Opening this block

Home · Toronto-St. Paul's · Eglinton Ave W

What's new around 185 Eglinton Ave W

185 Eglinton Ave W · Toronto-St. Paul's. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Spin Studio

1.0 km away · 2551 Yonge St · Don Valley West

Applied 8 Aug 2025

Inspection

Interior renovation - NEW "SPIN STUDIO"

Being built

The city has allowed these. Work may not have started. The permits in this area list 646 homes.

Multiple Unit Building

272 Eglinton Ave W

204 m away · 272 Eglinton Ave W · Eglinton-Lawrence

Approved 1 May 2026

Proposed interior alterations for butcher shop to include HVAC- 10ft commercial kitchen exhaust, upgrade air conditioning from 2 ton to 4 ton, gas lines from basement up to main floor for kitchen equipment.Plumbing-…

New house

122 Highbourne Rd

426 m away · 122 Highbourne Rd · Toronto-St. Paul's

Approved 13 Feb 2026

Renu Gupta

REVISION 01 REVISION: ADDED 2ND MECHANICAL ROOM IN ATTIC ACCESSED BY HATCH Construct a New 2-Storey Single Family Detached House with an integral garage.

Multiple Unit Building

2300 Yonge St

498 m away · 2300 Yonge St · Eglinton-Lawrence

Approved 6 Aug 2026

proposal for localized concrete repairs and waterproofing renewal at the parking garage helical ramp

Show 21 moreShow fewer
Multiple Unit Building

2200 Yonge St

499 m away · 2200 Yonge St · Toronto-St. Paul's

Approved 27 May 2026

Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage

New house

88 Colin Ave

504 m away · 88 Colin Ave · Toronto-St. Paul's

Approved 1 Jun 2026

1 new home · Georgina Myers

The permit lists 1 homes.

To construct a new single family dwelling

New house

102 Highbourne Rd

534 m away · 102 Highbourne Rd · Toronto-St. Paul's

Approved 18 Feb 2026

REVISION - changes to the architectural drawings are bubbled for referenceProposed New Single Family Dwelling Three-Storey Detached House. Existing SFD Detached House will be demolished.

Multiple Unit Building

2150 Yonge St

557 m away · 2150 Yonge St · Toronto-St. Paul's

Approved 3 Sep 2026

Revision 1: Revision to the building permit illustrating the pre-fire and post-repair ceiling height at the base of the basement staircaseProposed fire damage repairs. Scope includes removal and replacement of gypsum,…

Apartment

2161 Yonge St

564 m away · 2161 Yonge St · Toronto-St. Paul's

Approved 22 Jul 2025

31 new homes

The permit lists 31 homes.

REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA

Multiple Unit Building

2191 Yonge St

585 m away · 2191 Yonge St · Toronto-St. Paul's

Approved 1 May 2026

Proposal for interior alterations to first floor and third floor amenities area

New house

38 Braemar Ave

589 m away · 38 Braemar Ave · Toronto-St. Paul's

Approved 13 Jun 2025

1 new home · Marvin White

The permit lists 1 homes.

Rev 01 : To construct a new three-storey detached dwelling replcaing previously approved design entirelyConstruction of New 2-Storey Single Family Dwelling Detached House with an integral garage, a front covered porch,…

Multiple Unit Building

8 Eglinton Ave E

599 m away · 8 Eglinton Ave E · Toronto-St. Paul's

Approved 19 Oct 2026

Proposal for interior alterations to vacant unit RU05 into a Group E (Acai Shop).

Multiple Unit Building

453 Eglinton Ave W

633 m away · 453 Eglinton Ave W · Toronto-St. Paul's

Approved 17 Oct 2025

Proposal to convert and renovate the second floor to hotel use.

New house

75 Castlefield Ave

636 m away · 75 Castlefield Ave · Eglinton-Lawrence

Approved 31 Mar 2025

1 new home

The permit lists 1 homes.

Proposed new construction of two-storey detached dwelling with an integral garage, front porch, rear deck and rear basement walkout, rear balcony.

Multiple Unit Building

465 Eglinton Ave W

652 m away · 465 Eglinton Ave W · Toronto-St. Paul's

Approved 4 Nov 2026

Interior alterations to convert the Second Floor to Hotel suites. Note: a permit to convert part of basement to hotel suites under 26 139891 BLD 00 BA.

New house

98 Castlefield Ave

653 m away · 98 Castlefield Ave · Eglinton-Lawrence

Approved 29 Jul 2025

1 new home

The permit lists 1 homes.

Propose demolishing 1 storey dwelling to construct new 3 storey dwelling

New house

16 Braemar Ave

664 m away · 16 Braemar Ave · Toronto-St. Paul's

Approved 28 May 2025

Amirsalar Jamalzadeh

REV 02: Revised front yard and rear yard Revision #01 - Changes to structural design and minor interior changes.Proposal to construct a new two storey single family detached dwelling with an integral garage.

Mixed Use/res W Non Res

2400 Yonge St

672 m away · 2400 Yonge St · Eglinton-Lawrence

Approved 22 Oct 2025

Conditional Permit - Part Permit - To construct 27 Storey - South Tower mixed use residential (rental) with shared podium, two levels below grade parking for total of 385 rental units.

New house

243 St Clements Ave

673 m away · 243 St Clements Ave · Eglinton-Lawrence

Approved 12 Feb 2026

1 new home · Jayseejay Holdings Limited

The permit lists 1 homes.

Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a fnished basement.See also 26 107945 DEM, 25 241459 ZAP and 25 242648 MV.

New house

52 Imperial St

776 m away · 52 Imperial St · Toronto-St. Paul's

Approved 21 Jan 2025

1 new home · Haddington Developments Inc

The permit lists 1 homes.

REV 01 - Revision for 1 - washroom added in lower basement level.2 - increased size of mech. space in attic.3 - ground floor FFE was slightly raised. All other floor heights are unchanged.4 - grading plan has been…

New house

205 Forest Hill Rd

794 m away · 205 Forest Hill Rd · Toronto-St. Paul's

Approved 12 May 2026

1 new home · Sophia Bao-chau Hoang

The permit lists 1 homes.

PROPOSAL TO DEMOLISH EXISTING S.F.D AND CONSTRUCT NEW DETACHED 3-STOREY S.F.D WITH INTEGRAL GARAGE, BASEMENT WALKOUT, FRONT PORCH AND REAR DECK.

Multiple Unit Building

2472 Yonge St

795 m away · 2472 Yonge St · Eglinton-Lawrence

Approved 7 Aug 2026

Revison to basement layout changes, ground floor washroom changes, duct shaft detailProposed interior alterations to create 3 units (2 restaurants and 1 retail store) in existing 2 storeys 1 unit commercial building

Multiple Unit Building

1995 Yonge St

807 m away · 1995 Yonge St · Toronto-St. Paul's

Approved 20 Mar 2026

Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.

New house

503 Roselawn Ave

810 m away · 503 Roselawn Ave · Eglinton-Lawrence

Approved 19 Sep 2025

1 new home · Aleksandar Karamarkovic

The permit lists 1 homes.

Proposal to construct new 3 storey detached brick dwelling

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

19 Henning Ave

308 m away · 19 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

17 Henning Ave

311 m away · 17 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

21 Henning Ave

313 m away · 21 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Show 21 moreShow fewer
Demolition

27 Henning Ave

314 m away · 27 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

23 Henning Ave

317 m away · 23 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

25 Henning Ave

317 m away · 25 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

31 Henning Ave

320 m away · 31 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

29 Henning Ave

321 m away · 29 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

88 Colin Ave

504 m away · 88 Colin Ave · Toronto-St. Paul's

Approved 2 Jun 2026

Rl Urban Innovations Inc

Proposal to demolish existing single family dwelling.

Demolition

57 Montgomery Ave

535 m away · 57 Montgomery Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Proposal to demolish the existing 2 storey SFD-semi dwelling.See also 23 176474 NNY 08 OZ

Demolition

55 Montgomery Ave

540 m away · 55 Montgomery Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Proposal to demolish the existing 2 storey SFD-detached dwelling.

Demolition

70 Montgomery Ave

561 m away · 70 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

66 Montgomery Ave

567 m away · 66 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

64 Montgomery Ave

567 m away · 64 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

39 Montgomery Ave

574 m away · 39 Montgomery Ave · Eglinton-Lawrence

Approved 4 Mar 2026

Proposal to demolish existing SFD with no replacement building for future Park Development

Demolition

60 Montgomery Ave

575 m away · 60 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

58 Montgomery Ave

579 m away · 58 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

54 Montgomery Ave

584 m away · 54 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

52 Montgomery Ave

588 m away · 52 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

48 Montgomery Ave

596 m away · 48 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

46 Montgomery Ave

599 m away · 46 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

42 Montgomery Ave

604 m away · 42 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

40 Montgomery Ave

608 m away · 40 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

36 Montgomery Ave

613 m away · 36 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Loud nights

Hours the city has already allowed.

Construction

Canada Square Office Retrofit

517 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 10 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:00 p.m.

Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.

Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.

Ellisdon Corporation

Construction

Canada Square Office Retrofit

517 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 1 Nov 2026 – 30 Jun 2027

Hours from 7:00 p.m.

Ellisdon Corporation

Construction

Yonge And Roselawn Project

672 m away · 2400 Yonge St · Eglinton-Lawrence

Allowed 1 Jan 2026 – 31 Dec 2026

Hours 6:00 a.m.–10:00 p.m.

Skygrid Construction Inc

Show 4 moreShow fewer
Amplified And/or Instrument Sound

5th Halloween Hauntup 2026

816 m away · 20 Castlefield Ave · Eglinton-Lawrence

Allowed 31 Oct 2026

Hours 10:00 a.m.–3:00 p.m.

Setup 31 Oct 2026, 6:00 a.m.–10:00 a.m.

Tear down 31 Oct 2026, 3:00 p.m.–6:00 p.m.

Uptown Yonge Bia

Amplified And/or Instrument Sound

Holiday Tree Lighting

944 m away · 14 St Clements Ave · Eglinton-Lawrence

Allowed 20 Nov 2026

Hours 5:00 p.m.–8:00 p.m.

Setup 20 Nov 2026, 4:30 p.m.–5:00 p.m.

Tear down 20 Nov 2026, 8:00 p.m.–8:15 p.m.

Uptown Yonge Bia

Continuous Concrete Pour

The One Seventy

1.0 km away · 170 Roehampton Ave · Toronto-St. Paul's

Allowed 7 Aug 2026 – 7 Feb 2027

Hours from 7:00 p.m.

Clark Construction Management Inc.

Events

On the city's calendar. Check before you go.

Environmental

Seed-to-Habitat Workshop: Hands-on Seed Processing Workshop

103 m away · 200 Eglinton Ave W · Eglinton-Lawrence

On 21 Nov 2026

Free

Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle

Add to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

21 Henning Ave

313 m away · 21 Henning Ave · Eglinton-Lawrence

Asked 18 Jul 2023

OMB Appeal

The application proposes to amend the Official Plan and Zoning By-law to permit a 34-storey residential building containing 390 residential dwelling units and 45 car parking spaces.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Angela Zhao · [email protected].

Rezoning

36 Eglinton Ave W

408 m away · 36 Eglinton Ave W · Eglinton-Lawrence

Asked 3 Nov 2021

OMB Appeal

Official Plan Amendment to facilitate the redevelopment of the site for a 65-storey mixed-use building having a non-residential gross floor area of 549.8 square metres, and a residential gross floor area of 44,562.0 square metres. A total of 663 residential units are proposed. Related OZ File Nos. 20 165466 NNY 08 OZ…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Diane Pi · [email protected].

Show 21 moreShow fewer
Condominium plan

36 Eglinton Ave W

408 m away · 36 Eglinton Ave W · Eglinton-Lawrence

Asked 4 Nov 2021

Under Review

*** Draft Plan of Condominium for 663 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Sina Zekria · [email protected].

Site plan

36 Eglinton Ave W

408 m away · 36 Eglinton Ave W · Eglinton-Lawrence

Asked 29 Apr 2022

Under Review

Site Plan Approval to permit the redevelopment of the site for a 59-storey mixed-use building having a non-residential gross floor area of 2,784 square metres, and a residential gross floor area of 38,817 square metres. A total of 613 residential units are proposed. A total of 74 parking spaces are proposed to serve…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Diane Pi · [email protected].

Site plan

45 Berwick Ave

478 m away · 45 Berwick Ave · Toronto-St. Paul's

Asked 10 Jul 2025

Under Review

The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 158.2 m + MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,641.7 sq. m., which results in a total Floor Space Index (FSI) of 19.1 times the area of the lot. The…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Rezoning

29 Berwick Ave

505 m away · 29 Berwick Ave · Toronto-St. Paul's

Asked 10 Jul 2025

OMB Appeal

The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 162.15 m + 8.0 m MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,588.9 sq. m., which results in a total Floor Space Index (FSI) of 19.07 times the area of the lot.…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Patrick Miller · [email protected].

Rezoning

2180 Yonge St

517 m away · 2180 Yonge St · Toronto-St. Paul's

Asked 21 Dec 2020

Under Review

INACTIVE Zoning By-law Amendment application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Proposal includes a new public plaza, open spaces, street connections, a community use facility, and public park. Related OPA application: 22 242145 STE 12 OZ

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Rezoning

2180 Yonge St

517 m away · 2180 Yonge St · Toronto-St. Paul's

Asked 23 Dec 2022

Under Review

Official Plan application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Official Plan Amendment requested to amend policies and Map 21-9 within the Yonge-Eglinton Secondary Plan. Related ZBA application: 20 232714 STE 12 OZ

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Condominium plan

2128 Yonge St

559 m away · 2128 Yonge St · Toronto-St. Paul's

Asked 28 Oct 2021

Under Review

*** Draft Plan of Condominium for 80 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Kai Zhou · [email protected].

Rezoning

64 Montgomery Ave

567 m away · 64 Montgomery Ave · Eglinton-Lawrence

Asked 30 Jun 2022

Under Review

Proposal for a redevelopment of a 24-storey mixed-use building with 306 residential dwelling units, 525 square metres of grade-related retail space fronting onto Montgomery Avenue, 124 vehicular parking spaces, 348 bicycle parking spaces, and one loading space.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: North York Community Council, 24 Nov 2026, 9:30 a.m., Council Chamber, North York Civic Centre.

Write Shareefah René · [email protected].

Rezoning

2346 Yonge St

568 m away · 2346 Yonge St · Eglinton-Lawrence

Asked 10 May 2024

OMB Appeal

Application for a 56-storey mixed-use building containing 407 residential units and 272.2 square-meters of commercial space at-grade. The building will feature a 3-storey podium with outdoor amenity space above, and a 53-storey tower. It will contain a combined Gross Floor Area (GFA) of 36,656.0 square-meters, and…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Angela Zhao · [email protected].

Site plan

2346 Yonge St

568 m away · 2346 Yonge St · Eglinton-Lawrence

Asked 2 Dec 2024

Under Review

Site Plan Control Application proposing a 56-storey mixed-use building containing 407 residential units, with a combined Gross Floor Area of 36,656 square-meters including 272 square-meters of commercial space at-grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Angela Zhao · [email protected].

Site plan

1 Eglinton Ave E

574 m away · 1 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Oct 2021

Under Review

Site Plan Approval for a 65-storey mixed-use building having a non-residential gross floor area of 11,225.70 square metres, and a residential gross floor area of 43,684.60 square metres. A total of 600 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Condominium plan

1 Eglinton Ave E

574 m away · 1 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Oct 2021

Under Review

*** Draft Plan of Condominium for 600 residential dwelling units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Patrick Miller · [email protected].

Rezoning

2352 Yonge St

580 m away · 2352 Yonge St · Eglinton-Lawrence

Asked 13 Jul 2022

OMB Appeal

Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential space. (see 21-144988 NNY 8 PAC)

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Angela Zhao · [email protected].

Site plan

2350 Yonge St

582 m away · 2350 Yonge St · Eglinton-Lawrence

Asked 13 Jul 2022

Under Review

Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential space. (see 21-144988 NNY 8 PAC)

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Angela Zhao · [email protected].

Rezoning

454 Eglinton Ave W

607 m away · 454 Eglinton Ave W · Eglinton-Lawrence

Asked 27 Mar 2023

Appeal Received

The proposal is a 24-storey mixed use building, consisting of an approximately 20,330 sq. m. residential GFA and approximately 440 sq. m. non-residential GFA. The proposal provides a total of 269 units. A total of 77 parking spaces would be provided in a three-level underground parking garage.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Amie Chung · [email protected].

Site plan

36 Montgomery Ave

613 m away · 36 Montgomery Ave · Eglinton-Lawrence

Asked 30 Jun 2022

Under Review

Proposal for a redevelopment of a 27-storey mixed-use building with 314 residential dwelling units, 88 vehicular parking spaces, 146 bicycle parking spaces, and one loading space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shareefah René · [email protected].

Subdivision

2323 Yonge St

619 m away · 2323 Yonge St · Toronto-St. Paul's

Asked 29 Sep 2021

Under Review

Draft plan of subdivision for 3 development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

2323 Yonge St

619 m away · 2323 Yonge St · Toronto-St. Paul's

Asked 29 Sep 2021

Under Review

Site Plan Approval for a 34 storey mixed-use building

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Subdivision

2345 Yonge St

646 m away · 2345 Yonge St · Toronto-St. Paul's

Asked 1 Oct 2021

Under Review

Draft Plan of Subdivision to create 3 development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Rezoning

2345 Yonge St

646 m away · 2345 Yonge St · Toronto-St. Paul's

Asked 1 Oct 2021

OMB Appeal

Zoning By-law and Official Plan Amendment application to permit the redevelopment of the site with 54 and 56-storey towers, joined by a 10-storey residential podium with ground floor retail. The proposed buildings will include approximately 510 square metres of retail space and 80,416 square metres of residential GFA,…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].

Subdivision

2050 Yonge St

691 m away · 2050 Yonge St · Toronto-St. Paul's

Asked 8 Nov 2021

Under Review

2 blocks

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].