Tim Hortons
149 m away · 2171 Yonge St · Toronto-St. Paul's
Approved 18 Aug 2026
Opening this block
Home · Toronto-St. Paul's · Soudan Ave
60 Soudan Ave · Toronto-St. Paul's. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
149 m away · 2171 Yonge St · Toronto-St. Paul's
Approved 18 Aug 2026
188 m away · 2131 Yonge St · Toronto-St. Paul's
Approved 24 Jun 2026
190 m away · 2201 Yonge St · Toronto-St. Paul's
Approved 3 Jun 2026
197 m away · 2180 Yonge St · Toronto-St. Paul's
Approved 2 Oct 2026
202 m away · 90 Holly St · Toronto-St. Paul's
Approved 25 Feb 2026
216 m away · 2156 Yonge St · Toronto-St. Paul's
Approved 12 May 2026
216 m away · 77 Dunfield Ave · Toronto-St. Paul's
Approved 26 Jan 2026
217 m away · 45 Eglinton Ave E · Toronto-St. Paul's
Approved 16 Mar 2026
220 m away · 2144 Yonge St · Toronto-St. Paul's
Approved 20 Jul 2026
230 m away · 51 Eglinton Ave E · Toronto-St. Paul's
Approved 9 Jun 2026
242 m away · 2095 Yonge St · Toronto-St. Paul's
Approved 28 Nov 2025
282 m away · 30 Eglinton Ave E · Toronto-St. Paul's
Approved 27 Feb 2026
286 m away · 6 Eglinton Ave E · Toronto-St. Paul's
Approved 20 Jan 2026
286 m away · 6 Eglinton Ave E · Toronto-St. Paul's
Approved 13 Oct 2026
288 m away · 8 Eglinton Ave E · Toronto-St. Paul's
Approved 2 Sep 2025
288 m away · 8 Eglinton Ave E · Toronto-St. Paul's
Approved 21 Jan 2026
289 m away · 40 Eglinton Ave E · Toronto-St. Paul's
Approved 29 Sep 2025
289 m away · 40 Eglinton Ave E · Toronto-St. Paul's
Approved 2 Sep 2026
292 m away · 5 Manor Rd E · Toronto-St. Paul's
Approved 13 Mar 2026
298 m away · 20 Eglinton Ave E · Toronto-St. Paul's
Approved 3 Jul 2025
298 m away · 20 Eglinton Ave E · Toronto-St. Paul's
Approved 26 Sep 2025
298 m away · 20 Eglinton Ave E · Toronto-St. Paul's
Approved 10 Dec 2025
298 m away · 20 Eglinton Ave E · Toronto-St. Paul's
Approved 15 Jan 2026
298 m away · 20 Eglinton Ave E · Toronto-St. Paul's
Approved 27 Jan 2026
A permit application that names a shop. It is not a licence and not an opening day.
1.0 km away · 2551 Yonge St · Don Valley West
Applied 8 Aug 2025
Inspection
Interior renovation - NEW "SPIN STUDIO"
The city has allowed these. Work may not have started. The permits in this area list 2035 homes.
148 m away · 2161 Yonge St · Toronto-St. Paul's
Approved 22 Jul 2025
31 new homes
The permit lists 31 homes.
REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA
149 m away · 2191 Yonge St · Toronto-St. Paul's
Approved 1 May 2026
Proposal for interior alterations to first floor and third floor amenities area
197 m away · 131 Hillsdale Ave E · Toronto-St. Paul's
Approved 23 Jul 2026
Nikan Sharif-zadeh
REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…
223 m away · 2150 Yonge St · Toronto-St. Paul's
Approved 3 Sep 2026
Revision 1: Revision to the building permit illustrating the pre-fire and post-repair ceiling height at the base of the basement staircaseProposed fire damage repairs. Scope includes removal and replacement of gypsum,…
233 m away · 89 Dunfield Ave · Toronto-St. Paul's
Approved 5 Mar 2026
Proposal for waterproofing and concrete repairs
250 m away · 2200 Yonge St · Toronto-St. Paul's
Approved 27 May 2026
Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage
288 m away · 8 Eglinton Ave E · Toronto-St. Paul's
Approved 19 Oct 2026
Proposal for interior alterations to vacant unit RU05 into a Group E (Acai Shop).
360 m away · 2300 Yonge St · Eglinton-Lawrence
Approved 6 Aug 2026
proposal for localized concrete repairs and waterproofing renewal at the parking garage helical ramp
382 m away · 11 Oswald Cres · Toronto-St. Paul's
Approved 11 Sep 2026
2 new homes · 16230288 Canada Inc
The permit lists 2 homes.
TO CONSTRUCT A NEW TWO STOREY DUPLEX
402 m away · 18 Brownlow Ave · Toronto-St. Paul's
Approved 23 Jun 2026
194 new homes
The permit lists 194 homes.
Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…
412 m away · 176 Eglinton Ave E · Toronto-St. Paul's
Approved 9 Oct 2026
1 new home
The permit lists 1 homes.
Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.
429 m away · 12 Cuthbert Cres · Toronto-St. Paul's
Approved 20 May 2025
2 new homes
The permit lists 2 homes.
Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH
485 m away · 1995 Yonge St · Toronto-St. Paul's
Approved 20 Mar 2026
Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.
509 m away · 170 Roehampton Ave · Toronto-St. Paul's
Approved 28 Jul 2026
599 new homes
The permit lists 599 homes.
Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.
522 m away · 688 Mount Pleasant Rd · Toronto-St. Paul's
Approved 6 Nov 2026
Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty…
555 m away · 65 Broadway Ave · Toronto-St. Paul's
Approved 23 Jan 2025
Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.
569 m away · 88 Colin Ave · Toronto-St. Paul's
Approved 1 Jun 2026
1 new home · Georgina Myers
The permit lists 1 homes.
To construct a new single family dwelling
601 m away · 598 Mount Pleasant Rd · Toronto-St. Paul's
Approved 24 Jul 2026
Rear addition. Commercial building. Ground floor medical office; second storey office
637 m away · 2400 Yonge St · Eglinton-Lawrence
Approved 22 Oct 2025
Conditional Permit - Part Permit - To construct 27 Storey - South Tower mixed use residential (rental) with shared podium, two levels below grade parking for total of 385 rental units.
637 m away · 1951 Yonge St · Toronto-St. Paul's
Approved 21 May 2026
Shoring and excavation for remediation purposes
652 m away · 52 Imperial St · Toronto-St. Paul's
Approved 21 Jan 2025
1 new home · Haddington Developments Inc
The permit lists 1 homes.
REV 01 - Revision for 1 - washroom added in lower basement level.2 - increased size of mech. space in attic.3 - ground floor FFE was slightly raised. All other floor heights are unchanged.4 - grading plan has been…
662 m away · 117 Broadway Ave · Toronto-St. Paul's
Approved 12 Dec 2025
Proposed construction of exterior raised wood deck platform c/w wood trellis & wood screen along with exterior counter feed from existing exterior base building services.
676 m away · 29 Taunton Rd · Don Valley West
Approved 26 Sep 2025
1 new home · Michelle Basu Roy
The permit lists 1 homes.
Fire damage dwelling to be rebuilt from ground to third floor including front porch, a new walk out to be constructed, Existing basement/foundation walls and concrete slab-on-grade. Front porch concrete steps to remain
684 m away · 100 Broadway Ave · Don Valley West
Approved 5 May 2026
Proposal for interior alterations to fit new tenant
The city has allowed these buildings to come down. They may still be standing.
0 m away · 60 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey dwelling for City Parkland Dedication
5 m away · 62 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
11 m away · 64 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
16 m away · 66 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
21 m away · 68 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
382 m away · 11 Oswald Cres · Toronto-St. Paul's
Approved 17 Sep 2026
Hirman Architect Inc
TO CONSTRUCT A NEW TWO STOREY DUPLEX
473 m away · 61 Brownlow Ave · Toronto-St. Paul's
Approved 24 Sep 2025
Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)
482 m away · 17 Henning Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
487 m away · 19 Henning Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
492 m away · 21 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
492 m away · 23 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
496 m away · 25 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
500 m away · 27 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
502 m away · 29 Henning Ave · Eglinton-Lawrence
Approved 25 Aug 2025
Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.
507 m away · 31 Henning Ave · Eglinton-Lawrence
Approved 25 Aug 2025
Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.
569 m away · 88 Colin Ave · Toronto-St. Paul's
Approved 2 Jun 2026
Rl Urban Innovations Inc
Proposal to demolish existing single family dwelling.
589 m away · 39 Montgomery Ave · Eglinton-Lawrence
Approved 4 Mar 2026
Proposal to demolish existing SFD with no replacement building for future Park Development
605 m away · 55 Montgomery Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Proposal to demolish the existing 2 storey SFD-detached dwelling.
608 m away · 57 Montgomery Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Proposal to demolish the existing 2 storey SFD-semi dwelling.See also 23 176474 NNY 08 OZ
613 m away · 34 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
615 m away · 36 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
616 m away · 40 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
618 m away · 42 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
619 m away · 21 Imperial St · Toronto-St. Paul's
Approved 23 Oct 2026
Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.
Hours the city has already allowed.
197 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 10 Jul 2026 – 31 Oct 2026
Hours 7:00 p.m.–11:00 p.m.
Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.
Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.
Ellisdon Corporation
197 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 1 Nov 2026 – 30 Jun 2027
Hours from 7:00 p.m.
Ellisdon Corporation
414 m away · 8 Brownlow Ave · Toronto-St. Paul's
Allowed 1 May 2026 – 30 Oct 2026
Hours 7:00 a.m.–12:30 a.m.
Soudan-brownlow Properties
509 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 7 Aug 2026 – 7 Feb 2027
Hours from 7:00 p.m.
Clark Construction Management Inc.
509 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 21 Oct 2026 – 21 Jan 2027
Hours from 6:00 a.m.
Clark Construction Management Inc.
637 m away · 2400 Yonge St · Eglinton-Lawrence
Allowed 1 Jan 2026 – 31 Dec 2026
Hours 6:00 a.m.–10:00 p.m.
Skygrid Construction Inc
745 m away · 241 Redpath Ave · Don Valley West
Allowed 9 Sep 2026 – 31 Mar 2027
Hours from 7:00 p.m.
Bluescape 241 Redpath Inc.
745 m away · 241 Redpath Ave · Don Valley West
Allowed 16 Oct 2026 – 26 Oct 2026
Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.
Bluescape 241 Redpath Inc.
745 m away · 241 Redpath Ave · Don Valley West
Allowed 2 Nov 2026 – 18 Nov 2026
Hours 7:00 a.m.–10:00 p.m.
Bluescape 241 Redpath Inc.
856 m away · 20 Castlefield Ave · Eglinton-Lawrence
Allowed 31 Oct 2026
Hours 10:00 a.m.–3:00 p.m.
Setup 31 Oct 2026, 6:00 a.m.–10:00 a.m.
Tear down 31 Oct 2026, 3:00 p.m.–6:00 p.m.
Uptown Yonge Bia
887 m away · 140 Merton St · Toronto-St. Paul's
Allowed 17 Nov 2026 – 17 May 2027
Hours 7:00 a.m.–11:59 p.m.
Ellisdon Residential Inc.
915 m away · 30 Merton St · Toronto-St. Paul's
Allowed 2 Jul 2026 – 31 Dec 2026
Hours 7:00 a.m.–11:59 p.m.
Skygrid Construction Inc.
1.0 km away · 14 St Clements Ave · Eglinton-Lawrence
Allowed 20 Nov 2026
Hours 5:00 p.m.–8:00 p.m.
Setup 20 Nov 2026, 4:30 p.m.–5:00 p.m.
Tear down 20 Nov 2026, 8:00 p.m.–8:15 p.m.
Uptown Yonge Bia
On the city's calendar. Check before you go.
719 m away · 200 Eglinton Ave W · Eglinton-Lawrence
On 21 Nov 2026
Free
Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle
Add to calendarSomeone has asked the city for a change. Nothing here is a decision.
197 m away · 2180 Yonge St · Toronto-St. Paul's
Asked 21 Dec 2020
Under Review
INACTIVE Zoning By-law Amendment application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Proposal includes a new public plaza, open spaces, street connections, a community use facility, and public park. Related OPA application: 22 242145 STE 12 OZ
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
197 m away · 2180 Yonge St · Toronto-St. Paul's
Asked 23 Dec 2022
Under Review
Official Plan application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Official Plan Amendment requested to amend policies and Map 21-9 within the Yonge-Eglinton Secondary Plan. Related ZBA application: 20 232714 STE 12 OZ
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
220 m away · 55 Eglinton Ave E · Toronto-St. Paul's
Asked 27 Apr 2018
Under Review
INACTIVE Site Plan applciation for a total of 40,886.39 square metres of gross floor area (GFA) over 50 storeys. This GFA includes 253.58 square metres of at-grade retail fronting Eglinton Avenue East, and 6,409.82 square metres of office space to be located on Floors 2-6. A total of 461 residential units are proposed…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
240 m away · 1 Eglinton Ave E · Toronto-St. Paul's
Asked 15 Oct 2021
Under Review
Site Plan Approval for a 65-storey mixed-use building having a non-residential gross floor area of 11,225.70 square metres, and a residential gross floor area of 43,684.60 square metres. A total of 600 residential dwelling units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
240 m away · 1 Eglinton Ave E · Toronto-St. Paul's
Asked 15 Oct 2021
Under Review
*** Draft Plan of Condominium for 600 residential dwelling units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
245 m away · 2128 Yonge St · Toronto-St. Paul's
Asked 28 Oct 2021
Under Review
*** Draft Plan of Condominium for 80 units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
Write Kai Zhou · [email protected].
263 m away · 29 Berwick Ave · Toronto-St. Paul's
Asked 10 Jul 2025
OMB Appeal
The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 162.15 m + 8.0 m MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,588.9 sq. m., which results in a total Floor Space Index (FSI) of 19.07 times the area of the lot.…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
283 m away · 158 Soudan Ave · Toronto-St. Paul's
Asked 26 Mar 2025
Under Review
Site Plan Control for a 56-storey residential tower that will have a total of 46,547 square metres of residential gross floor area ("GFA") and a total of 674 total dwelling units (including the 13 required rental replacement units). See Related Rezoning file (25 135273 STE 12 OZ) Jan 2026 Revised Submission - Zoning…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
297 m away · 45 Berwick Ave · Toronto-St. Paul's
Asked 10 Jul 2025
Under Review
The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 158.2 m + MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,641.7 sq. m., which results in a total Floor Space Index (FSI) of 19.1 times the area of the lot. The…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
298 m away · 90 Eglinton Ave E · Toronto-St. Paul's
Asked 16 Sep 2021
Under Review
Draft Plan of Subdivision to create 3 blocks.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
314 m away · 120 Eglinton Ave E · Toronto-St. Paul's
Asked 30 Apr 2025
OMB Appeal
The redevelopment proposes a 70-storey mixed-use building with 187.4 sq. m. of retail space at-grade and 555 residential dwelling units above, resulting in a total gross floor area (GFA) of 39,275.7 sq. m., a total Floor Space Index (FSI) of 26.06, pursuant to GFA calculations under By-law 569-2013.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
321 m away · 110 Eglinton Ave E · Toronto-St. Paul's
Asked 15 Aug 2022
Under Review
The proposed development consists of a 9-storey podium topped with two residential towers that are 57 and 59 storeys in height and a 3-level underground garage. The total GFA is approximately 95,000 square metres, comprising of approximately 77,000 square metres of residential GFA, and approximately 18,000 square…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
352 m away · 2045 Yonge St · Toronto-St. Paul's
Asked 22 Aug 2022
Under Review
Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
357 m away · 77 Roehampton Ave · Toronto-St. Paul's
Asked 27 Apr 2022
Under Review
Site Plan Approval application to facilitate the redevelopment of the site for a 50-storey residential building having a gross floor area of 35,867 square metres. 623 residential dwelling units are proposed, of which, 81 are rental replacement dwelling units.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
360 m away · 150 Eglinton Ave E · Toronto-St. Paul's
Asked 16 Sep 2021
Under Review
Draft Plan of Subdivision for the creation of 5 lots.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
380 m away · 36 Eglinton Ave W · Eglinton-Lawrence
Asked 3 Nov 2021
OMB Appeal
Official Plan Amendment to facilitate the redevelopment of the site for a 65-storey mixed-use building having a non-residential gross floor area of 549.8 square metres, and a residential gross floor area of 44,562.0 square metres. A total of 663 residential units are proposed. Related OZ File Nos. 20 165466 NNY 08 OZ…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
Write Diane Pi · [email protected].
380 m away · 36 Eglinton Ave W · Eglinton-Lawrence
Asked 4 Nov 2021
Under Review
*** Draft Plan of Condominium for 663 units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
380 m away · 36 Eglinton Ave W · Eglinton-Lawrence
Asked 29 Apr 2022
Under Review
Site Plan Approval to permit the redevelopment of the site for a 59-storey mixed-use building having a non-residential gross floor area of 2,784 square metres, and a residential gross floor area of 38,817 square metres. A total of 613 residential units are proposed. A total of 74 parking spaces are proposed to serve…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Diane Pi · [email protected].
384 m away · 160 Eglinton Ave E · Toronto-St. Paul's
Asked 11 Apr 2022
Under Review
Site Plan application to permit a 61-storey multi-tower mixed use building with a maximum gross floor area of 90,000 square metres, 201 parking spaces, 1,329 bicycle parking spaces, and a north-south midblock connection.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
402 m away · 18 Brownlow Ave · Toronto-St. Paul's
Asked 23 Jul 2025
NOAC Issued
Site Plan Amendment to alter the development standards for the 21-storey residential building (previously approved under 23 152381 STE 12 SA), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor area and permitted projections, revising minimum setbacks…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
408 m away · 2050 Yonge St · Toronto-St. Paul's
Asked 8 Nov 2021
Under Review
2 blocks
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
Write Kai Zhou · [email protected].
408 m away · 2050 Yonge St · Toronto-St. Paul's
Asked 8 Nov 2021
Under Review
Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 2863 square metres, and a residential gross floor area of 15683 square metres. 164 residential units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
420 m away · 141 Roehampton Ave · Toronto-St. Paul's
Asked 28 Jun 2022
Appeal Received
Rezoning Application resubmission for a 58-storey residential building containing 762 residential dwelling units. A total gross floor area of 47,675.3 square metres is proposed, with an overall density equivalent to 16.12 times the area of the lot.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
Write Kai Zhou · [email protected].
420 m away · 141 Roehampton Ave · Toronto-St. Paul's
Asked 28 Jun 2022
Under Review
Site Plan Application for a 48-storey residential building. The building would consist of a 6-storey podium and 42-storey tower element containing 614 residential dwelling units. A total gross floor area of 36,849 square metres is proposed, with an overall density equivalent to 12.46 times the area of the subject site.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].