What's new around 70 Weston Rd

70 Weston Rd · York South-Weston. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 219 homes.

Sfd/townhouses

97 Tarragona Blvd

545 m away · 97 Tarragona Blvd · York South-Weston

Approved 21 Oct 2026

Install Plumbing Fixtures: 4" Sanitary Drain and weeping tile connetion to sump pump, l, 3/4" Water Service and Plumbing Fixtures: Basement: 1 HWT, 1 FD; 1st Floor: 1 2 comp. KS, 1 DW, 1 WC, 1 WB; 2nd Floor: 2 WC, 2…

Mixed Use/res W Non Res

1779 St Clair Ave W

673 m away · 1779 St Clair Ave W · Davenport

Approved 29 Apr 2025

REV03: Proposed revision to: Wall between Retail #1 & Retail #2Universal Washroom in Retail #2 (revised location)Wall between Retail #3 & Retail #4Wall between Retail #4 & Retail #5REVISION 2 - to add a demising wall…

Laneway suite

8 Ford St

716 m away · 8 Ford St · Davenport

Approved 1 Sep 2026

1 new home

The permit lists 1 homes.

Proposed Laneway Suite

Show 21 moreShow fewer
Multiple Unit Building

346 Weston Rd

741 m away · 346 Weston Rd · York South-Weston

Approved 22 Apr 2026

Proposal to construct a second floor rooftop deck on northwest and southwest corners of building,

Laneway suite

73 Northland Ave

746 m away · 73 Northland Ave · York South-Weston

Approved 11 Aug 2025

1 new home

The permit lists 1 homes.

Rev 01 Proposal to construct a new 2 storey laneway suite in the rear yard of an existing SFD-detached dwelling.

Laneway suite

31 Boler St

861 m away · 31 Boler St · Parkdale-High Park

Approved 4 Jun 2025

1 new home

The permit lists 1 homes.

Proposal for partial demolition of existing garage and construction of Laneway Suite.

8 homes

438 Pacific Ave

866 m away · 438 Pacific Ave · Parkdale-High Park

Approved 5 Aug 2026

8 new homes · 438 Pacific Development Inc

The permit lists 8 homes.

DEMOLITION OF EXISTING 2.5 STOREY BRICK RESIDENCE AND CONSTRUCTION OF 3 STOREY RESIDENTAIL APARTMENT BUILDING.

8 homes

436 Pacific Ave

872 m away · 436 Pacific Ave · Parkdale-High Park

Approved 11 Sep 2026

8 new homes · 438 Pacific Development Inc

The permit lists 8 homes.

DEMOLITION OF EXISTING 2.5 STOREY BRICK RESIDENCE AND CONSTRUCTION OF 3 STOREY RESIDENTAIL APARTMENT BUILDING.

Laneway suite

47 Hounslow Heath Rd

881 m away · 47 Hounslow Heath Rd · Davenport

Approved 20 Jan 2025

1 new home

The permit lists 1 homes.

PROPSAL TO DEMOLISH OLD GARAGE AND CONSTRUCT A NEW 2-STOREY, ONE BEDROOM LANEWAY HOUSE WITH A BASEMENT (TO BE USED AS MECHANICAL ROOM/STORAGE).

New house

39 Seneca Ave

883 m away · 39 Seneca Ave · York South-Weston

Approved 20 Nov 2025

1 new home · Teresa Figueira Araujo

The permit lists 1 homes.

Proposed 2nd and 3rd floor addition, interior alterations, and conversion to duplex. More than 50% of the ground floor walls are being removed due to structural deficiencies.

Apartment

490 Quebec Ave

908 m away · 490 Quebec Ave · Parkdale-High Park

Approved 22 Sep 2025

Conditional Permit - Interior alterations to first storey and basement and 2-storey residential above

Apartment

406 Keele St

930 m away · 406 Keele St · Parkdale-High Park

Approved 21 Aug 2025

65 new homes

The permit lists 65 homes.

To construct a new 6 storey residential condominium with one level U/G parking garage - total units 65

Apartment

2946 Dundas St W

941 m away · 2946 Dundas St W · Parkdale-High Park

Approved 22 Apr 2025

120 new homes

The permit lists 120 homes.

Construct an 8-storey mixed-use building with 120 residential rental units, office uses, retail on street level and two level underground parking garage

Laneway suite

191 Chambers Ave

948 m away · 191 Chambers Ave · Davenport

Approved 22 May 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new two storey garden suite.

Multiple Unit Building

1666 St Clair Ave W

1.0 km away · 1666 St Clair Ave W · Davenport

Approved 15 Oct 2026

Rev 01: Revision to permit, proposal for interior alterations to the second floor (not in original scope) and changes to the main floor and basement (as bubbled)Proposal for interior alterations to the ground and…

Laneway suite

49 Maria St

1.0 km away · 49 Maria St · Parkdale-High Park

Approved 24 Sep 2026

1 new home

The permit lists 1 homes.

Proposal for a 2 storey laneway suite

Laneway suite

108 Maria St

1.0 km away · 108 Maria St · Parkdale-High Park

Approved 27 May 2025

1 new home

The permit lists 1 homes.

PROPOSED GARDEN SUITE (ADDITION OVER EXISTING GARAGE) TO EXISTING SINGLE FAMILY DWELLING + SECONDARY UNIT

2 homes

212 Chambers Ave

1.0 km away · 212 Chambers Ave · Davenport

Approved 25 Mar 2026

2 new homes · Analisa Coito

The permit lists 2 homes.

Proposal to construct a new three storey, 3-unit semi-detached dwelling with a basement and first floor rear walkout, a front porch, and front and rear balconies on the second and third floor.

3 homes

214 Chambers Ave

1.0 km away · 214 Chambers Ave · Davenport

Approved 7 Apr 2026

3 new homes · Maria Lurdes Coito

The permit lists 3 homes.

Proposal to construct a new 3 storey semi dwelling with 3 units (triplex).See also 25 257515 DEM, 23 207776 ZAP and 24 159372 MV

1 homes

388 Keele St

1.0 km away · 388 Keele St · Parkdale-High Park

Approved 25 Feb 2025

1 new home

The permit lists 1 homes.

Interior alteration including associated mechanical, electrical, plumbing and structural work. New exterior cladding on west and part of north facade with no alteration to exterior wall assembly performance.

Laneway suite

44 Rowntree Ave

1.0 km away · 44 Rowntree Ave · Davenport

Approved 22 May 2026

1 new home

The permit lists 1 homes.

Convert the existing rear garage to a new garden suite and garage

Laneway suite

6 Watt Ave

1.0 km away · 6 Watt Ave · York South-Weston

Approved 29 Aug 2025

1 new home

The permit lists 1 homes.

Rev 01 - Propsed footings and foundations to be reviewed.Proposal to convert existing garage to a garden suite.

Multiple Unit Building

291 Silverthorn Ave

1.0 km away · 291 Silverthorn Ave · Davenport

Approved 22 Jan 2025

Proposal for interior alterations and underpinning

Laneway suite

138 Uxbridge Ave

1.0 km away · 138 Uxbridge Ave · Davenport

Approved 20 Aug 2025

1 new home

The permit lists 1 homes.

Proposal to demolish existing detached garage and construct a new 2 storey laneway suite.See also 25 136102 ZAP

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

1900 St Clair Ave W

370 m away · 1900 St Clair Ave W · Davenport

Approved 2 Jun 2026

Proposal to demolish existing building to prepare for the Davenport Rd Extension

Demolition

126 Union St

427 m away · 126 Union St · Davenport

Approved 24 Dec 2025

Proposal to demolish existing building to prepare for the Davenport Rd Extension

Demolition

254 Old Weston Rd

644 m away · 254 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Show 10 moreShow fewer
Demolition

252 Old Weston Rd

648 m away · 252 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

250 Old Weston Rd

651 m away · 250 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

248 Old Weston Rd

654 m away · 248 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

246 Old Weston Rd

657 m away · 246 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

244 Old Weston Rd

660 m away · 244 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd Ext for St Clair TMP/St Clair Old Weston Smart Track project

Demolition

242 Old Weston Rd

663 m away · 242 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

240 Old Weston Rd

666 m away · 240 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

238 Old Weston Rd

669 m away · 238 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

236 Old Weston Rd

673 m away · 236 Old Weston Rd · Davenport

Approved 13 Jan 2026

Proposal to demolish a vacated structure to prepare for the construction of Davenport Rd ext for St Clair TMP / St Clair - Old Weston Smart Track Project

Demolition

438 Pacific Ave

866 m away · 438 Pacific Ave · Parkdale-High Park

Approved 14 Aug 2026

Demolition of an existing 2.5 storey dwelling and construct a three storey apartment building

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

403 Keele Project Gp Inc.

942 m away · 403 Keele St · Parkdale-High Park

Allowed 14 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:59 p.m.

403 Keele Project Gp Inc.

Continuous Concrete Pour

403 Keele Project Gp Inc.

942 m away · 403 Keele St · Parkdale-High Park

Allowed 1 Nov 2026 – 31 Jan 2027

Hours 7:00 p.m.–11:59 p.m.

403 Keele Project Gp Inc.

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Subdivision

80 Union St

255 m away · 80 Union St · Davenport

Asked 9 Nov 2021

Under Review

3 blocks

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Pavel Kopec · [email protected].

Rezoning

80 Union St

255 m away · 80 Union St · Davenport

Asked 9 Nov 2021

OMB Appeal

The Official Plan and Zoning By-law Amendment application proposes the redevelopment of the site to permit three buildings ranging in height between 39 and 49-storeys. The application proposes 97,921 square metres of gross floor area (GFA), including 91,425 square metres of residential GFA, 6,009 square metres of…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Pavel Kopec · [email protected].

Site plan

619 Keele St

279 m away · 619 Keele St · York South-Weston

Asked 22 Jul 2022

Under Review

Proposed Development for a 31-storey mixed use building comprised of 670 square metres of retail space on the ground floor, 1,371 square metres of office space on the third floor, and 352 residential units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Eno Rebecca Udoh-Orok · [email protected].

Show 21 moreShow fewer
Site plan

2 Union St

303 m away · 2 Union St · Davenport

Asked 15 Dec 2022

Under Review

Proposed St. Clair - Old Weston GO station (Smart Track) by Metrolinx. Proposal comprises:- 3 entrance buildings: main entrance located at south end of site adjacent to Union St. Seconary entrance at north end of sit adjacent to Union St. Third entrance located on west side of rail corridor near planned extension of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Thomas Rees · [email protected].

Site plan

611 Keele St

303 m away · 611 Keele St · York South-Weston

Asked 26 Aug 2019

Under Review

INACTIVE Proposal for a 5-storey self-storage facility with 67.4 square metres of retail proposed at-grade at the corner of St. Clair Avenue and Keele Street. The building would have a gross floor area of 8228.9 square metres with 8 parking spaces provided within the building, accessed from Keele Street.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Prabhat Dahal · [email protected].

Rezoning

100 Union St

336 m away · 100 Union St · Davenport

Asked 22 Jun 2022

Under Review

The proposal is for two towers of 23 and 37 storeys, each with 6 storey podiums, with commercial, retail and residential uses framing the street edge and a park, expanding parkland planned to the south.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Pavel Kopec · [email protected].

Site plan

100 Union St

336 m away · 100 Union St · Davenport

Asked 24 Aug 2022

Under Review

The proposal contemplates the development of the subject site with two mixed-use buildings consisting of commercial, retail and residential uses framing the street edge and providing room for a parkland conveyance that will serve as an expansion to the parkland planned to the south. The proposal will incorporate two…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Victoria Fusz · [email protected].

Rezoning

171 Mulock Ave

359 m away · 171 Mulock Ave · York South-Weston

Asked 16 Dec 2013

OMB Appeal

Proposed amendments to the City's Official Plan to redesignate the north two-thirds of the lands from Employment Areas to Mixed Use Areas and establish a new Site and Area specific policy No. 447 over the entire site. Application has been appealed to the OMB/LPAT.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Prabhat Dahal · [email protected].

Site plan

171 Mulock Ave

359 m away · 171 Mulock Ave · York South-Weston

Asked 28 Jun 2021

Under Review

To permit a mixed use development that would include one north residential building (stepping up to 15-storeys (47.2 metres)) and one south residential building (stepping up to 17-storeys (53.1 metres)) connected by a podium (4-storeys (12.75 metres)) as well as one office building (8-storeys (32.1 metres)). The…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Prabhat Dahal · [email protected].

Rezoning

77 Union St

363 m away · 77 Union St · Davenport

Asked 7 Apr 2022

Under Review

Official Plan and Zoning By-law amendment application to facilitate the redevelopment on the site for a 39-storey mixed-use building having a non-residential gross floor area of 8467 square metres, and a residential gross floor area of 127,228 square metres. 1951 residential dwelling units are proposed.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Pavel Kopec · [email protected].

Subdivision

77 Union St

363 m away · 77 Union St · Davenport

Asked 7 Apr 2022

Under Review

Draft Plan of Subdivision for 5 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Pavel Kopec · [email protected].

Site plan

77 Union St

363 m away · 77 Union St · Davenport

Asked 25 Apr 2022

Under Review

Proposal for approximately 135,696 square metres of gross floor area, comprised of approximately 127,228 square metres of residential space, 8,467 square metres of non-residential space. In terms of dwelling units, the proposal will contribute 1,951 units, including a minimum of 10% three-bedroom units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write John Homsy · [email protected].

Rezoning

6 Lloyd Ave

421 m away · 6 Lloyd Ave · York South-Weston

Asked 22 Oct 2019

OMB Appeal

The Please be advised this application has been appealed to the OLT. The applicant is submitting a new proposal to the OLT instead of what was previously Council endorsed.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Prabhat Dahal · [email protected].

Condominium plan

6 Lloyd Ave

421 m away · 6 Lloyd Ave · York South-Weston

Asked 30 Sep 2021

Under Review

*** Draft Plan of Standard Condominium application for a 4 to 17 storey mixed-use building (residential/commercial) which contains 555 residential units (43,736 m2) and ground floor retail space (1,131 m2) proposed, with three levels of underground garage. The proposal also includes residential bicycle parking (500…

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Prabhat Dahal · [email protected].

Rezoning

126 Union St

427 m away · 126 Union St · Davenport

Asked 22 Jun 2022

Under Review

The proposal is for two towers of 20 and 34 storeys, connected by a 6 storey based podium, aligning with the existing and new public streets with active retail space at grade. Also contemplates the Gunns Road extension as well as new parkland.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Pavel Kopec · [email protected].

Site plan

126 Union St

427 m away · 126 Union St · Davenport

Asked 31 Aug 2022

Under Review

The proposal contemplates the development of the subject site with a mixed-use building consisting of retail and residential uses central to the property and allowing sufficient land to be conveyed for the Gunns Road extension as well as new parkland. The building will incorporate two towers of 20 and 34 storeys,…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Victoria Fusz · [email protected].

Rezoning

1799 St Clair Ave W

499 m away · 1799 St Clair Ave W · Davenport

Asked 11 Aug 2021

Appeal Received

Official Plan and Zoning By-law Amendment application to facilitate the development of the site for 3 mixed-use towers having heights of 30, 40, and 45 storeys atop podiums with ranging heights of 3-8 storeys. The proposed non-residential gross floor area is 11,025 square metres, and the proposed residential gross…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Victoria Fusz · [email protected].

Subdivision

1799 St Clair Ave W

499 m away · 1799 St Clair Ave W · Davenport

Asked 11 Aug 2021

Under Review

Draft Plan of Subdivision for 3 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Victoria Fusz · [email protected].

Site plan

1799 St Clair Ave W

499 m away · 1799 St Clair Ave W · Davenport

Asked 29 Apr 2022

Under Review

Site Plan approval application to facilitate the development of the site for 3 mixed-use towers having a proposed non-residential gross floor area of 10,699 square metres, and the proposed residential gross floor area of 93,034 square metres. A total of 1174 residential dwelling units are proposed

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Victoria Fusz · [email protected].

Rezoning

123 Benny Stark St

519 m away · 123 Benny Stark St · Davenport

Asked 21 Oct 2021

Appeal Received

Official Plan and Zoning By-law Amendment Application to facilitate the redevelopment of the site for a mixed-use development comprised of 7 buildings throughout the site, anchored by a public park of approximately 4,733 square metres. The proposed residential gross floor area is 179,357 square metres, and the…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Victoria Fusz · [email protected].

Rezoning

110 West Toronto St

531 m away · 110 West Toronto St · York South-Weston

Asked 10 Mar 2025

Appeal Received

The requested Official Plan Amendment seeks to redesignate the subject site from General Employment Areas to Mixed Use Areas. The proposal is being brought forward on a land use basis only, and does not seek to establish site-specific performance standards for future development.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Prabhat Dahal · [email protected].

Site plan

290 Old Weston Rd

597 m away · 290 Old Weston Rd · Davenport

Asked 29 Apr 2022

Under Review

Site Plan Approval for a 27-storey residential building having a residential gross floor area of 22,450 square metres, and a 6-storey non-residential building having a gross floor area of 1960 square metres. 321 residential dwelling units are proposed on the lot.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Victoria Fusz · [email protected].

Site plan

2231 St Clair Ave W

623 m away · 2231 St Clair Ave W · York South-Weston

Asked 26 Apr 2022

Under Review

The proposal is for an 11-storey mixed-use building (35.85 metres in height, excluding the mechanical penthouse) with retail at grade and residential units above. The development includes an underground parking structure. The total proposed Gross Floor Area (GFA) is 19,422 square metres, with 292 units, 178 vehicular…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jaspreet Nagra · [email protected].

Site plan

87 Ethel Ave

628 m away · 87 Ethel Ave · York South-Weston

Asked 30 Jun 2025

Under Review

Proposed redevelopment of the site will be comprised of (i) buildings A and B; and (ii) buildings C and D which will consist of 7,238.8 sq.m/77,919 sq.ft of non-residential uses or 7.14% of the total GFA will provide for offices, retail, services, restaurants, entertainment and other uses including a…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Nevra Gursoy · [email protected].