Fat Bastard Burrito
709 m away · 366 Bloor St E · University-Rosedale
Approved 22 Jul 2026
Opening this block
Home · University-Rosedale · Glen Rd
102 Glen Rd · University-Rosedale. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
709 m away · 366 Bloor St E · University-Rosedale
Approved 22 Jul 2026
754 m away · 365 Bloor St E · Toronto Centre
Approved 3 Feb 2026
773 m away · 600 Sherbourne St · Toronto Centre
Approved 20 Sep 2025
800 m away · 345 Bloor St E · Toronto Centre
Approved 28 Apr 2026
800 m away · 345 Bloor St E · Toronto Centre
Approved 29 Apr 2026
818 m away · 84 Howard St · Toronto Centre
Approved 31 Oct 2026
821 m away · 27 Howard St · Toronto Centre
Approved 6 Mar 2026
823 m away · 29 Howard St · Toronto Centre
Approved 19 Nov 2025
823 m away · 90 Howard St · Toronto Centre
Approved 21 Dec 2025
827 m away · 100 Howard St · Toronto Centre
Approved 4 Jun 2026
841 m away · 396 Summerhill Ave · University-Rosedale
Approved 1 Jun 2026
841 m away · 396 Summerhill Ave · University-Rosedale
Approved 28 Aug 2026
1.0 km away · 160 Bloor St E · University-Rosedale
Approved 5 Aug 2026
The city has allowed these. Work may not have started. The permits in this area list 8 homes.
0 m away · 102 Glen Rd · University-Rosedale
Approved 10 Jul 2026
1 new home · Antonio Lima
The permit lists 1 homes.
Proposal for third storey addition, side building addition, side yard deck and waterfeature reconstruction, wall repair, interior alterations.
556 m away · 9 Hawthorn Ave · University-Rosedale
Approved 11 Aug 2025
1 new home
The permit lists 1 homes.
Proposal to convert existing garage to a garden suite with ground and second floor addition.
605 m away · 8 Mc Kenzie Ave · University-Rosedale
Approved 5 Oct 2026
1 new home
The permit lists 1 homes.
Proposal for interior alteration (interior finishing, insulation, drywall and painting) to change the garage with storage loft to a garden suite
626 m away · 14 Mc Kenzie Ave · University-Rosedale
Approved 5 Feb 2025
1 new home · Moe Nikaien
The permit lists 1 homes.
PROPOSED 2 STOREY SFD HOUSE w/ REAR DETACHED GARAGE
647 m away · 123 Douglas Dr · University-Rosedale
Approved 8 Apr 2025
1 new home
The permit lists 1 homes.
Proposal to convert 1 storey garage to 2 storey garden suite with garage.
672 m away · 154 Roxborough Dr · University-Rosedale
Approved 28 Nov 2025
1 new home
The permit lists 1 homes.
Proposal to renovate semi-detached garage and add a garden suite.
702 m away · 360 Bloor St E · University-Rosedale
Approved 16 Mar 2026
Localized mastic and associated concrete repairs within the garage interior, garage roof deck waterproofing replacement at the breezeway, alleyway elastomeric waterproofing, painting to reinstate the finishes within the…
715 m away · 162 Douglas Dr · University-Rosedale
Approved 18 Aug 2026
1 new home
The permit lists 1 homes.
Proposal for a rear garden suite
767 m away · 611 Sherbourne St · Toronto Centre
Approved 2 Sep 2026
Revision No.3: ADDITION OF DEMISING PARTITION WALL IN RETAIL SHELL SPACE. REPLACES ARCHITECTURAL PAGES A2.01a, A4.03REV : Proposed revision for framing. Proposal to construct a new 53 storey mixed use building with 501…
823 m away · 25 Howard St · Toronto Centre
Approved 28 Jan 2025
Proposed interior alterations to an existing mixed-use building in the first and second floor residential units.
902 m away · 12 Cluny Dr · University-Rosedale
Approved 23 Jan 2026
1 new home · Greengold Construction Ltd
The permit lists 1 homes.
Proposal to construct a new 3 storey detached dwelling with integral garage.
922 m away · 50 Crescent Rd · University-Rosedale
Approved 10 Sep 2025
Erol Uzumeri
Rev 02: changes to car elevator as per CoA decision, changes to structural and rebuild of existing walls and floor as per site deficienciesRev 01: Revision to permit to shift basement car elevator and ground floor…
The city has allowed these buildings to come down. They may still be standing.
626 m away · 14 Mc Kenzie Ave · University-Rosedale
Approved 5 Feb 2025
Moe Nikaien
DEMOLITION, SFD - Detached, Building Permit RelatedProposed demolition of the existing dwelling and construction of a new 2-storey single family detached dwelling.
902 m away · 12 Cluny Dr · University-Rosedale
Approved 7 Oct 2025
Proposal to demolish existing three storey dwelling.
Hours the city has already allowed.
846 m away · 591 Sherbourne St · Toronto Centre
Allowed 5 Aug 2026 – 6 Feb 2027
Hours from 7:00 a.m.
591 Sherbourne Street Limited
On the city's calendar. Check before you go.
1.0 km away · 550 Bayview Ave · University-Rosedale
On 14 Nov 2026 – 6 Feb 2027
Free · Listed days only
Discover Toronto’s largest farmers market, happening year-round every Saturday at Evergreen Brick Works! Shop fresh, sea
Event pageAdd to calendar1.0 km away · 550 Bayview Ave · University-Rosedale
On 29 Nov 2026 – 20 Dec 2026
Listed days only
Toronto's most exciting holiday market is back for 2026! The holidays are better when they’re shared. The Winter Market
Event pageAdd to calendarSomeone has asked the city for a change. Nothing here is a decision.
739 m away · 350 Bloor St E · University-Rosedale
Asked 6 Jul 2022
Under Review
Proposal to construct a 63-storey mixed-use building on the subject site. The existing six-storey office building will be replaced. Approximately 486 square metres of retail is proposed at grade, with approximately 8,259 square metres of office space proposed on floors one to seven, and approximately 39,356 square…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
887 m away · 576 Sherbourne St · Toronto Centre
Asked 27 Apr 2023
Under Review
Site Plan Application for a 61-storey residential building that will contain 716 residential dwelling units (including 45 replacement rental units).
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
887 m away · 576 Sherbourne St · Toronto Centre
Asked 27 Apr 2023
OMB Appeal
Official Plan Amendment & Rezoning for a 69-storey residential building that will contain 872 residential dwelling units (including rental replacement units).
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
927 m away · 47 Huntley St · Toronto Centre
Asked 29 Apr 2022
Under Review
59-storey (west tower) and 48-storey (east tower) mixed-use buildings that will include: affordable rental units, rental replacement units, community space, retail, a daycare facility, on-site parkland dedication, as well as 4 levels of underground parking.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
928 m away · 49 Huntley St · Toronto Centre
Asked 19 Oct 2021
Appeal Received
Proposed Official Plan and Zoning By-law Amendment for 59-storey (west tower) and 48-storey (east tower) mixed-use buildings that will include: affordable rental units, rental replacement units, community spaces, retail, a daycare facility, on-site parkland dedication, as well as 4 levels of underground parking.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
1.0 km away · 40 Park Rd · University-Rosedale
Asked 12 Aug 2025
OMB Appeal
Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development includes 289 purpose-built dwelling units, inclusive of 40 rental replacement units and…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
1.0 km away · 40 Huntley St · Toronto Centre
Asked 11 Dec 2025
Under Review
To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street, 30-32 Huntley Street, and 38-40 Huntley Street.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.