Opening this block

Home · Toronto-St. Paul's · Redpath Ave

What's new around 155 Redpath Ave

155 Redpath Ave · Toronto-St. Paul's. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Spin Studio

732 m away · 2551 Yonge St · Don Valley West

Applied 8 Aug 2025

Inspection

Interior renovation - NEW "SPIN STUDIO"

Being built

The city has allowed these. Work may not have started. The permits in this area list 1930 homes.

1 homes

176 Eglinton Ave E

81 m away · 176 Eglinton Ave E · Toronto-St. Paul's

Approved 9 Oct 2026

1 new home

The permit lists 1 homes.

Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.

Apartment

170 Roehampton Ave

92 m away · 170 Roehampton Ave · Toronto-St. Paul's

Approved 28 Jul 2026

599 new homes

The permit lists 599 homes.

Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.

Multiple Unit Building

117 Broadway Ave

185 m away · 117 Broadway Ave · Toronto-St. Paul's

Approved 12 Dec 2025

Proposed construction of exterior raised wood deck platform c/w wood trellis & wood screen along with exterior counter feed from existing exterior base building services.

Show 21 moreShow fewer
Mixed Use/res W Non Res

65 Broadway Ave

228 m away · 65 Broadway Ave · Toronto-St. Paul's

Approved 23 Jan 2025

Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.

Multiple Unit Building

100 Broadway Ave

240 m away · 100 Broadway Ave · Don Valley West

Approved 5 May 2026

Proposal for interior alterations to fit new tenant

Apartment

110 Broadway Ave

243 m away · 110 Broadway Ave · Don Valley West

Approved 2 Feb 2026

869 new homes

The permit lists 869 homes.

Proposed construction of 26 Storey North Tower consisting of 352 Units & 37 Storey South Tower consisting of 506 Units with 2 Levels of U/G Parking. See permit 2020 201517 BLD 00 NB for 100 Broadway Ave for underground…

Apartment

18 Brownlow Ave

295 m away · 18 Brownlow Ave · Toronto-St. Paul's

Approved 23 Jun 2026

194 new homes

The permit lists 194 homes.

Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…

Apartment

241 Redpath Ave

310 m away · 241 Redpath Ave · Don Valley West

Approved 10 Jul 2026

Part Permit - Proposal to demolish existing apartment building and construct a 38 storey apartment building containing 356 units of which 310 condominium apartments, 46 rental-replacement apartments interior and…

Apartment

109 Erskine Ave

351 m away · 109 Erskine Ave · Don Valley West

Approved 28 Oct 2025

Rev 02 Revision 01: To units on floors A208, A211, A212, A215, A217, A218, A220 - Gym area on the 2nd floor has been revised - Bike locker room configurations on the parking levels have been revised.Construct 22-storey…

Multiple Unit Building

8 Eglinton Ave E

426 m away · 8 Eglinton Ave E · Toronto-St. Paul's

Approved 19 Oct 2026

Proposal for interior alterations to vacant unit RU05 into a Group E (Acai Shop).

Multiple Unit Building

688 Mount Pleasant Rd

436 m away · 688 Mount Pleasant Rd · Toronto-St. Paul's

Approved 6 Nov 2026

Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty…

New house

29 Taunton Rd

443 m away · 29 Taunton Rd · Don Valley West

Approved 26 Sep 2025

1 new home · Michelle Basu Roy

The permit lists 1 homes.

Fire damage dwelling to be rebuilt from ground to third floor including front porch, a new walk out to be constructed, Existing basement/foundation walls and concrete slab-on-grade. Front porch concrete steps to remain

Multiple Unit Building

2191 Yonge St

500 m away · 2191 Yonge St · Toronto-St. Paul's

Approved 1 May 2026

Proposal for interior alterations to first floor and third floor amenities area

Multiple Unit Building

2300 Yonge St

528 m away · 2300 Yonge St · Eglinton-Lawrence

Approved 6 Aug 2026

proposal for localized concrete repairs and waterproofing renewal at the parking garage helical ramp

New house

131 Hillsdale Ave E

537 m away · 131 Hillsdale Ave E · Toronto-St. Paul's

Approved 23 Jul 2026

Nikan Sharif-zadeh

REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…

Multiple Unit Building

2200 Yonge St

547 m away · 2200 Yonge St · Toronto-St. Paul's

Approved 27 May 2026

Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage

Mixed Use/res W Non Res

2400 Yonge St

551 m away · 2400 Yonge St · Eglinton-Lawrence

Approved 22 Oct 2025

Conditional Permit - Part Permit - To construct 27 Storey - South Tower mixed use residential (rental) with shared podium, two levels below grade parking for total of 385 rental units.

Apartment

2161 Yonge St

592 m away · 2161 Yonge St · Toronto-St. Paul's

Approved 22 Jul 2025

31 new homes

The permit lists 31 homes.

REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA

Apartment

413 Roehampton Ave

616 m away · 413 Roehampton Ave · Don Valley West

Approved 7 Aug 2026

Revision 01: See attached cover letter. Proposed construction of new 3-storey (28-units) residential condominium with 2-storey below grade (1-storey residential and 1-storey parking garage)

Multiple Unit Building

2472 Yonge St

619 m away · 2472 Yonge St · Eglinton-Lawrence

Approved 7 Aug 2026

Revison to basement layout changes, ground floor washroom changes, duct shaft detailProposed interior alterations to create 3 units (2 restaurants and 1 retail store) in existing 2 storeys 1 unit commercial building

Laneway suite

38 Keewatin Ave

626 m away · 38 Keewatin Ave · Don Valley West

Approved 20 Aug 2026

1 new home

The permit lists 1 homes.

Proposed 2 storey garden suite

New house

362 Soudan Ave

644 m away · 362 Soudan Ave · Don Valley West

Approved 22 Apr 2025

1 new home

The permit lists 1 homes.

Proposal for demolition of existing house and construction of new 3 storey detached single family dwelling and detached garage

Laneway suite

362 Soudan Ave

644 m away · 362 Soudan Ave · Don Valley West

Approved 3 Sep 2025

1 new home

The permit lists 1 homes.

2 storey wood frame garden suite with one car garage beneath

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

61 Brownlow Ave

248 m away · 61 Brownlow Ave · Toronto-St. Paul's

Approved 24 Sep 2025

Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)

Demolition

68 Soudan Ave

473 m away · 68 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

66 Soudan Ave

476 m away · 66 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Show 21 moreShow fewer
Demolition

64 Soudan Ave

480 m away · 64 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

62 Soudan Ave

484 m away · 62 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

60 Soudan Ave

488 m away · 60 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey dwelling for City Parkland Dedication

Demolition

34 Montgomery Ave

572 m away · 34 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

36 Montgomery Ave

577 m away · 36 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

40 Montgomery Ave

583 m away · 40 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

39 Montgomery Ave

585 m away · 39 Montgomery Ave · Eglinton-Lawrence

Approved 4 Mar 2026

Proposal to demolish existing SFD with no replacement building for future Park Development

Demolition

42 Montgomery Ave

588 m away · 42 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

46 Montgomery Ave

594 m away · 46 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

48 Montgomery Ave

598 m away · 48 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

52 Montgomery Ave

605 m away · 52 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

54 Montgomery Ave

610 m away · 54 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

58 Montgomery Ave

618 m away · 58 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

60 Montgomery Ave

623 m away · 60 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

55 Montgomery Ave

624 m away · 55 Montgomery Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Proposal to demolish the existing 2 storey SFD-detached dwelling.

Demolition

64 Montgomery Ave

629 m away · 64 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

57 Montgomery Ave

631 m away · 57 Montgomery Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Proposal to demolish the existing 2 storey SFD-semi dwelling.See also 23 176474 NNY 08 OZ

Demolition

66 Montgomery Ave

636 m away · 66 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

70 Montgomery Ave

640 m away · 70 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

23 Henning Ave

716 m away · 23 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

The One Seventy

92 m away · 170 Roehampton Ave · Toronto-St. Paul's

Allowed 7 Aug 2026 – 7 Feb 2027

Hours from 7:00 p.m.

Clark Construction Management Inc.

Continuous Concrete Pour

241 Redpath

310 m away · 241 Redpath Ave · Don Valley West

Allowed 9 Sep 2026 – 31 Mar 2027

Hours from 7:00 p.m.

Bluescape 241 Redpath Inc.

Show 8 moreShow fewer
Continuous Concrete Pour

241 Redpath

310 m away · 241 Redpath Ave · Don Valley West

Allowed 16 Oct 2026 – 26 Oct 2026

Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath Ave

310 m away · 241 Redpath Ave · Don Valley West

Allowed 2 Nov 2026 – 18 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

8 Brownlow Avenue (northwest Of Brownlow And Souda

337 m away · 8 Brownlow Ave · Toronto-St. Paul's

Allowed 1 May 2026 – 30 Oct 2026

Hours 7:00 a.m.–12:30 a.m.

Soudan-brownlow Properties

Construction

Yonge And Roselawn Project

551 m away · 2400 Yonge St · Eglinton-Lawrence

Allowed 1 Jan 2026 – 31 Dec 2026

Hours 6:00 a.m.–10:00 p.m.

Skygrid Construction Inc

Construction

Canada Square Office Retrofit

630 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 10 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:00 p.m.

Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.

Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.

Ellisdon Corporation

Construction

Canada Square Office Retrofit

630 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 1 Nov 2026 – 30 Jun 2027

Hours from 7:00 p.m.

Ellisdon Corporation

Amplified And/or Instrument Sound

5th Halloween Hauntup 2026

697 m away · 20 Castlefield Ave · Eglinton-Lawrence

Allowed 31 Oct 2026

Hours 10:00 a.m.–3:00 p.m.

Setup 31 Oct 2026, 6:00 a.m.–10:00 a.m.

Tear down 31 Oct 2026, 3:00 p.m.–6:00 p.m.

Uptown Yonge Bia

Amplified And/or Instrument Sound

Holiday Tree Lighting

765 m away · 14 St Clements Ave · Eglinton-Lawrence

Allowed 20 Nov 2026

Hours 5:00 p.m.–8:00 p.m.

Setup 20 Nov 2026, 4:30 p.m.–5:00 p.m.

Tear down 20 Nov 2026, 8:00 p.m.–8:15 p.m.

Uptown Yonge Bia

Events

On the city's calendar. Check before you go.

Environmental

Seed-to-Habitat Workshop: Hands-on Seed Processing Workshop

1.0 km away · 200 Eglinton Ave W · Eglinton-Lawrence

On 21 Nov 2026

Free

Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

160 Eglinton Ave E

105 m away · 160 Eglinton Ave E · Toronto-St. Paul's

Asked 11 Apr 2022

Under Review

Site Plan application to permit a 61-storey multi-tower mixed use building with a maximum gross floor area of 90,000 square metres, 201 parking spaces, 1,329 bicycle parking spaces, and a north-south midblock connection.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Rezoning

141 Roehampton Ave

113 m away · 141 Roehampton Ave · Toronto-St. Paul's

Asked 28 Jun 2022

Appeal Received

Rezoning Application resubmission for a 58-storey residential building containing 762 residential dwelling units. A total gross floor area of 47,675.3 square metres is proposed, with an overall density equivalent to 16.12 times the area of the lot.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].

Site plan

141 Roehampton Ave

113 m away · 141 Roehampton Ave · Toronto-St. Paul's

Asked 28 Jun 2022

Under Review

Site Plan Application for a 48-storey residential building. The building would consist of a 6-storey podium and 42-storey tower element containing 614 residential dwelling units. A total gross floor area of 36,849 square metres is proposed, with an overall density equivalent to 12.46 times the area of the subject site.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Show 21 moreShow fewer
Subdivision

150 Eglinton Ave E

132 m away · 150 Eglinton Ave E · Toronto-St. Paul's

Asked 16 Sep 2021

Under Review

Draft Plan of Subdivision for the creation of 5 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Site plan

181 Eglinton Ave E

142 m away · 181 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Under Review

Site Plan Application for proposed 21-storey buidling and three-levels of underground parking, excluding mechanical penthouse. The proposal includes 11,242.7 square metres of residential and 237.4 square metres of retail use. The building includes 139 unit and 23 vehicular parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Rezoning

191 Eglinton Ave E

145 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Appeal Received

Rezoning for proposed 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle parking spaces.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Shane Taylor · [email protected].

Site plan

191 Eglinton Ave E

145 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 6 Mar 2025

Under Review

Site Plan approval application for a 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Rezoning

250 Roehampton Ave

153 m away · 250 Roehampton Ave · Toronto-St. Paul's

Asked 8 Dec 2025

Under Review

Zoning By-law Amendment for a 59-storey residential building with a height of 190 m (excluding the mechanical penthouse). The proposed redevelopment consists of a total gross floor area (GFA) of 48,233.4 sq. m., which results in a total Floor Space Index (FSI) of 15.37 times the area of the lot. The proposed…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Subdivision

808 Mount Pleasant Rd

180 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's

Asked 8 Oct 2021

Under Review

2 lots

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

808 Mount Pleasant Rd

180 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's

Asked 27 Apr 2022

Under Review

Site Plan Approval for a 35-storey mixed-use building having a non-residential gross floor area of 1005 square metres, and a residential gross floor area of 31,514 square metres. 514 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Rezoning

808 Mount Pleasant Rd

180 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's

Asked 22 Nov 2024

OMB Appeal

Zoning By-law Amendment for a 61-storey mixed-use building with a height of 197.05 metres (excluding the mechanical penthouse). The proposed building will include approximately 812 square metres of non-residential Gross Floor Area and 49,040 square metres of residential gross floor area.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].

Rezoning

120 Eglinton Ave E

204 m away · 120 Eglinton Ave E · Toronto-St. Paul's

Asked 30 Apr 2025

OMB Appeal

The redevelopment proposes a 70-storey mixed-use building with 187.4 sq. m. of retail space at-grade and 555 residential dwelling units above, resulting in a total gross floor area (GFA) of 39,275.7 sq. m., a total Floor Space Index (FSI) of 26.06, pursuant to GFA calculations under By-law 569-2013.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Shane Taylor · [email protected].

Site plan

110 Eglinton Ave E

221 m away · 110 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Aug 2022

Under Review

The proposed development consists of a 9-storey podium topped with two residential towers that are 57 and 59 storeys in height and a 3-level underground garage. The total GFA is approximately 95,000 square metres, comprising of approximately 77,000 square metres of residential GFA, and approximately 18,000 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

61 Brownlow Ave

248 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 25 Aug 2021

NOAC Issued

Site Plan application to permit a residential building with two towers, 59 and 55 storeys , comprising 1,374 residential units, daycare facility and a gross floor area of 97,194 square metres. The proposal involves rental replacement.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Condominium plan

61 Brownlow Ave

248 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 10 Sep 2021

Under Review

*** Draft Plan of Standard Condominium to permit 384 residential units in a 35-storey residential building with a 2-level underground parking garage containing 69 vehicular parking spaces.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Cameron Williamson · [email protected].

Site plan

758 Mount Pleasant Rd

268 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's

Asked 5 Jul 2021

Under Review

Site Plan Approval for a 35-storey mixed-use building comprised of a 6-storey base building, and a 29-storey tower element. The proposed non-residential gross floor area is 208.37 square metres, and the proposed residential gross floor area is 28,692.73 square metres. A total of 398 residential dwelling units are…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Rezoning

758 Mount Pleasant Rd

268 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's

Asked 23 Apr 2026

Under Review

Zoning By-law Amendment application to allow for the development of a 56-storey mixed-use building comprised of a 4-storey podium and a 52-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 618 residential dwelling units.The site was subject to a…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

77 Roehampton Ave

271 m away · 77 Roehampton Ave · Toronto-St. Paul's

Asked 27 Apr 2022

Under Review

Site Plan Approval application to facilitate the redevelopment of the site for a 50-storey residential building having a gross floor area of 35,867 square metres. 623 residential dwelling units are proposed, of which, 81 are rental replacement dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Subdivision

90 Eglinton Ave E

273 m away · 90 Eglinton Ave E · Toronto-St. Paul's

Asked 16 Sep 2021

Under Review

Draft Plan of Subdivision to create 3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Condominium plan

136 Broadway Ave

285 m away · 136 Broadway Ave · Don Valley West

Asked 4 Nov 2021

Under Review

*** Draft plan of condominium for 72 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Sina Zekria · [email protected].

Site plan

124 Broadway Ave

288 m away · 124 Broadway Ave · Don Valley West

Asked 11 Jun 2021

Under Review

Site Plan Control application for two residential towers with shared podium and facilities, at 36 storeys on 124 Broadway Avenue and 30 storeys on 136 Broadway Avenue. 860 dwelling units are proposed, including 206 units in the purpose built rental tower at 136 Broadway Ave to replace rental units from 124 and 136…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Marian Prejel · [email protected].

Condominium plan

124 Broadway Ave

288 m away · 124 Broadway Ave · Don Valley West

Asked 19 Oct 2021

Under Review

*** Draft Plan of Condominium for 459 condominium units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Sina Zekria · [email protected].

Site plan

18 Brownlow Ave

295 m away · 18 Brownlow Ave · Toronto-St. Paul's

Asked 23 Jul 2025

NOAC Issued

Site Plan Amendment to alter the development standards for the 21-storey residential building (previously approved under 23 152381 STE 12 SA), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor area and permitted projections, revising minimum setbacks…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

241 Redpath Ave

310 m away · 241 Redpath Ave · Don Valley West

Asked 3 Feb 2026

NOAC Issued

Site Plan Amendment Application in response to the additional 5-storeys approved at the North York Committee of Adjustment on June 12, 2025, approving additional height and density among other performance standards.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Amie Chung · [email protected].