Opening this block

Home · Toronto-Danforth · Queen St E

What's new around 929 Queen St E

929 Queen St E · Toronto-Danforth. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Faya Coffee Inc

277 m away · 250 Carlaw Ave · Toronto-Danforth

Applied 10 Nov 2026

Not Started

Proposal to convert vacant unit for "FAYA COFFEE INC." (Coffee takeout at front and coffee roast at rear)

Permit application

Bailey Nelson

633 m away · 747 Queen St E · Toronto-Danforth

Applied 12 Feb 2026

Inspection

Proposal for interior alterations to change from a restaurant with less than 30 seats to a retail store - "Bailey Nelson".

Permit application

Shoppers Drug Mart

922 m away · 661 Queen St E · Toronto-Danforth

Applied 25 Aug 2026

Revision Issued

Revision 1: Proposal for interior alterations to an existing retail store - "Shoppers Drug Mart"

Being built

The city has allowed these. Work may not have started. The permits in this area list 61 homes.

Mixed Use/res W Non Res

929 Queen St E

0 m away · 929 Queen St E · Toronto-Danforth

Approved 14 Oct 2026

Conditional Permit - Part Permit - Construct a 9 storey residential building containing 78 units with mixed use commercial on ground floor and underground parking

Multiple Unit Building

909 Queen St E

78 m away · 909 Queen St E · Toronto-Danforth

Approved 15 Apr 2026

Interior alteration on second floor of a 3-storey building; including demolition of interior partitions and construction of new partitions.

Multiple Unit Building

998 Queen St E

116 m away · 998 Queen St E · Toronto-Danforth

Approved 20 May 2026

Proposal for interior alterations to the ground floor to convert existing retail store to a fitness club with an accessory cafe on the basement level.Revised scope of work per application form signed and dated in March…

Show 21 moreShow fewer
New house

165 Booth Ave

233 m away · 165 Booth Ave · Toronto-Danforth

Approved 17 Sep 2026

REVISION - Delete foundation walls and footing, and add a slab-on-grade system, Delete north party wall and add zero lot line wall, Delete wood framing and add steel stud framingProposed new 3 storey, 2 unit semi…

New house

163 Booth Ave

240 m away · 163 Booth Ave · Toronto-Danforth

Approved 13 Feb 2025

1 new home · Peggy Hornell

The permit lists 1 homes.

Proposal to demolish the existing house and construct a new 3 storey sfd detached with 1 front porch, 1 basement walk out and 1 second floor rear balcony.

Multiple Unit Building

245 Carlaw Ave

339 m away · 245 Carlaw Ave · Toronto-Danforth

Approved 19 Feb 2026

Proposed interior alterations to mezzanine structure due to water damage.

Multiple Unit Building

1100 Queen St E

420 m away · 1100 Queen St E · Toronto-Danforth

Approved 17 Sep 2026

Proposal for repair and reinstate a portion of the dwelling due to fire damage

Multiple Unit Building

1128 Queen St E

478 m away · 1128 Queen St E · Toronto-Danforth

Approved 8 Jun 2026

Proposal to alter the existing two-storey mixed-use building by constructing a rear two-storey addition with second storey balcony and exterior stairs. There is one non-residential unit (restaurant) on the ground floor,…

10 homes

1134 Queen St E

519 m away · 1134 Queen St E · Toronto-Danforth

Approved 26 Jan 2026

10 new homes

The permit lists 10 homes.

Proposed new construction on vacant lot new 3 storey building with no underground level, commercial on the ground floor and a total of 10 residential units on 2 &3.

Multiple Unit Building

779 Queen St E

533 m away · 779 Queen St E · Toronto-Danforth

Approved 14 Jul 2026

Proposed interior renovations that includes addition of 2 consultation rooms, staff room and installation of new rear exit for an optometry clinic.

Multiple Unit Building

388 Carlaw Ave

589 m away · 388 Carlaw Ave · Toronto-Danforth

Approved 26 Aug 2026

REV: Proposed revision to the loading dock- Demolition of the existing loading dock along the west side of the building, including the walkway and the loading pad;- Construct a new reinforced concrete loading dock to…

Apartment

759 Queen St E

609 m away · 759 Queen St E · Toronto-Danforth

Approved 26 Jan 2026

28 new homes

The permit lists 28 homes.

7 Storey mixed use with 28 residential and 3 commercial on the ground floor(condo not rental units as per applicant)

Mixed Use/res W Non Res

759 Queen St E

609 m away · 759 Queen St E · Toronto-Danforth

Approved 7 Jul 2026

REV: Revision to Permit 23 210061 BLD 00 NB to install cladding east and west elevations - this material change request is due to the water penetration issues on both faces of the building. 7 Storey mixed use with 28…

Transit Station,subway, Bus Terminal

375 Eastern Ave

652 m away · 375 Eastern Ave · Toronto-Danforth

Approved 20 Apr 2026

Proposal for New construction of East Harbour Transit Hub station at Lakeshore East rail corridor

3 homes

23 Lewis St

679 m away · 23 Lewis St · Toronto-Danforth

Approved 8 Jan 2025

3 new homes

The permit lists 3 homes.

Proposal to demolish existing dwelling and construct a new fourplex

Laneway suite

23 Lewis St

679 m away · 23 Lewis St · Toronto-Danforth

Approved 20 Jun 2025

1 new home

The permit lists 1 homes.

Construct a new rear yard laneway suite ancillary to Fourplex

6 homes

26B Lewis St

707 m away · 26B Lewis St · Toronto-Danforth

Approved 10 Jun 2026

6 new homes

The permit lists 6 homes.

Proposal to construct a new three-storey 14-unit apartment building that will span over 3 lots (municipally known as 24 Lewis Street, 26 Lewis Street and 26B Lewis Street). This apartment building will contain a total…

Laneway suite

26B Lewis St

707 m away · 26B Lewis St · Toronto-Danforth

Approved 11 Sep 2026

1 new home

The permit lists 1 homes.

Proposal to construct a 1 storey garden suite with a basement

6 homes

24 Lewis St

713 m away · 24 Lewis St · Toronto-Danforth

Approved 10 Jun 2026

6 new homes

The permit lists 6 homes.

Proposal to construct a new three storey six unit townhouse apartment building with a front porch, front basement walkout, second storey front and rear balconies, rear basement walkout and a rear porch will be…

Laneway suite

24 Lewis St

713 m away · 24 Lewis St · Toronto-Danforth

Approved 16 Jun 2026

1 new home

The permit lists 1 homes.

Proposal for a one-storey rear yard garden suite with basement and a front porch.

Laneway suite

88 Jones Ave

714 m away · 88 Jones Ave · Toronto-Danforth

Approved 27 Apr 2026

Revision 01: Layout changes to basement, ground and 2nd floor and HVAC work. Proposal for a laneway house.

Laneway suite

90 Jones Ave

717 m away · 90 Jones Ave · Toronto-Danforth

Approved 1 May 2026

1 new home

The permit lists 1 homes.

REV 01: Revision to ground floor and second floor layout.Proposal for a new laneway suite.

Laneway suite

29 Curzon St

810 m away · 29 Curzon St · Toronto-Danforth

Approved 21 Apr 2026

1 new home

The permit lists 1 homes.

REV 01: REVISION TO INTERIOR LAYOUT & AS BUILT HEIGHTProposed construction of laneway suite

Multiple Unit Building

677 Queen St E

878 m away · 677 Queen St E · Toronto-Danforth

Approved 22 Sep 2026

Proposal for piling and shoring to allow for remediation of the site.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

341 Eastern Ave

776 m away · 341 Eastern Ave · Toronto-Danforth

Approved 6 Oct 2025

Proposal for demolishing existing building and leave land level & clear to allow for construction access, laydown and material storage. Lands also required for future roadway construction.

Demolition

855 Gerrard St E

777 m away · 855 Gerrard St E · Toronto-Danforth

Approved 28 Jan 2026

Proposal for the demolition and removal of the south wing wall located on the southwest side of the Gerrard and Carlaw. Thewall is being removed because its current alignment conflicts with the approved design and…

Demolition

70 Allen Ave

781 m away · 70 Allen Ave · Toronto-Danforth

Approved 4 Jul 2025

1887981 Ontario Limited

Proposal to demolish existing one-storey dwelling and construct two semi-detached dwellings. See also 23-149947 STE 14 CO, 24-207758 BLD 00 NH, 24-207793 BLD 00 NH.

Show 2 moreShow fewer
Demolition

11 Sunlight Park Rd

942 m away · 11 Sunlight Park Rd · Toronto-Danforth

Approved 11 Sep 2026

Proposed demolition of main building (Car Dealership). Secondary structures, car wash and storage building will be processed as separate permits.

Demolition

440 Commissioners St

1.0 km away · 440 Commissioners St · Toronto-Danforth

Approved 6 Jul 2026

Proposal for demolition and removal of the two basin portable structure

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

Wanderlust

45 m away · 943 Queen St E · Toronto-Danforth

Allowed 21 Nov 2026

Hours 10:00 a.m.–6:00 p.m.

Setup 21 Nov 2026, 6:00 a.m.–10:00 a.m.

Tear down 21 Nov 2026, 6:00 p.m.–11:59 p.m.

Leslieville Bia

Amplified And/or Instrument Sound

Wanderlust

222 m away · 1001 Queen St E · Toronto-Danforth

Allowed 21 Nov 2026

Hours 12:00 p.m.–7:00 p.m.

Setup 21 Nov 2026, 6:00 a.m.–12:00 p.m.

Tear down 21 Nov 2026, 7:00 p.m.–11:59 p.m.

Leslieville Bia

Amplified And/or Instrument Sound

Wanderlust

597 m away · 1158 Queen St E · Toronto-Danforth

Allowed 21 Nov 2026

Hours 12:00 p.m.–7:00 p.m.

Setup 21 Nov 2026, 6:00 a.m.–12:00 p.m.

Tear down 21 Nov 2026, 7:00 p.m.–11:59 p.m.

Leslieville Bia

Show 3 moreShow fewer
Amplified And/or Instrument Sound

Glow N Treat

854 m away · 77 First Ave · Toronto-Danforth

Allowed 31 Oct 2026

Hours 6:00 p.m.–8:00 p.m.

Setup 31 Oct 2026, 5:00 p.m.–6:00 p.m.

Tear down 31 Oct 2026, 8:00 p.m.–9:00 p.m.

Toronto Community Alliance Church

Continuous Concrete Pour

1233 Queen Project Gp Inc.

896 m away · 1233 Queen St E · Toronto-Danforth

Allowed 1 Sep 2026 – 31 Dec 2026

Hours 7:00 a.m.–11:59 p.m.

1233 Queen Project Gp Inc.

Amplified And/or Instrument Sound

Riverside C'mon Events Series

1.0 km away · 10 Thompson St · Toronto-Danforth

Allowed 6 Jun 2026 – 25 Oct 2026

Hours 10:00 a.m.–8:00 p.m.

Setup 6 Jun 2026, 7:30 a.m.–10:00 a.m.; 20 Sep 2026, 7:30 a.m.–10:00 a.m.…

Tear down 6 Jun 2026, 8:00 p.m.–9:00 p.m.; 20 Sep 2026, 8:00 p.m.–9:00 p.m.…

Riverside Business Improvement Area

Events

On the city's calendar. Check before you go.

Live PerformancesTheatre

All's Well

515 m away · 345 Carlaw Ave · Toronto-Danforth

On 24 Nov 2026 – 27 Dec 2026

Listed days only

A dark comedy about a cure with wicked fine print. From celebrated Canadian author Mona Awad, writer of the bestselling

Event pageAdd to calendar
HistoryLive Performances

Canadian Premiere: A German Life

515 m away · 345 Carlaw Ave · Toronto-Danforth

On 12 Jan 2027 – 7 Feb 2027

Listed days only

Complicity rarely announces itself. From Tony- and Oscar-winning writer Christopher Hampton and based on the real-life

Event pageAdd to calendar
Show 4 moreShow fewer
Charity/CauseFood/Culinary

Riverside Antler Breakfast - Annual Fundraiser

587 m away · 765 Queen St E · Toronto-Danforth

On 11 Dec 2026

Now in its 15th year, this annual festive community fundraiser and celebration will be in support of Fontbonne Ministri

Event pageAdd to calendar
Arts/Exhibits

Break the Rules - A Contemporary Mosaic Art Exhibition

597 m away · 1158 Queen St E · Toronto-Danforth

On 14 Nov 2026 – 29 Nov 2026

Free

Celebrating a spirit of reinvention, challenging the rules of the ancients’ and prove mosaic is not a relic of the past

Event pageAdd to calendar
Food/CulinaryTour

Queen East Eats Fall Food Tours

940 m away · 657 Queen St E · Toronto-Danforth

On 14 Nov 2026 – 12 Dec 2026

Listed days only

Celebrate fall and support small businesses. Get ready to visit six pre-selected local food and drink establishments in

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

929 Queen St E

0 m away · 929 Queen St E · Toronto-Danforth

Asked 3 May 2023

NOAC Issued

Application for Site Plan Control to permit a 9-storey mixed use building, containing 78 rental units and 195 square metres of commercial gross floor area.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Alexa Legge · [email protected].

Site plan

263 Logan Ave

163 m away · 263 Logan Ave · Toronto-Danforth

Asked 12 Jan 2018

NOAC Issued

Site Plan Control application associated with Zoning By-law amendment to allow the redevelopment of a parking lot with a 6-unit townhouse block(1828.0 sq. m.). The future townhouse lots will be parcels of tied land to a common element drive aisle.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].

Site plan

1001 Queen St E

222 m away · 1001 Queen St E · Toronto-Danforth

Asked 29 May 2018

NOAC Issued

Site Plan Control application fpr a proposed mixed use building with an overall height of 6-storeys (inclusive of mechanical). A total of 16 residential units are proposed on the second through sixth storeys, and retail/commercial space is proposed on the ground floor.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].

Show 16 moreShow fewer
Site plan

629 Eastern Ave

434 m away · 629 Eastern Ave · Toronto-Danforth

Asked 17 Nov 2020

NOAC Issued

Site Plan approval application for the construction of a private road with public access easement to connect Eastern Ave and Lake Shore Blvd E, as contemplated by Site Specific by-law 1174-2015. NOAC issued December 5, 2025.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].

Site plan

8 De Grassi St

466 m away · 8 De Grassi St · Toronto-Danforth

Asked 28 Dec 2017

Appeal Received

Sties Plan Control application for a proposed 6-storey mixed use building with 15 residential and one commercial units. Minor Variance application 22 240793 STE 14 MV is associated (deferred Dec. 2022). This application (both SP and MV applications) were appelaed by the applicant. The MV appeal (OLT-23-000401) was…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Raymond Tung · [email protected].

Site plan

797 Queen St E

471 m away · 797 Queen St E · Toronto-Danforth

Asked 16 Dec 2024

Under Review

Site Plan Control Placeholder for Leslieville Station, one of the stations included in the Ontario Line Elevated Guideway and Stations contract.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Vanessa Opassinis · [email protected].

Subdivision

34 Lewis St

708 m away · 34 Lewis St · Toronto-Danforth

Asked 4 Nov 2021

Under Review

Draft Plan of Subdivision for 2 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Raymond Tung · [email protected].

Rezoning

21 Broadview Ave

767 m away · 21 Broadview Ave · Toronto-Danforth

Asked 9 Sep 2021

OMB Appeal

Official Plan and Zoning By-law amendment to facilitate the development of the site for a 12-storey mixed-use building having a non-residential gross floor area of 794 square metres, and a residential gross floor area of 28,638 square metres. A total of 340 residential dwelling units are proposed. Application appeald…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Raymond Tung · [email protected].

Site plan

21 Broadview Ave

767 m away · 21 Broadview Ave · Toronto-Danforth

Asked 5 Jul 2022

Appeal Received

This application is for a 12-storey mixed use building with rear courtyard and ground floor units. In total, the project with have a gross floor area of 29,377 sq.m. and will contain 340 residential units and 794 sq.m. of commercial space. There will be one level of below grade parking with 97 vehicle parking spaces…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Raymond Tung · [email protected].

Site plan

425 Carlaw Ave

849 m away · 425 Carlaw Ave · Toronto-Danforth

Asked 20 Dec 2024

Under Review

Site Plan Control Placeholder for Gerrard Station, one of the stations included in the Ontario Line Elevated Guideway and Stations contract.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tom Schwerdtfeger · [email protected].

Rezoning

20 Leslie St

886 m away · 20 Leslie St · Toronto-Danforth

Asked 23 Jun 2025

Appeal Received

Proposed Official Plan Amendment Application seeking to remove the site from Employment Areas as shown on Map 2 (Urban Structure) of the Official Plan and to redesignate the site from General Employment Areas to Mixed Use Areas on Map 21 of the Official Plan.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Raymond Tung · [email protected].

Site plan

1233 Queen St E

896 m away · 1233 Queen St E · Toronto-Danforth

Asked 17 Mar 2022

NOAC Issued

Site Plan Control application to facilitate the redevelopment of the site for a 9-storey mixed-use building having a non-residential gross floor area of 366.9m2, and a residential gross floor area of 10,088.1m2. A total of 142 dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].

Rezoning

120 Bouchette St

916 m away · 120 Bouchette St · Toronto-Danforth

Asked 15 May 2024

OMB Appeal

Official Plan and Zoning By-law Amendment to permit two towers, 56- and 53-storeys in height, atop a shared podium transitioning in height from 10-storeys at the north up to 12-storeys at the south. A 16-storey component is situated at the northwest corner of the site. The proposal includes 5,000 square metres of…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Steven Barber · [email protected].

Site plan

1249 Queen St E

1.0 km away · 1249 Queen St E · Toronto-Danforth

Asked 16 May 2019

NOAC Issued

Proposal for a 6 storey mid-rise building with 29 dwelling units, commercial space at grade and two levels of below grade parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].

Site plan

641 Queen St E

1.0 km away · 641 Queen St E · Toronto-Danforth

Asked 15 Sep 2022

Under Review

Proposed to retain the existing heritage buildings and construct a nine storey residential building. The building will contain 85 new residential dwelling units with a GFA of about 7186sqm and retail at grade with a GFA of 807sqm. The total proposed GFA is 9891sqm resulting in an FSI of 6.43

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].

Rezoning

641 Queen St E

1.0 km away · 641 Queen St E · Toronto-Danforth

Asked 15 Sep 2022

Under Review

Proposed to retain the existing heritage buildings and construct a nine storey residential building. The building will contain 85 new residential dwelling units with a GFA of about 7186sqm and retail at grade with a GFA of 807sqm. The total proposed GFA is 9891sqm resulting in an FSI of 6.43

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Raymond Tung · [email protected].

Site plan

685 Lake Shore Blvd E

1.0 km away · 685 Lake Shore Blvd E · Toronto-Danforth

Asked 16 Sep 2022

Appeal Received

The development will contain approximately 65,156 square metres of gross floor area, inclusive of 50,048 square metres of residential gross floor area, 16,108 square metres of non-residential space and 760 residential units, resulting in a gross density of approximately 6.68 times the existing lot area.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Steven Barber · [email protected].

Rezoning

685 Lake Shore Blvd E

1.0 km away · 685 Lake Shore Blvd E · Toronto-Danforth

Asked 16 Sep 2022

Appeal Received

The development will contain approximately 74,054square metres of gross floor area, inclusive of square metres of residential 58,459gross floor area, 15,595 square metres of non-residential space and 899 residential units, resulting in a gross density of approximately 7.48 times the existing lot area.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Steven Barber · [email protected].

Rezoning

685 Lake Shore Blvd E

1.0 km away · 685 Lake Shore Blvd E · Toronto-Danforth

Asked 3 Oct 2024

OMB Appeal

** Related applications for Zoning By-law Amendment (File No.: 22 204512 STE 14 OZ) and Site Plan Control (File No.: 22 204511 STE 14 SA) are currently under appeal to the Ontario Land Tribunal.** Official Plan Amendment (OPA) filed to address revised proportion of non-residential gross floor area and increased…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Steven Barber · [email protected].