Opening this block

Home · Toronto Centre · Queen St E

What's new around 275 Queen St E

275 Queen St E · Toronto Centre. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Equitable Bank

287 m away · 25 Ontario St · Toronto Centre

Applied 23 Jan 2026

Revision Issued

Rev 05 - Remove slab opening and associated stairs from level 23.REV: ADD FLOOR 12 AND 13 BACK INTO INITIAL PERMIT 22-115404, PER BUILDING INSPECTOR REQUEST, SEE COVER LETTER IN BLD DWGS.Proposal for interior…

Permit application

Scotia Bank

389 m away · 351 King St E · Toronto Centre

Applied 16 Jan 2026

Inspection

Proposal to construct a demising wall in existing office space - UNIT 301, "Scotia Bank"

Permit application

Brother Joseph Dooley Apartments

440 m away · 412 Queen St E · Toronto Centre

Applied 7 Jul 2026

Permit Issued

Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance…

Show 4 moreShow fewer
Permit application

Publicis Re:Sources

604 m away · 99 Queen St E · Toronto Centre

Applied 27 Aug 2025

Inspection

Proposal for interior alterations to existing office space - FLOOR 4, "PUBLICIS RE:SOURCES"Convenience address is 111 Queen St E

Permit application

McDonalds

621 m away · 121 Front St E · Toronto Centre

Applied 6 Jan 2026

Permit Issued

Proposal for interior alterations to exisiting restaurant with 7 seats - "McDonalds"

Permit application

Taco Bell

907 m away · 650 Dundas St E · Toronto Centre

Applied 10 Nov 2026

Not Started

REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

Permit application

Acumetis Toronto

1.0 km away · 18 King St E · Toronto Centre

Applied 14 Sep 2026

Permit Issued

Proposal for interior alterations to existing office suite for new tenant and install two (2) electromagnetic locks - "Acumetis Toronto"

Being built

The city has allowed these. Work may not have started. The permits in this area list 3745 homes.

Multiple Unit Building

314 Queen St E

194 m away · 314 Queen St E · Toronto Centre

Approved 11 Sep 2026

Demolish rear yard deteriorated stand alone building extension. The rear wall of the original building shall remain intact (addition was not connected to the existing building).

Apartment

49 Ontario St

219 m away · 49 Ontario St · Toronto Centre

Approved 14 Oct 2026

1226 new homes

The permit lists 1226 homes.

Construction of two buildings of 46 and 50 storeys with underground parking garage (245 affordable housing units) and townhouses

Transit Station,subway, Bus Terminal

150 Sherbourne St

236 m away · 150 Sherbourne St · Toronto Centre

Approved 2 Feb 2026

Conditional Permit - Part Permit - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter

Show 21 moreShow fewer
Multiple Unit Building

78 Berkeley St

268 m away · 78 Berkeley St · Toronto Centre

Approved 10 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Multiple Unit Building

76 Berkeley St

272 m away · 76 Berkeley St · Toronto Centre

Approved 10 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Multiple Unit Building

74 Berkeley St

277 m away · 74 Berkeley St · Toronto Centre

Approved 10 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Multiple Unit Building

72 Berkeley St

282 m away · 72 Berkeley St · Toronto Centre

Approved 9 Oct 2025

Proposal for partial demoltion to the rear of building and convert to a shell office use.

Multiple Unit Building

154 Shuter St

302 m away · 154 Shuter St · Toronto Centre

Approved 14 Sep 2026

Proposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes…

3 homes

284 King St E

343 m away · 284 King St E · Toronto Centre

Approved 22 Jan 2025

3 new homes

The permit lists 3 homes.

Rev 01 - Two (2) units have been added on Level 31 and one (1) has been added on Level 32. The total unit count for the building has increased from 216 to 219.32 Storey residential development with 216 units and 1…

Mixed Use/res W Non Res

125 George St

371 m away · 125 George St · Toronto Centre

Approved 30 Oct 2026

REV 01: Revision to permit for updates to ground floor, 2nd and 3rd floor, refer to memoProposal to construct a new 39 storey mixed use building with 516 residential dwelling units, ground floor retail and 4 levels…

Multiple Unit Building

275 King St E

382 m away · 275 King St E · Toronto Centre

Approved 23 Sep 2025

REV 01: Revision to second floor washroom area.INTERIOR ALTERATION TO GROUP D OCCUPANCY: - 2ND FLR INTERIOR OFFICE RENOVATION - REFRESH EXISTING WASHROOMS

Multiple Unit Building

334 King St E

411 m away · 334 King St E · Toronto Centre

Approved 9 Jul 2026

Proposal for interior alteration on the ground floor for an appliance showroom

Apartment

393 Dundas St E

448 m away · 393 Dundas St E · Toronto Centre

Approved 12 Nov 2026

Conditional Permit - Site Service - Proposing to construct a slab-on-grade, 4-storey plus mechanical penthouse and roof deck, 12 unit affordable housing residential building

Transit Station,subway, Bus Terminal

250 Front St E

469 m away · 250 Front St E · Toronto Centre

Approved 19 Feb 2026

Conditional Permit - Part Permit - To construct new Ontario Line transit - Corktown Transit Station

Multiple Unit Building

197 King St E

490 m away · 197 King St E · Toronto Centre

Approved 6 Aug 2025

Revision 03 - Revised access to the7th floor terrace to make it barrier free accessible - (stairs at door D705 removed and BF ramp added on the terrace), added elevator machine room on 7th floorRevision 02 - Revised…

Multiple Unit Building

171 King St E

563 m away · 171 King St E · Toronto Centre

Approved 2 Sep 2026

Proposal to remove a load bearing wall and replacing it with a steel beam.

Transit Station,subway, Bus Terminal

271 Front St E

565 m away · 271 Front St E · Toronto Centre

Approved 26 May 2026

Proposal for Station Team's Temporary Office Trailers (The building is to be dismantled before project completion)

1 homes

3 Gilead Pl

596 m away · 3 Gilead Pl · Toronto Centre

Approved 23 Jan 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations to convert existing manufacturing building to a live/work studio and office.building. See also 18 255069 ZZC, 19 155691 MV and Final and Binding A0522/19TEY.

Multiple Unit Building

261 Jarvis St

664 m away · 261 Jarvis St · Toronto Centre

Approved 28 Apr 2026

Proposed underground garage isolated repairs

Mixed Use/res W Non Res

60 Queen St E

665 m away · 60 Queen St E · Toronto Centre

Approved 28 Jun 2026

Conditional Permit - Part Permit - Proposal to construct a new 57 storey mixed use building with 445 residential units, ground floor retail and 4 levels underground parking. See also 22 164002 DEM and 21 152905 STE 13…

Apartment

120 Church St

705 m away · 120 Church St · Toronto Centre

Approved 14 Aug 2025

34 new homes

The permit lists 34 homes.

Proposal to add 3 additional floors to the existing plans Construct a 45 storey residential tower and podium with retail at grade and 4 level underground parking garagePB# 21-223105

Mixed Use/res W Non Res

120 Church St

705 m away · 120 Church St · Toronto Centre

Approved 16 Oct 2026

REV 02: Removal of two surplus 2-bedroom suites (411 and 511), refer to correspondenceREV 01:Proposal to add 3 additional floors to the existing plans Construct a 45 storey residential tower and podium with retail at…

Student Residence

294 Sherbourne St

720 m away · 294 Sherbourne St · Toronto Centre

Approved 30 Oct 2026

REV 03: Revised sprinkler drawings.REV 02: Revision to permit, changes related to basement level, revised exit sign, added pull station to east door, added enter phone to east door, and added pull station to east door…

Long Term Care Facility

55 Eastern Ave

738 m away · 55 Eastern Ave · Toronto Centre

Approved 29 May 2025

Proposal to construct a new 13 storey Long Term Care Facility with 348 beds, 2 clinical tenant spaces, administration areas, and support services. See also 21 151369 STE 12 SA.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

212 Dundas St E

573 m away · 212 Dundas St E · Toronto Centre

Approved 6 Jul 2026

Proposal to demolish the existing 4 storey commercial building with the retention of the exterior street facing facade of the Filmore Hotel building.See 20 151363 STE 13 SA for future proposal.

Demolition

295 Sackville St

849 m away · 295 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

319 Sackville St

897 m away · 319 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Show 10 moreShow fewer
Demolition

74 Dundas St E

899 m away · 74 Dundas St E · Toronto Centre

Approved 3 Feb 2026

Proposal to demolish existing two storey building.

Demolition

64 Dundas St E

906 m away · 64 Dundas St E · Toronto Centre

Approved 2 Mar 2026

Proposal to demolish existing 3 storey mixed use building in relation to new 21 storey student residence development

Demolition

60 Dundas St E

908 m away · 60 Dundas St E · Toronto Centre

Approved 2 Mar 2026

Proposal to demolish existing 3 storey mixed use building in relation to new 21 storey student residence development

Demolition

100 Bond St

916 m away · 100 Bond St · Toronto Centre

Approved 30 Jan 2026

Demolition of existing 3 Storey commercial building

Demolition

361 Gerrard St E

921 m away · 361 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

104 Bond St

922 m away · 104 Bond St · Toronto Centre

Approved 2 Feb 2026

Demolition of existing 4 storey commercial building

Demolition

415 Gerrard St E

929 m away · 415 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

110 Bond St

932 m away · 110 Bond St · Toronto Centre

Approved 30 Jan 2026

Demolition of existing 3 Storey commercial building

Demolition

407 Gerrard St E

1.0 km away · 407 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

260 Sumach St

1.0 km away · 260 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

49 Ontario

219 m away · 49 Ontario St · Toronto Centre

Allowed 12 May 2026 – 12 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Dcc 49 Ontario East Inc.

Construction

Construction

219 m away · 49 Ontario St · Toronto Centre

Allowed 30 Sep 2026 – 5 Sep 2027

Hours 7:00 a.m.–10:00 p.m.

Dcc 49 Ontario East Inc.

Continuous Concrete Pour

Residences Of Queen Church Inc.

665 m away · 60 Queen St E · Toronto Centre

Allowed 9 Jun 2026 – 31 Dec 2026

Hours from 7:00 a.m.

Residences Of Queen Church Inc.

Show 14 moreShow fewer
Amplified And/or Instrument Sound

I Hear Market Street / Winter Market On Market St

688 m away · 92 Front St E · Toronto Centre

Allowed 10 May 2026 – 9 Jan 2027

Hours 9:00 a.m.–11:00 p.m.

Tear down 10 May 2026 – 9 Jan 2027, 9:00 a.m.–11:00 p.m.

Old Town Toronto / St Lawrence Market

Construction

Rekai Cherry Place Campus Of Care

738 m away · 55 Eastern Ave · Toronto Centre

Allowed 12 Aug 2026 – 15 Jul 2027

Hours 7:00 p.m.–9:00 p.m., 7:00 a.m.–9:00 a.m.

Multiplex Construction Canada Limited

Construction

Hoem2

754 m away · 300 Sherbourne St · Toronto Centre

Allowed 2 Sep 2026 – 31 Dec 2026

Hours 7:00 a.m.–7:00 p.m.

Reliance Construction Inc.

Amplified And/or Instrument Sound

The Distillery Historic District Seasonal Program

785 m away · 55 Mill St · Spadina-Fort York

Allowed 27 May 2026 – 31 Oct 2026

Hours 7:00 a.m.–11:00 p.m.

Setup 29 Apr 2026 – 1 May 2026, 7:00 a.m.–11:00 p.m.

Tear down 1 Nov 2026, 7:00 a.m.–11:00 p.m.

Cityscape Property Management Corp.

Large Crane Work

30 Bond St.

820 m away · 30 Bond St · Toronto Centre

Allowed 30 Oct 2026 – 1 Nov 2026

Hours 7:00 a.m.–11:30 p.m.

Sarens Canada Inc.

Construction

Tchc Rental Building 4a

860 m away · 325 Gerrard St E · Toronto Centre

Allowed 1 Apr 2026 – 1 Apr 2027

Hours 6:00 a.m.–11:00 p.m.

Metro Toronto Housing Corporation

Continuous Concrete Pour

Regent Park Tower 4a

860 m away · 325 Gerrard St E · Toronto Centre

Allowed 24 Aug 2026 – 28 Feb 2027

Hours from 6:00 a.m.

Deltera Contracting Inc

Amplified And/or Instrument Sound

October Funfest

904 m away · 620 Dundas St E · Toronto Centre

Allowed 24 Oct 2026

Hours 1:00 p.m.–3:00 p.m.

Setup 24 Oct 2026, 10:00 a.m.–12:59 p.m.

Tear down 24 Oct 2026, 3:01 p.m.–5:00 p.m.

Fred Victor Centre

Amplified And/or Instrument Sound

Long Winter To At Allan Gardens

941 m away · 19 Horticultural Ave · Toronto Centre

Allowed 6 Nov 2026

Hours 6:00 p.m.–12:00 p.m.

Setup 6 Nov 2026, 2:00 p.m.–6:00 p.m.

Tear down 7 Nov 2026, from 1:00 a.m.

Friends Of Allan Gardens

Construction

Tmu Student Wellbeing Centre

1.0 km away · 137 Bond St · Toronto Centre

Allowed 30 Aug 2026 – 31 Dec 2026

Hours 6:00 a.m.–9:00 p.m.

Pomerleau

Construction

Tmu Student Wellbeing Centre

1.0 km away · 137 Bond St · Toronto Centre

Allowed 5 Oct 2026 – 31 Dec 2026

Hours 6:00 a.m.–11:00 p.m.

Pomerleau

Amplified And/or Instrument Sound

Berczy Park In Motion

1.0 km away · 35 Wellington St E · Toronto Centre

Allowed 15 Oct 2026 – 25 Oct 2026

Hours 6:30 p.m.–7:15 p.m., 1:00 p.m.–1:45 p.m.

Setup 7 Oct 2026, 5:30 p.m.–9:00 p.m.; 8 Oct 2026, 5:30 p.m.–9:00 p.m.…

Tear down 15 Oct 2026, 7:15 p.m.–8:30 p.m.; 16 Oct 2026, 7:15 p.m.–8:30 p.m.…

Fall For Dance North Festival Inc.

Amplified And/or Instrument Sound

Old Town Toronto Cavalcade Of Lights

1.0 km away · 35 Wellington St E · Toronto Centre

Allowed 27 Nov 2026

Hours 5:30 p.m.–6:30 p.m.

Setup 27 Nov 2026, 4:00 p.m.–5:30 p.m.

Tear down 27 Nov 2026, 6:30 p.m.–7:30 p.m.

Old Town Toronto Bia

Construction

6 Adelaide St E

1.0 km away · 6 Adelaide St E · Toronto Centre

Allowed 14 Apr 2026 – 31 Dec 2026

Hours 8:00 a.m.–11:59 p.m.

Palmark Construction Limited

Events

On the city's calendar. Check before you go.

CulturalLive Performances

Benedict Sheehan’s ‘Ukrainian War Requiem’: The National Tour

385 m away · 83 Power St · Toronto Centre

On 15 Nov 2026

The Axios Men’s Ensemble, in celebration of their historic Juno award, for Classical Album of the Year (Large Ensemble)

Event pageAdd to calendar
CulturalLive Performances

Rogers v. Rogers

536 m away · 26 Berkeley St · Toronto Centre

On 14 Nov 2026 – 13 Dec 2026

Listed days only

The hit show returns to a new venue, same buzz! Based on Rogers v. Rogers: The Battle for Control of Canada’s Telecom E

Event pageAdd to calendar
Show 21 moreShow fewer
ComedyTheatre

Sex in the '80s

536 m away · 26 Berkeley St · Toronto Centre

On 16 Jan 2027 – 7 Feb 2027

Listed days only

Old history. New rules. They haven’t seen each other since the 1980s. Now two accomplished architects are reunited in a

Event pageAdd to calendar
Family/ChildrenLive Performances

Disney and Pixar's Finding Nemo

537 m away · 165 Front St E · Toronto Centre

On 26 Nov 2026 – 23 Dec 2026

Listed days only

Make your holidays merry with an enchanting family adventure! This splashy musical adaptation of the beloved Pixar film

Event pageAdd to calendar
Food/Culinary

Saturday Farmers' Market

688 m away · 92 Front St E · Toronto Centre

On 14 Nov 2026 – 2 Jan 2027

Free · Listed days only

Visit the Saturday Farmers' Market in the newly redeveloped St. Lawrence Market North building. Discover seasonal produc

Event pageAdd to calendar
Consumer Show/ConventionSeminars/Workshops

Small Business Forum

688 m away · 92 Front St E · Toronto Centre

On 17 Nov 2026

Free

Experience the City of Toronto’s free signature event in support of small businesses. 2026 has been a year of rapid econ

Event pageAdd to calendar
ArtisanFarmers' Market

Winter Market Thursdays

688 m away · 92 Front St E · Toronto Centre

On 19 Nov 2026 – 17 Dec 2026

Free · Listed days only

Discover the magic of the St. Lawrence Winter Market! This free outdoor event transforms the heart of the city into a fe

Event pageAdd to calendar
Arts/ExhibitsFarmers' Market

Winter Market Fridays

688 m away · 92 Front St E · Toronto Centre

On 20 Nov 2026 – 18 Dec 2026

Free · Listed days only

Kick off the weekend at the St. Lawrence Winter Market! This free outdoor event brings holiday magic to the heart of the

Event pageAdd to calendar
Live PerformancesMusic

Friday Night Jazz

688 m away · 92 Front St E · Toronto Centre

On 20 Nov 2026 – 18 Dec 2026

Free · Listed days only

Ease into the weekend with the smooth sounds of live jazz. Join us at the Santa Hut for an evening of music, holiday che

Event pageAdd to calendar
CelebrationsFamily/Children

Ferris Wheel Rides

688 m away · 92 Front St E · Toronto Centre

On 20 Nov 2026 – 22 Nov 2026

Free

Take in the sights of the St. Lawrence Winter Market from above. Enjoy a festive spin on the Ferris Wheel and soak up th

Event pageAdd to calendar
CelebrationsFamily/Children

Weekend Santa Photos

688 m away · 92 Front St E · Toronto Centre

On 21 Nov 2026 – 20 Dec 2026

Free · Listed days only

Make a holiday memory at the St. Lawrence Winter Market with a visit to Santa. Stop by the Santa Hut, share your Christm

Event pageAdd to calendar
Arts/ExhibitsCelebrations

Weekend Photo Bus

688 m away · 92 Front St E · Toronto Centre

On 21 Nov 2026 – 20 Dec 2026

Free · Listed days only

Step aboard the photo bus on Market St. and capture a little holiday magic. Gather your friends and family for a fun, fe

Event pageAdd to calendar
CelebrationsDance

The Alpine Merry Sheep Choir

688 m away · 92 Front St E · Toronto Centre

On 21 Nov 2026 – 20 Dec 2026

Free · Listed days only

Get ready for a baa-rilliant holiday performance! Keep your ears open as the Alpine Merry Sheep Choir roams the market,

Event pageAdd to calendar
ArtisanFarmers' Market

Winter Market Saturdays

688 m away · 92 Front St E · Toronto Centre

On 21 Nov 2026 – 19 Dec 2026

Free · Listed days only

Make a day of holiday fun at the St. Lawrence Winter Market! This free outdoor event transforms the heart of the city in

Event pageAdd to calendar
ArtisanFarmers' Market

Winter Market Sundays

688 m away · 92 Front St E · Toronto Centre

On 22 Nov 2026 – 20 Dec 2026

Free · Listed days only

Spend a festive Sunday at the St. Lawrence Winter Market! Enjoy this free outdoor celebration in the heart of the city,

Event pageAdd to calendar
CelebrationsFamily/Children

Public Skating

688 m away · 92 Front St E · Toronto Centre

On 26 Nov 2026 – 13 Dec 2026

Free · Listed days only

Lace up and embrace the winter season. Enjoy a festive skate and live performances surrounded by the sights, sounds and

Event pageAdd to calendar
CelebrationsFilm

Movie Screenings

688 m away · 92 Front St E · Toronto Centre

On 4 Dec 2026 – 6 Dec 2026

Free

Enjoy a little movie magic at the St. Lawrence Winter Market with the Toronto Outdoor Picture Show. Gather with friends

Event pageAdd to calendar
Arts/ExhibitsArtisan

Antique Market Sundays

688 m away · 92 Front St E · Toronto Centre

On 6 Dec 2026 – 20 Dec 2026

Free · Listed days only

Looking for a gift with a story? Discover unique vintage finds, antique jewellery, beautiful ceramics, collectibles and

Event pageAdd to calendar
CelebrationsFamily/Children

Carousel Rides

688 m away · 92 Front St E · Toronto Centre

On 18 Dec 2026 – 20 Dec 2026

Free

Add a little extra magic to your market visit with a ride on the holiday Carousel. A festive favourite for visitors of a

Event pageAdd to calendar
ArtisanFarmers' Market

Winter Market Monday

688 m away · 92 Front St E · Toronto Centre

On 21 Dec 2026

Free

Keep the holiday spirit going at the St. Lawrence Winter Market! This free outdoor event transforms the heart of the cit

Event pageAdd to calendar
ArtisanFarmers' Market

Winter Market Tuesday

688 m away · 92 Front St E · Toronto Centre

On 22 Dec 2026

Free

Join us for the final day of the St. Lawrence Winter Market! This free outdoor event brings festive cheer to the heart o

Event pageAdd to calendar
Food/Culinary

FOOD TOURS: Cozy Bites in Old Town Toronto

698 m away · 95 Front St E · Toronto Centre

On 19 Nov 2026 – 21 Nov 2026

Take a delicious detour through Old Town Toronto this fall! Presented by Old Town Toronto BIA, Eat More Food Tours inv

Event pageAdd to calendar
Arts/ExhibitsHistory

Card Printing on the Historic Press: Holiday Season at Mackenzie House

868 m away · 82 Bond St · Toronto Centre

On 25 Nov 2026 – 31 Dec 2026

Free · Listed days only

Step back in time and experience the magic of card-making in a 19th-century printshop. Learn about the fascinating histo

Add to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

301 Queen St E

97 m away · 301 Queen St E · Toronto Centre

Asked 25 May 2016

Under Review

INACTIVE Site Plan application for a 25-storey mixed-use building: 206 dwelling units, 6 levels of below-grade parking, total combined GFA 15,711 sq. m.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Site plan

348 Richmond St E

121 m away · 348 Richmond St E · Toronto Centre

Asked 11 Jun 2021

Under Review

Site Plan Approval for a 25-storey mixed-use building having a non-residential gross floor area of 24,936 square metres, and a residential gross floor area of 35,803 square metres. A total of 446 residential dwelling units, and 180 vehicle parking spaces are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Christy Chow · [email protected].

Condominium plan

75 Ontario St

139 m away · 75 Ontario St · Toronto Centre

Asked 8 Nov 2021

Under Review

*** Draft plan of standard condominium for 354 dwelling units, 76 parking spaces, in a proposed 38-storey mixed-use building.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Show 21 moreShow fewer
Site plan

75 Ontario St

139 m away · 75 Ontario St · Toronto Centre

Asked 11 Aug 2023

OMB Appeal

Site Plan Application for a 43-storey mixed-use building that includes 278 square metres of retail space on the ground floor and 380 dwelling units above.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Rezoning

69 Ontario St

148 m away · 69 Ontario St · Toronto Centre

Asked 31 Dec 2019

OMB Appeal

Zoning By-law Amendment application to permit a 43-storey mixed-use building that includes 278 square metres of retail space on the ground floor and 380 dwelling units above.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

225 Queen St E

186 m away · 225 Queen St E · Toronto Centre

Asked 7 Nov 2021

Appeal Received

Proposed 38-storey mixed-use building containing 355 dwelling units and 455 square metres of retail space.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Condominium plan

102 Berkeley St

187 m away · 102 Berkeley St · Toronto Centre

Asked 8 Nov 2021

Under Review

*** Draft Plan of Condominium for 181 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

102 Berkeley St

187 m away · 102 Berkeley St · Toronto Centre

Asked 10 Aug 2023

Under Review

Proposed 35-storey (119.45 metres including the mechanical penthouse) mixed-use building containing 120 square metres of ground level retail uses and 257 dwelling units above and a 213 square metre park.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Site plan

494 Richmond St E

197 m away · 494 Richmond St E · Toronto Centre

Asked 12 Jul 2023

Under Review

The Proposed Development will consist of approximately 35,250 square metres of total gross floor area, including about 400 square metres of commercial uses at-grade, for a total FSI of 10.1. Residential uses are located in the podium and towers above grade and will total 588 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

150 Sherbourne St

236 m away · 150 Sherbourne St · Toronto Centre

Asked 17 Mar 2023

Under Review

Proposed underground transit station for the Ontario Line at Moss Park.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Vanessa Opassinis · [email protected].

Site plan

150 Sherbourne St

236 m away · 150 Sherbourne St · Toronto Centre

Asked 19 Jan 2024

Under Review

Site Plan Control application for a 7,544.3 square metres City of Toronto community centre to replace the existing John Innes Community Centre.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Site plan

134 Parliament St

274 m away · 134 Parliament St · Toronto Centre

Asked 14 Aug 2023

OMB Appeal

Site Plan Application for a 46 storey (156.3 metres including mechanical penthouse) mixed-use building with 419 dwelling units and 328 square metres of commercial uses at grade.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Subdivision

161 Parliament St

292 m away · 161 Parliament St · Toronto Centre

Asked 7 Nov 2021

Under Review

Draft Plan of subdivision for 3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Site plan

351 Queen St E

293 m away · 351 Queen St E · Toronto Centre

Asked 28 Jun 2021

NOAC Issued

Site Plan Application for a 28-storey mixed-use development with 526 units, 448 square metres of parkland, 1,350 square metres of non-residential gross floor area, and one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Site plan

550 Adelaide St E

307 m away · 550 Adelaide St E · Toronto Centre

Asked 16 Sep 2022

Under Review

Site Plan Application for a 29-storey mixed-use building having a non-residential gross floor area of 1012.2 square metres, and a residential gross floor area of 19248.9 square metres. 240 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Site plan

254 King St E

339 m away · 254 King St E · Toronto Centre

Asked 15 Oct 2021

Under Review

Site Plan Approval for two mixed-use towers having heights of 38 and 40 storeys. The proposed non-residential gross floor area is 5,490 square metres, and the proposed residential gross floor area is 62,695 square metres. A total of 819 rental dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Subdivision

254 King St E

339 m away · 254 King St E · Toronto Centre

Asked 15 Oct 2021

Under Review

Draft Plan of Subdivision for 5 development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Katherine Bailey · [email protected].

Site plan

250 King St E

343 m away · 250 King St E · Toronto Centre

Asked 28 Jun 2021

NOAC Issued

Site Plan application for a 40-storey mixed-use building with 537 square metres of non-residential gross floor area, 33507 square metres of residential gross floor area, and a total of 514 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Site plan

298 King St E

359 m away · 298 King St E · Toronto Centre

Asked 14 Aug 2023

OMB Appeal

Site Plan Application for a 42-storey (139.90 metres including mechanical penthouse) mixed-use building with 1,188 square metres of commercial uses at grade and 449 dwelling units.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

201 Sherbourne St

391 m away · 201 Sherbourne St · Toronto Centre

Asked 30 Dec 2024

Under Review

Site Plan application to permit two tall buildings (39- and 40-storeys), containing 693 new residential dwelling units, 525 square metres of non-residential space, and a new public park.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Site plan

214 Sherbourne St

397 m away · 214 Sherbourne St · Toronto Centre

Asked 16 Sep 2022

Under Review

Site Plan Control application to construct a 47-storey tower with a 6-storey prodium containing 66 parking spaces in two levels of below grade parking, 619 dwelling units and a total gross floor area of 41,195.99 square metres, including 481 square metres of community space. The proposal will retain in-situ the…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derek Waltho · [email protected].

Site plan

401 Dundas St E

446 m away · 401 Dundas St E · Toronto Centre

Asked 18 Oct 2021

Under Review

Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 291.6 square metres, and a residential gross floor area of 8518.90 square metres. A total of 137 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

250 Front St E

469 m away · 250 Front St E · Toronto Centre

Asked 5 May 2023

Under Review

for Corktown station

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Vanessa Opassinis · [email protected].

Site plan

134 Jarvis St

505 m away · 134 Jarvis St · Toronto Centre

Asked 2 Sep 2026

Under Review

Proposed 11-space surface commercial parking lot.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].