29 Berwick Ave · Toronto-St. Paul's. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 2031 homes.

Multiple Unit Building

2150 Yonge St

54 m away · 2150 Yonge St · Toronto-St. Paul's

Approved 3 Sep 2026

Revision 1: Revision to the building permit illustrating the pre-fire and post-repair ceiling height at the base of the basement staircaseProposed fire damage repairs. Scope includes removal and replacement of gypsum,…

Apartment

2161 Yonge St

133 m away · 2161 Yonge St · Toronto-St. Paul's

Approved 22 Jul 2025

31 new homes

The permit lists 31 homes.

REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA

Multiple Unit Building

2191 Yonge St

235 m away · 2191 Yonge St · Toronto-St. Paul's

Approved 1 May 2026

Proposal for interior alterations to first floor and third floor amenities area

Show 21 moreShow fewer
Multiple Unit Building

2200 Yonge St

252 m away · 2200 Yonge St · Toronto-St. Paul's

Approved 27 May 2026

Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage

New house

88 Colin Ave

318 m away · 88 Colin Ave · Toronto-St. Paul's

Approved 1 Jun 2026

1 new home · Georgina Myers

The permit lists 1 homes.

To construct a new single family dwelling

Multiple Unit Building

2300 Yonge St

379 m away · 2300 Yonge St · Eglinton-Lawrence

Approved 6 Aug 2026

proposal for localized concrete repairs and waterproofing renewal at the parking garage helical ramp

Multiple Unit Building

1995 Yonge St

379 m away · 1995 Yonge St · Toronto-St. Paul's

Approved 20 Mar 2026

Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.

Multiple Unit Building

8 Eglinton Ave E

383 m away · 8 Eglinton Ave E · Toronto-St. Paul's

Approved 19 Oct 2026

Proposal for interior alterations to vacant unit RU05 into a Group E (Acai Shop).

New house

131 Hillsdale Ave E

397 m away · 131 Hillsdale Ave E · Toronto-St. Paul's

Approved 23 Jul 2026

Nikan Sharif-zadeh

REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…

New house

52 Imperial St

471 m away · 52 Imperial St · Toronto-St. Paul's

Approved 21 Jan 2025

1 new home · Haddington Developments Inc

The permit lists 1 homes.

REV 01 - Revision for 1 - washroom added in lower basement level.2 - increased size of mech. space in attic.3 - ground floor FFE was slightly raised. All other floor heights are unchanged.4 - grading plan has been…

New house

12 Cuthbert Cres

484 m away · 12 Cuthbert Cres · Toronto-St. Paul's

Approved 20 May 2025

2 new homes

The permit lists 2 homes.

Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH

New house

11 Oswald Cres

512 m away · 11 Oswald Cres · Toronto-St. Paul's

Approved 11 Sep 2026

2 new homes · 16230288 Canada Inc

The permit lists 2 homes.

TO CONSTRUCT A NEW TWO STOREY DUPLEX

Multiple Unit Building

1951 Yonge St

534 m away · 1951 Yonge St · Toronto-St. Paul's

Approved 21 May 2026

Shoring and excavation for remediation purposes

New house

19 Colin Ave

545 m away · 19 Colin Ave · Toronto-St. Paul's

Approved 9 Oct 2025

1 new home · Sierra Custom Homes

The permit lists 1 homes.

Proposal to demolish existing dwelling and construct a new 2 storey dwelling.

Multiple Unit Building

1920 Yonge St

567 m away · 1920 Yonge St · Toronto-St. Paul's

Approved 20 Apr 2026

Proposal for interior alterations to existing office space - UNIT 500

1 homes

176 Eglinton Ave E

655 m away · 176 Eglinton Ave E · Toronto-St. Paul's

Approved 9 Oct 2026

1 new home

The permit lists 1 homes.

Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.

New house

122 Highbourne Rd

664 m away · 122 Highbourne Rd · Toronto-St. Paul's

Approved 13 Feb 2026

Renu Gupta

REVISION 01 REVISION: ADDED 2ND MECHANICAL ROOM IN ATTIC ACCESSED BY HATCH Construct a New 2-Storey Single Family Detached House with an integral garage.

Apartment

18 Brownlow Ave

664 m away · 18 Brownlow Ave · Toronto-St. Paul's

Approved 23 Jun 2026

194 new homes

The permit lists 194 homes.

Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…

New house

102 Highbourne Rd

686 m away · 102 Highbourne Rd · Toronto-St. Paul's

Approved 18 Feb 2026

REVISION - changes to the architectural drawings are bubbled for referenceProposed New Single Family Dwelling Three-Storey Detached House. Existing SFD Detached House will be demolished.

Mixed Use/res W Non Res

2400 Yonge St

695 m away · 2400 Yonge St · Eglinton-Lawrence

Approved 22 Oct 2025

Conditional Permit - Part Permit - To construct 27 Storey - South Tower mixed use residential (rental) with shared podium, two levels below grade parking for total of 385 rental units.

Multiple Unit Building

272 Eglinton Ave W

701 m away · 272 Eglinton Ave W · Eglinton-Lawrence

Approved 1 May 2026

Proposed interior alterations for butcher shop to include HVAC- 10ft commercial kitchen exhaust, upgrade air conditioning from 2 ton to 4 ton, gas lines from basement up to main floor for kitchen equipment.Plumbing-…

Apartment

170 Roehampton Ave

726 m away · 170 Roehampton Ave · Toronto-St. Paul's

Approved 28 Jul 2026

599 new homes

The permit lists 599 homes.

Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.

Mixed Use/res W Non Res

65 Broadway Ave

736 m away · 65 Broadway Ave · Toronto-St. Paul's

Approved 23 Jan 2025

Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

60 Soudan Ave

263 m away · 60 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey dwelling for City Parkland Dedication

Demolition

62 Soudan Ave

268 m away · 62 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

64 Soudan Ave

273 m away · 64 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Show 21 moreShow fewer
Demolition

66 Soudan Ave

279 m away · 66 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

68 Soudan Ave

284 m away · 68 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

88 Colin Ave

318 m away · 88 Colin Ave · Toronto-St. Paul's

Approved 2 Jun 2026

Rl Urban Innovations Inc

Proposal to demolish existing single family dwelling.

Demolition

17 Henning Ave

385 m away · 17 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

19 Henning Ave

389 m away · 19 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

21 Henning Ave

398 m away · 21 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

23 Henning Ave

401 m away · 23 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

25 Henning Ave

406 m away · 25 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

27 Henning Ave

409 m away · 27 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

29 Henning Ave

416 m away · 29 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

31 Henning Ave

420 m away · 31 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

25 Imperial St

483 m away · 25 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposed demolition of the existing 5-storey commercial building.

Demolition

21 Imperial St

484 m away · 21 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.

Demolition

55 Montgomery Ave

614 m away · 55 Montgomery Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Proposal to demolish the existing 2 storey SFD-detached dwelling.

Demolition

57 Montgomery Ave

615 m away · 57 Montgomery Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Proposal to demolish the existing 2 storey SFD-semi dwelling.See also 23 176474 NNY 08 OZ

Demolition

39 Montgomery Ave

616 m away · 39 Montgomery Ave · Eglinton-Lawrence

Approved 4 Mar 2026

Proposal to demolish existing SFD with no replacement building for future Park Development

Demolition

64 Montgomery Ave

648 m away · 64 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

54 Montgomery Ave

650 m away · 54 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

52 Montgomery Ave

650 m away · 52 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Demolition

70 Montgomery Ave

651 m away · 70 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Loud nights

Hours the city has already allowed.

Construction

Canada Square Office Retrofit

103 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 10 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:00 p.m.

Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.

Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.

Ellisdon Corporation

Construction

Canada Square Office Retrofit

103 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 1 Nov 2026 – 30 Jun 2027

Hours from 7:00 p.m.

Ellisdon Corporation

Continuous Concrete Pour

8 Brownlow Avenue (northwest Of Brownlow And Souda

674 m away · 8 Brownlow Ave · Toronto-St. Paul's

Allowed 1 May 2026 – 30 Oct 2026

Hours 7:00 a.m.–12:30 a.m.

Soudan-brownlow Properties

Show 9 moreShow fewer
Construction

Yonge And Roselawn Project

695 m away · 2400 Yonge St · Eglinton-Lawrence

Allowed 1 Jan 2026 – 31 Dec 2026

Hours 6:00 a.m.–10:00 p.m.

Skygrid Construction Inc

Continuous Concrete Pour

The One Seventy

726 m away · 170 Roehampton Ave · Toronto-St. Paul's

Allowed 7 Aug 2026 – 7 Feb 2027

Hours from 7:00 p.m.

Clark Construction Management Inc.

Continuous Concrete Pour

30 Merton

835 m away · 30 Merton St · Toronto-St. Paul's

Allowed 2 Jul 2026 – 31 Dec 2026

Hours 7:00 a.m.–11:59 p.m.

Skygrid Construction Inc.

Continuous Concrete Pour

140 Merton Street Development

890 m away · 140 Merton St · Toronto-St. Paul's

Allowed 17 Nov 2026 – 17 May 2027

Hours 7:00 a.m.–11:59 p.m.

Ellisdon Residential Inc.

Amplified And/or Instrument Sound

5th Halloween Hauntup 2026

913 m away · 20 Castlefield Ave · Eglinton-Lawrence

Allowed 31 Oct 2026

Hours 10:00 a.m.–3:00 p.m.

Setup 31 Oct 2026, 6:00 a.m.–10:00 a.m.

Tear down 31 Oct 2026, 3:00 p.m.–6:00 p.m.

Uptown Yonge Bia

Continuous Concrete Pour

241 Redpath

942 m away · 241 Redpath Ave · Don Valley West

Allowed 9 Sep 2026 – 31 Mar 2027

Hours from 7:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath

942 m away · 241 Redpath Ave · Don Valley West

Allowed 16 Oct 2026 – 26 Oct 2026

Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath Ave

942 m away · 241 Redpath Ave · Don Valley West

Allowed 2 Nov 2026 – 18 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Bluescape 241 Redpath Inc.

Events

On the city's calendar. Check before you go.

Environmental

Seed-to-Habitat Workshop: Hands-on Seed Processing Workshop

544 m away · 200 Eglinton Ave W · Eglinton-Lawrence

On 21 Nov 2026

Free

Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle

Add to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

29 Berwick Ave

0 m away · 29 Berwick Ave · Toronto-St. Paul's

Asked 10 Jul 2025

OMB Appeal

The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 162.15 m + 8.0 m MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,588.9 sq. m., which results in a total Floor Space Index (FSI) of 19.07 times the area of the lot.…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Patrick Miller · [email protected].

Site plan

45 Berwick Ave

34 m away · 45 Berwick Ave · Toronto-St. Paul's

Asked 10 Jul 2025

Under Review

The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 158.2 m + MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,641.7 sq. m., which results in a total Floor Space Index (FSI) of 19.1 times the area of the lot. The…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Condominium plan

2128 Yonge St

56 m away · 2128 Yonge St · Toronto-St. Paul's

Asked 28 Oct 2021

Under Review

*** Draft Plan of Condominium for 80 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Kai Zhou · [email protected].

Show 21 moreShow fewer
Rezoning

2180 Yonge St

103 m away · 2180 Yonge St · Toronto-St. Paul's

Asked 21 Dec 2020

Under Review

INACTIVE Zoning By-law Amendment application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Proposal includes a new public plaza, open spaces, street connections, a community use facility, and public park. Related OPA application: 22 242145 STE 12 OZ

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Rezoning

2180 Yonge St

103 m away · 2180 Yonge St · Toronto-St. Paul's

Asked 23 Dec 2022

Under Review

Official Plan application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Official Plan Amendment requested to amend policies and Map 21-9 within the Yonge-Eglinton Secondary Plan. Related ZBA application: 20 232714 STE 12 OZ

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

2045 Yonge St

247 m away · 2045 Yonge St · Toronto-St. Paul's

Asked 22 Aug 2022

Under Review

Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Cameron Williamson · [email protected].

Subdivision

2050 Yonge St

262 m away · 2050 Yonge St · Toronto-St. Paul's

Asked 8 Nov 2021

Under Review

2 blocks

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

2050 Yonge St

262 m away · 2050 Yonge St · Toronto-St. Paul's

Asked 8 Nov 2021

Under Review

Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 2863 square metres, and a residential gross floor area of 15683 square metres. 164 residential units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Site plan

1 Eglinton Ave E

321 m away · 1 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Oct 2021

Under Review

Site Plan Approval for a 65-storey mixed-use building having a non-residential gross floor area of 11,225.70 square metres, and a residential gross floor area of 43,684.60 square metres. A total of 600 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Condominium plan

1 Eglinton Ave E

321 m away · 1 Eglinton Ave E · Toronto-St. Paul's

Asked 15 Oct 2021

Under Review

*** Draft Plan of Condominium for 600 residential dwelling units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Patrick Miller · [email protected].

Rezoning

2010 Yonge St

327 m away · 2010 Yonge St · Toronto-St. Paul's

Asked 8 Nov 2021

Appeal Received

Zoning By-law amendment for a 14-storey mixed-use building having a non-residential gross floor area of 1,453 square metres, and a residential gross floor area of 21,757 square metres. 274 residential units are proposed.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].

Rezoning

36 Eglinton Ave W

331 m away · 36 Eglinton Ave W · Eglinton-Lawrence

Asked 3 Nov 2021

OMB Appeal

Official Plan Amendment to facilitate the redevelopment of the site for a 65-storey mixed-use building having a non-residential gross floor area of 549.8 square metres, and a residential gross floor area of 44,562.0 square metres. A total of 663 residential units are proposed. Related OZ File Nos. 20 165466 NNY 08 OZ…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Diane Pi · [email protected].

Condominium plan

36 Eglinton Ave W

331 m away · 36 Eglinton Ave W · Eglinton-Lawrence

Asked 4 Nov 2021

Under Review

*** Draft Plan of Condominium for 663 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Sina Zekria · [email protected].

Site plan

36 Eglinton Ave W

331 m away · 36 Eglinton Ave W · Eglinton-Lawrence

Asked 29 Apr 2022

Under Review

Site Plan Approval to permit the redevelopment of the site for a 59-storey mixed-use building having a non-residential gross floor area of 2,784 square metres, and a residential gross floor area of 38,817 square metres. A total of 613 residential units are proposed. A total of 74 parking spaces are proposed to serve…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Diane Pi · [email protected].

Rezoning

21 Henning Ave

398 m away · 21 Henning Ave · Eglinton-Lawrence

Asked 18 Jul 2023

OMB Appeal

The application proposes to amend the Official Plan and Zoning By-law to permit a 34-storey residential building containing 390 residential dwelling units and 45 car parking spaces.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Angela Zhao · [email protected].

Site plan

55 Eglinton Ave E

407 m away · 55 Eglinton Ave E · Toronto-St. Paul's

Asked 27 Apr 2018

Under Review

INACTIVE Site Plan applciation for a total of 40,886.39 square metres of gross floor area (GFA) over 50 storeys. This GFA includes 253.58 square metres of at-grade retail fronting Eglinton Avenue East, and 6,409.82 square metres of office space to be located on Floors 2-6. A total of 461 residential units are proposed…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Site plan

1984 Yonge St

428 m away · 1984 Yonge St · Toronto-St. Paul's

Asked 22 Dec 2016

NOAC Issued

Site Plan Approval for a mixed-use building: 9 storeys, retail at-grade, 1032 square metres of non-residential (office) gross floor area, and 20 rental dwelling units. Two surface car-parking spaces are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Rezoning

1962 Yonge St

482 m away · 1962 Yonge St · Toronto-St. Paul's

Asked 27 Feb 2026

Under Review

Zoning By-law Amendment for a 45-storey mixed-use building. The building will contain 379 residential units, 9 of which are rental replacement units, with commercial at grade.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Cameron Williamson · [email protected].

Subdivision

90 Eglinton Ave E

483 m away · 90 Eglinton Ave E · Toronto-St. Paul's

Asked 16 Sep 2021

Under Review

Draft Plan of Subdivision to create 3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Site plan

21 Imperial St

484 m away · 21 Imperial St · Toronto-St. Paul's

Asked 8 Oct 2021

Under Review

Site Plan Application for a 19-storey mixed-use building containing 228 residential dwelling units, 56 square metres of ground floor retail space, and two levels of underground parking. Two ground level units will have expanded home occupation (live/work) permissions.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Subdivision

2323 Yonge St

506 m away · 2323 Yonge St · Toronto-St. Paul's

Asked 29 Sep 2021

Under Review

Draft plan of subdivision for 3 development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

2323 Yonge St

506 m away · 2323 Yonge St · Toronto-St. Paul's

Asked 29 Sep 2021

Under Review

Site Plan Approval for a 34 storey mixed-use building

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Rezoning

2346 Yonge St

509 m away · 2346 Yonge St · Eglinton-Lawrence

Asked 10 May 2024

OMB Appeal

Application for a 56-storey mixed-use building containing 407 residential units and 272.2 square-meters of commercial space at-grade. The building will feature a 3-storey podium with outdoor amenity space above, and a 53-storey tower. It will contain a combined Gross Floor Area (GFA) of 36,656.0 square-meters, and…