Opening this block

Home · Toronto Centre · Sackville St

What's new around 295 Sackville St

295 Sackville St · Toronto Centre. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Taco Bell

256 m away · 650 Dundas St E · Toronto Centre

Applied 10 Nov 2026

Not Started

REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

Permit application

Brother Joseph Dooley Apartments

610 m away · 412 Queen St E · Toronto Centre

Applied 7 Jul 2026

Permit Issued

Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance…

Being built

The city has allowed these. Work may not have started. The permits in this area list 1361 homes.

Multiple Unit Building

620 Dundas St E

79 m away · 620 Dundas St E · Toronto Centre

Approved 26 Sep 2025

Proposed interior alteration to create a studio space for the Randolph College for the Performing Arts within the Daniels Artworks mixed-use condominium development located in Toronto's Regent Park. (688 Dundas St E is…

Multiple Unit Building

585 Dundas St E

209 m away · 585 Dundas St E · Toronto Centre

Approved 6 Aug 2026

REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for tenant fit up

Laneway suite

9 Spruce St

339 m away · 9 Spruce St · Toronto Centre

Approved 12 Nov 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new laneway suite (Unit # R)

Show 21 moreShow fewer
1 homes

261 Gerrard St E

434 m away · 261 Gerrard St E · Toronto Centre

Approved 27 Jun 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations.

Apartment

393 Dundas St E

500 m away · 393 Dundas St E · Toronto Centre

Approved 12 Nov 2026

Conditional Permit - Site Service - Proposing to construct a slab-on-grade, 4-storey plus mechanical penthouse and roof deck, 12 unit affordable housing residential building

Multiple Unit Building

237 Gerrard St E

502 m away · 237 Gerrard St E · Toronto Centre

Approved 4 Feb 2025

Proposal for administrative party wall permit for work on first, second, and thirdfloor party wall adjacent to work pursuant next door for 24137315 BLD 00 BA (391 ONTARIO ST)

Apartment

83 River St

514 m away · 83 River St · Toronto Centre

Approved 13 Oct 2026

Conditional Permit - Part Permit - Proposal to construct a 37 Storey residential condominium with 3 levels of underground parking, retail on grade, and various amenity spaces.

4 homes

209 Carlton St

571 m away · 209 Carlton St · Toronto Centre

Approved 2 Feb 2026

4 new homes

The permit lists 4 homes.

Proposal for interior alteration and addition to change the vacant residential semi detached house to a supportive housing (residential and ancillary office) building

Apartment

227 Gerrard St E

575 m away · 227 Gerrard St E · Toronto Centre

Approved 27 Oct 2025

116 new homes

The permit lists 116 homes.

Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage

Multiple Unit Building

222 Gerrard St E

592 m away · 222 Gerrard St E · Toronto Centre

Approved 16 Jan 2026

Rev 01: changes to add underpinning of basement stair and structural changes due to site conditionsProposal for interior and exterior alterations to construct a new dental clinic on the basement and ground floor and a…

Multiple Unit Building

549 Parliament St

672 m away · 549 Parliament St · Toronto Centre

Approved 20 Oct 2026

Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator…

Apartment

307 Sherbourne St

688 m away · 307 Sherbourne St · Toronto Centre

Approved 7 Nov 2025

Conditional Permit - Proposal to construct a 18 storey residential apartment building with 223 rental dwelling units and one level of basement.

Multiple Unit Building

314 Queen St E

704 m away · 314 Queen St E · Toronto Centre

Approved 11 Sep 2026

Demolish rear yard deteriorated stand alone building extension. The rear wall of the original building shall remain intact (addition was not connected to the existing building).

Multiple Unit Building

461 Sackville St

718 m away · 461 Sackville St · Toronto Centre

Approved 3 Feb 2025

Phase 2: to construct interior alterations for Day Nursery.

Other

300 Bayview Ave

719 m away · 300 Bayview Ave · Toronto Centre

Approved 30 Oct 2026

Part Permit - Proposal for an addition to exisiting car dealership consisting of a 4 Storey building elevated on columns with roof top parking, for same purposes.

Student Residence

294 Sherbourne St

731 m away · 294 Sherbourne St · Toronto Centre

Approved 30 Oct 2026

REV 03: Revised sprinkler drawings.REV 02: Revision to permit, changes related to basement level, revised exit sign, added pull station to east door, added enter phone to east door, and added pull station to east door…

Laneway suite

66 Amelia St

754 m away · 66 Amelia St · Toronto Centre

Approved 26 Sep 2025

1 new home

The permit lists 1 homes.

Proposal to construct a laneway suite behind existing 4plex.

Multiple Unit Building

510 King St E

760 m away · 510 King St E · Toronto Centre

Approved 19 Jun 2026

Interior alterations to an existing dental office.

Multiple Unit Building

154 Shuter St

860 m away · 154 Shuter St · Toronto Centre

Approved 14 Sep 2026

Proposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes…

Transit Station,subway, Bus Terminal

150 Sherbourne St

907 m away · 150 Sherbourne St · Toronto Centre

Approved 2 Feb 2026

Conditional Permit - Part Permit - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter

1 homes

3 Gilead Pl

1.0 km away · 3 Gilead Pl · Toronto Centre

Approved 23 Jan 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations to convert existing manufacturing building to a live/work studio and office.building. See also 18 255069 ZZC, 19 155691 MV and Final and Binding A0522/19TEY.

Multiple Unit Building

334 King St E

1.0 km away · 334 King St E · Toronto Centre

Approved 9 Jul 2026

Proposal for interior alteration on the ground floor for an appliance showroom

Multiple Unit Building

78 Berkeley St

1.0 km away · 78 Berkeley St · Toronto Centre

Approved 10 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Multiple Unit Building

76 Berkeley St

1.0 km away · 76 Berkeley St · Toronto Centre

Approved 10 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

295 Sackville St

0 m away · 295 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

319 Sackville St

68 m away · 319 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

361 Gerrard St E

93 m away · 361 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Show 12 moreShow fewer
Demolition

415 Gerrard St E

102 m away · 415 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

407 Gerrard St E

106 m away · 407 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

260 Sumach St

150 m away · 260 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

427 Gerrard St E

165 m away · 427 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

266 Sumach St

174 m away · 266 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

121 River St

447 m away · 121 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing single family dwelling (townhouse). See 21 236273 BLD for future development (mixed use condo).

Demolition

125 River St

449 m away · 125 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing mixed-use building containing one (1) owner¿occupied residential dwelling unit and one (1) commercial unit.See 21 236273 BLD for future development (mixed use condo).

Demolition

119 River St

450 m away · 119 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing 2 storey mixed use building containing one (1) three-bedroom rental dwelling unit and one (1) retail unit;See 21 236273 BLD for future development (mixed use condo).

Demolition

123 River St

450 m away · 123 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing 2 storey single family dwelling containing one (1) three-bedroom rental dwelling unit.See 21 236273 BLD for future development (mixed use condo).

Demolition

117 River St

453 m away · 117 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing mixed-use building containing one (1) owner-occupied residential dwelling unit, one (1) one-bedroom rental dwelling unit and one (1) retail unit.See 21 236273 BLD for future development…

Demolition

113 River St

457 m away · 113 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing single family dwelling (townhouse). See 21 236273 BLD for future development (mixed use condo).

Demolition

212 Dundas St E

928 m away · 212 Dundas St E · Toronto Centre

Approved 6 Jul 2026

Proposal to demolish the existing 4 storey commercial building with the retention of the exterior street facing facade of the Filmore Hotel building.See 20 151363 STE 13 SA for future proposal.

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

October Funfest

79 m away · 620 Dundas St E · Toronto Centre

Allowed 24 Oct 2026

Hours 1:00 p.m.–3:00 p.m.

Setup 24 Oct 2026, 10:00 a.m.–12:59 p.m.

Tear down 24 Oct 2026, 3:01 p.m.–5:00 p.m.

Fred Victor Centre

Construction

Tchc Rental Building 4a

132 m away · 325 Gerrard St E · Toronto Centre

Allowed 1 Apr 2026 – 1 Apr 2027

Hours 6:00 a.m.–11:00 p.m.

Metro Toronto Housing Corporation

Continuous Concrete Pour

Regent Park Tower 4a

132 m away · 325 Gerrard St E · Toronto Centre

Allowed 24 Aug 2026 – 28 Feb 2027

Hours from 6:00 a.m.

Deltera Contracting Inc

Show 6 moreShow fewer
Continuous Concrete Pour

The Riv

514 m away · 83 River St · Toronto Centre

Allowed 28 Sep 2026 – 28 Mar 2027

Hours from 7:00 a.m., from 9:00 a.m.

Labatt River Developments Inc.

Construction

Hoem2

748 m away · 300 Sherbourne St · Toronto Centre

Allowed 2 Sep 2026 – 31 Dec 2026

Hours 7:00 a.m.–7:00 p.m.

Reliance Construction Inc.

Amplified And/or Instrument Sound

Riverside C'mon Events Series

897 m away · 10 Thompson St · Toronto-Danforth

Allowed 6 Jun 2026 – 25 Oct 2026

Hours 10:00 a.m.–8:00 p.m.

Setup 6 Jun 2026, 7:30 a.m.–10:00 a.m.; 20 Sep 2026, 7:30 a.m.–10:00 a.m.…

Tear down 6 Jun 2026, 8:00 p.m.–9:00 p.m.; 20 Sep 2026, 8:00 p.m.–9:00 p.m.…

Riverside Business Improvement Area

Amplified And/or Instrument Sound

Long Winter To At Allan Gardens

929 m away · 19 Horticultural Ave · Toronto Centre

Allowed 6 Nov 2026

Hours 6:00 p.m.–12:00 p.m.

Setup 6 Nov 2026, 2:00 p.m.–6:00 p.m.

Tear down 7 Nov 2026, from 1:00 a.m.

Friends Of Allan Gardens

Continuous Concrete Pour

49 Ontario

1.0 km away · 49 Ontario St · Toronto Centre

Allowed 12 May 2026 – 12 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Dcc 49 Ontario East Inc.

Construction

Construction

1.0 km away · 49 Ontario St · Toronto Centre

Allowed 30 Sep 2026 – 5 Sep 2027

Hours 7:00 a.m.–10:00 p.m.

Dcc 49 Ontario East Inc.

Events

On the city's calendar. Check before you go.

CampFamily/Children

Meet Your Neighbour at an Early Local Registration Preparation Event

190 m away · 640 Dundas St E · Toronto Centre

On 16 Nov 2026 – 25 Nov 2026

Free · Listed days only

Check out a free recreation centre in person, meet your neighbours if you live nearby and learn more about who is eligib

Event pageAdd to calendar
CulturalLive Performances

Benedict Sheehan’s ‘Ukrainian War Requiem’: The National Tour

680 m away · 83 Power St · Toronto Centre

On 15 Nov 2026

The Axios Men’s Ensemble, in celebration of their historic Juno award, for Classical Album of the Year (Large Ensemble)

Event pageAdd to calendar
Show 18 moreShow fewer
MusicSeminars/Workshops

Let’s Talk Burnout, Leadership Responsibility

916 m away · 296 Broadview Ave · Toronto-Danforth

On 16 Nov 2026

Bringing artists and industry leaders together for an evening exploring the role of leadership in creating healthier, mo

Event pageAdd to calendar
Music

Everybody Here Wants You – The Music of Jeff Buckley

916 m away · 296 Broadview Ave · Toronto-Danforth

On 17 Nov 2026 – 18 Nov 2026

Almost three decades after his death, he remains one of the most beloved and influential performers of his generation.

Event pageAdd to calendar
Music

Hugh’s Goes Classical with Brett Polegato and Robert Kortgaard

916 m away · 296 Broadview Ave · Toronto-Danforth

On 22 Nov 2026

Polegato’s artistic sensibility has earned him the highest praise from audiences and critics: “his is a serious and sedu

Event pageAdd to calendar
Music

JazzInToronto’s “All That Cabaret” - George Masswohl Sing Mostly Sondheim

916 m away · 296 Broadview Ave · Toronto-Danforth

On 23 Nov 2026

Raised in St. Catharines, George Masswohl has been one of the leading performers in Canadian musical theatre for decades

Event pageAdd to calendar
Music

Sisters in Songs: Daughters of Donbas - Hildá Länsman & Tuomas Norvio - GETCHNAH

916 m away · 296 Broadview Ave · Toronto-Danforth

On 24 Nov 2026

Join us for an evening of music and sisterhood. The musicians will take you on a journey inspired by cultures and corner

Event pageAdd to calendar
Music

Discoveries Vol. 15 with Musical Hosts Amanda Walther and Michael Occhipinti

916 m away · 296 Broadview Ave · Toronto-Danforth

On 25 Nov 2026

This special edition of Discoveries features a handpicked lineup of artists who caught our attention through our online

Event pageAdd to calendar
Farmers' Market

Allan Gardens Saturday Farmers' Market

929 m away · 19 Horticultural Ave · Toronto Centre

On 14 Nov 2026 – 6 Feb 2027

Free · Listed days only

Celebrate local food, community, and sustainable agriculture. Discover fresh produce, artisanal products, and small-scal

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

325 Gerrard St E

132 m away · 325 Gerrard St E · Toronto Centre

Asked 20 Apr 2022

OMB Appeal

Zoning By-law Amendment application for Phases 4 & 5 of the Regent Park redevelopment. The Phases 4 & 5 lands are generally bounded by Gerrard Street to the north, River Street to the east, Oak Street to the south, and Dreamers Way to the west. The proposal consists of a total gross floor area (GFA) of 320,064 m2…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

325 Gerrard St E

132 m away · 325 Gerrard St E · Toronto Centre

Asked 13 Jan 2025

NOAC Issued

Building 4A Proposal to construct a 26-storey tower, 10 storey mid-rise podium TCHC social housing building with 271 units, retail at grade along Gerrard Street East, community space on the ground floor and mezzanine, with one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

306 Gerrard St E

271 m away · 306 Gerrard St E · Toronto Centre

Asked 26 May 2026

Under Review

Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Show 21 moreShow fewer
Site plan

111 River St

461 m away · 111 River St · Toronto Centre

Asked 20 Oct 2020

NOAC Issued

Site Plan application for a 39-storey mixed-use building containing 516 residential dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Condominium plan

111 River St

461 m away · 111 River St · Toronto Centre

Asked 4 Nov 2021

Under Review

*** Draft plan of condominium for 430 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

401 Dundas St E

477 m away · 401 Dundas St E · Toronto Centre

Asked 18 Oct 2021

Under Review

Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 291.6 square metres, and a residential gross floor area of 8518.90 square metres. A total of 137 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

93 River St

504 m away · 93 River St · Toronto Centre

Asked 25 May 2020

NOAC Issued

Site plan application for a 37-storey mixed use building comprised of 365 dwelling units and 300 square metres of retail at grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Rezoning

505 Parliament St

525 m away · 505 Parliament St · Toronto Centre

Asked 17 Mar 2023

OMB Appeal

Zoning By-law Amendment law to permit the development of site for a 10-storey mixed-use building (38.6 metres) with retail at-grade (278 square metres) and 60 dwelling units. The western (Parliament Street) elevation of the existing 1½ storey listed heritage building at 509 Parliament Street is proposed to be…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Rezoning

761 Dundas St E

554 m away · 761 Dundas St E · Toronto Centre

Asked 8 Oct 2025

Under Review

Official Plan and Zoning By-law Amendment application for a mixed-use development comprised of two 48-storey towers containing approximately 1,197 residential units and 1,300 square metres of non-residential GFA. The proposal includes a 729 square metre park and 245 square metre natural heritage open space.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Site plan

7 Labatt Ave

587 m away · 7 Labatt Ave · Toronto Centre

Asked 31 Oct 2019

Under Review

INACTIVE Site Plan Approval Application for a proposed 38-storey mixed-use building with 548 residential units (rental and condominium), 4752 square metres of non-residential floor area (retail, office and a Salvation Army facility), and two levels of below grade parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Rezoning

7 Labatt Ave

587 m away · 7 Labatt Ave · Toronto Centre

Asked 30 Sep 2026

Under Review

Official Plan and Zoning By-law Amendment application for two 46-storey residential buildings containing approximately 1,170 dwelling units and a 2-storey non-residential building containing 1,111 square metres of non-residential space.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Allsun Campbell · [email protected].

Site plan

213 Gerrard St E

619 m away · 213 Gerrard St E · Toronto Centre

Asked 4 Jul 2025

Under Review

Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Condominium plan

471 Queen St E

649 m away · 471 Queen St E · Toronto Centre

Asked 8 Nov 2021

Under Review

*** 143 dwelling units, 33 parking spaces*There is a concurrent Zoning By-law Amendment application which is currently under review/appeal

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

477 Queen St E

653 m away · 477 Queen St E · Toronto Centre

Asked 10 Aug 2023

OMB Appeal

The proposed development will be 15 storeys in height, plus mezzanine and mechanical penthouse along Queen Street East. Parking elevator access to four levels of below grade parking is proposedfrom the private east-west lane. Approximately 151 residential dwelling units,

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Jeremy Humphrey · [email protected].

Site plan

307 Sherbourne St

688 m away · 307 Sherbourne St · Toronto Centre

Asked 21 Aug 2018

NOAC Issued

Site Plan Control application for a 15-storey residential building consisting of 192 residential units with a total gross floor area of 7,853 square metres, 4 parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Site plan

351 Queen St E

697 m away · 351 Queen St E · Toronto Centre

Asked 28 Jun 2021

NOAC Issued

Site Plan Application for a 28-storey mixed-use development with 526 units, 448 square metres of parkland, 1,350 square metres of non-residential gross floor area, and one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Site plan

201 Sherbourne St

717 m away · 201 Sherbourne St · Toronto Centre

Asked 30 Dec 2024

Under Review

Site Plan application to permit two tall buildings (39- and 40-storeys), containing 693 new residential dwelling units, 525 square metres of non-residential space, and a new public park.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Condominium plan

294 Sherbourne St

731 m away · 294 Sherbourne St · Toronto Centre

Asked 26 Oct 2021

Under Review

*** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Subdivision

161 Parliament St

750 m away · 161 Parliament St · Toronto Centre

Asked 7 Nov 2021

Under Review

Draft Plan of subdivision for 3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Site plan

214 Sherbourne St

777 m away · 214 Sherbourne St · Toronto Centre

Asked 16 Sep 2022

Under Review

Site Plan Control application to construct a 47-storey tower with a 6-storey prodium containing 66 parking spaces in two levels of below grade parking, 619 dwelling units and a total gross floor area of 41,195.99 square metres, including 481 square metres of community space. The proposal will retain in-situ the…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derek Waltho · [email protected].

Site plan

301 Queen St E

787 m away · 301 Queen St E · Toronto Centre

Asked 25 May 2016

Under Review

INACTIVE Site Plan application for a 25-storey mixed-use building: 206 dwelling units, 6 levels of below-grade parking, total combined GFA 15,711 sq. m.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Site plan

494 Richmond St E

821 m away · 494 Richmond St E · Toronto Centre

Asked 12 Jul 2023

Under Review

The Proposed Development will consist of approximately 35,250 square metres of total gross floor area, including about 400 square metres of commercial uses at-grade, for a total FSI of 10.1. Residential uses are located in the podium and towers above grade and will total 588 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

383 Sherbourne St

823 m away · 383 Sherbourne St · Toronto Centre

Asked 6 Jul 2023

Appeal Received

The proposal will introduce a 39 storey residential building representing an F.S.I. of 13.58 and lot coverage of 69%. The total GFA will be 20,328 sq. m. incorporating 378 units, and 1,384 sq. m. of indoor and outdoor amenity space.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Rezoning

33 Davies Ave

827 m away · 33 Davies Ave · Toronto-Danforth

Asked 27 May 2021

Appeal Received

Zoning by-law Amendment application to facilitate the development of the site for a 15-storey, plus mezzanine non-residential building having a gross floor area of approximately 18343 square metres. 46 parking spaces will be provided on the lot, located within a below grade parking structure.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Ali Meghani · [email protected].