Opening this block

Home · York South-Weston · Lloyd Ave

What's new around 6 Lloyd Ave

6 Lloyd Ave · York South-Weston. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 242 homes.

Laneway suite

8 Ford St

310 m away · 8 Ford St · Davenport

Approved 1 Sep 2026

1 new home

The permit lists 1 homes.

Proposed Laneway Suite

Mixed Use/res W Non Res

1779 St Clair Ave W

384 m away · 1779 St Clair Ave W · Davenport

Approved 29 Apr 2025

REV03: Proposed revision to: Wall between Retail #1 & Retail #2Universal Washroom in Retail #2 (revised location)Wall between Retail #3 & Retail #4Wall between Retail #4 & Retail #5REVISION 2 - to add a demising wall…

Laneway suite

47 Hounslow Heath Rd

544 m away · 47 Hounslow Heath Rd · Davenport

Approved 20 Jan 2025

1 new home

The permit lists 1 homes.

PROPSAL TO DEMOLISH OLD GARAGE AND CONSTRUCT A NEW 2-STOREY, ONE BEDROOM LANEWAY HOUSE WITH A BASEMENT (TO BE USED AS MECHANICAL ROOM/STORAGE).

Show 19 moreShow fewer
Laneway suite

138 Uxbridge Ave

603 m away · 138 Uxbridge Ave · Davenport

Approved 20 Aug 2025

1 new home

The permit lists 1 homes.

Proposal to demolish existing detached garage and construct a new 2 storey laneway suite.See also 25 136102 ZAP

Apartment

406 Keele St

618 m away · 406 Keele St · Parkdale-High Park

Approved 21 Aug 2025

65 new homes

The permit lists 65 homes.

To construct a new 6 storey residential condominium with one level U/G parking garage - total units 65

1 homes

388 Keele St

658 m away · 388 Keele St · Parkdale-High Park

Approved 25 Feb 2025

1 new home

The permit lists 1 homes.

Interior alteration including associated mechanical, electrical, plumbing and structural work. New exterior cladding on west and part of north facade with no alteration to exterior wall assembly performance.

8 homes

438 Pacific Ave

686 m away · 438 Pacific Ave · Parkdale-High Park

Approved 5 Aug 2026

8 new homes · 438 Pacific Development Inc

The permit lists 8 homes.

DEMOLITION OF EXISTING 2.5 STOREY BRICK RESIDENCE AND CONSTRUCTION OF 3 STOREY RESIDENTAIL APARTMENT BUILDING.

Multiple Unit Building

1666 St Clair Ave W

689 m away · 1666 St Clair Ave W · Davenport

Approved 15 Oct 2026

Rev 01: Revision to permit, proposal for interior alterations to the second floor (not in original scope) and changes to the main floor and basement (as bubbled)Proposal for interior alterations to the ground and…

8 homes

436 Pacific Ave

691 m away · 436 Pacific Ave · Parkdale-High Park

Approved 11 Sep 2026

8 new homes · 438 Pacific Development Inc

The permit lists 8 homes.

DEMOLITION OF EXISTING 2.5 STOREY BRICK RESIDENCE AND CONSTRUCTION OF 3 STOREY RESIDENTAIL APARTMENT BUILDING.

Apartment

2946 Dundas St W

711 m away · 2946 Dundas St W · Parkdale-High Park

Approved 22 Apr 2025

120 new homes

The permit lists 120 homes.

Construct an 8-storey mixed-use building with 120 residential rental units, office uses, retail on street level and two level underground parking garage

Multiple Unit Building

2845 Dundas St W

742 m away · 2845 Dundas St W · Parkdale-High Park

Approved 9 Mar 2026

Proposal for interior alterations to an existing mixed use building, convert existing 2nd and 3rd floor to a single suite with a 3rd floor balcony.

Apartment

2760 Dundas St W

798 m away · 2760 Dundas St W · Parkdale-High Park

Approved 29 Aug 2025

33 new homes

The permit lists 33 homes.

Proposal for a six-storey mixed use building.

Sfd/townhouses

97 Tarragona Blvd

816 m away · 97 Tarragona Blvd · York South-Weston

Approved 21 Oct 2026

Install Plumbing Fixtures: 4" Sanitary Drain and weeping tile connetion to sump pump, l, 3/4" Water Service and Plumbing Fixtures: Basement: 1 HWT, 1 FD; 1st Floor: 1 2 comp. KS, 1 DW, 1 WC, 1 WB; 2nd Floor: 2 WC, 2…

Laneway suite

77 Laughton Ave

853 m away · 77 Laughton Ave · Davenport

Approved 25 Sep 2026

1 new home

The permit lists 1 homes.

REVISON-01Proposal for demolition of existing garage, construction of new 2 storey laneway suite with garage and basement.

Apartment

490 Quebec Ave

862 m away · 490 Quebec Ave · Parkdale-High Park

Approved 22 Sep 2025

Conditional Permit - Interior alterations to first storey and basement and 2-storey residential above

Multiple Unit Building

2739 Dundas St W

867 m away · 2739 Dundas St W · Parkdale-High Park

Approved 20 Oct 2025

Interior alterations to a convenience store to propose a sink.

Laneway suite

31 Boler St

909 m away · 31 Boler St · Parkdale-High Park

Approved 4 Jun 2025

1 new home

The permit lists 1 homes.

Proposal for partial demolition of existing garage and construction of Laneway Suite.

Laneway suite

168 Annette St

937 m away · 168 Annette St · Parkdale-High Park

Approved 21 May 2026

1 new home

The permit lists 1 homes.

PROPOSED GARDEN SUITE, PLUMBING, DRAINS, HVAC.

Mixed Use/res W Non Res

48 Annette St

941 m away · 48 Annette St · Parkdale-High Park

Approved 18 Feb 2026

Rev 01: changes to all floor layouts and elevations, new engineer stamp providedProposal to demolish existing residential building and construct a new 3-storey mixed use building containing an eating establishment and…

Self-service Storage Building

70 Caledonia Park Rd

1.0 km away · 70 Caledonia Park Rd · Davenport

Approved 27 Aug 2026

REVISION - to change the green roof to a cool roofPROPOSAL TO CONSTRUCT A NEW 6-STOREY SELF-STORAGE. INDOOR PARKING. NO BASEMENT.

Laneway suite

49 Maria St

1.0 km away · 49 Maria St · Parkdale-High Park

Approved 24 Sep 2026

1 new home

The permit lists 1 homes.

Proposal for a 2 storey laneway suite

Multiple Unit Building

3140 Dundas St W

1.0 km away · 3140 Dundas St W · Parkdale-High Park

Approved 4 Sep 2025

Plumbing works for the new Waffle & Ice Cream Shop. The occupancy classification remains Group E for both existing and proposed use. No HVAC or structural changes are proposed to the existing commercial space.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

1900 St Clair Ave W

171 m away · 1900 St Clair Ave W · Davenport

Approved 2 Jun 2026

Proposal to demolish existing building to prepare for the Davenport Rd Extension

Demolition

254 Old Weston Rd

233 m away · 254 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

252 Old Weston Rd

236 m away · 252 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Show 11 moreShow fewer
Demolition

250 Old Weston Rd

238 m away · 250 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

248 Old Weston Rd

240 m away · 248 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

246 Old Weston Rd

243 m away · 246 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

244 Old Weston Rd

245 m away · 244 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd Ext for St Clair TMP/St Clair Old Weston Smart Track project

Demolition

242 Old Weston Rd

248 m away · 242 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

240 Old Weston Rd

250 m away · 240 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

238 Old Weston Rd

252 m away · 238 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

236 Old Weston Rd

255 m away · 236 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

126 Union St

653 m away · 126 Union St · Davenport

Approved 24 Dec 2025

Proposal to demolish existing building to prepare for the Davenport Rd Extension

Demolition

438 Pacific Ave

686 m away · 438 Pacific Ave · Parkdale-High Park

Approved 14 Aug 2026

Demolition of an existing 2.5 storey dwelling and construct a three storey apartment building

Demolition

1613 St Clair Ave W

892 m away · 1613 St Clair Ave W · Davenport

Approved 22 Jul 2025

Proposal for demolishing existing building in preparation for the construction of a new mixed use building.

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

403 Keele Project Gp Inc.

611 m away · 403 Keele St · Parkdale-High Park

Allowed 14 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:59 p.m.

403 Keele Project Gp Inc.

Continuous Concrete Pour

403 Keele Project Gp Inc.

611 m away · 403 Keele St · Parkdale-High Park

Allowed 1 Nov 2026 – 31 Jan 2027

Hours 7:00 p.m.–11:59 p.m.

403 Keele Project Gp Inc.

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

6 Lloyd Ave

0 m away · 6 Lloyd Ave · York South-Weston

Asked 22 Oct 2019

OMB Appeal

The Please be advised this application has been appealed to the OLT. The applicant is submitting a new proposal to the OLT instead of what was previously Council endorsed.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Prabhat Dahal · [email protected].

Condominium plan

6 Lloyd Ave

0 m away · 6 Lloyd Ave · York South-Weston

Asked 30 Sep 2021

Under Review

*** Draft Plan of Standard Condominium application for a 4 to 17 storey mixed-use building (residential/commercial) which contains 555 residential units (43,736 m2) and ground floor retail space (1,131 m2) proposed, with three levels of underground garage. The proposal also includes residential bicycle parking (500…

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Prabhat Dahal · [email protected].

Rezoning

171 Mulock Ave

62 m away · 171 Mulock Ave · York South-Weston

Asked 16 Dec 2013

OMB Appeal

Proposed amendments to the City's Official Plan to redesignate the north two-thirds of the lands from Employment Areas to Mixed Use Areas and establish a new Site and Area specific policy No. 447 over the entire site. Application has been appealed to the OMB/LPAT.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Prabhat Dahal · [email protected].

Show 21 moreShow fewer
Site plan

171 Mulock Ave

62 m away · 171 Mulock Ave · York South-Weston

Asked 28 Jun 2021

Under Review

To permit a mixed use development that would include one north residential building (stepping up to 15-storeys (47.2 metres)) and one south residential building (stepping up to 17-storeys (53.1 metres)) connected by a podium (4-storeys (12.75 metres)) as well as one office building (8-storeys (32.1 metres)). The…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Prabhat Dahal · [email protected].

Site plan

611 Keele St

130 m away · 611 Keele St · York South-Weston

Asked 26 Aug 2019

Under Review

INACTIVE Proposal for a 5-storey self-storage facility with 67.4 square metres of retail proposed at-grade at the corner of St. Clair Avenue and Keele Street. The building would have a gross floor area of 8228.9 square metres with 8 parking spaces provided within the building, accessed from Keele Street.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Prabhat Dahal · [email protected].

Site plan

619 Keele St

147 m away · 619 Keele St · York South-Weston

Asked 22 Jul 2022

Under Review

Proposed Development for a 31-storey mixed use building comprised of 670 square metres of retail space on the ground floor, 1,371 square metres of office space on the third floor, and 352 residential units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Eno Rebecca Udoh-Orok · [email protected].

Rezoning

1799 St Clair Ave W

176 m away · 1799 St Clair Ave W · Davenport

Asked 11 Aug 2021

Appeal Received

Official Plan and Zoning By-law Amendment application to facilitate the development of the site for 3 mixed-use towers having heights of 30, 40, and 45 storeys atop podiums with ranging heights of 3-8 storeys. The proposed non-residential gross floor area is 11,025 square metres, and the proposed residential gross…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Victoria Fusz · [email protected].

Subdivision

1799 St Clair Ave W

176 m away · 1799 St Clair Ave W · Davenport

Asked 11 Aug 2021

Under Review

Draft Plan of Subdivision for 3 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Victoria Fusz · [email protected].

Site plan

1799 St Clair Ave W

176 m away · 1799 St Clair Ave W · Davenport

Asked 29 Apr 2022

Under Review

Site Plan approval application to facilitate the development of the site for 3 mixed-use towers having a proposed non-residential gross floor area of 10,699 square metres, and the proposed residential gross floor area of 93,034 square metres. A total of 1174 residential dwelling units are proposed

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Victoria Fusz · [email protected].

Site plan

290 Old Weston Rd

213 m away · 290 Old Weston Rd · Davenport

Asked 29 Apr 2022

Under Review

Site Plan Approval for a 27-storey residential building having a residential gross floor area of 22,450 square metres, and a 6-storey non-residential building having a gross floor area of 1960 square metres. 321 residential dwelling units are proposed on the lot.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Victoria Fusz · [email protected].

Site plan

2 Union St

245 m away · 2 Union St · Davenport

Asked 15 Dec 2022

Under Review

Proposed St. Clair - Old Weston GO station (Smart Track) by Metrolinx. Proposal comprises:- 3 entrance buildings: main entrance located at south end of site adjacent to Union St. Seconary entrance at north end of sit adjacent to Union St. Third entrance located on west side of rail corridor near planned extension of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Thomas Rees · [email protected].

Rezoning

77 Union St

363 m away · 77 Union St · Davenport

Asked 7 Apr 2022

Under Review

Official Plan and Zoning By-law amendment application to facilitate the redevelopment on the site for a 39-storey mixed-use building having a non-residential gross floor area of 8467 square metres, and a residential gross floor area of 127,228 square metres. 1951 residential dwelling units are proposed.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Pavel Kopec · [email protected].

Subdivision

77 Union St

363 m away · 77 Union St · Davenport

Asked 7 Apr 2022

Under Review

Draft Plan of Subdivision for 5 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Pavel Kopec · [email protected].

Site plan

77 Union St

363 m away · 77 Union St · Davenport

Asked 25 Apr 2022

Under Review

Proposal for approximately 135,696 square metres of gross floor area, comprised of approximately 127,228 square metres of residential space, 8,467 square metres of non-residential space. In terms of dwelling units, the proposal will contribute 1,951 units, including a minimum of 10% three-bedroom units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write John Homsy · [email protected].

Rezoning

189 Old Weston Rd

426 m away · 189 Old Weston Rd · Davenport

Asked 17 Aug 2021

OMB Appeal

Official Plan and Zoning By-law amendment application to facilitate the development of the site for two mixed use buildings of 28 and 39 storeys on an 11 storey podium and a 5 storey non-residential building.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Pavel Kopec · [email protected].

Site plan

189 Old Weston Rd

426 m away · 189 Old Weston Rd · Davenport

Asked 31 Mar 2023

Under Review

The site plan application proposes mix of mid-rise and tall building typologies and includes two mid-rise buildings that range from 8- to 11-storeys and a 27-storey tall building. Overall, the proposed development includes a total gross floor area (GFA) of approximately 34,361 square metres, including 4,410 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write John Homsy · [email protected].

Rezoning

110 West Toronto St

438 m away · 110 West Toronto St · York South-Weston

Asked 10 Mar 2025

Appeal Received

The requested Official Plan Amendment seeks to redesignate the subject site from General Employment Areas to Mixed Use Areas. The proposal is being brought forward on a land use basis only, and does not seek to establish site-specific performance standards for future development.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Prabhat Dahal · [email protected].

Subdivision

80 Union St

467 m away · 80 Union St · Davenport

Asked 9 Nov 2021

Under Review

3 blocks

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Pavel Kopec · [email protected].

Rezoning

80 Union St

467 m away · 80 Union St · Davenport

Asked 9 Nov 2021

OMB Appeal

The Official Plan and Zoning By-law Amendment application proposes the redevelopment of the site to permit three buildings ranging in height between 39 and 49-storeys. The application proposes 97,921 square metres of gross floor area (GFA), including 91,425 square metres of residential GFA, 6,009 square metres of…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Pavel Kopec · [email protected].

Subdivision

43 Junction Rd

469 m away · 43 Junction Rd · York South-Weston

Asked 9 Jul 2021

Under Review

A Plan of Subdivision application to establish 7 blocks and the public street to implement the proposed Official Plan and Zoning By-law amendment, file no. 21 182017 WET 05 OZ.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Etobicoke York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, Etobicoke Civic Centre.

Write Prabhat Dahal · [email protected].

Site plan

1745 St Clair Ave W

487 m away · 1745 St Clair Ave W · Davenport

Asked 23 Oct 2019

Under Review

Site Plan Approval application to facilitate the development of an 11-storey mixed use building comprised of 389 square metres of non-residential gross floor area and 65 residential dwelling units (5475 square metres of residential gross floor area).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Doris Ho · [email protected].

Rezoning

100 Union St

544 m away · 100 Union St · Davenport

Asked 22 Jun 2022

Under Review

The proposal is for two towers of 23 and 37 storeys, each with 6 storey podiums, with commercial, retail and residential uses framing the street edge and a park, expanding parkland planned to the south.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Pavel Kopec · [email protected].

Site plan

100 Union St

544 m away · 100 Union St · Davenport

Asked 24 Aug 2022

Under Review

The proposal contemplates the development of the subject site with two mixed-use buildings consisting of commercial, retail and residential uses framing the street edge and providing room for a parkland conveyance that will serve as an expansion to the parkland planned to the south. The proposal will incorporate two…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Victoria Fusz · [email protected].

Rezoning

108 Vine Ave

591 m away · 108 Vine Ave · Parkdale-High Park

Asked 10 Sep 2025

OMB Appeal

Proposed standalone Official Plan Amendment (OPA) application which seeks to only redesignate the lands comprising 108-162 Vine Avenue from Core Employment Areas to Mixed Use Areas andParks. There is no zoning by-law amendment application proposed at this time.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Camryn Chin · [email protected].