Opening this block

Home · Toronto-St. Paul's · Dunfield Ave

What's new around 77 Dunfield Ave

77 Dunfield Ave · Toronto-St. Paul's. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Spin Studio

817 m away · 2551 Yonge St · Don Valley West

Applied 8 Aug 2025

Inspection

Interior renovation - NEW "SPIN STUDIO"

Being built

The city has allowed these. Work may not have started. The permits in this area list 1709 homes.

1 homes

176 Eglinton Ave E

207 m away · 176 Eglinton Ave E · Toronto-St. Paul's

Approved 9 Oct 2026

1 new home

The permit lists 1 homes.

Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.

Multiple Unit Building

8 Eglinton Ave E

226 m away · 8 Eglinton Ave E · Toronto-St. Paul's

Approved 19 Oct 2026

Proposal for interior alterations to vacant unit RU05 into a Group E (Acai Shop).

Show 21 moreShow fewer
Multiple Unit Building

2191 Yonge St

232 m away · 2191 Yonge St · Toronto-St. Paul's

Approved 1 May 2026

Proposal for interior alterations to first floor and third floor amenities area

Apartment

170 Roehampton Ave

293 m away · 170 Roehampton Ave · Toronto-St. Paul's

Approved 28 Jul 2026

599 new homes

The permit lists 599 homes.

Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.

Apartment

18 Brownlow Ave

298 m away · 18 Brownlow Ave · Toronto-St. Paul's

Approved 23 Jun 2026

194 new homes

The permit lists 194 homes.

Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…

Multiple Unit Building

2200 Yonge St

301 m away · 2200 Yonge St · Toronto-St. Paul's

Approved 27 May 2026

Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage

Apartment

2161 Yonge St

316 m away · 2161 Yonge St · Toronto-St. Paul's

Approved 22 Jul 2025

31 new homes

The permit lists 31 homes.

REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA

New house

131 Hillsdale Ave E

323 m away · 131 Hillsdale Ave E · Toronto-St. Paul's

Approved 23 Jul 2026

Nikan Sharif-zadeh

REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…

Multiple Unit Building

2300 Yonge St

336 m away · 2300 Yonge St · Eglinton-Lawrence

Approved 6 Aug 2026

proposal for localized concrete repairs and waterproofing renewal at the parking garage helical ramp

Mixed Use/res W Non Res

65 Broadway Ave

351 m away · 65 Broadway Ave · Toronto-St. Paul's

Approved 23 Jan 2025

Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.

Multiple Unit Building

2150 Yonge St

421 m away · 2150 Yonge St · Toronto-St. Paul's

Approved 3 Sep 2026

Revision 1: Revision to the building permit illustrating the pre-fire and post-repair ceiling height at the base of the basement staircaseProposed fire damage repairs. Scope includes removal and replacement of gypsum,…

Multiple Unit Building

117 Broadway Ave

447 m away · 117 Broadway Ave · Toronto-St. Paul's

Approved 12 Dec 2025

Proposed construction of exterior raised wood deck platform c/w wood trellis & wood screen along with exterior counter feed from existing exterior base building services.

Multiple Unit Building

688 Mount Pleasant Rd

456 m away · 688 Mount Pleasant Rd · Toronto-St. Paul's

Approved 6 Nov 2026

Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty…

Multiple Unit Building

100 Broadway Ave

469 m away · 100 Broadway Ave · Don Valley West

Approved 5 May 2026

Proposal for interior alterations to fit new tenant

Apartment

110 Broadway Ave

486 m away · 110 Broadway Ave · Don Valley West

Approved 2 Feb 2026

869 new homes

The permit lists 869 homes.

Proposed construction of 26 Storey North Tower consisting of 352 Units & 37 Storey South Tower consisting of 506 Units with 2 Levels of U/G Parking. See permit 2020 201517 BLD 00 NB for 100 Broadway Ave for underground…

Mixed Use/res W Non Res

2400 Yonge St

516 m away · 2400 Yonge St · Eglinton-Lawrence

Approved 22 Oct 2025

Conditional Permit - Part Permit - To construct 27 Storey - South Tower mixed use residential (rental) with shared podium, two levels below grade parking for total of 385 rental units.

New house

11 Oswald Cres

518 m away · 11 Oswald Cres · Toronto-St. Paul's

Approved 11 Sep 2026

2 new homes · 16230288 Canada Inc

The permit lists 2 homes.

TO CONSTRUCT A NEW TWO STOREY DUPLEX

Apartment

241 Redpath Ave

531 m away · 241 Redpath Ave · Don Valley West

Approved 10 Jul 2026

Part Permit - Proposal to demolish existing apartment building and construct a 38 storey apartment building containing 356 units of which 310 condominium apartments, 46 rental-replacement apartments interior and…

Apartment

109 Erskine Ave

541 m away · 109 Erskine Ave · Don Valley West

Approved 28 Oct 2025

Rev 02 Revision 01: To units on floors A208, A211, A212, A215, A217, A218, A220 - Gym area on the 2nd floor has been revised - Bike locker room configurations on the parking levels have been revised.Construct 22-storey…

New house

29 Taunton Rd

563 m away · 29 Taunton Rd · Don Valley West

Approved 26 Sep 2025

1 new home · Michelle Basu Roy

The permit lists 1 homes.

Fire damage dwelling to be rebuilt from ground to third floor including front porch, a new walk out to be constructed, Existing basement/foundation walls and concrete slab-on-grade. Front porch concrete steps to remain

New house

12 Cuthbert Cres

603 m away · 12 Cuthbert Cres · Toronto-St. Paul's

Approved 20 May 2025

2 new homes

The permit lists 2 homes.

Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH

Multiple Unit Building

598 Mount Pleasant Rd

619 m away · 598 Mount Pleasant Rd · Toronto-St. Paul's

Approved 24 Jul 2026

Rear addition. Commercial building. Ground floor medical office; second storey office

Multiple Unit Building

2472 Yonge St

641 m away · 2472 Yonge St · Eglinton-Lawrence

Approved 7 Aug 2026

Revison to basement layout changes, ground floor washroom changes, duct shaft detailProposed interior alterations to create 3 units (2 restaurants and 1 retail store) in existing 2 storeys 1 unit commercial building

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

68 Soudan Ave

204 m away · 68 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

66 Soudan Ave

206 m away · 66 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

64 Soudan Ave

210 m away · 64 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Show 21 moreShow fewer
Demolition

62 Soudan Ave

213 m away · 62 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

60 Soudan Ave

216 m away · 60 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey dwelling for City Parkland Dedication

Demolition

61 Brownlow Ave

335 m away · 61 Brownlow Ave · Toronto-St. Paul's

Approved 24 Sep 2025

Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)

Demolition

39 Montgomery Ave

500 m away · 39 Montgomery Ave · Eglinton-Lawrence

Approved 4 Mar 2026

Proposal to demolish existing SFD with no replacement building for future Park Development

Demolition

34 Montgomery Ave

509 m away · 34 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

36 Montgomery Ave

513 m away · 36 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

17 Henning Ave

515 m away · 17 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

40 Montgomery Ave

516 m away · 40 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

23 Henning Ave

518 m away · 23 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

19 Henning Ave

519 m away · 19 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

42 Montgomery Ave

520 m away · 42 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

21 Henning Ave

520 m away · 21 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

25 Henning Ave

520 m away · 25 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

29 Henning Ave

523 m away · 29 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

46 Montgomery Ave

524 m away · 46 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

27 Henning Ave

525 m away · 27 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

31 Henning Ave

527 m away · 31 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

48 Montgomery Ave

527 m away · 48 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

55 Montgomery Ave

528 m away · 55 Montgomery Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Proposal to demolish the existing 2 storey SFD-detached dwelling.

Demolition

52 Montgomery Ave

531 m away · 52 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

The One Seventy

293 m away · 170 Roehampton Ave · Toronto-St. Paul's

Allowed 7 Aug 2026 – 7 Feb 2027

Hours from 7:00 p.m.

Clark Construction Management Inc.

Continuous Concrete Pour

8 Brownlow Avenue (northwest Of Brownlow And Souda

330 m away · 8 Brownlow Ave · Toronto-St. Paul's

Allowed 1 May 2026 – 30 Oct 2026

Hours 7:00 a.m.–12:30 a.m.

Soudan-brownlow Properties

Show 8 moreShow fewer
Construction

Canada Square Office Retrofit

356 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 10 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:00 p.m.

Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.

Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.

Ellisdon Corporation

Construction

Canada Square Office Retrofit

356 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 1 Nov 2026 – 30 Jun 2027

Hours from 7:00 p.m.

Ellisdon Corporation

Construction

Yonge And Roselawn Project

516 m away · 2400 Yonge St · Eglinton-Lawrence

Allowed 1 Jan 2026 – 31 Dec 2026

Hours 6:00 a.m.–10:00 p.m.

Skygrid Construction Inc

Continuous Concrete Pour

241 Redpath

531 m away · 241 Redpath Ave · Don Valley West

Allowed 9 Sep 2026 – 31 Mar 2027

Hours from 7:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath

531 m away · 241 Redpath Ave · Don Valley West

Allowed 16 Oct 2026 – 26 Oct 2026

Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath Ave

531 m away · 241 Redpath Ave · Don Valley West

Allowed 2 Nov 2026 – 18 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Bluescape 241 Redpath Inc.

Amplified And/or Instrument Sound

5th Halloween Hauntup 2026

720 m away · 20 Castlefield Ave · Eglinton-Lawrence

Allowed 31 Oct 2026

Hours 10:00 a.m.–3:00 p.m.

Setup 31 Oct 2026, 6:00 a.m.–10:00 a.m.

Tear down 31 Oct 2026, 3:00 p.m.–6:00 p.m.

Uptown Yonge Bia

Amplified And/or Instrument Sound

Holiday Tree Lighting

825 m away · 14 St Clements Ave · Eglinton-Lawrence

Allowed 20 Nov 2026

Hours 5:00 p.m.–8:00 p.m.

Setup 20 Nov 2026, 4:30 p.m.–5:00 p.m.

Tear down 20 Nov 2026, 8:00 p.m.–8:15 p.m.

Uptown Yonge Bia

Events

On the city's calendar. Check before you go.

Environmental

Seed-to-Habitat Workshop: Hands-on Seed Processing Workshop

782 m away · 200 Eglinton Ave W · Eglinton-Lawrence

On 21 Nov 2026

Free

Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle

Add to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

55 Eglinton Ave E

93 m away · 55 Eglinton Ave E · Toronto-St. Paul's

Asked 27 Apr 2018

Under Review

INACTIVE Site Plan applciation for a total of 40,886.39 square metres of gross floor area (GFA) over 50 storeys. This GFA includes 253.58 square metres of at-grade retail fronting Eglinton Avenue East, and 6,409.82 square metres of office space to be located on Floors 2-6. A total of 461 residential units are proposed…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Rezoning

120 Eglinton Ave E

102 m away · 120 Eglinton Ave E · Toronto-St. Paul's

Asked 30 Apr 2025

OMB Appeal

The redevelopment proposes a 70-storey mixed-use building with 187.4 sq. m. of retail space at-grade and 555 residential dwelling units above, resulting in a total gross floor area (GFA) of 39,275.7 sq. m., a total Floor Space Index (FSI) of 26.06, pursuant to GFA calculations under By-law 569-2013.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Shane Taylor · [email protected].

Site plan

110 Eglinton Ave E

118 m away · 110 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Aug 2022

Under Review

The proposed development consists of a 9-storey podium topped with two residential towers that are 57 and 59 storeys in height and a 3-level underground garage. The total GFA is approximately 95,000 square metres, comprising of approximately 77,000 square metres of residential GFA, and approximately 18,000 square…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Show 21 moreShow fewer
Subdivision

90 Eglinton Ave E

122 m away · 90 Eglinton Ave E · Toronto-St. Paul's

Asked 16 Sep 2021

Under Review

Draft Plan of Subdivision to create 3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Subdivision

150 Eglinton Ave E

146 m away · 150 Eglinton Ave E · Toronto-St. Paul's

Asked 16 Sep 2021

Under Review

Draft Plan of Subdivision for the creation of 5 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Site plan

160 Eglinton Ave E

172 m away · 160 Eglinton Ave E · Toronto-St. Paul's

Asked 11 Apr 2022

Under Review

Site Plan application to permit a 61-storey multi-tower mixed use building with a maximum gross floor area of 90,000 square metres, 201 parking spaces, 1,329 bicycle parking spaces, and a north-south midblock connection.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

77 Roehampton Ave

181 m away · 77 Roehampton Ave · Toronto-St. Paul's

Asked 27 Apr 2022

Under Review

Site Plan Approval application to facilitate the redevelopment of the site for a 50-storey residential building having a gross floor area of 35,867 square metres. 623 residential dwelling units are proposed, of which, 81 are rental replacement dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Rezoning

141 Roehampton Ave

204 m away · 141 Roehampton Ave · Toronto-St. Paul's

Asked 28 Jun 2022

Appeal Received

Rezoning Application resubmission for a 58-storey residential building containing 762 residential dwelling units. A total gross floor area of 47,675.3 square metres is proposed, with an overall density equivalent to 16.12 times the area of the lot.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].

Site plan

141 Roehampton Ave

204 m away · 141 Roehampton Ave · Toronto-St. Paul's

Asked 28 Jun 2022

Under Review

Site Plan Application for a 48-storey residential building. The building would consist of a 6-storey podium and 42-storey tower element containing 614 residential dwelling units. A total gross floor area of 36,849 square metres is proposed, with an overall density equivalent to 12.46 times the area of the subject site.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Site plan

1 Eglinton Ave E

228 m away · 1 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Oct 2021

Under Review

Site Plan Approval for a 65-storey mixed-use building having a non-residential gross floor area of 11,225.70 square metres, and a residential gross floor area of 43,684.60 square metres. A total of 600 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Condominium plan

1 Eglinton Ave E

228 m away · 1 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Oct 2021

Under Review

*** Draft Plan of Condominium for 600 residential dwelling units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Patrick Miller · [email protected].

Site plan

158 Soudan Ave

239 m away · 158 Soudan Ave · Toronto-St. Paul's

Asked 26 Mar 2025

Under Review

Site Plan Control for a 56-storey residential tower that will have a total of 46,547 square metres of residential gross floor area ("GFA") and a total of 674 total dwelling units (including the 13 required rental replacement units). See Related Rezoning file (25 135273 STE 12 OZ) Jan 2026 Revised Submission - Zoning…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Site plan

181 Eglinton Ave E

266 m away · 181 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Under Review

Site Plan Application for proposed 21-storey buidling and three-levels of underground parking, excluding mechanical penthouse. The proposal includes 11,242.7 square metres of residential and 237.4 square metres of retail use. The building includes 139 unit and 23 vehicular parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Rezoning

191 Eglinton Ave E

290 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Appeal Received

Rezoning for proposed 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle parking spaces.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Shane Taylor · [email protected].

Site plan

191 Eglinton Ave E

290 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 6 Mar 2025

Under Review

Site Plan approval application for a 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

18 Brownlow Ave

298 m away · 18 Brownlow Ave · Toronto-St. Paul's

Asked 23 Jul 2025

NOAC Issued

Site Plan Amendment to alter the development standards for the 21-storey residential building (previously approved under 23 152381 STE 12 SA), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor area and permitted projections, revising minimum setbacks…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Subdivision

2323 Yonge St

317 m away · 2323 Yonge St · Toronto-St. Paul's

Asked 29 Sep 2021

Under Review

Draft plan of subdivision for 3 development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

2323 Yonge St

317 m away · 2323 Yonge St · Toronto-St. Paul's

Asked 29 Sep 2021

Under Review

Site Plan Approval for a 34 storey mixed-use building

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Site plan

61 Brownlow Ave

335 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 25 Aug 2021

NOAC Issued

Site Plan application to permit a residential building with two towers, 59 and 55 storeys , comprising 1,374 residential units, daycare facility and a gross floor area of 97,194 square metres. The proposal involves rental replacement.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Condominium plan

61 Brownlow Ave

335 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 10 Sep 2021

Under Review

*** Draft Plan of Standard Condominium to permit 384 residential units in a 35-storey residential building with a 2-level underground parking garage containing 69 vehicular parking spaces.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Cameron Williamson · [email protected].

Rezoning

2180 Yonge St

356 m away · 2180 Yonge St · Toronto-St. Paul's

Asked 21 Dec 2020

Under Review

INACTIVE Zoning By-law Amendment application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Proposal includes a new public plaza, open spaces, street connections, a community use facility, and public park. Related OPA application: 22 242145 STE 12 OZ

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Rezoning

2180 Yonge St

356 m away · 2180 Yonge St · Toronto-St. Paul's

Asked 23 Dec 2022

Under Review

Official Plan application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Official Plan Amendment requested to amend policies and Map 21-9 within the Yonge-Eglinton Secondary Plan. Related ZBA application: 20 232714 STE 12 OZ

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Subdivision

2345 Yonge St

362 m away · 2345 Yonge St · Toronto-St. Paul's

Asked 1 Oct 2021

Under Review

Draft Plan of Subdivision to create 3 development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].