-Lawrence

On 21 Nov 2026

Free

Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle

Add to calendar
Family/ChildrenLive Performances

Christmas Through the Ages

1.0 km away · 35 Lytton Blvd · Eglinton-Lawrence

On 2 Dec 2026 – 5 Dec 2026

Listed days only

Celebrate the season in grand style with the timeless sound of brass, organ and choir. Glorious carols, rich harmonies a

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

21 Henning Ave

19 m away · 21 Henning Ave · Eglinton-Lawrence

Asked 18 Jul 2023

OMB Appeal

The application proposes to amend the Official Plan and Zoning By-law to permit a 34-storey residential building containing 390 residential dwelling units and 45 car parking spaces.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Angela Zhao · [email protected].

Rezoning

36 Eglinton Ave W

125 m away · 36 Eglinton Ave W · Eglinton-Lawrence

Asked 3 Nov 2021

OMB Appeal

Official Plan Amendment to facilitate the redevelopment of the site for a 65-storey mixed-use building having a non-residential gross floor area of 549.8 square metres, and a residential gross floor area of 44,562.0 square metres. A total of 663 residential units are proposed. Related OZ File Nos. 20 165466 NNY 08 OZ…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Diane Pi · [email protected].

Show 21 moreShow fewer
Condominium plan

36 Eglinton Ave W

125 m away · 36 Eglinton Ave W · Eglinton-Lawrence

Asked 4 Nov 2021

Under Review

*** Draft Plan of Condominium for 663 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Sina Zekria · [email protected].

Site plan

36 Eglinton Ave W

125 m away · 36 Eglinton Ave W · Eglinton-Lawrence

Asked 29 Apr 2022

Under Review

Site Plan Approval to permit the redevelopment of the site for a 59-storey mixed-use building having a non-residential gross floor area of 2,784 square metres, and a residential gross floor area of 38,817 square metres. A total of 613 residential units are proposed. A total of 74 parking spaces are proposed to serve…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Diane Pi · [email protected].

Rezoning

2346 Yonge St

247 m away · 2346 Yonge St · Eglinton-Lawrence

Asked 10 May 2024

OMB Appeal

Application for a 56-storey mixed-use building containing 407 residential units and 272.2 square-meters of commercial space at-grade. The building will feature a 3-storey podium with outdoor amenity space above, and a 53-storey tower. It will contain a combined Gross Floor Area (GFA) of 36,656.0 square-meters, and…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Angela Zhao · [email protected].

Site plan

2346 Yonge St

247 m away · 2346 Yonge St · Eglinton-Lawrence

Asked 2 Dec 2024

Under Review

Site Plan Control Application proposing a 56-storey mixed-use building containing 407 residential units, with a combined Gross Floor Area of 36,656 square-meters including 272 square-meters of commercial space at-grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Angela Zhao · [email protected].

Rezoning

2352 Yonge St

260 m away · 2352 Yonge St · Eglinton-Lawrence

Asked 13 Jul 2022

OMB Appeal

Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential space. (see 21-144988 NNY 8 PAC)

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Angela Zhao · [email protected].

Site plan

2350 Yonge St

261 m away · 2350 Yonge St · Eglinton-Lawrence

Asked 13 Jul 2022

Under Review

Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential space. (see 21-144988 NNY 8 PAC)

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Angela Zhao · [email protected].

Rezoning

64 Montgomery Ave

283 m away · 64 Montgomery Ave · Eglinton-Lawrence

Asked 30 Jun 2022

Under Review

Proposal for a redevelopment of a 24-storey mixed-use building with 306 residential dwelling units, 525 square metres of grade-related retail space fronting onto Montgomery Avenue, 124 vehicular parking spaces, 348 bicycle parking spaces, and one loading space.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.

Write Shareefah René · [email protected].

Site plan

1 Eglinton Ave E

298 m away · 1 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Oct 2021

Under Review

Site Plan Approval for a 65-storey mixed-use building having a non-residential gross floor area of 11,225.70 square metres, and a residential gross floor area of 43,684.60 square metres. A total of 600 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Condominium plan

1 Eglinton Ave E

298 m away · 1 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Oct 2021

Under Review

*** Draft Plan of Condominium for 600 residential dwelling units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Patrick Miller · [email protected].

Subdivision

2323 Yonge St

299 m away · 2323 Yonge St · Toronto-St. Paul's

Asked 29 Sep 2021

Under Review

Draft plan of subdivision for 3 development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

2323 Yonge St

299 m away · 2323 Yonge St · Toronto-St. Paul's

Asked 29 Sep 2021

Under Review

Site Plan Approval for a 34 storey mixed-use building

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Site plan

36 Montgomery Ave

316 m away · 36 Montgomery Ave · Eglinton-Lawrence

Asked 30 Jun 2022

Under Review

Proposal for a redevelopment of a 27-storey mixed-use building with 314 residential dwelling units, 88 vehicular parking spaces, 146 bicycle parking spaces, and one loading space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shareefah René · [email protected].

Subdivision

2345 Yonge St

326 m away · 2345 Yonge St · Toronto-St. Paul's

Asked 1 Oct 2021

Under Review

Draft Plan of Subdivision to create 3 development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Rezoning

2345 Yonge St

326 m away · 2345 Yonge St · Toronto-St. Paul's

Asked 1 Oct 2021

OMB Appeal

Zoning By-law and Official Plan Amendment application to permit the redevelopment of the site with 54 and 56-storey towers, joined by a 10-storey residential podium with ground floor retail. The proposed buildings will include approximately 510 square metres of retail space and 80,416 square metres of residential GFA,…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].

Rezoning

2180 Yonge St

361 m away · 2180 Yonge St · Toronto-St. Paul's

Asked 21 Dec 2020

Under Review

INACTIVE Zoning By-law Amendment application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Proposal includes a new public plaza, open spaces, street connections, a community use facility, and public park. Related OPA application: 22 242145 STE 12 OZ

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Rezoning

2180 Yonge St

361 m away · 2180 Yonge St · Toronto-St. Paul's

Asked 23 Dec 2022

Under Review

Official Plan application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Official Plan Amendment requested to amend policies and Map 21-9 within the Yonge-Eglinton Secondary Plan. Related ZBA application: 20 232714 STE 12 OZ

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

45 Berwick Ave

409 m away · 45 Berwick Ave · Toronto-St. Paul's

Asked 10 Jul 2025

Under Review

The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 158.2 m + MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,641.7 sq. m., which results in a total Floor Space Index (FSI) of 19.1 times the area of the lot. The…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Rezoning

29 Berwick Ave

416 m away · 29 Berwick Ave · Toronto-St. Paul's

Asked 10 Jul 2025

OMB Appeal

The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 162.15 m + 8.0 m MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,588.9 sq. m., which results in a total Floor Space Index (FSI) of 19.07 times the area of the lot.…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Patrick Miller · [email protected].

Site plan

55 Eglinton Ave E

432 m away · 55 Eglinton Ave E · Toronto-St. Paul's

Asked 27 Apr 2018

Under Review

INACTIVE Site Plan applciation for a total of 40,886.39 square metres of gross floor area (GFA) over 50 storeys. This GFA includes 253.58 square metres of at-grade retail fronting Eglinton Avenue East, and 6,409.82 square metres of office space to be located on Floors 2-6. A total of 461 residential units are proposed…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Site plan

77 Roehampton Ave

446 m away · 77 Roehampton Ave · Toronto-St. Paul's

Asked 27 Apr 2022

Under Review

Site Plan Approval application to facilitate the redevelopment of the site for a 50-storey residential building having a gross floor area of 35,867 square metres. 623 residential dwelling units are proposed, of which, 81 are rental replacement dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Subdivision

90 Eglinton Ave E

453 m away · 90 Eglinton Ave E · Toronto-St. Paul's

Asked 16 Sep 2021

Under Review

Draft Plan of Subdivision to create 3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].