Opening this block

Home · Toronto Centre · Bloor St E

What's new around 345 Bloor St E

345 Bloor St E · Toronto Centre. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Cmto

379 m away · 175 Bloor St E · University-Rosedale

Applied 23 Oct 2026

Not Started

REV01: Revision for structural engineering drawings for telescoping partition.Proposal for interior alterations to existing office space - UNITS 600 & 603, "CMTO"

Being built

The city has allowed these. Work may not have started. The permits in this area list 496 homes.

Multiple Unit Building

360 Bloor St E

106 m away · 360 Bloor St E · University-Rosedale

Approved 16 Mar 2026

Localized mastic and associated concrete repairs within the garage interior, garage roof deck waterproofing replacement at the breezeway, alleyway elastomeric waterproofing, painting to reinstate the finishes within the…

Mixed Use/res W Non Res

611 Sherbourne St

136 m away · 611 Sherbourne St · Toronto Centre

Approved 2 Sep 2026

Revision No.3: ADDITION OF DEMISING PARTITION WALL IN RETAIL SHELL SPACE. REPLACES ARCHITECTURAL PAGES A2.01a, A4.03REV : Proposed revision for framing. Proposal to construct a new 53 storey mixed use building with 501…

Multiple Unit Building

25 Howard St

240 m away · 25 Howard St · Toronto Centre

Approved 28 Jan 2025

Proposed interior alterations to an existing mixed-use building in the first and second floor residential units.

Show 21 moreShow fewer
Apartment

88 Isabella St

414 m away · 88 Isabella St · Toronto Centre

Approved 17 Sep 2026

Conditional Permit - Part Permit - Construction of a new 50 storey purpose built rental (PBR) residential building BLD NB permit, including PLB and HVAC, with 508 dwelling units (including 82 rental replacement units),…

Multiple Unit Building

620 Church St

471 m away · 620 Church St · Toronto Centre

Approved 5 Oct 2026

PROPOSED EXTERIOR WALL REPAIRS

Apartment

717 Church St

609 m away · 717 Church St · University-Rosedale

Approved 17 Mar 2026

303 new homes

The permit lists 303 homes.

To construct a 28 storey residential building with 303 units and 2 levels of below grade

Laneway suite

8 Mc Kenzie Ave

695 m away · 8 Mc Kenzie Ave · University-Rosedale

Approved 5 Oct 2026

1 new home

The permit lists 1 homes.

Proposal for interior alteration (interior finishing, insulation, drywall and painting) to change the garage with storage loft to a garden suite

Apartment

771 Yonge St

719 m away · 771 Yonge St · University-Rosedale

Approved 25 Mar 2025

REVISION 01 :front vestibule, alter unit 2402 and install one (1) additional rated door in stairwell vestibule of floor 19Proposal for a new 25 Storey mixed use Condominium with 3 level underground Garage. ALT SOL 21…

New house

14 Mc Kenzie Ave

739 m away · 14 Mc Kenzie Ave · University-Rosedale

Approved 5 Feb 2025

1 new home · Moe Nikaien

The permit lists 1 homes.

PROPOSED 2 STOREY SFD HOUSE w/ REAR DETACHED GARAGE

Mixed Use/res W Non Res

1 Bloor St W

746 m away · 1 Bloor St W · University-Rosedale

Approved 23 Oct 2026

Revision 05: Permit revisions on Levels 39-56 for applications 19 106142 for the construction of a 85-storey mixed use residential with non-residential buildingProposal to construct an 86 storey mixed use apartment…

Laneway suite

9 Hawthorn Ave

765 m away · 9 Hawthorn Ave · University-Rosedale

Approved 11 Aug 2025

1 new home

The permit lists 1 homes.

Proposal to convert existing garage to a garden suite with ground and second floor addition.

Multiple Unit Building

21 Balmuto St

798 m away · 21 Balmuto St · University-Rosedale

Approved 26 Nov 2025

Proposal for underground garage repairs and waterproofing to an existing mixed use builidng.

New house

102 Glen Rd

800 m away · 102 Glen Rd · University-Rosedale

Approved 10 Jul 2026

1 new home · Antonio Lima

The permit lists 1 homes.

Proposal for third storey addition, side building addition, side yard deck and waterfeature reconstruction, wall repair, interior alterations.

Multiple Unit Building

646 Yonge St

808 m away · 646 Yonge St · Toronto Centre

Approved 10 Mar 2026

Proposal to enlarge an existing window on the south wall of an existing ground floor restaurant - "Republique"Convenience address is 2 Irwin Ave.

New house

12 Cluny Dr

837 m away · 12 Cluny Dr · University-Rosedale

Approved 23 Jan 2026

1 new home · Greengold Construction Ltd

The permit lists 1 homes.

Proposal to construct a new 3 storey detached dwelling with integral garage.

14 homes

20 Maitland St

898 m away · 20 Maitland St · Toronto Centre

Approved 12 Jun 2026

14 new homes

The permit lists 14 homes.

Rev 01 - Construction of 1 additional floor.Construction of a new 40-storey building (41st partial storey) with 502 residential units, and a 2-storey below grade parking garage

Multiple Unit Building

584 Yonge St

899 m away · 584 Yonge St · Toronto Centre

Approved 28 Oct 2025

Party wall admin permit related to 582 Yonge St (25-217435 BLD 00 BA)

Multiple Unit Building

580 Yonge St

903 m away · 580 Yonge St · Toronto Centre

Approved 28 Oct 2025

Party wall admin permit related to 582 Yonge St (25-217435 BLD 00 BA)

Mixed Use/res W Non Res

50 Cumberland St

907 m away · 50 Cumberland St · University-Rosedale

Approved 30 Oct 2025

REV 01: Updated suite mix, as well updated Mechanical & Electrical drawings.Proposal to construct a mixed-use residential and commercial building consisting of (1) 42 Storey and (1) 64 storey residential towers above a…

Multiple Unit Building

920 Yonge St

931 m away · 920 Yonge St · University-Rosedale

Approved 19 Feb 2026

Revision to - see list provided.PROPOSAL FOR INTERIOR ALTERATIONS on GROUND FLOOR FROM STORAGE/LOADING AREA TO VETERINARY MRI AND STORAGE. UNIT B2TLAB REF: 19 248028 S45 11 TLAB

Multiple Unit Building

549 Parliament St

1.0 km away · 549 Parliament St · Toronto Centre

Approved 20 Oct 2026

Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator…

15 homes

344 Jarvis St

1.0 km away · 344 Jarvis St · Toronto Centre

Approved 12 Jan 2026

15 new homes · 2459024 Ontario Inc

The permit lists 15 homes.

Proposal to alter the existing two-and-one-half-storey semi-detached rooming house by constructing a 3 storey rear addition; underpinning. 12 new rooms to be added (4 accessible at ground floor)

Multiple Unit Building

1170 Bay St

1.0 km away · 1170 Bay St · University-Rosedale

Approved 13 May 2026

Proposal for interior alterations to the vestibule and creating a barrier free washroom.Convenience address is 1168 Bay St

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

14 Mc Kenzie Ave

739 m away · 14 Mc Kenzie Ave · University-Rosedale

Approved 5 Feb 2025

Moe Nikaien

DEMOLITION, SFD - Detached, Building Permit RelatedProposed demolition of the existing dwelling and construction of a new 2-storey single family detached dwelling.

Demolition

1075 Bay St

943 m away · 1075 Bay St · Toronto Centre

Approved 18 Aug 2026

Proposal to demolish existing office building down to grade. See also 25-213516 STE 13 OZ

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

591 Sherbourne

173 m away · 591 Sherbourne St · Toronto Centre

Allowed 5 Aug 2026 – 6 Feb 2027

Hours from 7:00 a.m.

591 Sherbourne Street Limited

Other

Oil-filling Transformer Unit

350 m away · 83 Charles St E · Toronto Centre

Allowed 26 Oct 2026 – 9 Nov 2026

Hours from 11:59 p.m.

Hydro One Networks Inc.

Construction

Charles Transformer Station

350 m away · 83 Charles St E · Toronto Centre

Allowed 12 Nov 2026 – 3 Dec 2026

Hours from 11:59 p.m.

Hydro One Networks Inc.

Show 6 moreShow fewer
Amplified And/or Instrument Sound

Halloween At The Manor

609 m away · 580 Church St · Toronto Centre

Allowed 30 Oct 2026 – 31 Oct 2026

Hours from 7:00 p.m.

Setup 30 Oct 2026, 6:00 p.m.–7:00 p.m.

Tear down 31 Oct 2026, from 2:00 a.m.

Storm Crow Manor Llt

Construction

Roof Replacement

626 m away · 33 Bloor St E · University-Rosedale

Allowed 13 Sep 2026 – 15 Nov 2026

Hours 10:00 a.m.–5:00 p.m.

Triumph Roofing & Sheet Metal Inc.

Construction

One Bloor West

746 m away · 1 Bloor St W · University-Rosedale

Allowed 7 Sep 2026 – 30 Sep 2027

Hours 6:30 a.m.–11:00 p.m.

Deltera Construction Ltd

Amplified And/or Instrument Sound

Halloween On Church

826 m away · 512 Church St · Toronto Centre

Allowed 30 Oct 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:59 p.m., 6:30 p.m.–11:59 p.m.

Setup 30 Oct 2026, 7:00 a.m.–6:30 p.m.

Tear down 31 Oct 2026 – 1 Nov 2026, 11:59 p.m.–6:30 a.m.

Church Wellesley Village Bia

Construction

Manulife Centre Parking Garage Rehabilitation

887 m away · 55 Bloor St W · University-Rosedale

Allowed 5 Mar 2026 – 30 Oct 2026

Hours 10:00 p.m.–8:00 a.m.

Manulife Financial

Events

On the city's calendar. Check before you go.

DanceLive Performances

Immersion Festival

485 m away · 504 Jarvis St · Toronto Centre

On 14 Nov 2026 – 22 Nov 2026

Listed days only

Join us for a celebration of Canadian cultural life for audiences and a sought-after performance and networking opportun

Event pageAdd to calendar
Arts/ExhibitsCultural

A Legacy in Motion: The National Ballet of Canada at 75

700 m away · 789 Yonge St · University-Rosedale

On 14 Nov 2026 – 10 Jan 2027

Free

Explore 75 years of The National Ballet of Canada through archival content from Toronto Public Library Special Collectio

Add to calendar
Charity/CauseLiterary

Christmas Book Sale

700 m away · 789 Yonge St · University-Rosedale

On 19 Nov 2026 – 21 Nov 2026

Holidays are arriving early at the Reference Library! Perfect for the gift-giving season, find deep discounts on books,

Add to calendar
Show 3 moreShow fewer
Talks

Ecosystem Connects: AI and Beyond - Kick-off to the TPL AI Summit

700 m away · 789 Yonge St · University-Rosedale

On 27 Nov 2026

Free

​Kick off the Toronto Public Library AI Summit with a half-day forum presented by the City of Toronto’s Office of Techno

Event pageAdd to calendar
DanceLive Performances

Immersion Festival

809 m away · 404 Jarvis St · Toronto Centre

On 14 Nov 2026 – 22 Nov 2026

Listed days only

Join us for a celebration of Canadian cultural life for audiences and a sought-after performance and networking opportun

Event pageAdd to calendar
Live PerformancesMusic

Dog Days: Canadian Opera Premiere

859 m away · 877 Yonge St · University-Rosedale

On 18 Nov 2026 – 22 Nov 2026

Listed days only

A contemporary opera that combines classical vocals with dark ambient noise and amplified electric guitars. Set during

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

350 Bloor St E

106 m away · 350 Bloor St E · University-Rosedale

Asked 6 Jul 2022

Under Review

Proposal to construct a 63-storey mixed-use building on the subject site. The existing six-storey office building will be replaced. Approximately 486 square metres of retail is proposed at grade, with approximately 8,259 square metres of office space proposed on floors one to seven, and approximately 39,356 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Chris Pereira · [email protected].

Site plan

47 Huntley St

126 m away · 47 Huntley St · Toronto Centre

Asked 29 Apr 2022

Under Review

59-storey (west tower) and 48-storey (east tower) mixed-use buildings that will include: affordable rental units, rental replacement units, community space, retail, a daycare facility, on-site parkland dedication, as well as 4 levels of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Rezoning

49 Huntley St

127 m away · 49 Huntley St · Toronto Centre

Asked 19 Oct 2021

Appeal Received

Proposed Official Plan and Zoning By-law Amendment for 59-storey (west tower) and 48-storey (east tower) mixed-use buildings that will include: affordable rental units, rental replacement units, community spaces, retail, a daycare facility, on-site parkland dedication, as well as 4 levels of underground parking.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Abraham Plunkett-Latimer · [email protected].

Show 21 moreShow fewer
Site plan

576 Sherbourne St

169 m away · 576 Sherbourne St · Toronto Centre

Asked 27 Apr 2023

Under Review

Site Plan Application for a 61-storey residential building that will contain 716 residential dwelling units (including 45 replacement rental units).

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Rezoning

576 Sherbourne St

169 m away · 576 Sherbourne St · Toronto Centre

Asked 27 Apr 2023

OMB Appeal

Official Plan Amendment & Rezoning for a 69-storey residential building that will contain 872 residential dwelling units (including rental replacement units).

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

40 Huntley St

187 m away · 40 Huntley St · Toronto Centre

Asked 11 Dec 2025

Under Review

To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street, 30-32 Huntley Street, and 38-40 Huntley Street.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Rezoning

137 Isabella St

281 m away · 137 Isabella St · Toronto Centre

Asked 26 Feb 2024

OMB Appeal

Zoning By-law Amendment for a 69-storey residential building containing 823 dwelling units. The existing 7-storey apartment building and 3-storey single detached dwelling on the site would be demolished. The 61 demolished rental units would be replaced in the new proposal. The proposed redevelopment consists of a…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Stephan Posikira · [email protected].

Site plan

135 Isabella St

283 m away · 135 Isabella St · Toronto Centre

Asked 21 Jun 2023

Under Review

Proposed 69 storey residential building with 770 units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Rezoning

10 Huntley St

328 m away · 10 Huntley St · Toronto Centre

Asked 7 Nov 2021

Appeal Received

Official Plan and Zoning by-law amendment application to facilitate the redevelopment of the site for a 29-storey infill residential building having a gross floor area of 15,000 square metres and 213 new residential units. The existing 20-storey apartment building containing 117 rental units will be maintained.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Stephan Posikira · [email protected].

Site plan

10 Huntley St

328 m away · 10 Huntley St · Toronto Centre

Asked 18 Aug 2022

Under Review

Proposed 29-storey residential building fronting Jarvis Street including just under 15,000sqm of new gross floor area. In total, the maximum height of the proposed building is 99.0m, including a three-storey podium and 7m mechanical penthouse. In total, this represents a Floor Space Index of 11.70. The proposed unit…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Site plan

2 Earl St

343 m away · 2 Earl St · Toronto Centre

Asked 23 Sep 2024

Under Review

Site Plan Application to permit a 63-storey residential building including a total of 50,580.8 square metres of residential gross floor area which will result in a total of 730 total dwelling units.The proposal includes two (2) residential visitor parking spaces and zero (0) residential spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

90 Isabella St

366 m away · 90 Isabella St · Toronto Centre

Asked 30 May 2022

Under Review

Site Plan Approval for proposed for a 69-storey mixed-use building having a gross floor area of 52,797 square metres and 837 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Rezoning

118 Earl Pl

370 m away · 118 Earl Pl · Toronto Centre

Asked 4 Aug 2022

Appeal Received

Proposed 58-storey residential building containing 818 dwelling units (including 31 rental replacement units) and 96.8 square metres of retail space on the ground floor.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

102 Earl Pl

387 m away · 102 Earl Pl · Toronto Centre

Asked 4 Aug 2022

Appeal Received

Site Plan Control application for a 58-storey residential building containing 818 dwelling units (including 31 rental replacement units) and 96.8 square metres of retail space on the ground floor.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

625 Church St

396 m away · 625 Church St · University-Rosedale

Asked 30 Apr 2021

Under Review

Site Plan Approval application for a 59-storey mixed-use tower, inclusive of a 6-storey podium. The proposed non-residential gross floor area is 10,488 square metres, and a residential gross floor area of 46,282 square metres. A total of 656 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Konain Edhi · [email protected].

Site plan

88 Isabella St

414 m away · 88 Isabella St · Toronto Centre

Asked 26 Apr 2022

NOAC Issued

Site Plan Control application for a 50-storey residential development containing 508 units, of which 82 are rental replacement units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Site plan

545 Sherbourne St

417 m away · 545 Sherbourne St · Toronto Centre

Asked 27 Apr 2018

NOAC Issued

Site Plan Control application for a 51-storey mixed use building with a GFA of 35,000 sq. m with 499 sq. m of retail space and 511 residential units, and the total number of rental units on the Block is 2057 units, of which 24 are rental replacement units (and therefore not market). The overall FSI is 7.38.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Rezoning

81 Isabella St

446 m away · 81 Isabella St · Toronto Centre

Asked 10 Jun 2025

OMB Appeal

Zoning By-law Amendment for a 69-storey residential building, containing 647 dwelling units, including 48 replacement rental dwelling units.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

66 Charles St E

476 m away · 66 Charles St E · University-Rosedale

Asked 5 Jul 2024

Under Review

Site Plan Approval for an 11-storey residential apartment building containing 16 dwelling units while preserving the existing heritage building.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Konain Edhi · [email protected].

Rezoning

48 Isabella St

566 m away · 48 Isabella St · Toronto Centre

Asked 23 Jun 2025

Under Review

Combined Official Plan & Zoning By-law Amendment for a 69-storey residential apartment building and will contain a total of 814 dwelling units, including 84 rental replacement units.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Stephan Posikira · [email protected].

Rezoning

40 Park Rd

580 m away · 40 Park Rd · University-Rosedale

Asked 12 Aug 2025

OMB Appeal

Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development includes 289 purpose-built dwelling units, inclusive of 40 rental replacement units and…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write David Driedger · [email protected].

Rezoning

55 Isabella St

587 m away · 55 Isabella St · Toronto Centre

Asked 17 Mar 2026

Under Review

The application proposes to amend the Zoning By-law to permit a 75-storey mixed-use building (250.5 metres including mechanical penthouse) containing 92 square metres of ground floor retail space, 1,064 square metres of office space, and 843 dwelling units, including the replacement of 83 existing rental dwelling…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Christy Chow · [email protected].

Rezoning

2 Bloor St E

616 m away · 2 Bloor St E · University-Rosedale

Asked 22 Apr 2026

Under Review

Zoning By-law Amendment to permit a self-storage warehouse use on floors 2-5 (formely The Bay retail space). The existing ground floor retail unit will be maintained. Access for loading and parking will be from Asquith Avenue. No new development is proposed on site.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Aviva Pelt · [email protected].

Site plan

240 Wellesley St E

632 m away · 240 Wellesley St E · Toronto Centre

Asked 27 Apr 2022

Under Review

Site Plan Approval application to permit three new buildings on the lands, comprising a 47-storey mixed-use building with 5,770 square metres of non-residential uses in the lower floors and 620 dwelling units, a 21-storey building with 300 dwelling units, and a 9-storey building with 65 dwelling units, including 27…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].