Relax Lounge
0 m away · 326 Parliament St · Toronto Centre
Approved 2 Apr 2026
Opening this block
Home · Toronto Centre · Parliament St
326 Parliament St · Toronto Centre. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
0 m away · 326 Parliament St · Toronto Centre
Approved 2 Apr 2026
164 m away · 272 Parliament St · Toronto Centre
Approved 22 Sep 2025
258 m away · 242 Parliament St · Toronto Centre
Approved 16 Dec 2025
263 m away · 296A Gerrard St E · Toronto Centre
Approved 10 Feb 2026
273 m away · 234 Parliament St · Toronto Centre
Approved 19 Nov 2025
273 m away · 234 Parliament St · Toronto Centre
Approved 21 Jul 2026
273 m away · 234 Parliament St · Toronto Centre
Approved 11 Oct 2026
280 m away · 405 Parliament St · Toronto Centre
Approved 11 Aug 2026
293 m away · 346 Dundas St E · Toronto Centre
Approved 3 Sep 2025
317 m away · 245 Gerrard St E · Toronto Centre
Approved 12 Jul 2025
352 m away · 246 Gerrard St E · Toronto Centre
Approved 13 May 2026
359 m away · 585 Dundas St E · Toronto Centre
Approved 3 Mar 2026
368 m away · 428 Parliament St · Toronto Centre
Approved 6 Jul 2026
378 m away · 430 Parliament St · Toronto Centre
Approved 28 Jul 2026
379 m away · 432 Parliament St · Toronto Centre
Approved 24 Jun 2026
383 m away · 434 Parliament St · Toronto Centre
Approved 30 Apr 2026
426 m away · 220 Gerrard St E · Toronto Centre
Approved 11 May 2026
436 m away · 236 Sherbourne St · Toronto Centre
Approved 28 Aug 2025
441 m away · 457 Parliament St · Toronto Centre
Approved 15 Oct 2026
446 m away · 459 Parliament St · Toronto Centre
Approved 7 Aug 2025
453 m away · 181 Parliament St · Toronto Centre
Approved 26 Sep 2025
453 m away · 181 Parliament St · Toronto Centre
Approved 9 Mar 2026
453 m away · 181 Parliament St · Toronto Centre
Approved 7 Apr 2026
453 m away · 181 Parliament St · Toronto Centre
Approved 15 May 2026
A permit application that names a shop. It is not a licence and not an opening day.
500 m away · 412 Queen St E · Toronto Centre
Applied 7 Jul 2026
Permit Issued
Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance…
509 m away · 650 Dundas St E · Toronto Centre
Applied 10 Nov 2026
Not Started
REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.
820 m away · 25 Ontario St · Toronto Centre
Applied 23 Jan 2026
Revision Issued
Rev 05 - Remove slab opening and associated stairs from level 23.REV: ADD FLOOR 12 AND 13 BACK INTO INITIAL PERMIT 22-115404, PER BUILDING INSPECTOR REQUEST, SEE COVER LETTER IN BLD DWGS.Proposal for interior…
898 m away · 351 King St E · Toronto Centre
Applied 16 Jan 2026
Inspection
Proposal to construct a demising wall in existing office space - UNIT 301, "Scotia Bank"
1.0 km away · 355 Church St · Toronto Centre
Applied 30 Oct 2026
Not Started
REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
1.0 km away · 99 Queen St E · Toronto Centre
Applied 27 Aug 2025
Inspection
Proposal for interior alterations to existing office space - FLOOR 4, "PUBLICIS RE:SOURCES"Convenience address is 111 Queen St E
The city has allowed these. Work may not have started. The permits in this area list 1970 homes.
170 m away · 393 Dundas St E · Toronto Centre
Approved 12 Nov 2026
Conditional Permit - Site Service - Proposing to construct a slab-on-grade, 4-storey plus mechanical penthouse and roof deck, 12 unit affordable housing residential building
282 m away · 261 Gerrard St E · Toronto Centre
Approved 27 Jun 2025
1 new home
The permit lists 1 homes.
Proposal for interior alterations.
321 m away · 237 Gerrard St E · Toronto Centre
Approved 4 Feb 2025
Proposal for administrative party wall permit for work on first, second, and thirdfloor party wall adjacent to work pursuant next door for 24137315 BLD 00 BA (391 ONTARIO ST)
359 m away · 585 Dundas St E · Toronto Centre
Approved 6 Aug 2026
REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for tenant fit up
368 m away · 227 Gerrard St E · Toronto Centre
Approved 27 Oct 2025
116 new homes
The permit lists 116 homes.
Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage
379 m away · 9 Spruce St · Toronto Centre
Approved 12 Nov 2026
1 new home
The permit lists 1 homes.
Proposal to construct a new laneway suite (Unit # R)
404 m away · 222 Gerrard St E · Toronto Centre
Approved 16 Jan 2026
Rev 01: changes to add underpinning of basement stair and structural changes due to site conditionsProposal for interior and exterior alterations to construct a new dental clinic on the basement and ground floor and a…
405 m away · 620 Dundas St E · Toronto Centre
Approved 26 Sep 2025
Proposed interior alteration to create a studio space for the Randolph College for the Performing Arts within the Daniels Artworks mixed-use condominium development located in Toronto's Regent Park. (688 Dundas St E is…
454 m away · 307 Sherbourne St · Toronto Centre
Approved 7 Nov 2025
Conditional Permit - Proposal to construct a 18 storey residential apartment building with 223 rental dwelling units and one level of basement.
467 m away · 294 Sherbourne St · Toronto Centre
Approved 30 Oct 2026
REV 03: Revised sprinkler drawings.REV 02: Revision to permit, changes related to basement level, revised exit sign, added pull station to east door, added enter phone to east door, and added pull station to east door…
472 m away · 314 Queen St E · Toronto Centre
Approved 11 Sep 2026
Demolish rear yard deteriorated stand alone building extension. The rear wall of the original building shall remain intact (addition was not connected to the existing building).
515 m away · 209 Carlton St · Toronto Centre
Approved 2 Feb 2026
4 new homes
The permit lists 4 homes.
Proposal for interior alteration and addition to change the vacant residential semi detached house to a supportive housing (residential and ancillary office) building
532 m away · 154 Shuter St · Toronto Centre
Approved 14 Sep 2026
Proposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes…
586 m away · 150 Sherbourne St · Toronto Centre
Approved 2 Feb 2026
Conditional Permit - Part Permit - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter
692 m away · 261 Jarvis St · Toronto Centre
Approved 28 Apr 2026
Proposed underground garage isolated repairs
726 m away · 83 River St · Toronto Centre
Approved 13 Oct 2026
Conditional Permit - Part Permit - Proposal to construct a 37 Storey residential condominium with 3 levels of underground parking, retail on grade, and various amenity spaces.
742 m away · 49 Ontario St · Toronto Centre
Approved 14 Oct 2026
1226 new homes
The permit lists 1226 homes.
Construction of two buildings of 46 and 50 storeys with underground parking garage (245 affordable housing units) and townhouses
743 m away · 78 Berkeley St · Toronto Centre
Approved 10 Oct 2025
Proposal for partial demoltion to the rear of building and convert to a shell office use.
746 m away · 76 Berkeley St · Toronto Centre
Approved 10 Oct 2025
Proposal for partial demoltion to the rear of building and convert to a shell office use.
751 m away · 74 Berkeley St · Toronto Centre
Approved 10 Oct 2025
Proposal for partial demoltion to the rear of building and convert to a shell office use.
756 m away · 72 Berkeley St · Toronto Centre
Approved 9 Oct 2025
Proposal for partial demoltion to the rear of building and convert to a shell office use.
758 m away · 549 Parliament St · Toronto Centre
Approved 20 Oct 2026
Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator…
791 m away · 334 King St E · Toronto Centre
Approved 9 Jul 2026
Proposal for interior alteration on the ground floor for an appliance showroom
815 m away · 134 Carlton St · Toronto Centre
Approved 21 Nov 2025
11 new homes
The permit lists 11 homes.
Creation of 10 new rental units in the basement and one on the ground floor of an existing apartment building.
The city has allowed these buildings to come down. They may still be standing.
330 m away · 295 Sackville St · Toronto Centre
Approved 8 May 2026
Proposal for full building demolition and backfill to grade
357 m away · 319 Sackville St · Toronto Centre
Approved 8 May 2026
Proposal to demolish the existing building and backfill to grade
377 m away · 361 Gerrard St E · Toronto Centre
Approved 8 May 2026
Proposal for demolition of existing building and backfill to grade
429 m away · 415 Gerrard St E · Toronto Centre
Approved 8 May 2026
Proposal to demolish the existing building and backfill to grade
430 m away · 407 Gerrard St E · Toronto Centre
Approved 8 May 2026
Proposal for full building demolition and backfill to grade
475 m away · 260 Sumach St · Toronto Centre
Approved 8 May 2026
Proposal for demolition of existing building and backfill to grade
493 m away · 427 Gerrard St E · Toronto Centre
Approved 8 May 2026
Proposal for full building demolition and backfill to grade
504 m away · 266 Sumach St · Toronto Centre
Approved 8 May 2026
Proposal for full building demolition and backfill to grade
609 m away · 212 Dundas St E · Toronto Centre
Approved 6 Jul 2026
Proposal to demolish the existing 4 storey commercial building with the retention of the exterior street facing facade of the Filmore Hotel building.See 20 151363 STE 13 SA for future proposal.
702 m away · 121 River St · Toronto Centre
Approved 4 May 2026
Proposal to demolish the existing single family dwelling (townhouse). See 21 236273 BLD for future development (mixed use condo).
703 m away · 119 River St · Toronto Centre
Approved 4 May 2026
Proposal to demolish the existing 2 storey mixed use building containing one (1) three-bedroom rental dwelling unit and one (1) retail unit;See 21 236273 BLD for future development (mixed use condo).
704 m away · 117 River St · Toronto Centre
Approved 4 May 2026
Proposal to demolish the existing mixed-use building containing one (1) owner-occupied residential dwelling unit, one (1) one-bedroom rental dwelling unit and one (1) retail unit.See 21 236273 BLD for future development…
704 m away · 113 River St · Toronto Centre
Approved 4 May 2026
Proposal to demolish the existing single family dwelling (townhouse). See 21 236273 BLD for future development (mixed use condo).
708 m away · 123 River St · Toronto Centre
Approved 4 May 2026
Proposal to demolish the existing 2 storey single family dwelling containing one (1) three-bedroom rental dwelling unit.See 21 236273 BLD for future development (mixed use condo).
710 m away · 125 River St · Toronto Centre
Approved 4 May 2026
Proposal to demolish the existing mixed-use building containing one (1) owner¿occupied residential dwelling unit and one (1) commercial unit.See 21 236273 BLD for future development (mixed use condo).
Hours the city has already allowed.
299 m away · 325 Gerrard St E · Toronto Centre
Allowed 1 Apr 2026 – 1 Apr 2027
Hours 6:00 a.m.–11:00 p.m.
Metro Toronto Housing Corporation
299 m away · 325 Gerrard St E · Toronto Centre
Allowed 24 Aug 2026 – 28 Feb 2027
Hours from 6:00 a.m.
Deltera Contracting Inc
405 m away · 620 Dundas St E · Toronto Centre
Allowed 24 Oct 2026
Hours 1:00 p.m.–3:00 p.m.
Setup 24 Oct 2026, 10:00 a.m.–12:59 p.m.
Tear down 24 Oct 2026, 3:01 p.m.–5:00 p.m.
Fred Victor Centre
494 m away · 300 Sherbourne St · Toronto Centre
Allowed 2 Sep 2026 – 31 Dec 2026
Hours 7:00 a.m.–7:00 p.m.
Reliance Construction Inc.
701 m away · 19 Horticultural Ave · Toronto Centre
Allowed 6 Nov 2026
Hours 6:00 p.m.–12:00 p.m.
Setup 6 Nov 2026, 2:00 p.m.–6:00 p.m.
Tear down 7 Nov 2026, from 1:00 a.m.
Friends Of Allan Gardens
726 m away · 83 River St · Toronto Centre
Allowed 28 Sep 2026 – 28 Mar 2027
Hours from 7:00 a.m., from 9:00 a.m.
Labatt River Developments Inc.
742 m away · 49 Ontario St · Toronto Centre
Allowed 12 May 2026 – 12 Nov 2026
Hours 7:00 a.m.–10:00 p.m.
Dcc 49 Ontario East Inc.
742 m away · 49 Ontario St · Toronto Centre
Allowed 30 Sep 2026 – 5 Sep 2027
Hours 7:00 a.m.–10:00 p.m.
Dcc 49 Ontario East Inc.
1.0 km away · 55 Eastern Ave · Toronto Centre
Allowed 12 Aug 2026 – 15 Jul 2027
Hours 7:00 p.m.–9:00 p.m., 7:00 a.m.–9:00 a.m.
Multiplex Construction Canada Limited
On the city's calendar. Check before you go.
449 m away · 640 Dundas St E · Toronto Centre
On 16 Nov 2026 – 25 Nov 2026
Free · Listed days only
Check out a free recreation centre in person, meet your neighbours if you live nearby and learn more about who is eligib
Event pageAdd to calendar541 m away · 83 Power St · Toronto Centre
On 15 Nov 2026
The Axios Men’s Ensemble, in celebration of their historic Juno award, for Classical Album of the Year (Large Ensemble)
Event pageAdd to calendar701 m away · 19 Horticultural Ave · Toronto Centre
On 14 Nov 2026 – 6 Feb 2027
Free · Listed days only
Celebrate local food, community, and sustainable agriculture. Discover fresh produce, artisanal products, and small-scal
Event pageAdd to calendar701 m away · 19 Horticultural Ave · Toronto Centre
On 6 Dec 2026
Free
Spread the holiday cheer and support small businesses at the Allan Gardens Holiday Market. Discover local vendors, holid
Event pageAdd to calendar848 m away · 80 Sherbourne St · Toronto Centre
On 21 Nov 2026
You are warmly invited to join us for an evening of interactive musical mantra meditation (kirtan). Kirtan is a call-and
Event pageAdd to calendar878 m away · 80 Gould St · Toronto Centre
On 1 Dec 2026
Free
In this keynote lecture, Dr. Drew Thompson introduces the questions and themes that guide the Black History of Photograp
Event pageAdd to calendar934 m away · 80 Gerrard St E · Toronto Centre
On 14 Nov 2026 – 28 Nov 2026
Free · Listed days only
A show from curator Deborah Harris, who has gathered artists' works including several drawings by E.J. Gold. Voyage thr
Event pageAdd to calendarSomeone has asked the city for a change. Nothing here is a decision.
149 m away · 401 Dundas St E · Toronto Centre
Asked 18 Oct 2021
Under Review
Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 291.6 square metres, and a residential gross floor area of 8518.90 square metres. A total of 137 residential dwelling units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
298 m away · 306 Gerrard St E · Toronto Centre
Asked 26 May 2026
Under Review
Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
299 m away · 325 Gerrard St E · Toronto Centre
Asked 20 Apr 2022
OMB Appeal
Zoning By-law Amendment application for Phases 4 & 5 of the Regent Park redevelopment. The Phases 4 & 5 lands are generally bounded by Gerrard Street to the north, River Street to the east, Oak Street to the south, and Dreamers Way to the west. The proposal consists of a total gross floor area (GFA) of 320,064 m2…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
299 m away · 325 Gerrard St E · Toronto Centre
Asked 13 Jan 2025
NOAC Issued
Building 4A Proposal to construct a 26-storey tower, 10 storey mid-rise podium TCHC social housing building with 271 units, retail at grade along Gerrard Street East, community space on the ground floor and mezzanine, with one level of underground parking.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
387 m away · 201 Sherbourne St · Toronto Centre
Asked 30 Dec 2024
Under Review
Site Plan application to permit two tall buildings (39- and 40-storeys), containing 693 new residential dwelling units, 525 square metres of non-residential space, and a new public park.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
401 m away · 213 Gerrard St E · Toronto Centre
Asked 4 Jul 2025
Under Review
Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
447 m away · 214 Sherbourne St · Toronto Centre
Asked 16 Sep 2022
Under Review
Site Plan Control application to construct a 47-storey tower with a 6-storey prodium containing 66 parking spaces in two levels of below grade parking, 619 dwelling units and a total gross floor area of 41,195.99 square metres, including 481 square metres of community space. The proposal will retain in-situ the…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
454 m away · 307 Sherbourne St · Toronto Centre
Asked 21 Aug 2018
NOAC Issued
Site Plan Control application for a 15-storey residential building consisting of 192 residential units with a total gross floor area of 7,853 square metres, 4 parking spaces.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
467 m away · 294 Sherbourne St · Toronto Centre
Asked 26 Oct 2021
Under Review
*** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
513 m away · 351 Queen St E · Toronto Centre
Asked 28 Jun 2021
NOAC Issued
Site Plan Application for a 28-storey mixed-use development with 526 units, 448 square metres of parkland, 1,350 square metres of non-residential gross floor area, and one level of underground parking.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
530 m away · 301 Queen St E · Toronto Centre
Asked 25 May 2016
Under Review
INACTIVE Site Plan application for a 25-storey mixed-use building: 206 dwelling units, 6 levels of below-grade parking, total combined GFA 15,711 sq. m.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
556 m away · 239 Dundas St E · Toronto Centre
Asked 18 Mar 2022
Under Review
Site Plan Approval application to facilitate the redevelopment of the site for a 49-storey mixed-use building having a non-residential gross floor area of 198.40 square metres, and a residential gross floor area of 41,363.20 square metres. 678 residential dwelling units are proposed, of which, 8 are rental replacement…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
568 m away · 161 Parliament St · Toronto Centre
Asked 7 Nov 2021
Under Review
Draft Plan of subdivision for 3 blocks.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
573 m away · 218 Dundas St E · Toronto Centre
Asked 28 Sep 2021
Under Review
Site Plan Approval application for a 44-storey mixed-use building comprised of 32,829 square metres of gross floor area including 542 residential dwelling units.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
573 m away · 218 Dundas St E · Toronto Centre
Asked 25 Oct 2021
Under Review
*** Draft Plan of Condominium for 495 units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
586 m away · 150 Sherbourne St · Toronto Centre
Asked 17 Mar 2023
Under Review
Proposed underground transit station for the Ontario Line at Moss Park.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
586 m away · 150 Sherbourne St · Toronto Centre
Asked 19 Jan 2024
Under Review
Site Plan Control application for a 7,544.3 square metres City of Toronto community centre to replace the existing John Innes Community Centre.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
590 m away · 505 Parliament St · Toronto Centre
Asked 17 Mar 2023
OMB Appeal
Zoning By-law Amendment law to permit the development of site for a 10-storey mixed-use building (38.6 metres) with retail at-grade (278 square metres) and 60 dwelling units. The western (Parliament Street) elevation of the existing 1½ storey listed heritage building at 509 Parliament Street is proposed to be…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
600 m away · 494 Richmond St E · Toronto Centre
Asked 12 Jul 2023
Under Review
The Proposed Development will consist of approximately 35,250 square metres of total gross floor area, including about 400 square metres of commercial uses at-grade, for a total FSI of 10.1. Residential uses are located in the podium and towers above grade and will total 588 dwelling units.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
614 m away · 309 George St · Toronto Centre
Asked 15 Oct 2025
Under Review
Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal would replace the existing Seaton House men's shelter. For more information…
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
639 m away · 134 Parliament St · Toronto Centre
Asked 14 Aug 2023
OMB Appeal
Site Plan Application for a 46 storey (156.3 metres including mechanical penthouse) mixed-use building with 419 dwelling units and 328 square metres of commercial uses at grade.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
660 m away · 75 Ontario St · Toronto Centre
Asked 8 Nov 2021
Under Review
*** Draft plan of standard condominium for 354 dwelling units, 76 parking spaces, in a proposed 38-storey mixed-use building.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
660 m away · 75 Ontario St · Toronto Centre
Asked 11 Aug 2023
OMB Appeal
Site Plan Application for a 43-storey mixed-use building that includes 278 square metres of retail space on the ground floor and 380 dwelling units above.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
668 m away · 471 Queen St E · Toronto Centre
Asked 8 Nov 2021
Under Review
*** 143 dwelling units, 33 parking spaces*There is a concurrent Zoning By-law Amendment application which is currently under review/appeal
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.