What's new around 75 Basin St

75 Basin St · Toronto-Danforth. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Being built

The city has allowed these. Work may not have started.

Industrial

400 Commissioners St

339 m away · 400 Commissioners St · Toronto-Danforth

Approved 28 Jul 2025

Proposal for construction of a domed winter salt storage bunker with concrete base.

Other

9 Leslie St

1.0 km away · 9 Leslie St · Toronto-Danforth

Approved 26 Aug 2025

PROPOSED: CONSTRUCTION OF THE IPS SUBSTATION FACILITY STRUCTURE CONSISTING OF A LOWER LEVEL FLOOR HOUSING THE EAST AND WEST ELECTRICAL VAULTS, AND AN OPERATING LEVEL FLOOR HOUSING THE EAST AND WEST SWITCHGEAR ROOMS, PLC…

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

440 Commissioners St

188 m away · 440 Commissioners St · Toronto-Danforth

Approved 6 Jul 2026

Proposal for demolition and removal of the two basin portable structure

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

75 Basin St

0 m away · 75 Basin St · Toronto-Danforth

Asked 15 Mar 2023

NOAC Issued

Site Plan Approval for a film and television studio campus with 44,504 square metres of development with twelve sound stages, production offices, mill and support spaces, vehicular and bicycle parking in an above grade garage, and associated base camp and backlot facilities.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Chris Hilbrecht · [email protected].

Rezoning

120 Bouchette St

545 m away · 120 Bouchette St · Toronto-Danforth

Asked 15 May 2024

OMB Appeal

Official Plan and Zoning By-law Amendment to permit two towers, 56- and 53-storeys in height, atop a shared podium transitioning in height from 10-storeys at the north up to 12-storeys at the south. A 16-storey component is situated at the northwest corner of the site. The proposal includes 5,000 square metres of…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Steven Barber · [email protected].

Rezoning

280 Commissioners St

568 m away · 280 Commissioners St · Toronto-Danforth

Asked 4 Dec 2024

OMB Appeal

Official Plan Amendment for a 40 and 45-storey mixed-use buildings containing 937 residential dwellings, including 42 affordable units, retail, self-storage and a PIC / data centre uses.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Steven Barber · [email protected].

Show 5 moreShow fewer
Site plan

685 Lake Shore Blvd E

638 m away · 685 Lake Shore Blvd E · Toronto-Danforth

Asked 16 Sep 2022

Appeal Received

The development will contain approximately 65,156 square metres of gross floor area, inclusive of 50,048 square metres of residential gross floor area, 16,108 square metres of non-residential space and 760 residential units, resulting in a gross density of approximately 6.68 times the existing lot area.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Steven Barber · [email protected].

Rezoning

685 Lake Shore Blvd E

638 m away · 685 Lake Shore Blvd E · Toronto-Danforth

Asked 16 Sep 2022

Appeal Received

The development will contain approximately 74,054square metres of gross floor area, inclusive of square metres of residential 58,459gross floor area, 15,595 square metres of non-residential space and 899 residential units, resulting in a gross density of approximately 7.48 times the existing lot area.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Steven Barber · [email protected].

Rezoning

685 Lake Shore Blvd E

638 m away · 685 Lake Shore Blvd E · Toronto-Danforth

Asked 3 Oct 2024

OMB Appeal

** Related applications for Zoning By-law Amendment (File No.: 22 204512 STE 14 OZ) and Site Plan Control (File No.: 22 204511 STE 14 SA) are currently under appeal to the Ontario Land Tribunal.** Official Plan Amendment (OPA) filed to address revised proportion of non-residential gross floor area and increased…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Steven Barber · [email protected].

Rezoning

402 Unwin Ave

670 m away · 402 Unwin Ave · Toronto-Danforth

Asked 24 Dec 2024

OMB Appeal

Official Plan Amendment proposing redevelopment of the Hearn Power Generating Station. The site is subject to the Port Lands Area Specific Policies of the City's Central Waterfront Secondary Plan, which envisions the Hearn as a catalytic destination for cultural, sport, entertainment, recreational and institutional…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Erika Ivanic · [email protected].

Site plan

629 Eastern Ave

814 m away · 629 Eastern Ave · Toronto-Danforth

Asked 17 Nov 2020

NOAC Issued

Site Plan approval application for the construction of a private road with public access easement to connect Eastern Ave and Lake Shore Blvd E, as contemplated by Site Specific by-law 1174-2015. NOAC issued December 5, 2025.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].