Gono Karaoke
86 m away · 2156 Yonge St · Toronto-St. Paul's
Approved 12 May 2026
Opening this block
Home · Toronto-St. Paul's · Berwick Ave
45 Berwick Ave · Toronto-St. Paul's. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
86 m away · 2156 Yonge St · Toronto-St. Paul's
Approved 12 May 2026
94 m away · 2144 Yonge St · Toronto-St. Paul's
Approved 20 Jul 2026
127 m away · 2180 Yonge St · Toronto-St. Paul's
Approved 2 Oct 2026
133 m away · 2131 Yonge St · Toronto-St. Paul's
Approved 24 Jun 2026
158 m away · 2095 Yonge St · Toronto-St. Paul's
Approved 28 Nov 2025
191 m away · 2171 Yonge St · Toronto-St. Paul's
Approved 18 Aug 2026
208 m away · 2082 Yonge St · Toronto-St. Paul's
Approved 8 Jul 2026
213 m away · 5 Manor Rd E · Toronto-St. Paul's
Approved 13 Mar 2026
227 m away · 2066 Yonge St · Toronto-St. Paul's
Approved 15 Jul 2026
232 m away · 2057 Yonge St · Toronto-St. Paul's
Approved 21 May 2026
261 m away · 2201 Yonge St · Toronto-St. Paul's
Approved 3 Jun 2026
278 m away · 2046 Yonge St · Toronto-St. Paul's
Approved 22 Jan 2026
279 m away · 2033 Yonge St · Toronto-St. Paul's
Approved 19 Aug 2026
314 m away · 2019 Yonge St · Toronto-St. Paul's
Approved 12 May 2026
339 m away · 2013 Yonge St · Toronto-St. Paul's
Approved 22 Apr 2026
341 m away · 3 Glebe Rd E · Toronto-St. Paul's
Approved 20 Sep 2025
375 m away · 90 Holly St · Toronto-St. Paul's
Approved 25 Feb 2026
389 m away · 2300 Yonge St · Eglinton-Lawrence
Approved 25 Aug 2025
389 m away · 2300 Yonge St · Eglinton-Lawrence
Approved 14 Jan 2026
389 m away · 2300 Yonge St · Eglinton-Lawrence
Approved 25 Aug 2026
389 m away · 2300 Yonge St · Eglinton-Lawrence
Approved 27 Aug 2026
389 m away · 2300 Yonge St · Eglinton-Lawrence
Approved 1 Sep 2026
389 m away · 2300 Yonge St · Eglinton-Lawrence
Approved 29 Sep 2026
391 m away · 6 Eglinton Ave E · Toronto-St. Paul's
Approved 20 Jan 2026
The city has allowed these. Work may not have started. The permits in this area list 2030 homes.
86 m away · 2150 Yonge St · Toronto-St. Paul's
Approved 3 Sep 2026
Revision 1: Revision to the building permit illustrating the pre-fire and post-repair ceiling height at the base of the basement staircaseProposed fire damage repairs. Scope includes removal and replacement of gypsum,…
164 m away · 2161 Yonge St · Toronto-St. Paul's
Approved 22 Jul 2025
31 new homes
The permit lists 31 homes.
REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA
261 m away · 2191 Yonge St · Toronto-St. Paul's
Approved 1 May 2026
Proposal for interior alterations to first floor and third floor amenities area
267 m away · 2200 Yonge St · Toronto-St. Paul's
Approved 27 May 2026
Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage
290 m away · 88 Colin Ave · Toronto-St. Paul's
Approved 1 Jun 2026
1 new home · Georgina Myers
The permit lists 1 homes.
To construct a new single family dwelling
383 m away · 1995 Yonge St · Toronto-St. Paul's
Approved 20 Mar 2026
Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.
389 m away · 2300 Yonge St · Eglinton-Lawrence
Approved 6 Aug 2026
proposal for localized concrete repairs and waterproofing renewal at the parking garage helical ramp
402 m away · 8 Eglinton Ave E · Toronto-St. Paul's
Approved 19 Oct 2026
Proposal for interior alterations to vacant unit RU05 into a Group E (Acai Shop).
430 m away · 131 Hillsdale Ave E · Toronto-St. Paul's
Approved 23 Jul 2026
Nikan Sharif-zadeh
REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…
459 m away · 52 Imperial St · Toronto-St. Paul's
Approved 21 Jan 2025
1 new home · Haddington Developments Inc
The permit lists 1 homes.
REV 01 - Revision for 1 - washroom added in lower basement level.2 - increased size of mech. space in attic.3 - ground floor FFE was slightly raised. All other floor heights are unchanged.4 - grading plan has been…
490 m away · 89 Dunfield Ave · Toronto-St. Paul's
Approved 5 Mar 2026
Proposal for waterproofing and concrete repairs
506 m away · 12 Cuthbert Cres · Toronto-St. Paul's
Approved 20 May 2025
2 new homes
The permit lists 2 homes.
Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH
530 m away · 19 Colin Ave · Toronto-St. Paul's
Approved 9 Oct 2025
1 new home · Sierra Custom Homes
The permit lists 1 homes.
Proposal to demolish existing dwelling and construct a new 2 storey dwelling.
535 m away · 1951 Yonge St · Toronto-St. Paul's
Approved 21 May 2026
Shoring and excavation for remediation purposes
541 m away · 11 Oswald Cres · Toronto-St. Paul's
Approved 11 Sep 2026
2 new homes · 16230288 Canada Inc
The permit lists 2 homes.
TO CONSTRUCT A NEW TWO STOREY DUPLEX
563 m away · 1920 Yonge St · Toronto-St. Paul's
Approved 20 Apr 2026
Proposal for interior alterations to existing office space - UNIT 500
629 m away · 122 Highbourne Rd · Toronto-St. Paul's
Approved 13 Feb 2026
Renu Gupta
REVISION 01 REVISION: ADDED 2ND MECHANICAL ROOM IN ATTIC ACCESSED BY HATCH Construct a New 2-Storey Single Family Detached House with an integral garage.
653 m away · 102 Highbourne Rd · Toronto-St. Paul's
Approved 18 Feb 2026
REVISION - changes to the architectural drawings are bubbled for referenceProposed New Single Family Dwelling Three-Storey Detached House. Existing SFD Detached House will be demolished.
672 m away · 272 Eglinton Ave W · Eglinton-Lawrence
Approved 1 May 2026
Proposed interior alterations for butcher shop to include HVAC- 10ft commercial kitchen exhaust, upgrade air conditioning from 2 ton to 4 ton, gas lines from basement up to main floor for kitchen equipment.Plumbing-…
686 m away · 176 Eglinton Ave E · Toronto-St. Paul's
Approved 9 Oct 2026
1 new home
The permit lists 1 homes.
Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.
698 m away · 18 Brownlow Ave · Toronto-St. Paul's
Approved 23 Jun 2026
194 new homes
The permit lists 194 homes.
Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…
704 m away · 2400 Yonge St · Eglinton-Lawrence
Approved 22 Oct 2025
Conditional Permit - Part Permit - To construct 27 Storey - South Tower mixed use residential (rental) with shared podium, two levels below grade parking for total of 385 rental units.
753 m away · 170 Roehampton Ave · Toronto-St. Paul's
Approved 28 Jul 2026
599 new homes
The permit lists 599 homes.
Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.
760 m away · 65 Broadway Ave · Toronto-St. Paul's
Approved 23 Jan 2025
Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.
The city has allowed these buildings to come down. They may still be standing.
290 m away · 88 Colin Ave · Toronto-St. Paul's
Approved 2 Jun 2026
Rl Urban Innovations Inc
Proposal to demolish existing single family dwelling.
297 m away · 60 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey dwelling for City Parkland Dedication
302 m away · 62 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
307 m away · 64 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
313 m away · 66 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
318 m away · 68 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
378 m away · 17 Henning Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
382 m away · 19 Henning Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
392 m away · 21 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
394 m away · 23 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
399 m away · 25 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
402 m away · 27 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
409 m away · 29 Henning Ave · Eglinton-Lawrence
Approved 25 Aug 2025
Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.
413 m away · 31 Henning Ave · Eglinton-Lawrence
Approved 25 Aug 2025
Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.
478 m away · 25 Imperial St · Toronto-St. Paul's
Approved 23 Oct 2026
Proposed demolition of the existing 5-storey commercial building.
480 m away · 21 Imperial St · Toronto-St. Paul's
Approved 23 Oct 2026
Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.
541 m away · 11 Oswald Cres · Toronto-St. Paul's
Approved 17 Sep 2026
Hirman Architect Inc
TO CONSTRUCT A NEW TWO STOREY DUPLEX
618 m away · 55 Montgomery Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Proposal to demolish the existing 2 storey SFD-detached dwelling.
618 m away · 57 Montgomery Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Proposal to demolish the existing 2 storey SFD-semi dwelling.See also 23 176474 NNY 08 OZ
622 m away · 39 Montgomery Ave · Eglinton-Lawrence
Approved 4 Mar 2026
Proposal to demolish existing SFD with no replacement building for future Park Development
652 m away · 64 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
654 m away · 70 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
655 m away · 54 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
656 m away · 52 Montgomery Ave · Eglinton-Lawrence
Approved 6 May 2025
First Capital (king Liberty-barrymore) Corporation
Proposal to demolish the two-storey residential building.
Hours the city has already allowed.
127 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 10 Jul 2026 – 31 Oct 2026
Hours 7:00 p.m.–11:00 p.m.
Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.
Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.
Ellisdon Corporation
127 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 1 Nov 2026 – 30 Jun 2027
Hours from 7:00 p.m.
Ellisdon Corporation
704 m away · 2400 Yonge St · Eglinton-Lawrence
Allowed 1 Jan 2026 – 31 Dec 2026
Hours 6:00 a.m.–10:00 p.m.
Skygrid Construction Inc
708 m away · 8 Brownlow Ave · Toronto-St. Paul's
Allowed 1 May 2026 – 30 Oct 2026
Hours 7:00 a.m.–12:30 a.m.
Soudan-brownlow Properties
753 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 7 Aug 2026 – 7 Feb 2027
Hours from 7:00 p.m.
Clark Construction Management Inc.
753 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 21 Oct 2026 – 21 Jan 2027
Hours from 6:00 a.m.
Clark Construction Management Inc.
836 m away · 30 Merton St · Toronto-St. Paul's
Allowed 2 Jul 2026 – 31 Dec 2026
Hours 7:00 a.m.–11:59 p.m.
Skygrid Construction Inc.
902 m away · 140 Merton St · Toronto-St. Paul's
Allowed 17 Nov 2026 – 17 May 2027
Hours 7:00 a.m.–11:59 p.m.
Ellisdon Residential Inc.
919 m away · 20 Castlefield Ave · Eglinton-Lawrence
Allowed 31 Oct 2026
Hours 10:00 a.m.–3:00 p.m.
Setup 31 Oct 2026, 6:00 a.m.–10:00 a.m.
Tear down 31 Oct 2026, 3:00 p.m.–6:00 p.m.
Uptown Yonge Bia
1.0 km away · 241 Redpath Ave · Don Valley West
Allowed 9 Sep 2026 – 31 Mar 2027
Hours from 7:00 p.m.
Bluescape 241 Redpath Inc.
1.0 km away · 241 Redpath Ave · Don Valley West
Allowed 16 Oct 2026 – 26 Oct 2026
Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.
Bluescape 241 Redpath Inc.
1.0 km away · 241 Redpath Ave · Don Valley West
Allowed 2 Nov 2026 – 18 Nov 2026
Hours 7:00 a.m.–10:00 p.m.
Bluescape 241 Redpath Inc.
On the city's calendar. Check before you go.
522 m away · 200 Eglinton Ave W · Eglinton-Lawrence
On 21 Nov 2026
Free
Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle
Add to calendarSomeone has asked the city for a change. Nothing here is a decision.
0 m away · 45 Berwick Ave · Toronto-St. Paul's
Asked 10 Jul 2025
Under Review
The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 158.2 m + MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,641.7 sq. m., which results in a total Floor Space Index (FSI) of 19.1 times the area of the lot. The…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
34 m away · 29 Berwick Ave · Toronto-St. Paul's
Asked 10 Jul 2025
OMB Appeal
The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 162.15 m + 8.0 m MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,588.9 sq. m., which results in a total Floor Space Index (FSI) of 19.07 times the area of the lot.…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
81 m away · 2128 Yonge St · Toronto-St. Paul's
Asked 28 Oct 2021
Under Review
*** Draft Plan of Condominium for 80 units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
Write Kai Zhou · [email protected].
127 m away · 2180 Yonge St · Toronto-St. Paul's
Asked 21 Dec 2020
Under Review
INACTIVE Zoning By-law Amendment application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Proposal includes a new public plaza, open spaces, street connections, a community use facility, and public park. Related OPA application: 22 242145 STE 12 OZ
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
127 m away · 2180 Yonge St · Toronto-St. Paul's
Asked 23 Dec 2022
Under Review
Official Plan application to permit phased development of five mixed-use buildings at 45, 55, 60 and 65 storeys with 2,892 residential units. Official Plan Amendment requested to amend policies and Map 21-9 within the Yonge-Eglinton Secondary Plan. Related ZBA application: 20 232714 STE 12 OZ
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
257 m away · 2045 Yonge St · Toronto-St. Paul's
Asked 22 Aug 2022
Under Review
Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
263 m away · 2050 Yonge St · Toronto-St. Paul's
Asked 8 Nov 2021
Under Review
2 blocks
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
Write Kai Zhou · [email protected].
263 m away · 2050 Yonge St · Toronto-St. Paul's
Asked 8 Nov 2021
Under Review
Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 2863 square metres, and a residential gross floor area of 15683 square metres. 164 residential units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
327 m away · 2010 Yonge St · Toronto-St. Paul's
Asked 8 Nov 2021
Appeal Received
Zoning By-law amendment for a 14-storey mixed-use building having a non-residential gross floor area of 1,453 square metres, and a residential gross floor area of 21,757 square metres. 274 residential units are proposed.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
Write Kai Zhou · [email protected].
334 m away · 36 Eglinton Ave W · Eglinton-Lawrence
Asked 3 Nov 2021
OMB Appeal
Official Plan Amendment to facilitate the redevelopment of the site for a 65-storey mixed-use building having a non-residential gross floor area of 549.8 square metres, and a residential gross floor area of 44,562.0 square metres. A total of 663 residential units are proposed. Related OZ File Nos. 20 165466 NNY 08 OZ…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
Write Diane Pi · [email protected].
334 m away · 36 Eglinton Ave W · Eglinton-Lawrence
Asked 4 Nov 2021
Under Review
*** Draft Plan of Condominium for 663 units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
334 m away · 36 Eglinton Ave W · Eglinton-Lawrence
Asked 29 Apr 2022
Under Review
Site Plan Approval to permit the redevelopment of the site for a 59-storey mixed-use building having a non-residential gross floor area of 2,784 square metres, and a residential gross floor area of 38,817 square metres. A total of 613 residential units are proposed. A total of 74 parking spaces are proposed to serve…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Diane Pi · [email protected].
341 m away · 1 Eglinton Ave E · Toronto-St. Paul's
Asked 15 Oct 2021
Under Review
Site Plan Approval for a 65-storey mixed-use building having a non-residential gross floor area of 11,225.70 square metres, and a residential gross floor area of 43,684.60 square metres. A total of 600 residential dwelling units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
341 m away · 1 Eglinton Ave E · Toronto-St. Paul's
Asked 15 Oct 2021
Under Review
*** Draft Plan of Condominium for 600 residential dwelling units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
392 m away · 21 Henning Ave · Eglinton-Lawrence
Asked 18 Jul 2023
OMB Appeal
The application proposes to amend the Official Plan and Zoning By-law to permit a 34-storey residential building containing 390 residential dwelling units and 45 car parking spaces.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
394 m away · 23 Henning Ave · Eglinton-Lawrence
Asked 25 Jul 2023
Under Review
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
426 m away · 1984 Yonge St · Toronto-St. Paul's
Asked 22 Dec 2016
NOAC Issued
Site Plan Approval for a mixed-use building: 9 storeys, retail at-grade, 1032 square metres of non-residential (office) gross floor area, and 20 rental dwelling units. Two surface car-parking spaces are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
434 m away · 55 Eglinton Ave E · Toronto-St. Paul's
Asked 27 Apr 2018
Under Review
INACTIVE Site Plan applciation for a total of 40,886.39 square metres of gross floor area (GFA) over 50 storeys. This GFA includes 253.58 square metres of at-grade retail fronting Eglinton Avenue East, and 6,409.82 square metres of office space to be located on Floors 2-6. A total of 461 residential units are proposed…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
480 m away · 21 Imperial St · Toronto-St. Paul's
Asked 8 Oct 2021
Under Review
Site Plan Application for a 19-storey mixed-use building containing 228 residential dwelling units, 56 square metres of ground floor retail space, and two levels of underground parking. Two ground level units will have expanded home occupation (live/work) permissions.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
480 m away · 1962 Yonge St · Toronto-St. Paul's
Asked 27 Feb 2026
Under Review
Zoning By-law Amendment for a 45-storey mixed-use building. The building will contain 379 residential units, 9 of which are rental replacement units, with commercial at grade.
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
509 m away · 90 Eglinton Ave E · Toronto-St. Paul's
Asked 16 Sep 2021
Under Review
Draft Plan of Subdivision to create 3 blocks.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
519 m away · 2346 Yonge St · Eglinton-Lawrence
Asked 10 May 2024
OMB Appeal
Application for a 56-storey mixed-use building containing 407 residential units and 272.2 square-meters of commercial space at-grade. The building will feature a 3-storey podium with outdoor amenity space above, and a 53-storey tower. It will contain a combined Gross Floor Area (GFA) of 36,656.0 square-meters, and…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
519 m away · 2346 Yonge St · Eglinton-Lawrence
Asked 2 Dec 2024
Under Review
Site Plan Control Application proposing a 56-storey mixed-use building containing 407 residential units, with a combined Gross Floor Area of 36,656 square-meters including 272 square-meters of commercial space at-grade.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
520 m away · 2323 Yonge St · Toronto-St. Paul's
Asked 29 Sep 2021
Under Review
Draft plan of subdivision for 3 development blocks.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
Write Kai Zhou · [email protected].