Bossa Nova Spa
0 m away · 323 Eglinton Ave E · Don Valley West
Approved 22 Dec 2025
Opening this block
Home · Don Valley West · Eglinton Ave E
323 Eglinton Ave E · Don Valley West. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
0 m away · 323 Eglinton Ave E · Don Valley West
Approved 22 Dec 2025
179 m away · 379 Eglinton Ave E · Don Valley West
Approved 19 Aug 2025
185 m away · 381 Eglinton Ave E · Don Valley West
Approved 11 May 2026
191 m away · 383 Eglinton Ave E · Don Valley West
Approved 25 May 2026
278 m away · 250 Eglinton Ave E · Toronto-St. Paul's
Approved 27 Mar 2026
284 m away · 711 Mount Pleasant Rd · Don Valley West
Approved 5 Nov 2025
291 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's
Approved 30 Mar 2026
316 m away · 693 Mount Pleasant Rd · Don Valley West
Approved 24 Sep 2025
353 m away · 220 Eglinton Ave E · Toronto-St. Paul's
Approved 14 Sep 2026
379 m away · 667 Mount Pleasant Rd · Don Valley West
Approved 13 Apr 2026
402 m away · 647 Mount Pleasant Rd · Don Valley West
Approved 14 Jul 2025
434 m away · 188 Eglinton Ave E · Toronto-St. Paul's
Approved 1 Sep 2026
439 m away · 643A Mount Pleasant Rd · Don Valley West
Approved 23 Oct 2026
454 m away · 155 Redpath Ave · Toronto-St. Paul's
Approved 5 Aug 2026
473 m away · 180 Eglinton Ave E · Toronto-St. Paul's
Approved 11 Jun 2026
486 m away · 623 Mount Pleasant Rd · Don Valley West
Approved 3 Oct 2025
530 m away · 953 Mount Pleasant Rd · Don Valley West
Approved 26 Aug 2026
550 m away · 595 Mount Pleasant Rd · Don Valley West
Approved 15 Jun 2026
594 m away · 130 Eglinton Ave E · Toronto-St. Paul's
Approved 27 Jan 2026
616 m away · 567 Mount Pleasant Rd · Don Valley West
Approved 24 Sep 2026
630 m away · 120 Eglinton Ave E · Toronto-St. Paul's
Approved 28 Oct 2025
630 m away · 120 Eglinton Ave E · Toronto-St. Paul's
Approved 2 Nov 2025
630 m away · 120 Eglinton Ave E · Toronto-St. Paul's
Approved 29 Apr 2026
630 m away · 120 Eglinton Ave E · Toronto-St. Paul's
Approved 9 Aug 2026
The city has allowed these. Work may not have started. The permits in this area list 1940 homes.
200 m away · 29 Taunton Rd · Don Valley West
Approved 26 Sep 2025
1 new home · Michelle Basu Roy
The permit lists 1 homes.
Fire damage dwelling to be rebuilt from ground to third floor including front porch, a new walk out to be constructed, Existing basement/foundation walls and concrete slab-on-grade. Front porch concrete steps to remain
225 m away · 413 Roehampton Ave · Don Valley West
Approved 7 Aug 2026
Revision 01: See attached cover letter. Proposed construction of new 3-storey (28-units) residential condominium with 2-storey below grade (1-storey residential and 1-storey parking garage)
248 m away · 362 Soudan Ave · Don Valley West
Approved 22 Apr 2025
1 new home
The permit lists 1 homes.
Proposal for demolition of existing house and construction of new 3 storey detached single family dwelling and detached garage
248 m away · 362 Soudan Ave · Don Valley West
Approved 3 Sep 2025
1 new home
The permit lists 1 homes.
2 storey wood frame garden suite with one car garage beneath
378 m away · 688 Mount Pleasant Rd · Toronto-St. Paul's
Approved 6 Nov 2026
Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty…
417 m away · 18 Brownlow Ave · Toronto-St. Paul's
Approved 23 Jun 2026
194 new homes
The permit lists 194 homes.
Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…
418 m away · 44 Banff Rd · Don Valley West
Approved 1 Apr 2026
1 new home · Jordan Tarshis
The permit lists 1 homes.
Proposal to construct a new 1 storey SFD-detached dwelling. Parts of existing dwelling to be underpinned and convert garage to livable space at rear.See also 25 214601 ZAP.
420 m away · 50 Cardiff Rd · Don Valley West
Approved 16 Oct 2025
1 new home · Behnam Amirghassemi
The permit lists 1 homes.
Proposal for a new 2 storey SFD-Detached
425 m away · 134 Banff Rd · Don Valley West
Approved 1 Dec 2025
3 new homes · 1001127633 Ontario Inc
The permit lists 3 homes.
Proposal to demolish existing dwelling and construct a new 2-storey 3-unit dwelling.
471 m away · 117 Broadway Ave · Toronto-St. Paul's
Approved 12 Dec 2025
Proposed construction of exterior raised wood deck platform c/w wood trellis & wood screen along with exterior counter feed from existing exterior base building services.
476 m away · 176 Eglinton Ave E · Toronto-St. Paul's
Approved 9 Oct 2026
1 new home
The permit lists 1 homes.
Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.
531 m away · 170 Roehampton Ave · Toronto-St. Paul's
Approved 28 Jul 2026
599 new homes
The permit lists 599 homes.
Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.
534 m away · 110 Broadway Ave · Don Valley West
Approved 2 Feb 2026
869 new homes
The permit lists 869 homes.
Proposed construction of 26 Storey North Tower consisting of 352 Units & 37 Storey South Tower consisting of 506 Units with 2 Levels of U/G Parking. See permit 2020 201517 BLD 00 NB for 100 Broadway Ave for underground…
553 m away · 389 Cleveland St · Don Valley West
Approved 24 Sep 2026
217 new homes
The permit lists 217 homes.
Proposal to construct a new 16-storey rental apartment building, with 217 residential units with (43 affordable housing), ground floor retail and 1 level of underground parking.See also 22 168174 NNY 14 SA and 25 209959…
563 m away · 100 Broadway Ave · Don Valley West
Approved 5 May 2026
Proposal for interior alterations to fit new tenant
576 m away · 34 Hadley Rd · Don Valley West
Approved 17 Dec 2025
1 new home
The permit lists 1 homes.
Proposal to construct a new detached laneway suite.
582 m away · 598 Mount Pleasant Rd · Toronto-St. Paul's
Approved 24 Jul 2026
Rear addition. Commercial building. Ground floor medical office; second storey office
609 m away · 241 Redpath Ave · Don Valley West
Approved 10 Jul 2026
Part Permit - Proposal to demolish existing apartment building and construct a 38 storey apartment building containing 356 units of which 310 condominium apartments, 46 rental-replacement apartments interior and…
656 m away · 65 Broadway Ave · Toronto-St. Paul's
Approved 23 Jan 2025
Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.
656 m away · 89 Dunfield Ave · Toronto-St. Paul's
Approved 5 Mar 2026
Proposal for waterproofing and concrete repairs
683 m away · 109 Erskine Ave · Don Valley West
Approved 28 Oct 2025
Rev 02 Revision 01: To units on floors A208, A211, A212, A215, A217, A218, A220 - Gym area on the 2nd floor has been revised - Bike locker room configurations on the parking levels have been revised.Construct 22-storey…
687 m away · 23 Hoyle Ave · Don Valley West
Approved 24 Jun 2025
2 new homes · Lu Ye
The permit lists 2 homes.
Proposal to demolish existing 1 storey SFD, construct new 2 storey Duplex
696 m away · 34 Rowley Ave · Don Valley West
Approved 23 May 2025
Devika Penekelapati
Revision 01 - interior alterations to basementProposed to demolish the existing single family dwelling and to build a new single family dwelling with integral garage.
704 m away · 45 McBain Ave · Don Valley West
Approved 26 Jun 2025
Revision: changes to interior layout and windows
The city has allowed these buildings to come down. They may still be standing.
339 m away · 61 Brownlow Ave · Toronto-St. Paul's
Approved 24 Sep 2025
Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)
553 m away · 383 Cleveland St · Don Valley West
Approved 8 Jan 2026
389 Cleveland Street Lp
Proposal to demolish 6 residential properties and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV
553 m away · 385 Cleveland St · Don Valley West
Approved 8 Jan 2026
389 Cleveland Street Lp
Proposal to demolish 4 residential properties + church and office building and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV.See 25-210326 DEM @ 383 Cleveland
553 m away · 387 Cleveland St · Don Valley West
Approved 8 Jan 2026
389 Cleveland Street Lp
Proposal to demolish 4 residential properties + church and office building and construct a new 14-storey mixed-use building..See also 25-171584 NNY 15 MV
582 m away · 503 Eglinton Ave E · Don Valley West
Approved 7 Jan 2026
389 Cleveland Street Lp
Proposal to demolish church and office building and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV
731 m away · 51 McBain Ave · Don Valley West
Approved 20 Feb 2026
Danclair Construction Ltd
Proposal to demolish existing 2 storey SFD, construct new 2 storey SFD
765 m away · 589 Eglinton Ave E · Don Valley West
Approved 14 Jan 2026
Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct -storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB
769 m away · 63 Mann Ave · Don Valley West
Approved 14 Jan 2026
Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB
771 m away · 591 Eglinton Ave E · Don Valley West
Approved 14 Jan 2026
Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB
773 m away · 61 Mann Ave · Don Valley West
Approved 14 Jan 2026
Bayview Investment Corp
Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB
773 m away · 65 Mann Ave · Don Valley West
Approved 14 Jan 2026
Bayview Investment Corp
Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB
774 m away · 67 Mann Ave · Don Valley West
Approved 14 Jan 2026
Bayview Investment Corp
Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB
780 m away · 593 Eglinton Ave E · Don Valley West
Approved 14 Jan 2026
Bayvieweg Investment Corp
Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB
785 m away · 595 Eglinton Ave E · Don Valley West
Approved 14 Jan 2026
Bayview Investment Corp
Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB
791 m away · 68 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
795 m away · 66 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
801 m away · 64 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
806 m away · 62 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
811 m away · 60 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey dwelling for City Parkland Dedication
825 m away · 11 Oswald Cres · Toronto-St. Paul's
Approved 17 Sep 2026
Hirman Architect Inc
TO CONSTRUCT A NEW TWO STOREY DUPLEX
843 m away · 1802 Bayview Ave · Don Valley West
Approved 18 Jun 2026
Proposal to demolish the existing car wash to permit environmental remediation work for future development
1.0 km away · 37 Blyth Hill Rd · Don Valley West
Approved 11 Jul 2025
Eleonora Crystal
Proposal to demolish the existing 2 storey SFD-detached dwelling.
Hours the city has already allowed.
420 m away · 8 Brownlow Ave · Toronto-St. Paul's
Allowed 1 May 2026 – 30 Oct 2026
Hours 7:00 a.m.–12:30 a.m.
Soudan-brownlow Properties
531 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 7 Aug 2026 – 7 Feb 2027
Hours from 7:00 p.m.
Clark Construction Management Inc.
531 m away · 170 Roehampton Ave · Toronto-St. Paul's
Allowed 21 Oct 2026 – 21 Jan 2027
Hours from 6:00 a.m.
Clark Construction Management Inc.
609 m away · 241 Redpath Ave · Don Valley West
Allowed 9 Sep 2026 – 31 Mar 2027
Hours from 7:00 p.m.
Bluescape 241 Redpath Inc.
609 m away · 241 Redpath Ave · Don Valley West
Allowed 16 Oct 2026 – 26 Oct 2026
Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.
Bluescape 241 Redpath Inc.
609 m away · 241 Redpath Ave · Don Valley West
Allowed 2 Nov 2026 – 18 Nov 2026
Hours 7:00 a.m.–10:00 p.m.
Bluescape 241 Redpath Inc.
1.0 km away · 2180 Yonge St · Toronto-St. Paul's
Allowed 10 Jul 2026 – 31 Oct 2026
Hours 7:00 p.m.–11:00 p.m.
Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.
Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.
Ellisdon Corporation
1.0 km away · 2180 Yonge St · Toronto-St. Paul's
Allowed 1 Nov 2026 – 30 Jun 2027
Hours from 7:00 p.m.
Ellisdon Corporation
1.0 km away · 2400 Yonge St · Eglinton-Lawrence
Allowed 1 Jan 2026 – 31 Dec 2026
Hours 6:00 a.m.–10:00 p.m.
Skygrid Construction Inc
Someone has asked the city for a change. Nothing here is a decision.
79 m away · 368 Eglinton Ave E · Don Valley West
Asked 24 Dec 2019
Under Review
INACTIVE Site Plan Control Application to construct an 11-storey addition on the east side of the existing 13-storey, 148 unit rental apartment building. The proposed addition will contain 76 rental dwelling units with a total residential GFA of 5,045 square metres. When combined with the existing building, the total…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
140 m away · 355 Roehampton Ave · Don Valley West
Asked 13 Jul 2020
Under Review
INACTIVE 1) Application to permit a 4 storey residential building with 8 parking spaces. 2) October 1, 2021: Revised application to permit a 4-storey, 14 unit residential apartment building with 14 vehicular parking spaces, 16 bicycle parking spaces, gross floor area of 1422.80 square metres, floor space index of…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
150 m away · 305 Roehampton Ave · Don Valley West
Asked 3 Jul 2025
OMB Appeal
Redevelopment of 299 Roehampton Avenue with a new purpose-built rental apartment building with a shared 10-storey (33.3 metres) podium element and two towers with a total building height of 59-storeys (189.2 metres, inclusive of 7.0-metre mechanical penthouses). The proposal provides a total gross floor area (GFA) of…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
248 m away · 733 Mount Pleasant Rd · Don Valley West
Asked 27 Oct 2020
NOAC Issued
Site Plan Control application to permit a 27-storey mixed use building containing 325 residential units and 258.7 square metres of retail gross floor area on the ground floor
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Diane Pi · [email protected].
275 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's
Asked 8 Oct 2021
Under Review
2 lots
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
Write Kai Zhou · [email protected].
275 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's
Asked 27 Apr 2022
Under Review
Site Plan Approval for a 35-storey mixed-use building having a non-residential gross floor area of 1005 square metres, and a residential gross floor area of 31,514 square metres. 514 residential dwelling units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
275 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's
Asked 22 Nov 2024
OMB Appeal
Zoning By-law Amendment for a 61-storey mixed-use building with a height of 197.05 metres (excluding the mechanical penthouse). The proposed building will include approximately 812 square metres of non-residential Gross Floor Area and 49,040 square metres of residential gross floor area.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
Write Kai Zhou · [email protected].
291 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's
Asked 5 Jul 2021
Under Review
Site Plan Approval for a 35-storey mixed-use building comprised of a 6-storey base building, and a 29-storey tower element. The proposed non-residential gross floor area is 208.37 square metres, and the proposed residential gross floor area is 28,692.73 square metres. A total of 398 residential dwelling units are…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
291 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's
Asked 23 Apr 2026
Under Review
Zoning By-law Amendment application to allow for the development of a 56-storey mixed-use building comprised of a 4-storey podium and a 52-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 618 residential dwelling units.The site was subject to a…
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
296 m away · 732 Mount Pleasant Rd · Toronto-St. Paul's
Asked 17 Apr 2026
Under Review
Zoning By-law Amendment application to allow for the development of a 36-storey mixed-use building comprised of a 4-storey podium and a 32-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 396 residential dwelling units.
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
339 m away · 61 Brownlow Ave · Toronto-St. Paul's
Asked 25 Aug 2021
NOAC Issued
Site Plan application to permit a residential building with two towers, 59 and 55 storeys , comprising 1,374 residential units, daycare facility and a gross floor area of 97,194 square metres. The proposal involves rental replacement.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
339 m away · 61 Brownlow Ave · Toronto-St. Paul's
Asked 10 Sep 2021
Under Review
*** Draft Plan of Standard Condominium to permit 384 residential units in a 35-storey residential building with a 2-level underground parking garage containing 69 vehicular parking spaces.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
359 m away · 250 Roehampton Ave · Toronto-St. Paul's
Asked 8 Dec 2025
Under Review
Zoning By-law Amendment for a 59-storey residential building with a height of 190 m (excluding the mechanical penthouse). The proposed redevelopment consists of a total gross floor area (GFA) of 48,233.4 sq. m., which results in a total Floor Space Index (FSI) of 15.37 times the area of the lot. The proposed…
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
Write Kai Zhou · [email protected].
368 m away · 191 Eglinton Ave E · Toronto-St. Paul's
Asked 14 Jul 2022
Appeal Received
Rezoning for proposed 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle parking spaces.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
368 m away · 191 Eglinton Ave E · Toronto-St. Paul's
Asked 6 Mar 2025
Under Review
Site Plan approval application for a 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
389 m away · 19 Brownlow Ave · Toronto-St. Paul's
Asked 22 Jul 2022
Under Review
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
392 m away · 181 Eglinton Ave E · Toronto-St. Paul's
Asked 14 Jul 2022
Under Review
Site Plan Application for proposed 21-storey buidling and three-levels of underground parking, excluding mechanical penthouse. The proposal includes 11,242.7 square metres of residential and 237.4 square metres of retail use. The building includes 139 unit and 23 vehicular parking spaces.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
401 m away · 216 Soudan Ave · Toronto-St. Paul's
Asked 13 Nov 2024
Under Review
Zoning By-law Amendment for a 45-storey purpose built rental residential building containing 527 new dwelling units, and a total of 32,900.29 sq. m of residential gross floor area (GFA).
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
417 m away · 18 Brownlow Ave · Toronto-St. Paul's
Asked 23 Jul 2025
NOAC Issued
Site Plan Amendment to alter the development standards for the 21-storey residential building (previously approved under 23 152381 STE 12 SA), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor area and permitted projections, revising minimum setbacks…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
462 m away · 14 Elvina Gdns · Don Valley West
Asked 4 Sep 2019
NOAC Issued
Site Plan Application for the development of 7 new dwelling units, consisting of 5 three-storey townhouse dwelling units, 2 new semi-detached dwellings, and the retention of the existing two-storey single detached dwelling (197 Erskine Avenue). A total of 12 underground parking spaces are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
468 m away · 136 Broadway Ave · Don Valley West
Asked 4 Nov 2021
Under Review
*** Draft plan of condominium for 72 units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
509 m away · 124 Broadway Ave · Don Valley West
Asked 11 Jun 2021
Under Review
Site Plan Control application for two residential towers with shared podium and facilities, at 36 storeys on 124 Broadway Avenue and 30 storeys on 136 Broadway Avenue. 860 dwelling units are proposed, including 206 units in the purpose built rental tower at 136 Broadway Ave to replace rental units from 124 and 136…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
509 m away · 124 Broadway Ave · Don Valley West
Asked 19 Oct 2021
Under Review
*** Draft Plan of Condominium for 459 condominium units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
523 m away · 160 Eglinton Ave E · Toronto-St. Paul's
Asked 11 Apr 2022
Under Review
Site Plan application to permit a 61-storey multi-tower mixed use building with a maximum gross floor area of 90,000 square metres, 201 parking spaces, 1,329 bicycle parking spaces, and a north-south midblock connection.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.