Opening this block

Home · Don Valley West · Mount Pleasant Rd

What's new around 667 Mount Pleasant Rd

667 Mount Pleasant Rd · Don Valley West. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Being built

The city has allowed these. Work may not have started. The permits in this area list 1938 homes.

Multiple Unit Building

688 Mount Pleasant Rd

55 m away · 688 Mount Pleasant Rd · Toronto-St. Paul's

Approved 6 Nov 2026

Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty…

New house

29 Taunton Rd

179 m away · 29 Taunton Rd · Don Valley West

Approved 26 Sep 2025

1 new home · Michelle Basu Roy

The permit lists 1 homes.

Fire damage dwelling to be rebuilt from ground to third floor including front porch, a new walk out to be constructed, Existing basement/foundation walls and concrete slab-on-grade. Front porch concrete steps to remain

Multiple Unit Building

598 Mount Pleasant Rd

215 m away · 598 Mount Pleasant Rd · Toronto-St. Paul's

Approved 24 Jul 2026

Rear addition. Commercial building. Ground floor medical office; second storey office

Show 21 moreShow fewer
Apartment

18 Brownlow Ave

219 m away · 18 Brownlow Ave · Toronto-St. Paul's

Approved 23 Jun 2026

194 new homes

The permit lists 194 homes.

Application to construct a 27 storey purpose built residential building with 194 dwelling units and 3 levels of below grade parking garage (Below grade connections to existing parking garage to the property to the west-…

Laneway suite

34 Hadley Rd

249 m away · 34 Hadley Rd · Don Valley West

Approved 17 Dec 2025

1 new home

The permit lists 1 homes.

Proposal to construct a new detached laneway suite.

New house

362 Soudan Ave

334 m away · 362 Soudan Ave · Don Valley West

Approved 22 Apr 2025

1 new home

The permit lists 1 homes.

Proposal for demolition of existing house and construction of new 3 storey detached single family dwelling and detached garage

Laneway suite

362 Soudan Ave

334 m away · 362 Soudan Ave · Don Valley West

Approved 3 Sep 2025

1 new home

The permit lists 1 homes.

2 storey wood frame garden suite with one car garage beneath

New house

131 Hillsdale Ave E

435 m away · 131 Hillsdale Ave E · Toronto-St. Paul's

Approved 23 Jul 2026

Nikan Sharif-zadeh

REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…

1 homes

176 Eglinton Ave E

443 m away · 176 Eglinton Ave E · Toronto-St. Paul's

Approved 9 Oct 2026

1 new home

The permit lists 1 homes.

Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.

New house

11 Oswald Cres

462 m away · 11 Oswald Cres · Toronto-St. Paul's

Approved 11 Sep 2026

2 new homes · 16230288 Canada Inc

The permit lists 2 homes.

TO CONSTRUCT A NEW TWO STOREY DUPLEX

Apartment

170 Roehampton Ave

577 m away · 170 Roehampton Ave · Toronto-St. Paul's

Approved 28 Jul 2026

599 new homes

The permit lists 599 homes.

Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage.

Apartment

413 Roehampton Ave

597 m away · 413 Roehampton Ave · Don Valley West

Approved 7 Aug 2026

Revision 01: See attached cover letter. Proposed construction of new 3-storey (28-units) residential condominium with 2-storey below grade (1-storey residential and 1-storey parking garage)

New house

12 Cuthbert Cres

600 m away · 12 Cuthbert Cres · Toronto-St. Paul's

Approved 20 May 2025

2 new homes

The permit lists 2 homes.

Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH

Multiple Unit Building

117 Broadway Ave

623 m away · 117 Broadway Ave · Toronto-St. Paul's

Approved 12 Dec 2025

Proposed construction of exterior raised wood deck platform c/w wood trellis & wood screen along with exterior counter feed from existing exterior base building services.

Laneway suite

281 Davisville Ave

628 m away · 281 Davisville Ave · Don Valley West

Approved 1 Dec 2025

1 new home

The permit lists 1 homes.

Proposed rear 2 storey laneway suite

4 homes

281 Davisville Ave

628 m away · 281 Davisville Ave · Don Valley West

Approved 31 Dec 2025

4 new homes · Modcity Construction Ltd

The permit lists 4 homes.

Proposed new construction of 4 unit detached dwelling (fourplex)

New house

44 Banff Rd

648 m away · 44 Banff Rd · Don Valley West

Approved 1 Apr 2026

1 new home · Jordan Tarshis

The permit lists 1 homes.

Proposal to construct a new 1 storey SFD-detached dwelling. Parts of existing dwelling to be underpinned and convert garage to livable space at rear.See also 25 214601 ZAP.

Multiple Unit Building

2191 Yonge St

690 m away · 2191 Yonge St · Toronto-St. Paul's

Approved 1 May 2026

Proposal for interior alterations to first floor and third floor amenities area

Apartment

110 Broadway Ave

695 m away · 110 Broadway Ave · Don Valley West

Approved 2 Feb 2026

869 new homes

The permit lists 869 homes.

Proposed construction of 26 Storey North Tower consisting of 352 Units & 37 Storey South Tower consisting of 506 Units with 2 Levels of U/G Parking. See permit 2020 201517 BLD 00 NB for 100 Broadway Ave for underground…

Multiple Unit Building

100 Broadway Ave

707 m away · 100 Broadway Ave · Don Valley West

Approved 5 May 2026

Proposal for interior alterations to fit new tenant

Mixed Use/res W Non Res

65 Broadway Ave

709 m away · 65 Broadway Ave · Toronto-St. Paul's

Approved 23 Jan 2025

Revision 01- as per cover letterProposal to construct 2, 39 storey residential towers with a daycare at grade and 4 levels of below grade parking.

Apartment

2161 Yonge St

718 m away · 2161 Yonge St · Toronto-St. Paul's

Approved 22 Jul 2025

31 new homes

The permit lists 31 homes.

REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

61 Brownlow Ave

238 m away · 61 Brownlow Ave · Toronto-St. Paul's

Approved 24 Sep 2025

Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)

Demolition

68 Soudan Ave

549 m away · 68 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Show 15 moreShow fewer
Demolition

66 Soudan Ave

553 m away · 66 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

64 Soudan Ave

559 m away · 64 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

62 Soudan Ave

564 m away · 62 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

60 Soudan Ave

569 m away · 60 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey dwelling for City Parkland Dedication

Demolition

295 Balliol St

743 m away · 295 Balliol St · Toronto-St. Paul's

Approved 7 Mar 2025

Demolish an existing 2-storey semi-detached building on the lands municipally known as 293-295 Balliol Street. The lands will be later improved with the construction of a residential apartment building as noted in the…

Demolition

383 Cleveland St

817 m away · 383 Cleveland St · Don Valley West

Approved 8 Jan 2026

389 Cleveland Street Lp

Proposal to demolish 6 residential properties and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV

Demolition

385 Cleveland St

820 m away · 385 Cleveland St · Don Valley West

Approved 8 Jan 2026

389 Cleveland Street Lp

Proposal to demolish 4 residential properties + church and office building and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV.See 25-210326 DEM @ 383 Cleveland

Demolition

387 Cleveland St

823 m away · 387 Cleveland St · Don Valley West

Approved 8 Jan 2026

389 Cleveland Street Lp

Proposal to demolish 4 residential properties + church and office building and construct a new 14-storey mixed-use building..See also 25-171584 NNY 15 MV

Demolition

503 Eglinton Ave E

853 m away · 503 Eglinton Ave E · Don Valley West

Approved 7 Jan 2026

389 Cleveland Street Lp

Proposal to demolish church and office building and construct a new 14-storey mixed-use building.See also 25-171584 NNY 15 MV

Demolition

180 Merton St

909 m away · 180 Merton St · Toronto-St. Paul's

Approved 4 Jun 2026

Proposed demolition of row of townhouses/buildings to accommodate proposed project for 45-storey mixed-use residential building - Re: 170/180 Merton St

Demolition

140 Merton St

924 m away · 140 Merton St · Toronto-St. Paul's

Approved 16 Mar 2026

The proposed development involves the demolition of the existing building and parking lot, and the construction of a 28-storey mixed use building with underground parking, outdoor amenity spaces, pedestrian walkways, a…

Demolition

21 Imperial St

1.0 km away · 21 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.

Demolition

25 Imperial St

1.0 km away · 25 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposed demolition of the existing 5-storey commercial building.

Demolition

39 Montgomery Ave

1.0 km away · 39 Montgomery Ave · Eglinton-Lawrence

Approved 4 Mar 2026

Proposal to demolish existing SFD with no replacement building for future Park Development

Demolition

34 Montgomery Ave

1.0 km away · 34 Montgomery Ave · Eglinton-Lawrence

Approved 6 May 2025

First Capital (king Liberty-barrymore) Corporation

Proposal to demolish the two-storey residential building.

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

8 Brownlow Avenue (northwest Of Brownlow And Souda

182 m away · 8 Brownlow Ave · Toronto-St. Paul's

Allowed 1 May 2026 – 30 Oct 2026

Hours 7:00 a.m.–12:30 a.m.

Soudan-brownlow Properties

Continuous Concrete Pour

The One Seventy

577 m away · 170 Roehampton Ave · Toronto-St. Paul's

Allowed 7 Aug 2026 – 7 Feb 2027

Hours from 7:00 p.m.

Clark Construction Management Inc.

Show 7 moreShow fewer
Construction

Canada Square Office Retrofit

766 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 10 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:00 p.m.

Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.

Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.

Ellisdon Corporation

Construction

Canada Square Office Retrofit

766 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 1 Nov 2026 – 30 Jun 2027

Hours from 7:00 p.m.

Ellisdon Corporation

Continuous Concrete Pour

241 Redpath

773 m away · 241 Redpath Ave · Don Valley West

Allowed 9 Sep 2026 – 31 Mar 2027

Hours from 7:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath

773 m away · 241 Redpath Ave · Don Valley West

Allowed 16 Oct 2026 – 26 Oct 2026

Hours 7:00 a.m.–10:00 p.m., 7:00 a.m.–9:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

241 Redpath Ave

773 m away · 241 Redpath Ave · Don Valley West

Allowed 2 Nov 2026 – 18 Nov 2026

Hours 7:00 a.m.–10:00 p.m.

Bluescape 241 Redpath Inc.

Continuous Concrete Pour

140 Merton Street Development

924 m away · 140 Merton St · Toronto-St. Paul's

Allowed 17 Nov 2026 – 17 May 2027

Hours 7:00 a.m.–11:59 p.m.

Ellisdon Residential Inc.

Construction

Yonge And Roselawn Project

1.0 km away · 2400 Yonge St · Eglinton-Lawrence

Allowed 1 Jan 2026 – 31 Dec 2026

Hours 6:00 a.m.–10:00 p.m.

Skygrid Construction Inc

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

216 Soudan Ave

143 m away · 216 Soudan Ave · Toronto-St. Paul's

Asked 13 Nov 2024

Under Review

Zoning By-law Amendment for a 45-storey purpose built rental residential building containing 527 new dwelling units, and a total of 32,900.29 sq. m of residential gross floor area (GFA).

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

733 Mount Pleasant Rd

177 m away · 733 Mount Pleasant Rd · Don Valley West

Asked 27 Oct 2020

NOAC Issued

Site Plan Control application to permit a 27-storey mixed use building containing 325 residential units and 258.7 square metres of retail gross floor area on the ground floor

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Diane Pi · [email protected].

Show 21 moreShow fewer
Rezoning

732 Mount Pleasant Rd

182 m away · 732 Mount Pleasant Rd · Toronto-St. Paul's

Asked 17 Apr 2026

Under Review

Zoning By-law Amendment application to allow for the development of a 36-storey mixed-use building comprised of a 4-storey podium and a 32-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 396 residential dwelling units.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

18 Brownlow Ave

219 m away · 18 Brownlow Ave · Toronto-St. Paul's

Asked 23 Jul 2025

NOAC Issued

Site Plan Amendment to alter the development standards for the 21-storey residential building (previously approved under 23 152381 STE 12 SA), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor area and permitted projections, revising minimum setbacks…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

758 Mount Pleasant Rd

227 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's

Asked 5 Jul 2021

Under Review

Site Plan Approval for a 35-storey mixed-use building comprised of a 6-storey base building, and a 29-storey tower element. The proposed non-residential gross floor area is 208.37 square metres, and the proposed residential gross floor area is 28,692.73 square metres. A total of 398 residential dwelling units are…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Rezoning

758 Mount Pleasant Rd

227 m away · 758 Mount Pleasant Rd · Toronto-St. Paul's

Asked 23 Apr 2026

Under Review

Zoning By-law Amendment application to allow for the development of a 56-storey mixed-use building comprised of a 4-storey podium and a 52-storey tower element. The proposed building includes approximately 65 square metres of non-reisdential space at grade and 618 residential dwelling units.The site was subject to a…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Site plan

61 Brownlow Ave

238 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 25 Aug 2021

NOAC Issued

Site Plan application to permit a residential building with two towers, 59 and 55 storeys , comprising 1,374 residential units, daycare facility and a gross floor area of 97,194 square metres. The proposal involves rental replacement.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Condominium plan

61 Brownlow Ave

238 m away · 61 Brownlow Ave · Toronto-St. Paul's

Asked 10 Sep 2021

Under Review

*** Draft Plan of Standard Condominium to permit 384 residential units in a 35-storey residential building with a 2-level underground parking garage containing 69 vehicular parking spaces.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Cameron Williamson · [email protected].

Site plan

158 Soudan Ave

292 m away · 158 Soudan Ave · Toronto-St. Paul's

Asked 26 Mar 2025

Under Review

Site Plan Control for a 56-storey residential tower that will have a total of 46,547 square metres of residential gross floor area ("GFA") and a total of 674 total dwelling units (including the 13 required rental replacement units). See Related Rezoning file (25 135273 STE 12 OZ) Jan 2026 Revised Submission - Zoning…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Site plan

551 Mount Pleasant Rd

303 m away · 551 Mount Pleasant Rd · Don Valley West

Asked 3 Feb 2023

Under Review

Proposal to fully renovate and partially reconstruct the existing theatre. The existing historic front (west) facade fronting on Mount Pleasant Road will be retained. Construction plans include a new roof, full/new excavated basement, replacing the north, east and south walls, and full interior renovation. A new, 3…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Diane Pi · [email protected].

Rezoning

191 Eglinton Ave E

341 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Appeal Received

Rezoning for proposed 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle parking spaces.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Shane Taylor · [email protected].

Site plan

191 Eglinton Ave E

341 m away · 191 Eglinton Ave E · Toronto-St. Paul's

Asked 6 Mar 2025

Under Review

Site Plan approval application for a 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

181 Eglinton Ave E

346 m away · 181 Eglinton Ave E · Toronto-St. Paul's

Asked 14 Jul 2022

Under Review

Site Plan Application for proposed 21-storey buidling and three-levels of underground parking, excluding mechanical penthouse. The proposal includes 11,242.7 square metres of residential and 237.4 square metres of retail use. The building includes 139 unit and 23 vehicular parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Subdivision

808 Mount Pleasant Rd

395 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's

Asked 8 Oct 2021

Under Review

2 lots

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

808 Mount Pleasant Rd

395 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's

Asked 27 Apr 2022

Under Review

Site Plan Approval for a 35-storey mixed-use building having a non-residential gross floor area of 1005 square metres, and a residential gross floor area of 31,514 square metres. 514 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Rezoning

808 Mount Pleasant Rd

395 m away · 808 Mount Pleasant Rd · Toronto-St. Paul's

Asked 22 Nov 2024

OMB Appeal

Zoning By-law Amendment for a 61-storey mixed-use building with a height of 197.05 metres (excluding the mechanical penthouse). The proposed building will include approximately 812 square metres of non-residential Gross Floor Area and 49,040 square metres of residential gross floor area.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].

Rezoning

305 Roehampton Ave

455 m away · 305 Roehampton Ave · Don Valley West

Asked 3 Jul 2025

OMB Appeal

Redevelopment of 299 Roehampton Avenue with a new purpose-built rental apartment building with a shared 10-storey (33.3 metres) podium element and two towers with a total building height of 59-storeys (189.2 metres, inclusive of 7.0-metre mechanical penthouses). The proposal provides a total gross floor area (GFA) of…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Marian Prejel · [email protected].

Site plan

368 Eglinton Ave E

457 m away · 368 Eglinton Ave E · Don Valley West

Asked 24 Dec 2019

Under Review

INACTIVE Site Plan Control Application to construct an 11-storey addition on the east side of the existing 13-storey, 148 unit rental apartment building. The proposed addition will contain 76 rental dwelling units with a total residential GFA of 5,045 square metres. When combined with the existing building, the total…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Marty Rokos · [email protected].

Site plan

160 Eglinton Ave E

478 m away · 160 Eglinton Ave E · Toronto-St. Paul's

Asked 11 Apr 2022

Under Review

Site Plan application to permit a 61-storey multi-tower mixed use building with a maximum gross floor area of 90,000 square metres, 201 parking spaces, 1,329 bicycle parking spaces, and a north-south midblock connection.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Subdivision

150 Eglinton Ave E

491 m away · 150 Eglinton Ave E · Toronto-St. Paul's

Asked 16 Sep 2021

Under Review

Draft Plan of Subdivision for the creation of 5 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Rezoning

250 Roehampton Ave

512 m away · 250 Roehampton Ave · Toronto-St. Paul's

Asked 8 Dec 2025

Under Review

Zoning By-law Amendment for a 59-storey residential building with a height of 190 m (excluding the mechanical penthouse). The proposed redevelopment consists of a total gross floor area (GFA) of 48,233.4 sq. m., which results in a total Floor Space Index (FSI) of 15.37 times the area of the lot. The proposed…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

355 Roehampton Ave

512 m away · 355 Roehampton Ave · Don Valley West

Asked 13 Jul 2020

Under Review

INACTIVE 1) Application to permit a 4 storey residential building with 8 parking spaces. 2) October 1, 2021: Revised application to permit a 4-storey, 14 unit residential apartment building with 14 vehicular parking spaces, 16 bicycle parking spaces, gross floor area of 1422.80 square metres, floor space index of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Angela Zhao · [email protected].

Rezoning

120 Eglinton Ave E

547 m away · 120 Eglinton Ave E · Toronto-St. Paul's

Asked 30 Apr 2025

OMB Appeal

The redevelopment proposes a 70-storey mixed-use building with 187.4 sq. m. of retail space at-grade and 555 residential dwelling units above, resulting in a total gross floor area (GFA) of 39,275.7 sq. m., a total Floor Space Index (FSI) of 26.06, pursuant to GFA calculations under By-law 569-2013.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Shane Taylor · [email protected].