Agrarian Kitchen
393 m away · 20 Logan Ave · Toronto-Danforth
Approved 6 Nov 2026
Opening this block
Home · Toronto-Danforth · Commissioners St
440 Commissioners St · Toronto-Danforth. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
393 m away · 20 Logan Ave · Toronto-Danforth
Approved 6 Nov 2026
1.0 km away · 913 Queen St E · Toronto-Danforth
Approved 26 Feb 2026
The city has allowed these. Work may not have started. The permits in this area list 1 homes.
187 m away · 400 Commissioners St · Toronto-Danforth
Approved 28 Jul 2025
Proposal for construction of a domed winter salt storage bunker with concrete base.
877 m away · 375 Eastern Ave · Toronto-Danforth
Approved 20 Apr 2026
Proposal for New construction of East Harbour Transit Hub station at Lakeshore East rail corridor
915 m away · 163 Booth Ave · Toronto-Danforth
Approved 13 Feb 2025
1 new home · Peggy Hornell
The permit lists 1 homes.
Proposal to demolish the existing house and construct a new 3 storey sfd detached with 1 front porch, 1 basement walk out and 1 second floor rear balcony.
917 m away · 165 Booth Ave · Toronto-Danforth
Approved 17 Sep 2026
REVISION - Delete foundation walls and footing, and add a slab-on-grade system, Delete north party wall and add zero lot line wall, Delete wood framing and add steel stud framingProposed new 3 storey, 2 unit semi…
1.0 km away · 929 Queen St E · Toronto-Danforth
Approved 14 Oct 2026
Conditional Permit - Part Permit - Construct a 9 storey residential building containing 78 units with mixed use commercial on ground floor and underground parking
1.0 km away · 909 Queen St E · Toronto-Danforth
Approved 15 Apr 2026
Interior alteration on second floor of a 3-storey building; including demolition of interior partitions and construction of new partitions.
The city has allowed these buildings to come down. They may still be standing.
0 m away · 440 Commissioners St · Toronto-Danforth
Approved 6 Jul 2026
Proposal for demolition and removal of the two basin portable structure
1.0 km away · 341 Eastern Ave · Toronto-Danforth
Approved 6 Oct 2025
Proposal for demolishing existing building and leave land level & clear to allow for construction access, laydown and material storage. Lands also required for future roadway construction.
Hours the city has already allowed.
1.0 km away · 943 Queen St E · Toronto-Danforth
Allowed 21 Nov 2026
Hours 10:00 a.m.–6:00 p.m.
Setup 21 Nov 2026, 6:00 a.m.–10:00 a.m.
Tear down 21 Nov 2026, 6:00 p.m.–11:59 p.m.
Leslieville Bia
Someone has asked the city for a change. Nothing here is a decision.
188 m away · 75 Basin St · Toronto-Danforth
Asked 15 Mar 2023
NOAC Issued
Site Plan Approval for a film and television studio campus with 44,504 square metres of development with twelve sound stages, production offices, mill and support spaces, vehicular and bicycle parking in an above grade garage, and associated base camp and backlot facilities.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
386 m away · 120 Bouchette St · Toronto-Danforth
Asked 15 May 2024
OMB Appeal
Official Plan and Zoning By-law Amendment to permit two towers, 56- and 53-storeys in height, atop a shared podium transitioning in height from 10-storeys at the north up to 12-storeys at the south. A 16-storey component is situated at the northwest corner of the site. The proposal includes 5,000 square metres of…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
484 m away · 280 Commissioners St · Toronto-Danforth
Asked 4 Dec 2024
OMB Appeal
Official Plan Amendment for a 40 and 45-storey mixed-use buildings containing 937 residential dwellings, including 42 affordable units, retail, self-storage and a PIC / data centre uses.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
495 m away · 685 Lake Shore Blvd E · Toronto-Danforth
Asked 16 Sep 2022
Appeal Received
The development will contain approximately 65,156 square metres of gross floor area, inclusive of 50,048 square metres of residential gross floor area, 16,108 square metres of non-residential space and 760 residential units, resulting in a gross density of approximately 6.68 times the existing lot area.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
495 m away · 685 Lake Shore Blvd E · Toronto-Danforth
Asked 16 Sep 2022
Appeal Received
The development will contain approximately 74,054square metres of gross floor area, inclusive of square metres of residential 58,459gross floor area, 15,595 square metres of non-residential space and 899 residential units, resulting in a gross density of approximately 7.48 times the existing lot area.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
495 m away · 685 Lake Shore Blvd E · Toronto-Danforth
Asked 3 Oct 2024
OMB Appeal
** Related applications for Zoning By-law Amendment (File No.: 22 204512 STE 14 OZ) and Site Plan Control (File No.: 22 204511 STE 14 SA) are currently under appeal to the Ontario Land Tribunal.** Official Plan Amendment (OPA) filed to address revised proportion of non-residential gross floor area and increased…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
689 m away · 629 Eastern Ave · Toronto-Danforth
Asked 17 Nov 2020
NOAC Issued
Site Plan approval application for the construction of a private road with public access easement to connect Eastern Ave and Lake Shore Blvd E, as contemplated by Site Specific by-law 1174-2015. NOAC issued December 5, 2025.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
802 m away · 402 Unwin Ave · Toronto-Danforth
Asked 24 Dec 2024
OMB Appeal
Official Plan Amendment proposing redevelopment of the Hearn Power Generating Station. The site is subject to the Port Lands Area Specific Policies of the City's Central Waterfront Secondary Plan, which envisions the Hearn as a catalytic destination for cultural, sport, entertainment, recreational and institutional…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
1.0 km away · 929 Queen St E · Toronto-Danforth
Asked 3 May 2023
NOAC Issued
Application for Site Plan Control to permit a 9-storey mixed use building, containing 78 rental units and 195 square metres of commercial gross floor area.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.