Taco Bell

200 m away · 650 Dundas St E · Toronto Centre

Applied 10 Nov 2026

Not Started

REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

Permit application

Brother Joseph Dooley Apartments

380 m away · 412 Queen St E · Toronto Centre

Applied 7 Jul 2026

Permit Issued

Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance…

Permit application

Shoppers Drug Mart

691 m away · 661 Queen St E · Toronto-Danforth

Applied 25 Aug 2026

Revision Issued

Revision 1: Proposal for interior alterations to an existing retail store - "Shoppers Drug Mart"

Show 3 moreShow fewer
Permit application

Equitable Bank

894 m away · 25 Ontario St · Toronto Centre

Applied 23 Jan 2026

Revision Issued

Rev 05 - Remove slab opening and associated stairs from level 23.REV: ADD FLOOR 12 AND 13 BACK INTO INITIAL PERMIT 22-115404, PER BUILDING INSPECTOR REQUEST, SEE COVER LETTER IN BLD DWGS.Proposal for interior…

Permit application

Scotia Bank

915 m away · 351 King St E · Toronto Centre

Applied 16 Jan 2026

Inspection

Proposal to construct a demising wall in existing office space - UNIT 301, "Scotia Bank"

Permit application

Bailey Nelson

1.0 km away · 747 Queen St E · Toronto-Danforth

Applied 12 Feb 2026

Inspection

Proposal for interior alterations to change from a restaurant with less than 30 seats to a retail store - "Bailey Nelson".

Being built

The city has allowed these. Work may not have started. The permits in this area list 2181 homes.

Multiple Unit Building

585 Dundas St E

184 m away · 585 Dundas St E · Toronto Centre

Approved 6 Aug 2026

REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for tenant fit up

Apartment

83 River St

233 m away · 83 River St · Toronto Centre

Approved 13 Oct 2026

Conditional Permit - Part Permit - Proposal to construct a 37 Storey residential condominium with 3 levels of underground parking, retail on grade, and various amenity spaces.

Multiple Unit Building

620 Dundas St E

359 m away · 620 Dundas St E · Toronto Centre

Approved 26 Sep 2025

Proposed interior alteration to create a studio space for the Randolph College for the Performing Arts within the Daniels Artworks mixed-use condominium development located in Toronto's Regent Park. (688 Dundas St E is…

Show 21 moreShow fewer
Other

300 Bayview Ave

375 m away · 300 Bayview Ave · Toronto Centre

Approved 30 Oct 2026

Part Permit - Proposal for an addition to exisiting car dealership consisting of a 4 Storey building elevated on columns with roof top parking, for same purposes.

Multiple Unit Building

510 King St E

377 m away · 510 King St E · Toronto Centre

Approved 19 Jun 2026

Interior alterations to an existing dental office.

Multiple Unit Building

314 Queen St E

591 m away · 314 Queen St E · Toronto Centre

Approved 11 Sep 2026

Demolish rear yard deteriorated stand alone building extension. The rear wall of the original building shall remain intact (addition was not connected to the existing building).

Apartment

393 Dundas St E

638 m away · 393 Dundas St E · Toronto Centre

Approved 12 Nov 2026

Conditional Permit - Site Service - Proposing to construct a slab-on-grade, 4-storey plus mechanical penthouse and roof deck, 12 unit affordable housing residential building

1 homes

3 Gilead Pl

643 m away · 3 Gilead Pl · Toronto Centre

Approved 23 Jan 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations to convert existing manufacturing building to a live/work studio and office.building. See also 18 255069 ZZC, 19 155691 MV and Final and Binding A0522/19TEY.

Long Term Care Facility

55 Eastern Ave

657 m away · 55 Eastern Ave · Toronto Centre

Approved 29 May 2025

Proposal to construct a new 13 storey Long Term Care Facility with 348 beds, 2 clinical tenant spaces, administration areas, and support services. See also 21 151369 STE 12 SA.

Multiple Unit Building

661 Queen St E

691 m away · 661 Queen St E · Toronto-Danforth

Approved 28 Sep 2026

Revision 1: Proposal for interior alterations to an existing retail store - "Shoppers Drug Mart"

Laneway suite

9 Spruce St

713 m away · 9 Spruce St · Toronto Centre

Approved 12 Nov 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new laneway suite (Unit # R)

Multiple Unit Building

334 King St E

714 m away · 334 King St E · Toronto Centre

Approved 9 Jul 2026

Proposal for interior alteration on the ground floor for an appliance showroom

Multiple Unit Building

677 Queen St E

733 m away · 677 Queen St E · Toronto-Danforth

Approved 22 Sep 2026

Proposal for piling and shoring to allow for remediation of the site.

1 homes

261 Gerrard St E

749 m away · 261 Gerrard St E · Toronto Centre

Approved 27 Jun 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations.

Multiple Unit Building

76 Berkeley St

779 m away · 76 Berkeley St · Toronto Centre

Approved 10 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Multiple Unit Building

78 Berkeley St

779 m away · 78 Berkeley St · Toronto Centre

Approved 10 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Multiple Unit Building

74 Berkeley St

783 m away · 74 Berkeley St · Toronto Centre

Approved 10 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Multiple Unit Building

72 Berkeley St

786 m away · 72 Berkeley St · Toronto Centre

Approved 9 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Apartment

373 Front St E

802 m away · 373 Front St E · Toronto Centre

Approved 30 Apr 2025

787 new homes

The permit lists 787 homes.

Proposal to construct 2 - 13 storey residential buildings with one level of underground parking (Blocks 3-4) for Affordable Housing.

Mixed Use/res W Non Res

373 Front St E

802 m away · 373 Front St E · Toronto Centre

Approved 18 Aug 2025

REV 01 - Revision to drawing set to include specific retail tenant requirementsProposal to construct 2 - 13 storey residential buildings with one level of underground parking (Blocks 3-4) for Affordable Housing.

Multiple Unit Building

237 Gerrard St E

808 m away · 237 Gerrard St E · Toronto Centre

Approved 4 Feb 2025

Proposal for administrative party wall permit for work on first, second, and thirdfloor party wall adjacent to work pursuant next door for 24137315 BLD 00 BA (391 ONTARIO ST)

Apartment

49 Ontario St

828 m away · 49 Ontario St · Toronto Centre

Approved 14 Oct 2026

1226 new homes

The permit lists 1226 homes.

Construction of two buildings of 46 and 50 storeys with underground parking garage (245 affordable housing units) and townhouses

Apartment

227 Gerrard St E

869 m away · 227 Gerrard St E · Toronto Centre

Approved 27 Oct 2025

116 new homes

The permit lists 116 homes.

Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage

3 homes

284 King St E

889 m away · 284 King St E · Toronto Centre

Approved 22 Jan 2025

3 new homes

The permit lists 3 homes.

Rev 01 - Two (2) units have been added on Level 31 and one (1) has been added on Level 32. The total unit count for the building has increased from 216 to 219.32 Storey residential development with 216 units and 1…

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

113 River St

256 m away · 113 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing single family dwelling (townhouse). See 21 236273 BLD for future development (mixed use condo).

Demolition

117 River St

263 m away · 117 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing mixed-use building containing one (1) owner-occupied residential dwelling unit, one (1) one-bedroom rental dwelling unit and one (1) retail unit.See 21 236273 BLD for future development…

Demolition

119 River St

266 m away · 119 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing 2 storey mixed use building containing one (1) three-bedroom rental dwelling unit and one (1) retail unit;See 21 236273 BLD for future development (mixed use condo).

Show 12 moreShow fewer
Demolition

121 River St

269 m away · 121 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing single family dwelling (townhouse). See 21 236273 BLD for future development (mixed use condo).

Demolition

123 River St

277 m away · 123 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing 2 storey single family dwelling containing one (1) three-bedroom rental dwelling unit.See 21 236273 BLD for future development (mixed use condo).

Demolition

125 River St

283 m away · 125 River St · Toronto Centre

Approved 4 May 2026

Proposal to demolish the existing mixed-use building containing one (1) owner¿occupied residential dwelling unit and one (1) commercial unit.See 21 236273 BLD for future development (mixed use condo).

Demolition

260 Sumach St

364 m away · 260 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

415 Gerrard St E

367 m away · 415 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

295 Sackville St

384 m away · 295 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

266 Sumach St

412 m away · 266 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

407 Gerrard St E

431 m away · 407 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

427 Gerrard St E

441 m away · 427 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

319 Sackville St

449 m away · 319 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

361 Gerrard St E

470 m away · 361 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

11 Sunlight Park Rd

918 m away · 11 Sunlight Park Rd · Toronto-Danforth

Approved 11 Sep 2026

Proposed demolition of main building (Car Dealership). Secondary structures, car wash and storage building will be processed as separate permits.

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

The Riv

233 m away · 83 River St · Toronto Centre

Allowed 28 Sep 2026 – 28 Mar 2027

Hours from 7:00 a.m., from 9:00 a.m.

Labatt River Developments Inc.

Amplified And/or Instrument Sound

October Funfest

359 m away · 620 Dundas St E · Toronto Centre

Allowed 24 Oct 2026

Hours 1:00 p.m.–3:00 p.m.

Setup 24 Oct 2026, 10:00 a.m.–12:59 p.m.

Tear down 24 Oct 2026, 3:01 p.m.–5:00 p.m.

Fred Victor Centre

Construction

Tchc Rental Building 4a

509 m away · 325 Gerrard St E · Toronto Centre

Allowed 1 Apr 2026 – 1 Apr 2027

Hours 6:00 a.m.–11:00 p.m.

Metro Toronto Housing Corporation

Show 6 moreShow fewer
Continuous Concrete Pour

Regent Park Tower 4a

509 m away · 325 Gerrard St E · Toronto Centre

Allowed 24 Aug 2026 – 28 Feb 2027

Hours from 6:00 a.m.

Deltera Contracting Inc

Amplified And/or Instrument Sound

Riverside C'mon Events Series

590 m away · 10 Thompson St · Toronto-Danforth

Allowed 6 Jun 2026 – 25 Oct 2026

Hours 10:00 a.m.–8:00 p.m.

Setup 6 Jun 2026, 7:30 a.m.–10:00 a.m.; 20 Sep 2026, 7:30 a.m.–10:00 a.m.…

Tear down 6 Jun 2026, 8:00 p.m.–9:00 p.m.; 20 Sep 2026, 8:00 p.m.–9:00 p.m.…

Riverside Business Improvement Area

Construction

Rekai Cherry Place Campus Of Care

657 m away · 55 Eastern Ave · Toronto Centre

Allowed 12 Aug 2026 – 15 Jul 2027

Hours 7:00 p.m.–9:00 p.m., 7:00 a.m.–9:00 a.m.

Multiplex Construction Canada Limited

Continuous Concrete Pour

49 Ontario

828 m away · 49 Ontario St · Toronto Centre

Allowed 12 May 2026 – 12 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Dcc 49 Ontario East Inc.

Construction

Construction

828 m away · 49 Ontario St · Toronto Centre

Allowed 30 Sep 2026 – 5 Sep 2027

Hours 7:00 a.m.–10:00 p.m.

Dcc 49 Ontario East Inc.

Amplified And/or Instrument Sound

The Distillery Historic District Seasonal Program

947 m away · 55 Mill St · Spadina-Fort York

Allowed 27 May 2026 – 31 Oct 2026

Hours 7:00 a.m.–11:00 p.m.

Setup 29 Apr 2026 – 1 May 2026, 7:00 a.m.–11:00 p.m.

Tear down 1 Nov 2026, 7:00 a.m.–11:00 p.m.

Cityscape Property Management Corp.

Events

On the city's calendar. Check before you go.

CampFamily/Children

Meet Your Neighbour at an Early Local Registration Preparation Event

226 m away · 640 Dundas St E · Toronto Centre

On 16 Nov 2026 – 25 Nov 2026

Free · Listed days only

Check out a free recreation centre in person, meet your neighbours if you live nearby and learn more about who is eligib

Event pageAdd to calendar
CulturalLive Performances

Benedict Sheehan’s ‘Ukrainian War Requiem’: The National Tour

460 m away · 83 Power St · Toronto Centre

On 15 Nov 2026

The Axios Men’s Ensemble, in celebration of their historic Juno award, for Classical Album of the Year (Large Ensemble)

Event pageAdd to calendar
Food/CulinaryTour

Queen East Eats Fall Food Tours

676 m away · 657 Queen St E · Toronto-Danforth

On 14 Nov 2026 – 12 Dec 2026

Listed days only

Celebrate fall and support small businesses. Get ready to visit six pre-selected local food and drink establishments in

Event pageAdd to calendar
Show 17 moreShow fewer
MusicSeminars/Workshops

Let’s Talk Burnout, Leadership Responsibility

815 m away · 296 Broadview Ave · Toronto-Danforth

On 16 Nov 2026

Bringing artists and industry leaders together for an evening exploring the role of leadership in creating healthier, mo

Event pageAdd to calendar
Music

Everybody Here Wants You – The Music of Jeff Buckley

815 m away · 296 Broadview Ave · Toronto-Danforth

On 17 Nov 2026 – 18 Nov 2026

Almost three decades after his death, he remains one of the most beloved and influential performers of his generation.

Event pageAdd to calendar
Music

Hugh’s Goes Classical with Brett Polegato and Robert Kortgaard

815 m away · 296 Broadview Ave · Toronto-Danforth

On 22 Nov 2026

Polegato’s artistic sensibility has earned him the highest praise from audiences and critics: “his is a serious and sedu

Event pageAdd to calendar
Music

JazzInToronto’s “All That Cabaret” - George Masswohl Sing Mostly Sondheim

815 m away · 296 Broadview Ave · Toronto-Danforth

On 23 Nov 2026

Raised in St. Catharines, George Masswohl has been one of the leading performers in Canadian musical theatre for decades

Event pageAdd to calendar
Music

Sisters in Songs: Daughters of Donbas - Hildá Länsman & Tuomas Norvio - GETCHNAH

815 m away · 296 Broadview Ave · Toronto-Danforth

On 24 Nov 2026

Join us for an evening of music and sisterhood. The musicians will take you on a journey inspired by cultures and corner

Event pageAdd to calendar
Music

Discoveries Vol. 15 with Musical Hosts Amanda Walther and Michael Occhipinti

815 m away · 296 Broadview Ave · Toronto-Danforth

On 25 Nov 2026

This special edition of Discoveries features a handpicked lineup of artists who caught our attention through our online

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

93 River St

243 m away · 93 River St · Toronto Centre

Asked 25 May 2020

NOAC Issued

Site plan application for a 37-storey mixed use building comprised of 365 dwelling units and 300 square metres of retail at grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Site plan

111 River St

253 m away · 111 River St · Toronto Centre

Asked 20 Oct 2020

NOAC Issued

Site Plan application for a 39-storey mixed-use building containing 516 residential dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Condominium plan

111 River St

253 m away · 111 River St · Toronto Centre

Asked 4 Nov 2021

Under Review

*** Draft plan of condominium for 430 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Show 21 moreShow fewer
Site plan

7 Labatt Ave

284 m away · 7 Labatt Ave · Toronto Centre

Asked 31 Oct 2019

Under Review

INACTIVE Site Plan Approval Application for a proposed 38-storey mixed-use building with 548 residential units (rental and condominium), 4752 square metres of non-residential floor area (retail, office and a Salvation Army facility), and two levels of below grade parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Rezoning

7 Labatt Ave

284 m away · 7 Labatt Ave · Toronto Centre

Asked 30 Sep 2026

Under Review

Official Plan and Zoning By-law Amendment application for two 46-storey residential buildings containing approximately 1,170 dwelling units and a 2-storey non-residential building containing 1,111 square metres of non-residential space.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Allsun Campbell · [email protected].

Site plan

477 Queen St E

287 m away · 477 Queen St E · Toronto Centre

Asked 10 Aug 2023

OMB Appeal

The proposed development will be 15 storeys in height, plus mezzanine and mechanical penthouse along Queen Street East. Parking elevator access to four levels of below grade parking is proposedfrom the private east-west lane. Approximately 151 residential dwelling units,

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Jeremy Humphrey · [email protected].

Condominium plan

471 Queen St E

288 m away · 471 Queen St E · Toronto Centre

Asked 8 Nov 2021

Under Review

*** 143 dwelling units, 33 parking spaces*There is a concurrent Zoning By-law Amendment application which is currently under review/appeal

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Rezoning

761 Dundas St E

378 m away · 761 Dundas St E · Toronto Centre

Asked 8 Oct 2025

Under Review

Official Plan and Zoning By-law Amendment application for a mixed-use development comprised of two 48-storey towers containing approximately 1,197 residential units and 1,300 square metres of non-residential GFA. The proposal includes a 729 square metre park and 245 square metre natural heritage open space.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Rezoning

325 Gerrard St E

509 m away · 325 Gerrard St E · Toronto Centre

Asked 20 Apr 2022

OMB Appeal

Zoning By-law Amendment application for Phases 4 & 5 of the Regent Park redevelopment. The Phases 4 & 5 lands are generally bounded by Gerrard Street to the north, River Street to the east, Oak Street to the south, and Dreamers Way to the west. The proposal consists of a total gross floor area (GFA) of 320,064 m2…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

325 Gerrard St E

509 m away · 325 Gerrard St E · Toronto Centre

Asked 13 Jan 2025

NOAC Issued

Building 4A Proposal to construct a 26-storey tower, 10 storey mid-rise podium TCHC social housing building with 271 units, retail at grade along Gerrard Street East, community space on the ground floor and mezzanine, with one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

16 Sumach St

511 m away · 16 Sumach St · Toronto Centre

Asked 21 Oct 2025

Under Review

Site Plan Control Application to facilitate the development of the site with two mixed use buildings: 59 and 55 storeys, containing 1,284 dwelling units and 1,662 square metres of non-residential gross floor area.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Rezoning

33 Davies Ave

523 m away · 33 Davies Ave · Toronto-Danforth

Asked 27 May 2021

Appeal Received

Zoning by-law Amendment application to facilitate the development of the site for a 15-storey, plus mezzanine non-residential building having a gross floor area of approximately 18343 square metres. 46 parking spaces will be provided on the lot, located within a below grade parking structure.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Ali Meghani · [email protected].

Site plan

351 Queen St E

523 m away · 351 Queen St E · Toronto Centre

Asked 28 Jun 2021

NOAC Issued

Site Plan Application for a 28-storey mixed-use development with 526 units, 448 square metres of parkland, 1,350 square metres of non-residential gross floor area, and one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Rezoning

1 Sumach St

537 m away · 1 Sumach St · Toronto Centre

Asked 18 Sep 2026

Under Review

Lift the (H)

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Katherine Bailey · [email protected].

Subdivision

161 Parliament St

561 m away · 161 Parliament St · Toronto Centre

Asked 7 Nov 2021

Under Review

Draft Plan of subdivision for 3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Site plan

401 Dundas St E

608 m away · 401 Dundas St E · Toronto Centre

Asked 18 Oct 2021

Under Review

Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 291.6 square metres, and a residential gross floor area of 8518.90 square metres. A total of 137 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Rezoning

4 Gilead Pl

628 m away · 4 Gilead Pl · Toronto Centre

Asked 9 Apr 2026

OMB Appeal

The application proposes to amend the Official Plan and Zoning By-law to permit a 20 storey residential building containing 297 residential dwelling units.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Christy Chow · [email protected].

Site plan

4 Gilead Pl

628 m away · 4 Gilead Pl · Toronto Centre

Asked 16 Apr 2026

Application Received

Site Plan Approval for a 20-storey purpose built rental residential building, containing 297 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kyle Strik · [email protected].

Site plan

641 Queen St E

629 m away · 641 Queen St E · Toronto-Danforth

Asked 15 Sep 2022

Under Review

Proposed to retain the existing heritage buildings and construct a nine storey residential building. The building will contain 85 new residential dwelling units with a GFA of about 7186sqm and retail at grade with a GFA of 807sqm. The total proposed GFA is 9891sqm resulting in an FSI of 6.43

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Raymond Tung · [email protected].

Rezoning

641 Queen St E

629 m away · 641 Queen St E · Toronto-Danforth

Asked 15 Sep 2022

Under Review

Proposed to retain the existing heritage buildings and construct a nine storey residential building. The building will contain 85 new residential dwelling units with a GFA of about 7186sqm and retail at grade with a GFA of 807sqm. The total proposed GFA is 9891sqm resulting in an FSI of 6.43

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Raymond Tung · [email protected].

Site plan

306 Gerrard St E

635 m away · 306 Gerrard St E · Toronto Centre

Asked 26 May 2026

Under Review

Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

134 Parliament St

642 m away · 134 Parliament St · Toronto Centre

Asked 14 Aug 2023

OMB Appeal

Site Plan Application for a 46 storey (156.3 metres including mechanical penthouse) mixed-use building with 419 dwelling units and 328 square metres of commercial uses at grade.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

494 Richmond St E

666 m away · 494 Richmond St E · Toronto Centre

Asked 12 Jul 2023

Under Review

The Proposed Development will consist of approximately 35,250 square metres of total gross floor area, including about 400 square metres of commercial uses at-grade, for a total FSI of 10.1. Residential uses are located in the podium and towers above grade and will total 588 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

301 Queen St E

691 m away · 301 Queen St E · Toronto Centre

Asked 25 May 2016

Under Review

INACTIVE Site Plan application for a 25-storey mixed-use building: 206 dwelling units, 6 levels of below-grade parking, total combined GFA 15,711 sq. m.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].