Opening this block

Home · Don Valley West · Roehampton Ave

What's new around 355 Roehampton Ave

355 Roehampton Ave · Don Valley West. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 1904 homes.

Apartment

413 Roehampton Ave

145 m away · 413 Roehampton Ave · Don Valley West

Approved 7 Aug 2026

Revision 01: See attached cover letter. Proposed construction of new 3-storey (28-units) residential condominium with 2-storey below grade (1-storey residential and 1-storey parking garage)

New house

50 Cardiff Rd

319 m away · 50 Cardiff Rd · Don Valley West

Approved 16 Oct 2025

1 new home · Behnam Amirghassemi

The permit lists 1 homes.

Proposal for a new 2 storey SFD-Detached

New house

29 Taunton Rd

337 m away · 29 Taunton Rd · Don Valley West

Approved 26 Sep 2025

1 new home · Michelle Basu Roy

The permit lists 1 homes.

Fire damage dwelling to be rebuilt from ground to third floor including front porch, a new walk out to be constructed, Existing basement/foundation walls and concrete slab-on-grade. Front porch concrete steps to remain

Show 21 moreShow fewer
New house

362 Soudan Ave

367 m away · 362 Soudan Ave · Don Valley West

Approved 22 Apr 2025

1 new home

The permit lists 1 homes.

Proposal for demolition of existing house and construction of new 3 storey detached single family dwelling and detached garage

Laneway suite

362 Soudan Ave

367 m away · 362 Soudan Ave · Don Valley West

Approved 3 Sep 2025

1 new home

The permit lists 1 homes.

2 storey wood frame garden suite with one car garage beneath

3 homes

134 Banff Rd

370 m away · 134 Banff Rd · Don Valley West

Approved 1 Dec 2025

3 new homes · 1001127633 Ontario Inc

The permit lists 3 homes.

Proposal to demolish existing dwelling and construct a new 2-storey 3-unit dwelling.

Multiple Unit Building

117 Broadway Ave

432 m away · 117 Broadway Ave · Toronto-St. Paul's

Approved 12 Dec 2025

Proposed construction of exterior raised wood deck platform c/w wood trellis & wood screen along with exterior counter feed from existing exterior base building services.

New house

44 Banff Rd

445 m away · 44 Banff Rd · Don Valley West

Approved 1 Apr 2026

1 new home · Jordan Tarshis

The permit lists 1 homes.

Proposal to construct a new 1 storey SFD-detached dwelling. Parts of existing dwelling to be underpinned and convert garage to livable space at rear.See also 25 214601 ZAP.

Apartment

110 Broadway Ave

483 m away · 110 Broadway Ave · Don Valley West

Approved 2 Feb 2026

869 new homes

The permit lists 869 homes.

Proposed construction of 26 Storey North Tower consisting of 352 Units & 37 Storey South Tower consisting of 506 Units with 2 Levels of U/G Parking. See permit 2020 201517 BLD 00 NB for 100 Broadway Ave for underground…

Multiple Unit Building

688 Mount Pleasant Rd

505 m away · 688 Mount Pleasant Rd · Toronto-St. Paul's

Approved 6 Nov 2026

Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty…

Apartment

18 Brownlow Ave

514 m away · 18 Brownlow Ave · Toronto-St. Paul's

Approved 23 Jun 2026

194 new homes

The permit lists 194 homes.

Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…

1 homes

176 Eglinton Ave E

515 m away · 176 Eglinton Ave E · Toronto-St. Paul's

Approved 9 Oct 2026

1 new home

The permit lists 1 homes.

Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.

Multiple Unit Building

100 Broadway Ave

517 m away · 100 Broadway Ave · Don Valley West

Approved 5 May 2026

Proposal for interior alterations to fit new tenant

Apartment

170 Roehampton Ave

531 m away · 170 Roehampton Ave · Toronto-St. Paul's

Approved 28 Jul 2026

599 new homes

The permit lists 599 homes.

Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.

Apartment

389 Cleveland St

540 m away · 389 Cleveland St · Don Valley West

Approved 24 Sep 2026

217 new homes

The permit lists 217 homes.

Proposal to construct a new 16-storey rental apartment building, with 217 residential units with (43 affordable housing), ground floor retail and 1 level of underground parking.See also 22 168174 NNY 14 SA and 25 209959…

Apartment

241 Redpath Ave

550 m away · 241 Redpath Ave · Don Valley West

Approved 10 Jul 2026

Part Permit - Proposal to demolish existing apartment building and construct a 38 storey apartment building containing 356 units of which 310 condominium apartments, 46 rental-replacement apartments interior and…

New house

45 McBain Ave

614 m away · 45 McBain Ave · Don Valley West

Approved 26 Jun 2025

Revision: changes to interior layout and windows

Apartment

109 Erskine Ave

626 m away · 109 Erskine Ave · Don Valley West

Approved 28 Oct 2025

Rev 02 Revision 01: To units on floors A208, A211, A212, A215, A217, A218, A220 - Gym area on the 2nd floor has been revised - Bike locker room configurations on the parking levels have been revised.Construct 22-storey…

New house

34 Rowley Ave

627 m away · 34 Rowley Ave · Don Valley West

Approved 23 May 2025

Devika Penekelapati

Revision 01 - interior alterations to basementProposed to demolish the existing single family dwelling and to build a new single family dwelling with integral garage.

New house

51 McBain Ave

637 m away · 51 McBain Ave · Don Valley West

Approved 20 Feb 2026

1 new home · Danclair Construction Ltd

The permit lists 1 homes.

Proposal to demolish existing 2 storey SFD, construct new 2 storey SFD

Mixed Use/res W Non Res

65 Broadway Ave

640 m away · 65 Broadway Ave · Toronto-St. Paul's

Approved 23 Jan 2025

Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.

New house

23 Hoyle Ave

700 m away · 23 Hoyle Ave · Don Valley West

Approved 24 Jun 2025

2 new homes · Lu Ye

The permit lists 2 homes.

Proposal to demolish existing 1 storey SFD, construct new 2 storey Duplex

Laneway suite

34 Hadley Rd

716 m away · 34 Hadley Rd · Don Valley West

Approved 17 Dec 2025

1 new home

The permit lists 1 homes.

Proposal to construct a new detached laneway suite.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

61 Brownlow Ave

428 m away · 61 Brownlow Ave · Toronto-St. Paul's

Approved 24 Sep 2025

Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)

Demolition

387 Cleveland St

541 m away · 387 Cleveland St · Don Valley West

Approved 8 Jan 2026

389 Cleveland Street Lp

Proposal to demolish 4 residential properties + church and office building and construct a new 14-storey mixed-use building..See also 25-171584 NNY 15 MV

Demolition

385 Cleveland St

543 m away · 385 Cleveland St · Don Valley West

Approved 8 Jan 2026

389 Cleveland Street Lp

Proposal to demolish 4 residential properties + church and office building and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV.See 25-210326 DEM @ 383 Cleveland

Show 19 moreShow fewer
Demolition

383 Cleveland St

544 m away · 383 Cleveland St · Don Valley West

Approved 8 Jan 2026

389 Cleveland Street Lp

Proposal to demolish 6 residential properties and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV

Demolition

503 Eglinton Ave E

567 m away · 503 Eglinton Ave E · Don Valley West

Approved 7 Jan 2026

389 Cleveland Street Lp

Proposal to demolish church and office building and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV

Demolition

51 McBain Ave

637 m away · 51 McBain Ave · Don Valley West

Approved 20 Feb 2026

Danclair Construction Ltd

Proposal to demolish existing 2 storey SFD, construct new 2 storey SFD

Demolition

589 Eglinton Ave E

744 m away · 589 Eglinton Ave E · Don Valley West

Approved 14 Jan 2026

Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct -storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB

Demolition

591 Eglinton Ave E

750 m away · 591 Eglinton Ave E · Don Valley West

Approved 14 Jan 2026

Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB

Demolition

63 Mann Ave

756 m away · 63 Mann Ave · Don Valley West

Approved 14 Jan 2026

Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB

Demolition

67 Mann Ave

758 m away · 67 Mann Ave · Don Valley West

Approved 14 Jan 2026

Bayview Investment Corp

Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB

Demolition

65 Mann Ave

758 m away · 65 Mann Ave · Don Valley West

Approved 14 Jan 2026

Bayview Investment Corp

Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB

Demolition

593 Eglinton Ave E

760 m away · 593 Eglinton Ave E · Don Valley West

Approved 14 Jan 2026

Bayvieweg Investment Corp

Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB

Demolition

61 Mann Ave

761 m away · 61 Mann Ave · Don Valley West

Approved 14 Jan 2026

Bayview Investment Corp

Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB

Demolition

595 Eglinton Ave E

764 m away · 595 Eglinton Ave E · Don Valley West

Approved 14 Jan 2026

Bayview Investment Corp

Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB

Demolition

1802 Bayview Ave

794 m away · 1802 Bayview Ave · Don Valley West

Approved 18 Jun 2026

Proposal to demolish the existing car wash to permit environmental remediation work for future development

Demolition

37 Blyth Hill Rd

838 m away · 37 Blyth Hill Rd · Don Valley West

Approved 11 Jul 2025

Eleonora Crystal

Proposal to demolish the existing 2 storey SFD-detached dwelling.

Demolition

68 Soudan Ave

870 m away · 68 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

66 Soudan Ave

874 m away · 66 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

64 Soudan Ave

880 m away · 64 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

62 Soudan Ave

885 m away · 62 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

60 Soudan Ave

890 m away · 60 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey dwelling for City Parkland Dedication

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

8 Brownlow Avenue (northwest Of Brownlow And Souda

526 m away · 8 Brownlow Ave · Toronto-St. Paul's

Allowed 1 May 2026 – 30 Oct 2026

Hours 7:00 a.m.–12:30 a.m.

Soudan-brownlow Properties

Continuous Concrete Pour

The One Seventy

531 m away · 170 Roehampton Ave · Toronto-St. Paul's

Allowed 7 Aug 2026 – 7 Feb 2027

Hours from 7:00 p.m.

Clark Construction Management Inc.

Show 4 moreShow fewer
Continuous Concrete Pour

241 Redpath

550 m away · 241 Redpath Ave · Don Valley West

Allowed 9 Sep 2026 – 31 Mar 2027

Hours from 7:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath

550 m away · 241 Redpath Ave · Don Valley West

Allowed 16 Oct 2026 – 26 Oct 2026

Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath Ave

550 m away · 241 Redpath Ave · Don Valley West

Allowed 2 Nov 2026 – 18 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Bluescape 241 Redpath Inc.

Construction

Yonge And Roselawn Project

1.0 km away · 2400 Yonge St · Eglinton-Lawrence

Allowed 1 Jan 2026 – 31 Dec 2026

Hours 6:00 a.m.–10:00 p.m.

Skygrid Construction Inc

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

355 Roehampton Ave

0 m away · 355 Roehampton Ave · Don Valley West

Asked 13 Jul 2020

Under Review

INACTIVE 1) Application to permit a 4 storey residential building with 8 parking spaces. 2) October 1, 2021: Revised application to permit a 4-storey, 14 unit residential apartment building with 14 vehicular parking spaces, 16 bicycle parking spaces, gross floor area of 1422.80 square metres, floor space index of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Angela Zhao · [email protected].

Site plan

368 Eglinton Ave E

75 m away · 368 Eglinton Ave E · Don Valley West

Asked 24 Dec 2019

Under Review

INACTIVE Site Plan Control Application to construct an 11-storey addition on the east side of the existing 13-storey, 148 unit rental apartment building. The proposed addition will contain 76 rental dwelling units with a total residential GFA of 5,045 square metres. When combined with the existing building, the total…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Marty Rokos · [email protected].

Rezoning

305 Roehampton Ave

118 m away · 305 Roehampton Ave · Don Valley West

Asked 3 Jul 2025

OMB Appeal

Redevelopment of 299 Roehampton Avenue with a new purpose-built rental apartment building with a shared 10-storey (33.3 metres) podium element and two towers with a total building height of 59-storeys (189.2 metres, inclusive of 7.0-metre mechanical penthouses). The proposal provides a total gross floor area (GFA) of…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Marian Prejel · [email protected].

Show 21 moreShow fewer
Subdivision

808 Mount Pleasant Rd

301 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's

Asked 8 Oct 2021

Under Review

2 lots

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

808 Mount Pleasant Rd

301 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's

Asked 27 Apr 2022

Under Review

Site Plan Approval for a 35-storey mixed-use building having a non-residential gross floor area of 1005 square metres, and a residential gross floor area of 31,514 square metres. 514 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Rezoning

808 Mount Pleasant Rd

301 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's

Asked 22 Nov 2024

OMB Appeal

Zoning By-law Amendment for a 61-storey mixed-use building with a height of 197.05 metres (excluding the mechanical penthouse). The proposed building will include approximately 812 square metres of non-residential Gross Floor Area and 49,040 square metres of residential gross floor area.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].

Rezoning

250 Roehampton Ave

341 m away · 250 Roehampton Ave · Toronto-St. Paul's

Asked 8 Dec 2025

Under Review

Zoning By-law Amendment for a 59-storey residential building with a height of 190 m (excluding the mechanical penthouse). The proposed redevelopment consists of a total gross floor area (GFA) of 48,233.4 sq. m., which results in a total Floor Space Index (FSI) of 15.37 times the area of the lot. The proposed…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

14 Elvina Gdns

362 m away · 14 Elvina Gdns · Don Valley West

Asked 4 Sep 2019

NOAC Issued

Site Plan Application for the development of 7 new dwelling units, consisting of 5 three-storey townhouse dwelling units, 2 new semi-detached dwellings, and the retention of the existing two-storey single detached dwelling (197 Erskine Avenue). A total of 12 underground parking spaces are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kathryn Moore · [email protected].

Site plan

733 Mount Pleasant Rd

362 m away · 733 Mount Pleasant Rd · Don Valley West

Asked 27 Oct 2020

NOAC Issued

Site Plan Control application to permit a 27-storey mixed use building containing 325 residential units and 258.7 square metres of retail gross floor area on the ground floor

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Diane Pi · [email protected].

Site plan

758 Mount Pleasant Rd

384 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's

Asked 5 Jul 2021

Under Review

Site Plan Approval for a 35-storey mixed-use building comprised of a 6-storey base building, and a 29-storey tower element. The proposed non-residential gross floor area is 208.37 square metres, and the proposed residential gross floor area is 28,692.73 square metres. A total of 398 residential dwelling units are…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Rezoning

758 Mount Pleasant Rd

384 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's

Asked 23 Apr 2026

Under Review

Zoning By-law Amendment application to allow for the development of a 56-storey mixed-use building comprised of a 4-storey podium and a 52-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 618 residential dwelling units.The site was subject to a…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Condominium plan

136 Broadway Ave

399 m away · 136 Broadway Ave · Don Valley West

Asked 4 Nov 2021

Under Review

*** Draft plan of condominium for 72 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Sina Zekria · [email protected].

Rezoning

732 Mount Pleasant Rd

403 m away · 732 Mount Pleasant Rd · Toronto-St. Paul's

Asked 17 Apr 2026

Under Review

Zoning By-law Amendment application to allow for the development of a 36-storey mixed-use building comprised of a 4-storey podium and a 32-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 396 residential dwelling units.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Rezoning

191 Eglinton Ave E

426 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Appeal Received

Rezoning for proposed 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle parking spaces.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Shane Taylor · [email protected].

Site plan

191 Eglinton Ave E

426 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 6 Mar 2025

Under Review

Site Plan approval application for a 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

61 Brownlow Ave

428 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 25 Aug 2021

NOAC Issued

Site Plan application to permit a residential building with two towers, 59 and 55 storeys , comprising 1,374 residential units, daycare facility and a gross floor area of 97,194 square metres. The proposal involves rental replacement.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Condominium plan

61 Brownlow Ave

428 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 10 Sep 2021

Under Review

*** Draft Plan of Standard Condominium to permit 384 residential units in a 35-storey residential building with a 2-level underground parking garage containing 69 vehicular parking spaces.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Cameron Williamson · [email protected].

Site plan

124 Broadway Ave

441 m away · 124 Broadway Ave · Don Valley West

Asked 11 Jun 2021

Under Review

Site Plan Control application for two residential towers with shared podium and facilities, at 36 storeys on 124 Broadway Avenue and 30 storeys on 136 Broadway Avenue. 860 dwelling units are proposed, including 206 units in the purpose built rental tower at 136 Broadway Ave to replace rental units from 124 and 136…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Marian Prejel · [email protected].

Condominium plan

124 Broadway Ave

441 m away · 124 Broadway Ave · Don Valley West

Asked 19 Oct 2021

Under Review

*** Draft Plan of Condominium for 459 condominium units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Sina Zekria · [email protected].

Site plan

181 Eglinton Ave E

450 m away · 181 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Under Review

Site Plan Application for proposed 21-storey buidling and three-levels of underground parking, excluding mechanical penthouse. The proposal includes 11,242.7 square metres of residential and 237.4 square metres of retail use. The building includes 139 unit and 23 vehicular parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Rezoning

216 Soudan Ave

514 m away · 216 Soudan Ave · Toronto-St. Paul's

Asked 13 Nov 2024

Under Review

Zoning By-law Amendment for a 45-storey purpose built rental residential building containing 527 new dwelling units, and a total of 32,900.29 sq. m of residential gross floor area (GFA).

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

18 Brownlow Ave

514 m away · 18 Brownlow Ave · Toronto-St. Paul's

Asked 23 Jul 2025

NOAC Issued

Site Plan Amendment to alter the development standards for the 21-storey residential building (previously approved under 23 152381 STE 12 SA), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor area and permitted projections, revising minimum setbacks…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Rezoning

544 Eglinton Ave E

527 m away · 544 Eglinton Ave E · Don Valley West

Asked 23 Jul 2025

OMB Appeal

OPA & Rezoning Application proposes the development of an 25-storey mixed-use building providing commercial use at grade. The building will provide a total of 256 residential units, with a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units.A paved access from Bruce Ave will be provided, leading to 2 levels of…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Rebecca Thompson · [email protected].