Opening this block

Home · Toronto Centre · River St

What's new around 119 River St

119 River St · Toronto Centre. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Taco Bell

200 m away · 650 Dundas St E · Toronto Centre

Applied 10 Nov 2026

Not Started

REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

Permit application

Shoppers Drug Mart

579 m away · 661 Queen St E · Toronto-Danforth

Applied 25 Aug 2026

Revision Issued

Revision 1: Proposal for interior alterations to an existing retail store - "Shoppers Drug Mart"

Permit application

Brother Joseph Dooley Apartments

643 m away · 412 Queen St E · Toronto Centre

Applied 7 Jul 2026

Permit Issued

Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance…

Show 1 moreShow fewer
Permit application

Bailey Nelson

807 m away · 747 Queen St E · Toronto-Danforth

Applied 12 Feb 2026

Inspection

Proposal for interior alterations to change from a restaurant with less than 30 seats to a retail store - "Bailey Nelson".

Being built

The city has allowed these. Work may not have started. The permits in this area list 836 homes.

Apartment

83 River St

113 m away · 83 River St · Toronto Centre

Approved 13 Oct 2026

Conditional Permit - Part Permit - Proposal to construct a 37 Storey residential condominium with 3 levels of underground parking, retail on grade, and various amenity spaces.

Other

300 Bayview Ave

320 m away · 300 Bayview Ave · Toronto Centre

Approved 30 Oct 2026

Part Permit - Proposal for an addition to exisiting car dealership consisting of a 4 Storey building elevated on columns with roof top parking, for same purposes.

Multiple Unit Building

585 Dundas St E

346 m away · 585 Dundas St E · Toronto Centre

Approved 6 Aug 2026

REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for tenant fit up

Show 21 moreShow fewer
Multiple Unit Building

620 Dundas St E

383 m away · 620 Dundas St E · Toronto Centre

Approved 26 Sep 2025

Proposed interior alteration to create a studio space for the Randolph College for the Performing Arts within the Daniels Artworks mixed-use condominium development located in Toronto's Regent Park. (688 Dundas St E is…

Multiple Unit Building

510 King St E

501 m away · 510 King St E · Toronto Centre

Approved 19 Jun 2026

Interior alterations to an existing dental office.

Multiple Unit Building

661 Queen St E

579 m away · 661 Queen St E · Toronto-Danforth

Approved 28 Sep 2026

Revision 1: Proposal for interior alterations to an existing retail store - "Shoppers Drug Mart"

Multiple Unit Building

677 Queen St E

614 m away · 677 Queen St E · Toronto-Danforth

Approved 22 Sep 2026

Proposal for piling and shoring to allow for remediation of the site.

Laneway suite

9 Spruce St

780 m away · 9 Spruce St · Toronto Centre

Approved 12 Nov 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new laneway suite (Unit # R)

Apartment

759 Queen St E

829 m away · 759 Queen St E · Toronto-Danforth

Approved 26 Jan 2026

28 new homes

The permit lists 28 homes.

7 Storey mixed use with 28 residential and 3 commercial on the ground floor(condo not rental units as per applicant)

Mixed Use/res W Non Res

759 Queen St E

829 m away · 759 Queen St E · Toronto-Danforth

Approved 7 Jul 2026

REV: Revision to Permit 23 210061 BLD 00 NB to install cladding east and west elevations - this material change request is due to the water penetration issues on both faces of the building. 7 Storey mixed use with 28…

Long Term Care Facility

55 Eastern Ave

844 m away · 55 Eastern Ave · Toronto Centre

Approved 29 May 2025

Proposal to construct a new 13 storey Long Term Care Facility with 348 beds, 2 clinical tenant spaces, administration areas, and support services. See also 21 151369 STE 12 SA.

Apartment

393 Dundas St E

852 m away · 393 Dundas St E · Toronto Centre

Approved 12 Nov 2026

Conditional Permit - Site Service - Proposing to construct a slab-on-grade, 4-storey plus mechanical penthouse and roof deck, 12 unit affordable housing residential building

Multiple Unit Building

314 Queen St E

856 m away · 314 Queen St E · Toronto Centre

Approved 11 Sep 2026

Demolish rear yard deteriorated stand alone building extension. The rear wall of the original building shall remain intact (addition was not connected to the existing building).

1 homes

3 Gilead Pl

863 m away · 3 Gilead Pl · Toronto Centre

Approved 23 Jan 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations to convert existing manufacturing building to a live/work studio and office.building. See also 18 255069 ZZC, 19 155691 MV and Final and Binding A0522/19TEY.

1 homes

261 Gerrard St E

879 m away · 261 Gerrard St E · Toronto Centre

Approved 27 Jun 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations.

6 homes

26B Lewis St

882 m away · 26B Lewis St · Toronto-Danforth

Approved 10 Jun 2026

6 new homes

The permit lists 6 homes.

Proposal to construct a new three-storey 14-unit apartment building that will span over 3 lots (municipally known as 24 Lewis Street, 26 Lewis Street and 26B Lewis Street). This apartment building will contain a total…

Laneway suite

26B Lewis St

882 m away · 26B Lewis St · Toronto-Danforth

Approved 11 Sep 2026

1 new home

The permit lists 1 homes.

Proposal to construct a 1 storey garden suite with a basement

6 homes

24 Lewis St

883 m away · 24 Lewis St · Toronto-Danforth

Approved 10 Jun 2026

6 new homes

The permit lists 6 homes.

Proposal to construct a new three storey six unit townhouse apartment building with a front porch, front basement walkout, second storey front and rear balconies, rear basement walkout and a rear porch will be…

Laneway suite

24 Lewis St

883 m away · 24 Lewis St · Toronto-Danforth

Approved 16 Jun 2026

1 new home

The permit lists 1 homes.

Proposal for a one-storey rear yard garden suite with basement and a front porch.

Multiple Unit Building

779 Queen St E

891 m away · 779 Queen St E · Toronto-Danforth

Approved 14 Jul 2026

Proposed interior renovations that includes addition of 2 consultation rooms, staff room and installation of new rear exit for an optometry clinic.

3 homes

23 Lewis St

916 m away · 23 Lewis St · Toronto-Danforth

Approved 8 Jan 2025

3 new homes

The permit lists 3 homes.

Proposal to demolish existing dwelling and construct a new fourplex

Laneway suite

23 Lewis St

916 m away · 23 Lewis St · Toronto-Danforth

Approved 20 Jun 2025

1 new home

The permit lists 1 homes.

Construct a new rear yard laneway suite ancillary to Fourplex

Multiple Unit Building

237 Gerrard St E

946 m away · 237 Gerrard St E · Toronto Centre

Approved 4 Feb 2025

Proposal for administrative party wall permit for work on first, second, and thirdfloor party wall adjacent to work pursuant next door for 24137315 BLD 00 BA (391 ONTARIO ST)

Multiple Unit Building

334 King St E

1.0 km away · 334 King St E · Toronto Centre

Approved 9 Jul 2026

Proposal for interior alteration on the ground floor for an appliance showroom

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

119 River St

0 m away · 119 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing 2 storey mixed use building containing one (1) three-bedroom rental dwelling unit and one (1) retail unit;See 21 236273 BLD for future development (mixed use condo).

Demolition

121 River St

6 m away · 121 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing single family dwelling (townhouse). See 21 236273 BLD for future development (mixed use condo).

Demolition

117 River St

6 m away · 117 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing mixed-use building containing one (1) owner-occupied residential dwelling unit, one (1) one-bedroom rental dwelling unit and one (1) retail unit.See 21 236273 BLD for future development…

Show 14 moreShow fewer
Demolition

123 River St

13 m away · 123 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing 2 storey single family dwelling containing one (1) three-bedroom rental dwelling unit.See 21 236273 BLD for future development (mixed use condo).

Demolition

113 River St

17 m away · 113 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing single family dwelling (townhouse). See 21 236273 BLD for future development (mixed use condo).

Demolition

125 River St

21 m away · 125 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing mixed-use building containing one (1) owner¿occupied residential dwelling unit and one (1) commercial unit.See 21 236273 BLD for future development (mixed use condo).

Demolition

260 Sumach St

338 m away · 260 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

266 Sumach St

364 m away · 266 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

415 Gerrard St E

373 m away · 415 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

427 Gerrard St E

402 m away · 427 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

407 Gerrard St E

432 m away · 407 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

295 Sackville St

450 m away · 295 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

319 Sackville St

492 m away · 319 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

361 Gerrard St E

502 m away · 361 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

70 Allen Ave

757 m away · 70 Allen Ave · Toronto-Danforth

Approved 4 Jul 2025

1887981 Ontario Limited

Proposal to demolish existing one-storey dwelling and construct two semi-detached dwellings. See also 23-149947 STE 14 CO, 24-207758 BLD 00 NH, 24-207793 BLD 00 NH.

Demolition

11 Sunlight Park Rd

880 m away · 11 Sunlight Park Rd · Toronto-Danforth

Approved 11 Sep 2026

Proposed demolition of main building (Car Dealership). Secondary structures, car wash and storage building will be processed as separate permits.

Demolition

341 Eastern Ave

1.0 km away · 341 Eastern Ave · Toronto-Danforth

Approved 6 Oct 2025

Proposal for demolishing existing building and leave land level & clear to allow for construction access, laydown and material storage. Lands also required for future roadway construction.

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

The Riv

113 m away · 83 River St · Toronto Centre

Allowed 28 Sep 2026 – 28 Mar 2027

Hours from 7:00 a.m., from 9:00 a.m.

Labatt River Developments Inc.

Amplified And/or Instrument Sound

October Funfest

383 m away · 620 Dundas St E · Toronto Centre

Allowed 24 Oct 2026

Hours 1:00 p.m.–3:00 p.m.

Setup 24 Oct 2026, 10:00 a.m.–12:59 p.m.

Tear down 24 Oct 2026, 3:01 p.m.–5:00 p.m.

Fred Victor Centre

Amplified And/or Instrument Sound

Riverside C'mon Events Series

454 m away · 10 Thompson St · Toronto-Danforth

Allowed 6 Jun 2026 – 25 Oct 2026

Hours 10:00 a.m.–8:00 p.m.

Setup 6 Jun 2026, 7:30 a.m.–10:00 a.m.; 20 Sep 2026, 7:30 a.m.–10:00 a.m.…

Tear down 6 Jun 2026, 8:00 p.m.–9:00 p.m.; 20 Sep 2026, 8:00 p.m.–9:00 p.m.…

Riverside Business Improvement Area

Show 4 moreShow fewer
Construction

Tchc Rental Building 4a

580 m away · 325 Gerrard St E · Toronto Centre

Allowed 1 Apr 2026 – 1 Apr 2027

Hours 6:00 a.m.–11:00 p.m.

Metro Toronto Housing Corporation

Continuous Concrete Pour

Regent Park Tower 4a

580 m away · 325 Gerrard St E · Toronto Centre

Allowed 24 Aug 2026 – 28 Feb 2027

Hours from 6:00 a.m.

Deltera Contracting Inc

Amplified And/or Instrument Sound

Glow N Treat

840 m away · 77 First Ave · Toronto-Danforth

Allowed 31 Oct 2026

Hours 6:00 p.m.–8:00 p.m.

Setup 31 Oct 2026, 5:00 p.m.–6:00 p.m.

Tear down 31 Oct 2026, 8:00 p.m.–9:00 p.m.

Toronto Community Alliance Church

Construction

Rekai Cherry Place Campus Of Care

844 m away · 55 Eastern Ave · Toronto Centre

Allowed 12 Aug 2026 – 15 Jul 2027

Hours 7:00 p.m.–9:00 p.m., 7:00 a.m.–9:00 a.m.

Multiplex Construction Canada Limited

Events

On the city's calendar. Check before you go.

CampFamily/Children

Meet Your Neighbour at an Early Local Registration Preparation Event

266 m away · 640 Dundas St E · Toronto Centre

On 16 Nov 2026 – 25 Nov 2026

Free · Listed days only

Check out a free recreation centre in person, meet your neighbours if you live nearby and learn more about who is eligib

Event pageAdd to calendar
Show 20 moreShow fewer
MusicSeminars/Workshops

Let’s Talk Burnout, Leadership Responsibility

552 m away · 296 Broadview Ave · Toronto-Danforth

On 16 Nov 2026

Bringing artists and industry leaders together for an evening exploring the role of leadership in creating healthier, mo

Event pageAdd to calendar
Music

Everybody Here Wants You – The Music of Jeff Buckley

552 m away · 296 Broadview Ave · Toronto-Danforth

On 17 Nov 2026 – 18 Nov 2026

Almost three decades after his death, he remains one of the most beloved and influential performers of his generation.

Event pageAdd to calendar
Music

Hugh’s Goes Classical with Brett Polegato and Robert Kortgaard

552 m away · 296 Broadview Ave · Toronto-Danforth

On 22 Nov 2026

Polegato’s artistic sensibility has earned him the highest praise from audiences and critics: “his is a serious and sedu

Event pageAdd to calendar
Music

JazzInToronto’s “All That Cabaret” - George Masswohl Sing Mostly Sondheim

552 m away · 296 Broadview Ave · Toronto-Danforth

On 23 Nov 2026

Raised in St. Catharines, George Masswohl has been one of the leading performers in Canadian musical theatre for decades

Event pageAdd to calendar
Music

Sisters in Songs: Daughters of Donbas - Hildá Länsman & Tuomas Norvio - GETCHNAH

552 m away · 296 Broadview Ave · Toronto-Danforth

On 24 Nov 2026

Join us for an evening of music and sisterhood. The musicians will take you on a journey inspired by cultures and corner

Event pageAdd to calendar
Music

Discoveries Vol. 15 with Musical Hosts Amanda Walther and Michael Occhipinti

552 m away · 296 Broadview Ave · Toronto-Danforth

On 25 Nov 2026

This special edition of Discoveries features a handpicked lineup of artists who caught our attention through our online

Event pageAdd to calendar
Food/CulinaryTour

Queen East Eats Fall Food Tours

569 m away · 657 Queen St E · Toronto-Danforth

On 14 Nov 2026 – 12 Dec 2026

Listed days only

Celebrate fall and support small businesses. Get ready to visit six pre-selected local food and drink establishments in

Event pageAdd to calendar
CulturalLive Performances

Benedict Sheehan’s ‘Ukrainian War Requiem’: The National Tour

722 m away · 83 Power St · Toronto Centre

On 15 Nov 2026

The Axios Men’s Ensemble, in celebration of their historic Juno award, for Classical Album of the Year (Large Ensemble)

Event pageAdd to calendar
Charity/CauseFood/Culinary

Riverside Antler Breakfast - Annual Fundraiser

843 m away · 765 Queen St E · Toronto-Danforth

On 11 Dec 2026

Now in its 15th year, this annual festive community fundraiser and celebration will be in support of Fontbonne Ministri

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

111 River St

24 m away · 111 River St · Toronto Centre

Asked 20 Oct 2020

NOAC Issued

Site Plan application for a 39-storey mixed-use building containing 516 residential dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Condominium plan

111 River St

24 m away · 111 River St · Toronto Centre

Asked 4 Nov 2021

Under Review

*** Draft plan of condominium for 430 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

93 River St

88 m away · 93 River St · Toronto Centre

Asked 25 May 2020

NOAC Issued

Site plan application for a 37-storey mixed use building comprised of 365 dwelling units and 300 square metres of retail at grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Show 21 moreShow fewer
Rezoning

761 Dundas St E

120 m away · 761 Dundas St E · Toronto Centre

Asked 8 Oct 2025

Under Review

Official Plan and Zoning By-law Amendment application for a mixed-use development comprised of two 48-storey towers containing approximately 1,197 residential units and 1,300 square metres of non-residential GFA. The proposal includes a 729 square metre park and 245 square metre natural heritage open space.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Site plan

7 Labatt Ave

174 m away · 7 Labatt Ave · Toronto Centre

Asked 31 Oct 2019

Under Review

INACTIVE Site Plan Approval Application for a proposed 38-storey mixed-use building with 548 residential units (rental and condominium), 4752 square metres of non-residential floor area (retail, office and a Salvation Army facility), and two levels of below grade parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Rezoning

7 Labatt Ave

174 m away · 7 Labatt Ave · Toronto Centre

Asked 30 Sep 2026

Under Review

Official Plan and Zoning By-law Amendment application for two 46-storey residential buildings containing approximately 1,170 dwelling units and a 2-storey non-residential building containing 1,111 square metres of non-residential space.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Allsun Campbell · [email protected].

Rezoning

33 Davies Ave

385 m away · 33 Davies Ave · Toronto-Danforth

Asked 27 May 2021

Appeal Received

Zoning by-law Amendment application to facilitate the development of the site for a 15-storey, plus mezzanine non-residential building having a gross floor area of approximately 18343 square metres. 46 parking spaces will be provided on the lot, located within a below grade parking structure.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Ali Meghani · [email protected].

Site plan

477 Queen St E

484 m away · 477 Queen St E · Toronto Centre

Asked 10 Aug 2023

OMB Appeal

The proposed development will be 15 storeys in height, plus mezzanine and mechanical penthouse along Queen Street East. Parking elevator access to four levels of below grade parking is proposedfrom the private east-west lane. Approximately 151 residential dwelling units,

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Jeremy Humphrey · [email protected].

Condominium plan

471 Queen St E

493 m away · 471 Queen St E · Toronto Centre

Asked 8 Nov 2021

Under Review

*** 143 dwelling units, 33 parking spaces*There is a concurrent Zoning By-law Amendment application which is currently under review/appeal

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

641 Queen St E

534 m away · 641 Queen St E · Toronto-Danforth

Asked 15 Sep 2022

Under Review

Proposed to retain the existing heritage buildings and construct a nine storey residential building. The building will contain 85 new residential dwelling units with a GFA of about 7186sqm and retail at grade with a GFA of 807sqm. The total proposed GFA is 9891sqm resulting in an FSI of 6.43

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].

Rezoning

641 Queen St E

534 m away · 641 Queen St E · Toronto-Danforth

Asked 15 Sep 2022

Under Review

Proposed to retain the existing heritage buildings and construct a nine storey residential building. The building will contain 85 new residential dwelling units with a GFA of about 7186sqm and retail at grade with a GFA of 807sqm. The total proposed GFA is 9891sqm resulting in an FSI of 6.43

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Raymond Tung · [email protected].

Rezoning

325 Gerrard St E

580 m away · 325 Gerrard St E · Toronto Centre

Asked 20 Apr 2022

OMB Appeal

Zoning By-law Amendment application for Phases 4 & 5 of the Regent Park redevelopment. The Phases 4 & 5 lands are generally bounded by Gerrard Street to the north, River Street to the east, Oak Street to the south, and Dreamers Way to the west. The proposal consists of a total gross floor area (GFA) of 320,064 m2…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

325 Gerrard St E

580 m away · 325 Gerrard St E · Toronto Centre

Asked 13 Jan 2025

NOAC Issued

Building 4A Proposal to construct a 26-storey tower, 10 storey mid-rise podium TCHC social housing building with 271 units, retail at grade along Gerrard Street East, community space on the ground floor and mezzanine, with one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

16 Sumach St

685 m away · 16 Sumach St · Toronto Centre

Asked 21 Oct 2025

Under Review

Site Plan Control Application to facilitate the development of the site with two mixed use buildings: 59 and 55 storeys, containing 1,284 dwelling units and 1,662 square metres of non-residential gross floor area.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Rezoning

1 Sumach St

694 m away · 1 Sumach St · Toronto Centre

Asked 18 Sep 2026

Under Review

Lift the (H)

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Katherine Bailey · [email protected].

Site plan

306 Gerrard St E

720 m away · 306 Gerrard St E · Toronto Centre

Asked 26 May 2026

Under Review

Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Rezoning

415 Broadview Ave

749 m away · 415 Broadview Ave · Toronto-Danforth

Asked 24 Dec 2021

Appeal Received

A 10 storey building adding to, and modifying, the existing heritage church building onsite. 4,892.98 square metres of residential gross floor area (GFA) are proposed, as well as 683 square metres of non-residential space to be allocated to the church congregation, to a total of 5,575.98 square metres GFA.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Ali Meghani · [email protected].

Site plan

415 Broadview Ave

749 m away · 415 Broadview Ave · Toronto-Danforth

Asked 24 Apr 2024

Under Review

Site Plan Approval for a proposed residential addition to the existing congregation. The proposal will contain 3,824 square metres of residential gross floor area (GFA) and 51 residential units . The proposed plans also included 181 square metres of parkland dedication at the corner of Broadview Avenue and Simpson…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Ali Meghani · [email protected].

Site plan

351 Queen St E

788 m away · 351 Queen St E · Toronto Centre

Asked 28 Jun 2021

NOAC Issued

Site Plan Application for a 28-storey mixed-use development with 526 units, 448 square metres of parkland, 1,350 square metres of non-residential gross floor area, and one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Site plan

401 Dundas St E

823 m away · 401 Dundas St E · Toronto Centre

Asked 18 Oct 2021

Under Review

Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 291.6 square metres, and a residential gross floor area of 8518.90 square metres. A total of 137 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Subdivision

161 Parliament St

825 m away · 161 Parliament St · Toronto Centre

Asked 7 Nov 2021

Under Review

Draft Plan of subdivision for 3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Rezoning

21 Broadview Ave

839 m away · 21 Broadview Ave · Toronto-Danforth

Asked 9 Sep 2021

OMB Appeal

Official Plan and Zoning By-law amendment to facilitate the development of the site for a 12-storey mixed-use building having a non-residential gross floor area of 794 square metres, and a residential gross floor area of 28,638 square metres. A total of 340 residential dwelling units are proposed. Application appeald…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Raymond Tung · [email protected].

Site plan

21 Broadview Ave

839 m away · 21 Broadview Ave · Toronto-Danforth

Asked 5 Jul 2022

Appeal Received

This application is for a 12-storey mixed use building with rear courtyard and ground floor units. In total, the project with have a gross floor area of 29,377 sq.m. and will contain 340 residential units and 794 sq.m. of commercial space. There will be one level of below grade parking with 97 vehicle parking spaces…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Raymond Tung · [email protected].

Rezoning

4 Gilead Pl

856 m away · 4 Gilead Pl · Toronto Centre

Asked 9 Apr 2026

OMB Appeal

The application proposes to amend the Official Plan and Zoning By-law to permit a 20 storey residential building containing 297 residential dwelling units.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Christy Chow · [email protected].