Opening this block

Home · Toronto Centre · Gerrard St E

What's new around 220 Gerrard St E

220 Gerrard St E · Toronto Centre. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Gerstein Crisis Centre

628 m away · 355 Church St · Toronto Centre

Applied 30 Oct 2026

Not Started

REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

Permit application

Taco Bell

864 m away · 650 Dundas St E · Toronto Centre

Applied 10 Nov 2026

Not Started

REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

Permit application

Brother Joseph Dooley Apartments

910 m away · 412 Queen St E · Toronto Centre

Applied 7 Jul 2026

Permit Issued

Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance…

Being built

The city has allowed these. Work may not have started. The permits in this area list 740 homes.

Multiple Unit Building

222 Gerrard St E

26 m away · 222 Gerrard St E · Toronto Centre

Approved 16 Jan 2026

Rev 01: changes to add underpinning of basement stair and structural changes due to site conditionsProposal for interior and exterior alterations to construct a new dental clinic on the basement and ground floor and a…

Apartment

227 Gerrard St E

58 m away · 227 Gerrard St E · Toronto Centre

Approved 27 Oct 2025

116 new homes

The permit lists 116 homes.

Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage

Apartment

307 Sherbourne St

101 m away · 307 Sherbourne St · Toronto Centre

Approved 7 Nov 2025

Conditional Permit - Proposal to construct a 18 storey residential apartment building with 223 rental dwelling units and one level of basement.

Show 21 moreShow fewer
Multiple Unit Building

237 Gerrard St E

117 m away · 237 Gerrard St E · Toronto Centre

Approved 4 Feb 2025

Proposal for administrative party wall permit for work on first, second, and thirdfloor party wall adjacent to work pursuant next door for 24137315 BLD 00 BA (391 ONTARIO ST)

Student Residence

294 Sherbourne St

182 m away · 294 Sherbourne St · Toronto Centre

Approved 30 Oct 2026

REV 03: Revised sprinkler drawings.REV 02: Revision to permit, changes related to basement level, revised exit sign, added pull station to east door, added enter phone to east door, and added pull station to east door…

1 homes

261 Gerrard St E

184 m away · 261 Gerrard St E · Toronto Centre

Approved 27 Jun 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations.

4 homes

209 Carlton St

237 m away · 209 Carlton St · Toronto Centre

Approved 2 Feb 2026

4 new homes

The permit lists 4 homes.

Proposal for interior alteration and addition to change the vacant residential semi detached house to a supportive housing (residential and ancillary office) building

Laneway suite

9 Spruce St

359 m away · 9 Spruce St · Toronto Centre

Approved 12 Nov 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new laneway suite (Unit # R)

Apartment

134 Carlton St

392 m away · 134 Carlton St · Toronto Centre

Approved 21 Nov 2025

11 new homes

The permit lists 11 homes.

Creation of 10 new rental units in the basement and one on the ground floor of an existing apartment building.

Apartment

393 Dundas St E

407 m away · 393 Dundas St E · Toronto Centre

Approved 12 Nov 2026

Conditional Permit - Site Service - Proposing to construct a slab-on-grade, 4-storey plus mechanical penthouse and roof deck, 12 unit affordable housing residential building

Multiple Unit Building

130 Carlton St

446 m away · 130 Carlton St · Toronto Centre

Approved 16 Dec 2025

Proposal to construct new storage room is existing parking spot. Parking spot located in underground parking garage

Multiple Unit Building

261 Jarvis St

514 m away · 261 Jarvis St · Toronto Centre

Approved 28 Apr 2026

Proposed underground garage isolated repairs

15 homes

344 Jarvis St

523 m away · 344 Jarvis St · Toronto Centre

Approved 12 Jan 2026

15 new homes · 2459024 Ontario Inc

The permit lists 15 homes.

Proposal to alter the existing two-and-one-half-storey semi-detached rooming house by constructing a 3 storey rear addition; underpinning. 12 new rooms to be added (4 accessible at ground floor)

Multiple Unit Building

549 Parliament St

560 m away · 549 Parliament St · Toronto Centre

Approved 20 Oct 2026

Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator…

Multiple Unit Building

154 Shuter St

614 m away · 154 Shuter St · Toronto Centre

Approved 14 Sep 2026

Proposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes…

Multiple Unit Building

620 Dundas St E

694 m away · 620 Dundas St E · Toronto Centre

Approved 26 Sep 2025

Proposed interior alteration to create a studio space for the Randolph College for the Performing Arts within the Daniels Artworks mixed-use condominium development located in Toronto's Regent Park. (688 Dundas St E is…

Transit Station,subway, Bus Terminal

150 Sherbourne St

706 m away · 150 Sherbourne St · Toronto Centre

Approved 2 Feb 2026

Conditional Permit - Part Permit - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter

Mixed Use/res W Non Res

241 Church St

730 m away · 241 Church St · Toronto Centre

Approved 6 Oct 2025

Conditional Permit - Drain - Proposal to construct a new 53 storey mixed use building with 591 dwelling units, 4 levels of below grade parking garage and retail on the ground floor. See also 22 195181 DEM and 21 206338…

Apartment

241 Church St

730 m away · 241 Church St · Toronto Centre

Approved 30 Sep 2026

591 new homes

The permit lists 591 homes.

Proposal to construct a new 53 storey mixed use building with 591 dwelling units, 2 levels of below grade parking garage and retail on the ground floor. See also 22 195181 DEM and 21 206338 STE 13 SA

Multiple Unit Building

585 Dundas St E

747 m away · 585 Dundas St E · Toronto Centre

Approved 6 Aug 2026

REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for tenant fit up

Laneway suite

66 Amelia St

773 m away · 66 Amelia St · Toronto Centre

Approved 26 Sep 2025

1 new home

The permit lists 1 homes.

Proposal to construct a laneway suite behind existing 4plex.

Multiple Unit Building

461 Sackville St

804 m away · 461 Sackville St · Toronto Centre

Approved 3 Feb 2025

Phase 2: to construct interior alterations for Day Nursery.

Multiple Unit Building

314 Queen St E

811 m away · 314 Queen St E · Toronto Centre

Approved 11 Sep 2026

Demolish rear yard deteriorated stand alone building extension. The rear wall of the original building shall remain intact (addition was not connected to the existing building).

Student Residence

100 Bond St

852 m away · 100 Bond St · Toronto Centre

Approved 17 Sep 2026

Part Permit - Proposed construction of a new 21 storey student residence including 1 level of basement (Assembly School) Toronto Metropolitan University.

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

212 Dundas St E

486 m away · 212 Dundas St E · Toronto Centre

Approved 6 Jul 2026

Proposal to demolish the existing 4 storey commercial building with the retention of the exterior street facing facade of the Filmore Hotel building.See 20 151363 STE 13 SA for future proposal.

Demolition

319 Sackville St

595 m away · 319 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

361 Gerrard St E

597 m away · 361 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Show 12 moreShow fewer
Demolition

295 Sackville St

618 m away · 295 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

407 Gerrard St E

674 m away · 407 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

415 Gerrard St E

712 m away · 415 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

427 Gerrard St E

733 m away · 427 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

260 Sumach St

758 m away · 260 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

266 Sumach St

762 m away · 266 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

110 Bond St

843 m away · 110 Bond St · Toronto Centre

Approved 30 Jan 2026

Demolition of existing 3 Storey commercial building

Demolition

104 Bond St

848 m away · 104 Bond St · Toronto Centre

Approved 2 Feb 2026

Demolition of existing 4 storey commercial building

Demolition

100 Bond St

852 m away · 100 Bond St · Toronto Centre

Approved 30 Jan 2026

Demolition of existing 3 Storey commercial building

Demolition

74 Dundas St E

854 m away · 74 Dundas St E · Toronto Centre

Approved 3 Feb 2026

Proposal to demolish existing two storey building.

Demolition

64 Dundas St E

859 m away · 64 Dundas St E · Toronto Centre

Approved 2 Mar 2026

Proposal to demolish existing 3 storey mixed use building in relation to new 21 storey student residence development

Demolition

60 Dundas St E

864 m away · 60 Dundas St E · Toronto Centre

Approved 2 Mar 2026

Proposal to demolish existing 3 storey mixed use building in relation to new 21 storey student residence development

Loud nights

Hours the city has already allowed.

Construction

Hoem2

176 m away · 300 Sherbourne St · Toronto Centre

Allowed 2 Sep 2026 – 31 Dec 2026

Hours 7:00 a.m.–7:00 p.m.

Reliance Construction Inc.

Amplified And/or Instrument Sound

Long Winter To At Allan Gardens

312 m away · 19 Horticultural Ave · Toronto Centre

Allowed 6 Nov 2026

Hours 6:00 p.m.–12:00 p.m.

Setup 6 Nov 2026, 2:00 p.m.–6:00 p.m.

Tear down 7 Nov 2026, from 1:00 a.m.

Friends Of Allan Gardens

Construction

Tchc Rental Building 4a

501 m away · 325 Gerrard St E · Toronto Centre

Allowed 1 Apr 2026 – 1 Apr 2027

Hours 6:00 a.m.–11:00 p.m.

Metro Toronto Housing Corporation

Show 12 moreShow fewer
Continuous Concrete Pour

Regent Park Tower 4a

501 m away · 325 Gerrard St E · Toronto Centre

Allowed 24 Aug 2026 – 28 Feb 2027

Hours from 6:00 a.m.

Deltera Contracting Inc

Amplified And/or Instrument Sound

October Funfest

694 m away · 620 Dundas St E · Toronto Centre

Allowed 24 Oct 2026

Hours 1:00 p.m.–3:00 p.m.

Setup 24 Oct 2026, 10:00 a.m.–12:59 p.m.

Tear down 24 Oct 2026, 3:01 p.m.–5:00 p.m.

Fred Victor Centre

Construction

Tmu Student Wellbeing Centre

761 m away · 137 Bond St · Toronto Centre

Allowed 30 Aug 2026 – 31 Dec 2026

Hours 6:00 a.m.–9:00 p.m.

Pomerleau

Construction

Tmu Student Wellbeing Centre

761 m away · 137 Bond St · Toronto Centre

Allowed 5 Oct 2026 – 31 Dec 2026

Hours 6:00 a.m.–11:00 p.m.

Pomerleau

Amplified And/or Instrument Sound

Halloween On Church

832 m away · 512 Church St · Toronto Centre

Allowed 30 Oct 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:59 p.m., 6:30 p.m.–11:59 p.m.

Setup 30 Oct 2026, 7:00 a.m.–6:30 p.m.

Tear down 31 Oct 2026 – 1 Nov 2026, 11:59 p.m.–6:30 a.m.

Church Wellesley Village Bia

Amplified And/or Instrument Sound

November 5th Walk-out For Education

847 m away · 25 Gould St · Toronto Centre

Allowed 5 Nov 2026

Hours 12:00 p.m.–3:00 p.m.

Setup 5 Nov 2026, 11:30 p.m.–12:00 p.m.

Tear down 5 Nov 2026, 3:00 p.m.–3:30 p.m.

Ryerson Students' Union

Construction

Concord Sky

929 m away · 389 Yonge St · Toronto Centre

Allowed 1 Oct 2026 – 31 Oct 2026

Hours 6:00 a.m.–7:00 a.m., 7:00 a.m.–9:00 a.m.

Concord Properties Developments Corp

Amplified And/or Instrument Sound

Halloween Spooktacular

1.0 km away · 1 Dundas St E · Toronto Centre

Allowed 31 Oct 2026

Hours 12:00 p.m.–5:00 p.m.

Setup 31 Oct 2026, 8:00 a.m.–12:00 p.m.

Tear down 31 Oct 2026, 5:00 p.m.–10:00 p.m.

Downtown Yonge Business Improvement Area

Amplified And/or Instrument Sound

55th Annual Chariot Fest

1.0 km away · 4 Edward St · University-Rosedale

Allowed 10 Jul 2027

Hours 10:00 a.m.–1:00 p.m.

Setup 10 Jul 2027, 6:00 a.m.–10:00 a.m.

Tear down 10 Jul 2027, 1:00 p.m.–3:00 p.m.

Iskcon Toronto

Amplified And/or Instrument Sound

Catrinas Festival Canada

1.0 km away · 444 Yonge St · University-Rosedale

Allowed 24 Oct 2026 – 25 Oct 2026

Hours 11:00 a.m.–6:00 p.m.

Setup 24 Oct 2026, 8:00 a.m.–11:00 a.m.

Tear down 25 Oct 2026, 6:00 p.m.–10:00 p.m.

Gaucha Argentina Love For Humanity

Amplified And/or Instrument Sound

Howl-o-ween

1.0 km away · 444 Yonge St · University-Rosedale

Allowed 24 Oct 2026

Hours 11:00 a.m.–4:00 p.m.

Setup 24 Oct 2026, 9:00 a.m.–11:00 a.m.

Tear down 24 Oct 2026, 4:00 p.m.–6:00 p.m.

Downtown Yonge Bia

Amplified And/or Instrument Sound

Barbara Ann Scott Ice Trail Celebration

1.0 km away · 444 Yonge St · University-Rosedale

Allowed 5 Dec 2026

Hours 2:00 p.m.–6:00 p.m.

Setup 5 Dec 2026, 12:00 p.m.–2:00 p.m.

Tear down 5 Dec 2026, 6:00 p.m.–8:00 p.m.

Downtown Yonge Bia

Events

On the city's calendar. Check before you go.

Farmers' Market

Allan Gardens Saturday Farmers' Market

312 m away · 19 Horticultural Ave · Toronto Centre

On 14 Nov 2026 – 6 Feb 2027

Free · Listed days only

Celebrate local food, community, and sustainable agriculture. Discover fresh produce, artisanal products, and small-scal

Event pageAdd to calendar
Arts/ExhibitsMuseum

The possibility of viewing the world differently: Autumn Edition

593 m away · 80 Gerrard St E · Toronto Centre

On 14 Nov 2026 – 28 Nov 2026

Free · Listed days only

A show from curator Deborah Harris, who has gathered artists' works including several drawings by E.J. Gold. Voyage thr

Event pageAdd to calendar
Show 19 moreShow fewer
Arts/ExhibitsCultural

A Black History of Photography: A Short Introduction with Drew Thompson

615 m away · 80 Gould St · Toronto Centre

On 1 Dec 2026

Free

In this keynote lecture, Dr. Drew Thompson introduces the questions and themes that guide the Black History of Photograp

Event pageAdd to calendar
DanceLive Performances

Immersion Festival

639 m away · 404 Jarvis St · Toronto Centre

On 14 Nov 2026 – 22 Nov 2026

Listed days only

Join us for a celebration of Canadian cultural life for audiences and a sought-after performance and networking opportun

Event pageAdd to calendar
2SLGBTQ+Live Performances

The Other Reindeer, A Choral Panto Show, Singing Out’s Holiday concert

694 m away · 43 Gerrard St E · Toronto Centre

On 12 Dec 2026

Toronto’s Largest 2SLGBTQQIA+ choir presents a one-of-a-kind choral panto show! When the North Pole’s most famous flye

Event pageAdd to calendar
CampFamily/Children

Meet Your Neighbour at an Early Local Registration Preparation Event

797 m away · 640 Dundas St E · Toronto Centre

On 16 Nov 2026 – 25 Nov 2026

Free · Listed days only

Check out a free recreation centre in person, meet your neighbours if you live nearby and learn more about who is eligib

Event pageAdd to calendar
Arts/ExhibitsCultural

Molly Steels: I Am/Was/Always

807 m away · 33 Gould St · Toronto Centre

On 14 Nov 2026 – 5 Dec 2026

Free · Listed days only

The philosopher Diana Prokofyeva considers a photograph to be a phenomenon that exists as a way to avoid death by copyin

Event pageAdd to calendar
Arts/ExhibitsCultural

Tanya Marcuse: Portent

807 m away · 33 Gould St · Toronto Centre

On 14 Nov 2026 – 5 Dec 2026

Free · Listed days only

Tanya Marcuse’s multichannel video Portent presents ominous scenes of the natural world: trees swaying in the wind, vapo

Event pageAdd to calendar
Arts/ExhibitsCultural

Richard Avedon: Immortal: Portraits of Aging

807 m away · 33 Gould St · Toronto Centre

On 14 Nov 2026 – 5 Dec 2026

Free

For nearly half a century, celebrated American photographer Richard Avedon confronted one of portraiture’s enduring tabo

Event pageAdd to calendar
Arts/ExhibitsTalks

Lasting Letters: An Evening with Frish Brandt & Dr. Samir Sinha

807 m away · 33 Gould St · Toronto Centre

On 17 Nov 2026

Free

"Letter midwife" Frish Brandt joins geriatrician Dr. Samir Sinha for a conversation presented in conjunction with Richar

Event pageAdd to calendar
Arts/ExhibitsCultural

Symposium: A Black History of Photography

817 m away · 122 Bond St · Toronto Centre

On 1 Dec 2026

Free

Join us for a day of talks by international scholars and artists examining photography through the lens of Black history

Event pageAdd to calendar
Arts/ExhibitsHistory

Card Printing on the Historic Press: Holiday Season at Mackenzie House

894 m away · 82 Bond St · Toronto Centre

On 25 Nov 2026 – 31 Dec 2026

Free · Listed days only

Step back in time and experience the magic of card-making in a 19th-century printshop. Learn about the fascinating histo

Add to calendar
HistoryMuseum

Rebellion Talks: Riots & the Rebel Mayor

894 m away · 82 Bond St · Toronto Centre

On 30 Jan 2027

Free

Learn about the riots that shook Toronto to its core in the years before and after the Rebellion of 1837 in the rebel ma

Event pageAdd to calendar
DanceLive Performances

Immersion Festival

899 m away · 504 Jarvis St · Toronto Centre

On 14 Nov 2026 – 22 Nov 2026

Listed days only

Join us for a celebration of Canadian cultural life for audiences and a sought-after performance and networking opportun

Event pageAdd to calendar
Food/CulinaryRun/Walk

Taste of Downtown Yonge Fall Flavours: Walking Food Tour

923 m away · 407 Yonge St · Toronto Centre

On 19 Nov 2026 – 26 Nov 2026

Listed days only

Fall Flavours is a seasonal one-hour food tour designed especially for people who work in and around the neighbourhood.

Add to calendar
CulturalLive Performances

Benedict Sheehan’s ‘Ukrainian War Requiem’: The National Tour

937 m away · 83 Power St · Toronto Centre

On 15 Nov 2026

The Axios Men’s Ensemble, in celebration of their historic Juno award, for Classical Album of the Year (Large Ensemble)

Event pageAdd to calendar
CelebrationsFamily/Children

Mini Mission: The Holiday Edition

1.0 km away · 10 Dundas St E · Toronto Centre

On 16 Nov 2026 – 3 Jan 2027

The holidays are coming and a miniature adventure awaits at North America's largest animated miniature world! Discover

Event pageAdd to calendar
Food/CulinaryHistory

Taste of Downtown Yonge Beverage Tour

1.0 km away · 475 Yonge St · Toronto Centre

On 15 Nov 2026 – 20 Dec 2026

Listed days only

Six drinks. Local cafés, tea shops, bakeries and neighbourhood hot spots. 90 minutes of discovery. Explore Downtown Yon

Add to calendar
Tour

Holiday Season Festive Lights Tour

1.0 km away · 1 Dundas St E · Toronto Centre

On 4 Dec 2026 – 31 Dec 2026

Discover the magic of Toronto’s holiday season on this enchanting festive lights bus tour. Hop on board and enjoy a pano

Event pageAdd to calendar
ArtisanCharity/Cause

Holiday Fair in Sankofa Square

1.0 km away · 1 Dundas St E · Toronto Centre

On 10 Dec 2026 – 20 Dec 2026

Free · Listed days only

Celebrate the Holiday season right in the heart of downtown Toronto! Enjoy twinkling lights, a Holiday Market featurin

Add to calendar
DanceNightlife

The Toronto Burlesque Festival

1.0 km away · 12 Alexander St · Toronto Centre

On 14 Nov 2026 – 15 Nov 2026

Inviting you into REVERIE, a world beyond the ordinary. With four distinct shows of bold artistry, glamour, fantasy and

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

213 Gerrard St E

50 m away · 213 Gerrard St E · Toronto Centre

Asked 4 Jul 2025

Under Review

Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Site plan

307 Sherbourne St

101 m away · 307 Sherbourne St · Toronto Centre

Asked 21 Aug 2018

NOAC Issued

Site Plan Control application for a 15-storey residential building consisting of 192 residential units with a total gross floor area of 7,853 square metres, 4 parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Condominium plan

294 Sherbourne St

182 m away · 294 Sherbourne St · Toronto Centre

Asked 26 Oct 2021

Under Review

*** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Show 21 moreShow fewer
Site plan

383 Sherbourne St

299 m away · 383 Sherbourne St · Toronto Centre

Asked 6 Jul 2023

Appeal Received

The proposal will introduce a 39 storey residential building representing an F.S.I. of 13.58 and lot coverage of 69%. The total GFA will be 20,328 sq. m. incorporating 378 units, and 1,384 sq. m. of indoor and outdoor amenity space.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Site plan

306 Gerrard St E

370 m away · 306 Gerrard St E · Toronto Centre

Asked 26 May 2026

Under Review

Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

405 Sherbourne St

374 m away · 405 Sherbourne St · Toronto Centre

Asked 9 Mar 2026

Application Received

Site Plan Control Application for a 35-storey (112.6) metre building (excluding mechanical penthouse) 25,069 square metres of residential gross floor area and 388 square metres of non-residential gross floor area and a landscaped mid-block connection between Sherbourne and Bleecker Streets.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Rezoning

309 George St

384 m away · 309 George St · Toronto Centre

Asked 15 Oct 2025

Under Review

Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal would replace the existing Seaton House men's shelter. For more information…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Site plan

410 Sherbourne St

423 m away · 410 Sherbourne St · Toronto Centre

Asked 7 Nov 2021

Under Review

Site Plan Approval Application for a 42-storey mixed-use building having a non-residential gross floor area of 240 square metres and a residential gross floor area of 31,273 square metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Condominium plan

410 Sherbourne St

423 m away · 410 Sherbourne St · Toronto Centre

Asked 8 Nov 2021

Under Review

*** Proposed Draft Plan of Condominium for a 39-storey mixed-use building containing 456 residential units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

401 Dundas St E

426 m away · 401 Dundas St E · Toronto Centre

Asked 18 Oct 2021

Under Review

Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 291.6 square metres, and a residential gross floor area of 8518.90 square metres. A total of 137 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Rezoning

505 Parliament St

432 m away · 505 Parliament St · Toronto Centre

Asked 17 Mar 2023

OMB Appeal

Zoning By-law Amendment law to permit the development of site for a 10-storey mixed-use building (38.6 metres) with retail at-grade (278 square metres) and 60 dwelling units. The western (Parliament Street) elevation of the existing 1½ storey listed heritage building at 509 Parliament Street is proposed to be…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Site plan

295 Jarvis St

440 m away · 295 Jarvis St · Toronto Centre

Asked 15 Nov 2022

Under Review

Proposal to facilitate the redevelopment of the site with a 60-storey residential building with a 9-storey podium along Jarvis Street. Overall, the proposal consists of a total of 44,530 square metres of gross floor area. The proposed building will contain a total of 618 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Site plan

218 Dundas St E

446 m away · 218 Dundas St E · Toronto Centre

Asked 28 Sep 2021

Under Review

Site Plan Approval application for a 44-storey mixed-use building comprised of 32,829 square metres of gross floor area including 542 residential dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Condominium plan

218 Dundas St E

446 m away · 218 Dundas St E · Toronto Centre

Asked 25 Oct 2021

Under Review

*** Draft Plan of Condominium for 495 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

201 Sherbourne St

450 m away · 201 Sherbourne St · Toronto Centre

Asked 30 Dec 2024

Under Review

Site Plan application to permit two tall buildings (39- and 40-storeys), containing 693 new residential dwelling units, 525 square metres of non-residential space, and a new public park.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Site plan

239 Dundas St E

461 m away · 239 Dundas St E · Toronto Centre

Asked 18 Mar 2022

Under Review

Site Plan Approval application to facilitate the redevelopment of the site for a 49-storey mixed-use building having a non-residential gross floor area of 198.40 square metres, and a residential gross floor area of 41,363.20 square metres. 678 residential dwelling units are proposed, of which, 8 are rental replacement…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Site plan

214 Sherbourne St

479 m away · 214 Sherbourne St · Toronto Centre

Asked 16 Sep 2022

Under Review

Site Plan Control application to construct a 47-storey tower with a 6-storey prodium containing 66 parking spaces in two levels of below grade parking, 619 dwelling units and a total gross floor area of 41,195.99 square metres, including 481 square metres of community space. The proposal will retain in-situ the…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derek Waltho · [email protected].

Rezoning

325 Gerrard St E

501 m away · 325 Gerrard St E · Toronto Centre

Asked 20 Apr 2022

OMB Appeal

Zoning By-law Amendment application for Phases 4 & 5 of the Regent Park redevelopment. The Phases 4 & 5 lands are generally bounded by Gerrard Street to the north, River Street to the east, Oak Street to the south, and Dreamers Way to the west. The proposal consists of a total gross floor area (GFA) of 320,064 m2…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

325 Gerrard St E

501 m away · 325 Gerrard St E · Toronto Centre

Asked 13 Jan 2025

NOAC Issued

Building 4A Proposal to construct a 26-storey tower, 10 storey mid-rise podium TCHC social housing building with 271 units, retail at grade along Gerrard Street East, community space on the ground floor and mezzanine, with one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

225 Jarvis St

628 m away · 225 Jarvis St · Toronto Centre

Asked 16 Oct 2020

NOAC Issued

Proposal for a 49-storey mixed-use building comprised of 215 hotel suites, 580 residential dwelling units, and ground floor non-residential uses. The total residential gross floor area is 42,780 square metres, and the total non-residential gross floor area is 13,095 square metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Rezoning

211 Jarvis St

688 m away · 211 Jarvis St · Toronto Centre

Asked 31 Mar 2026

Under Review

This application proposes to amend the Official Plan and Zoning By-law to permit a 32-storey mixed-use building, containing 315 dwelling units (including 38 replacement rental units), approximately 377 sq. m. of non-residential gross floor area and 22,153 sq.m of residential GFA, resulting in a Floor Space Index of…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Abraham Plunkett-Latimer · [email protected].

Rezoning

75 McGill St

688 m away · 75 McGill St · Toronto Centre

Asked 8 Nov 2022

Appeal Received

Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that existing student residence being demolished to accommodate the…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Derek Waltho · [email protected].

Site plan

73 McGill St

693 m away · 73 McGill St · Toronto Centre

Asked 8 Nov 2022

Under Review

Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that existing student residence being demolished to accommodate the proposed new…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derek Waltho · [email protected].

Site plan

79 Granby St

695 m away · 79 Granby St · Toronto Centre

Asked 5 Feb 2023

Under Review

Application for Site Plan Control Approval for a proposed 33-storey mixed-use building.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].