Opening this block

Home · This week

What's new in York Centre

349 records in York Centre.

Wilson Ave · Finch Ave W · Sheppard Ave W · Keele St · Steeles Ave W · Bathurst St · Wilson Heights Blvd · Dufferin St · Carl Hall Rd · Tippett Rd · Plewes Rd · Canuck Ave · Cocksfield Ave · Winston Park Blvd · Billy Bishop Way · Tavistock Rd · Regent Rd · Norcross Rd · McAllister Rd · Luverne Ave · King High Ave · Keelegate Dr · Jane St · Goddard St

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 9 moreShow fewer

Being built

The city has allowed these. Work may not have started.

New house

47 Sandale Gdns

47 Sandale Gdns · York Centre

Approved 6 Nov 2026

2 new homes · 1001609984 Ontario Inc

The permit lists 2 homes.

proposed two-storey detached dwelling with a secondary suite (within the basement), with an integral garage, a front covered porch, a rear partially covered deck, and a side basement walkout.

4 homes

209 Faywood Blvd

209 Faywood Blvd · York Centre

Approved 6 Nov 2026

4 new homes · Zigma Homes

The permit lists 4 homes.

demolishing existing house to construct new detached 3 storey quadplex

New house

11 Bayford Ave

11 Bayford Ave · York Centre

Approved 3 Nov 2026

1 new home · Gennaro Rino Cipolletta

The permit lists 1 homes.

Proposal to construct a 2 storey single family dwelling with an integral garage, covered patio, and rear yard accessory structure (cabana)

Show 9 moreShow fewer
Laneway suite

27 Stonedene Blvd

27 Stonedene Blvd · York Centre

Approved 2 Nov 2026

1 new home

The permit lists 1 homes.

new 1-storey garden suite

4 homes

3905 Bathurst St

3905 Bathurst St · York Centre

Approved 22 Oct 2026

4 new homes

The permit lists 4 homes.

Proposal for interior alterations to convert existing storage rooms on ground level to four residential units and exterior landscape updates for a new dog walking amenity area

Laneway suite

25 Luverne Ave

25 Luverne Ave · York Centre

Approved 8 Oct 2026

1 new home

The permit lists 1 homes.

NEW 2-STOREY GARDEN SUITE

Mixed Use/res W Non Res

799 Sheppard Ave W

799 Sheppard Ave W · York Centre

Approved 6 Oct 2026

Revision 01: Revision to permit, On the ground floor; indoor amenity area; added staff room and workroom by way of revising bicycle storage room. On the 8th floor; indoor/outdoor amenity area revised. Door schedule…

Apartment

50 Wilson Heights Blvd

50 Wilson Heights Blvd · York Centre

Approved 25 Sep 2026

Conditional Permit - Site Services - Tower A - includes and supported by a tw levels underground parking garage, and a 7 storeys podium with ground floor retail (shell space only), day nursery, and community centre.…

4 homes

16 Faith Ave

16 Faith Ave · York Centre

Approved 24 Sep 2026

4 new homes · Zigma Homes

The permit lists 4 homes.

Proposal to demolish the existing dwelling and construct a 3 storey multiplex (4 units)

4 homes

24 Goodwill Ave

24 Goodwill Ave · York Centre

Approved 8 Sep 2026

4 new homes · Zigma Homes

The permit lists 4 homes.

Proposal to demolish existing house and construct a new three-storey four-unit dwelling.

4 homes

46 Keelegate Dr

46 Keelegate Dr · York Centre

Approved 26 Aug 2026

4 new homes · Murat Yildrim

The permit lists 4 homes.

To demolish existing dwelling and construct a new four-unit residential building

Laneway suite

46 Keelegate Dr

46 Keelegate Dr · York Centre

Approved 26 Aug 2026

1 new home

The permit lists 1 homes.

To construct a new rear garden suite ancillary to fourplex

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

47 Sandale Gdns

47 Sandale Gdns · York Centre

Approved 6 Nov 2026

1001609984 Ontario Inc

Proposal to demolish the existing 2 storey SFD-detached dwelling.

Demolition

209 Faywood Blvd

209 Faywood Blvd · York Centre

Approved 6 Nov 2026

Proposed demolishing existing house for 3 floor quadplex

Demolition

11 Bayford Ave

11 Bayford Ave · York Centre

Approved 3 Nov 2026

Gennaro Rino Cipolletta

Proposal to demolish the existing dwelling

Show 9 moreShow fewer
Demolition

35 Vanley Cres

35 Vanley Cres · York Centre

Approved 5 Oct 2026

Demolition of Building NO.275 within subject property.

Demolition

46 Keelegate Dr

46 Keelegate Dr · York Centre

Approved 15 Sep 2026

To demolish existing dwelling and construct a new four-unit residential building

Demolition

24 Goodwill Ave

24 Goodwill Ave · York Centre

Approved 8 Sep 2026

Proposal to demolish existing house and construct a new three-storey four-unit dwelling.

Demolition

17 Embro Dr

17 Embro Dr · York Centre

Approved 22 Jun 2026

Ghassan El-mor

Proposal to demolish the existing 1 storey dwelling and detached garage.

Demolition

11 Buxton Rd

11 Buxton Rd · York Centre

Approved 4 Jun 2026

Melissa Sintra-pugliese

DEMOLITION, SFD - DETACHED, BUILDING PERMIT RELATEDPROPOSED DEMOLITION OF THE EXISTING DWELLING AND CONSTRUCTION OF A NEW 2-STOREY SFD DWELLING.

Demolition

2 Hawksdale Rd

2 Hawksdale Rd · York Centre

Approved 4 Jun 2026

Proposal for demolition of existing dwelling and construction of a new two storey detached SFD

Demolition

165 Tavistock Rd

165 Tavistock Rd · York Centre

Approved 14 May 2026

Matthew Mario Damaso

Demolish existing house and build new fourplex

Demolition

53 Winston Park Blvd

53 Winston Park Blvd · York Centre

Approved 15 Apr 2026

Proposal to demolish existing dwelling and construct a new fourplex with integral garage.

Demolition

47 Plewes Rd

47 Plewes Rd · York Centre

Approved 19 Mar 2026

Demolish the existing one storey dwelling

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

Chanukah Menorah Lighting At Hidden Trail Park

506 Hidden Trl · York Centre

Allowed 9 Dec 2026

Hours 7:00 p.m.–8:15 p.m.

Setup 9 Dec 2026, 6:30 p.m.–7:00 p.m.

Tear down 9 Dec 2026, 8:15 p.m.–8:30 p.m.

Jewish Russian Speaking Community Of Toronto

Continuous Concrete Pour

Corner Of Wilson Ave. And Wilson Heights Blvd

50 Wilson Heights Blvd · York Centre

Allowed 1 Dec 2026 – 1 Jun 2027

Hours 7:00 a.m.–11:59 p.m.

King Green 50 Wilson Heights Inc.

Construction

Corner Of Wilson Ave. And Wilson Heights Blvd

50 Wilson Heights Blvd · York Centre

Allowed 31 Oct 2026 – 31 Oct 2027

Hours from 6:00 p.m.

King Green 50 Wilson Heights Inc.

Show 7 moreShow fewer
Construction

Corner Of Wilson Ave. And Wilson Heights Blvd

50 Wilson Heights Blvd · York Centre

Allowed 22 Oct 2026 – 30 Sep 2027

Hours from 11:59 p.m.

King Green 50 Wilson Heights Inc.

Construction

Fairbanks Phase 1 Civil

75 Billy Bishop Way · York Centre

Allowed 19 Oct 2026 – 15 Nov 2026

Hours 9:00 p.m.–5:00 a.m.

Valard Construction Lp

Construction

Sanofi Steeles Watermain

1755 Steeles Ave W · York Centre

Allowed 4 Oct 2026 – 23 Dec 2026

Hours 7:00 p.m.–7:00 a.m.

Sanofi Pasteur Limited

Amplified And/or Instrument Sound

Yzd Runway Reels

10 Hanover Rd · York Centre

Allowed 2 Oct 2026 – 24 Oct 2026

Hours 5:30 p.m.–11:00 p.m.

Setup 30 Sep 2026 – 2 Oct 2026, 9:00 a.m.–6:00 p.m.

Tear down 26 Oct 2026 – 28 Oct 2026, 9:00 a.m.–6:00 p.m.

2649843 Ontario Ltd.

Continuous Concrete Pour

Corner Of Wilson Ave. And Wilson Heights Blvd

50 Wilson Heights Blvd · York Centre

Allowed 14 May 2026 – 30 Nov 2026

Hours 7:00 a.m.–11:59 p.m.

King Green 50 Wilson Heights Inc.

Construction

North York

6 Tippett Rd · York Centre

Allowed 9 Feb 2026 – 8 Feb 2027

Hours 6:00 a.m.–7:00 a.m.

Tippett Yorkdale Inc.

Construction

Construction

50 Wilson Heights Blvd · York Centre

Allowed 14 Oct 2025 – 1 Mar 2027

Hours 6:00 a.m.–6:00 p.m., 7:00 a.m.–1:00 p.m.

King Green 50 Wilson Heights Inc.

Events

On the city's calendar. Check before you go.

EnvironmentalFamily/Children

Fire Building with Kory Snache

70 Canuck Ave · York Centre

On 23 Jan 2027

Free

Kory Snache is a cultural land-based educator that works for Wasauksing First Nation. He is from Rama First Nation and h

Event pageAdd to calendar
EnvironmentalFamily/Children

Jr. Forest Explorers: Celebration of Light and Sunshine

70 Canuck Ave · York Centre

On 14 Dec 2026

Free

Join us for a caregiver and toddler nature program. Connect with the natural world through hands-on outdoor activities.

Event pageAdd to calendar
Show 9 moreShow fewer
EnvironmentalFamily/Children

Nature Connection: Bonfire Program – food around the fire

70 Canuck Ave · York Centre

On 13 Dec 2026

Free

We will be learning how to build fires, roasting some snacks and enjoying some time in the forest. This program is inte

Event pageAdd to calendar
EnvironmentalFamily/Children

Buckthorn Wreath-Making

70 Canuck Ave · York Centre

On 28 Nov 2026

Free

Did you know that buckthorn is one of the most invasive shrubs in Ontario? Help us transform these destructive plants in

Event pageAdd to calendar
EnvironmentalFamily/Children

Jr. Forest Explorers: Fall Frolic

70 Canuck Ave · York Centre

On 16 Nov 2026

Free

Fall is coming to an end and it is time to get outdoors for a forest frolic. Join us for a caregiver and toddler nature

Event pageAdd to calendar
CampFamily/Children

Meet Your Neighbour at an Early Local Registration Preparation Event

23 Grandravine Dr · York Centre

On 16 Nov 2026 – 25 Nov 2026

Free · Listed days only

Check out a free recreation centre in person, meet your neighbours if you live nearby and learn more about who is eligib

Event pageAdd to calendar
Farmers' MarketFood/Culinary

Downsview Park Merchants Market

40 Carl Hall Rd · York Centre

On 14 Nov 2026 – 7 Feb 2027

Free · Listed days only

Downsview Park Merchants Market is one of Toronto’s vibrant weekend destinations, offering a dynamic indoor marketplace

Add to calendar
CulturalLive Performances

Storytime At The Park

70 Canuck Ave · York Centre

On 14 Nov 2026 – 12 Dec 2026

Free · Listed days only

Perfect for families and children ages 3 to 9! Enjoy interactive read-alouds of beloved books in English and French, t

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

500 Sheppard Ave W

500 Sheppard Ave W · York Centre

Asked 3 Nov 2026

Application Received

Offical Plan Amendment proposes the development of a 35-storey residential building providing residential. The building will provide a total of 331 residential units, being a mix of 1-bedroom, 1-bedroom+de, 2-bedroom, and 3-bedroom units. A paved access from Canyon Rd along the north property line will be provided,…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Nolan Tipping · [email protected].

Rezoning

4384 Bathurst St

4384 Bathurst St · York Centre

Asked 27 Oct 2026

Under Review

OPA & Rezoning Application proposes the development of a 38-storey mixed-use building providing residential, home and commercial use at grade. The building will provide a total of 558 residential units, being a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units. The building will also provide retail at grade. A…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Marty Rokos · [email protected].

Site plan

6 Tippett Rd

6 Tippett Rd · York Centre

Asked 24 Sep 2026

Under Review

Site Plan Amendment application to amend Site Plan application no. 18 150482 NNY 10 SA for the development of a 17-storey mixed-use building with 416 residential units, including eight (8) two (2)-storey live-work units, and 789 square metres of commercial/retail use (Express Condos - Phase 2), which is under…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Leila Mirriahi · [email protected].

Show 9 moreShow fewer
Site plan

1125 Finch Ave W

1125 Finch Ave W · York Centre

Asked 11 Jun 2026

Under Review

The proposed development to build a Class A, 4-storey self-storage facility offering approximately 14.787 sq. m of GFA and approximately 1,450 climate-controlled storage units. The facility features 3 accessible loading docks, drive up units, 19 parking stalls.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Ali Darouiche · [email protected].

Rezoning

4646 Dufferin St

4646 Dufferin St · York Centre

Asked 2 Apr 2026

Under Review

Official Plan Amendment proposes the comprehensive redevelopment of the Subject Lands with a mixed use development comprised of 6 development blocks containing a range of retail, medical office, community, and residential uses. Since the current application is an Official Plan Amendment only, the plans are conceptual…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Marty Rokos · [email protected].

Rezoning

6200 Bathurst St

6200 Bathurst St · York Centre

Asked 24 Mar 2026

Under Review

OPA & Rezoning Application proposes the development of two residnetial towers, 43-storey and 39-storeys. A total of 1,021 residential units are proposed, being a mix of 1-bedroom, 2-bedroom and 3-bedroom units. A paved access from Fisherville road will be provided, leading to 2 levels of below-grade parking, providing…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Marty Rokos · [email protected].

Rezoning

590 Wilson Ave

590 Wilson Ave · York Centre

Asked 12 Mar 2026

Under Review

Rezoning application and district plan to permit a mixed-use development with a GFA of 705,280 square metres, including 635,780 square metres residential GFA (9,52 9 dwelling units) and 69,500 square metres non-residential GFA comprising 13,471 square metres retail, 24,505 square metres office and 31,524 square metres…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Sophie Knowles · [email protected].

Subdivision

590 Wilson Ave

590 Wilson Ave · York Centre

Asked 12 Mar 2026

Under Review

Draft Plan of Subdivision application to create 28 lots, including 9 mixed-use development blocks, 2 park blocks, 4 POPS blocks, 1 Green Spine block, 1 future Wilson station development block (0.01 ha), 5 end of street reserve blocks, 2 corner rounding blocks, 2 public ROW blocks, and 2 framework road ROW blocks (road…

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Write Sophie Knowles · [email protected].

Site plan

1222 Wilson Ave

1222 Wilson Ave · York Centre

Asked 6 Nov 2025

Under Review

Site Plan Control Application for a 6-storey municipal shelter (HSCIS) containing 80 beds. Council approved July 23, 2025 - By-law 769-2025

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Ben DiRaimo · [email protected].

Rezoning

500 Sheppard Ave W

500 Sheppard Ave W · York Centre

Asked 1 Aug 2025

Under Review

Zoning By-law Amendment proposes the development of a 35-storey mixed use building. The applicant proposes 331 dwelling units, being a mix of 1-bedroom, 1-bedroom+de, 2-bedroom, and 3-bedroom units, 23,000 m2 GFA, 250 bicycle parking spaces, and 68 vehicle parking spaces. The gross FSI is 3.00 and the net FSI is 6.54.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Marty Rokos · [email protected].

Rezoning

271 Cocksfield Ave

271 Cocksfield Ave · York Centre

Asked 3 Jul 2025

Under Review

Official Plan Amendment (OPA) and Zoning By-law Amendment (ZBA) application for the redevelopment of the lands with a twelve (12)-storey residential apartment building with 318 units. The existing six (6) one (1)-storey single-detached houses would be demolished to accommodate the proposed development.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Write Leila Mirriahi · [email protected].

Site plan

1377 Sheppard Ave W

1377 Sheppard Ave W · York Centre

Asked 24 Mar 2025

Under Review

Site plan control application proposing a 1-storey wood panel manufacturing building.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Perry Korouyenis · [email protected].