Opening this block

Home · Toronto Centre · Sherbourne St

What's new around 383 Sherbourne St

383 Sherbourne St · Toronto Centre. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Gerstein Crisis Centre

598 m away · 355 Church St · Toronto Centre

Applied 30 Oct 2026

Not Started

REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

Being built

The city has allowed these. Work may not have started. The permits in this area list 754 homes.

Apartment

134 Carlton St

225 m away · 134 Carlton St · Toronto Centre

Approved 21 Nov 2025

11 new homes

The permit lists 11 homes.

Creation of 10 new rental units in the basement and one on the ground floor of an existing apartment building.

4 homes

209 Carlton St

259 m away · 209 Carlton St · Toronto Centre

Approved 2 Feb 2026

4 new homes

The permit lists 4 homes.

Proposal for interior alteration and addition to change the vacant residential semi detached house to a supportive housing (residential and ancillary office) building

Multiple Unit Building

130 Carlton St

290 m away · 130 Carlton St · Toronto Centre

Approved 16 Dec 2025

Proposal to construct new storage room is existing parking spot. Parking spot located in underground parking garage

Show 21 moreShow fewer
Multiple Unit Building

222 Gerrard St E

313 m away · 222 Gerrard St E · Toronto Centre

Approved 16 Jan 2026

Rev 01: changes to add underpinning of basement stair and structural changes due to site conditionsProposal for interior and exterior alterations to construct a new dental clinic on the basement and ground floor and a…

Apartment

307 Sherbourne St

340 m away · 307 Sherbourne St · Toronto Centre

Approved 7 Nov 2025

Conditional Permit - Proposal to construct a 18 storey residential apartment building with 223 rental dwelling units and one level of basement.

Apartment

227 Gerrard St E

355 m away · 227 Gerrard St E · Toronto Centre

Approved 27 Oct 2025

116 new homes

The permit lists 116 homes.

Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage

15 homes

344 Jarvis St

356 m away · 344 Jarvis St · Toronto Centre

Approved 12 Jan 2026

15 new homes · 2459024 Ontario Inc

The permit lists 15 homes.

Proposal to alter the existing two-and-one-half-storey semi-detached rooming house by constructing a 3 storey rear addition; underpinning. 12 new rooms to be added (4 accessible at ground floor)

Multiple Unit Building

237 Gerrard St E

385 m away · 237 Gerrard St E · Toronto Centre

Approved 4 Feb 2025

Proposal for administrative party wall permit for work on first, second, and thirdfloor party wall adjacent to work pursuant next door for 24137315 BLD 00 BA (391 ONTARIO ST)

Student Residence

294 Sherbourne St

410 m away · 294 Sherbourne St · Toronto Centre

Approved 30 Oct 2026

REV 03: Revised sprinkler drawings.REV 02: Revision to permit, changes related to basement level, revised exit sign, added pull station to east door, added enter phone to east door, and added pull station to east door…

1 homes

261 Gerrard St E

430 m away · 261 Gerrard St E · Toronto Centre

Approved 27 Jun 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations.

Multiple Unit Building

549 Parliament St

456 m away · 549 Parliament St · Toronto Centre

Approved 20 Oct 2026

Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator…

Laneway suite

9 Spruce St

494 m away · 9 Spruce St · Toronto Centre

Approved 12 Nov 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new laneway suite (Unit # R)

Laneway suite

66 Amelia St

670 m away · 66 Amelia St · Toronto Centre

Approved 26 Sep 2025

1 new home

The permit lists 1 homes.

Proposal to construct a laneway suite behind existing 4plex.

Multiple Unit Building

261 Jarvis St

684 m away · 261 Jarvis St · Toronto Centre

Approved 28 Apr 2026

Proposed underground garage isolated repairs

Apartment

393 Dundas St E

706 m away · 393 Dundas St E · Toronto Centre

Approved 12 Nov 2026

Conditional Permit - Site Service - Proposing to construct a slab-on-grade, 4-storey plus mechanical penthouse and roof deck, 12 unit affordable housing residential building

Multiple Unit Building

461 Sackville St

729 m away · 461 Sackville St · Toronto Centre

Approved 3 Feb 2025

Phase 2: to construct interior alterations for Day Nursery.

14 homes

20 Maitland St

807 m away · 20 Maitland St · Toronto Centre

Approved 12 Jun 2026

14 new homes

The permit lists 14 homes.

Rev 01 - Construction of 1 additional floor.Construction of a new 40-storey building (41st partial storey) with 502 residential units, and a 2-storey below grade parking garage

Multiple Unit Building

25 Howard St

811 m away · 25 Howard St · Toronto Centre

Approved 28 Jan 2025

Proposed interior alterations to an existing mixed-use building in the first and second floor residential units.

Apartment

88 Isabella St

855 m away · 88 Isabella St · Toronto Centre

Approved 17 Sep 2026

Conditional Permit - Part Permit - Construction of a new 50 storey purpose built rental (PBR) residential building BLD NB permit, including PLB and HVAC, with 508 dwelling units (including 82 rental replacement units),…

Mixed Use/res W Non Res

241 Church St

858 m away · 241 Church St · Toronto Centre

Approved 6 Oct 2025

Conditional Permit - Drain - Proposal to construct a new 53 storey mixed use building with 591 dwelling units, 4 levels of below grade parking garage and retail on the ground floor. See also 22 195181 DEM and 21 206338…

Apartment

241 Church St

858 m away · 241 Church St · Toronto Centre

Approved 30 Sep 2026

591 new homes

The permit lists 591 homes.

Proposal to construct a new 53 storey mixed use building with 591 dwelling units, 2 levels of below grade parking garage and retail on the ground floor. See also 22 195181 DEM and 21 206338 STE 13 SA

Multiple Unit Building

154 Shuter St

881 m away · 154 Shuter St · Toronto Centre

Approved 14 Sep 2026

Proposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes…

Multiple Unit Building

620 Dundas St E

889 m away · 620 Dundas St E · Toronto Centre

Approved 26 Sep 2025

Proposed interior alteration to create a studio space for the Randolph College for the Performing Arts within the Daniels Artworks mixed-use condominium development located in Toronto's Regent Park. (688 Dundas St E is…

Mixed Use/res W Non Res

611 Sherbourne St

892 m away · 611 Sherbourne St · Toronto Centre

Approved 2 Sep 2026

Revision No.3: ADDITION OF DEMISING PARTITION WALL IN RETAIL SHELL SPACE. REPLACES ARCHITECTURAL PAGES A2.01a, A4.03REV : Proposed revision for framing. Proposal to construct a new 53 storey mixed use building with 501…

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

212 Dundas St E

694 m away · 212 Dundas St E · Toronto Centre

Approved 6 Jul 2026

Proposal to demolish the existing 4 storey commercial building with the retention of the exterior street facing facade of the Filmore Hotel building.See 20 151363 STE 13 SA for future proposal.

Demolition

361 Gerrard St E

773 m away · 361 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

319 Sackville St

780 m away · 319 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Show 13 moreShow fewer
Demolition

295 Sackville St

823 m away · 295 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

407 Gerrard St E

848 m away · 407 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

427 Gerrard St E

895 m away · 427 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

415 Gerrard St E

901 m away · 415 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

110 Bond St

930 m away · 110 Bond St · Toronto Centre

Approved 30 Jan 2026

Demolition of existing 3 Storey commercial building

Demolition

266 Sumach St

931 m away · 266 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

104 Bond St

940 m away · 104 Bond St · Toronto Centre

Approved 2 Feb 2026

Demolition of existing 4 storey commercial building

Demolition

260 Sumach St

941 m away · 260 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

100 Bond St

946 m away · 100 Bond St · Toronto Centre

Approved 30 Jan 2026

Demolition of existing 3 Storey commercial building

Demolition

74 Dundas St E

1.0 km away · 74 Dundas St E · Toronto Centre

Approved 3 Feb 2026

Proposal to demolish existing two storey building.

Demolition

64 Dundas St E

1.0 km away · 64 Dundas St E · Toronto Centre

Approved 2 Mar 2026

Proposal to demolish existing 3 storey mixed use building in relation to new 21 storey student residence development

Demolition

60 Dundas St E

1.0 km away · 60 Dundas St E · Toronto Centre

Approved 2 Mar 2026

Proposal to demolish existing 3 storey mixed use building in relation to new 21 storey student residence development

Demolition

27 Grosvenor St

1.0 km away · 27 Grosvenor St · Toronto Centre

Approved 22 Sep 2026

The scope includes the demolition of a non-operational morgue at 26 Grenville Street and an existing above- and below-grade parking garage at 27 Grosvenor Street, located in the City of Toronto. The demolition will…

Loud nights

Hours the city has already allowed.

Amplified And/or Instrument Sound

Long Winter To At Allan Gardens

317 m away · 19 Horticultural Ave · Toronto Centre

Allowed 6 Nov 2026

Hours 6:00 p.m.–12:00 p.m.

Setup 6 Nov 2026, 2:00 p.m.–6:00 p.m.

Tear down 7 Nov 2026, from 1:00 a.m.

Friends Of Allan Gardens

Construction

Hoem2

381 m away · 300 Sherbourne St · Toronto Centre

Allowed 2 Sep 2026 – 31 Dec 2026

Hours 7:00 a.m.–7:00 p.m.

Reliance Construction Inc.

Amplified And/or Instrument Sound

Halloween On Church

615 m away · 512 Church St · Toronto Centre

Allowed 30 Oct 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:59 p.m., 6:30 p.m.–11:59 p.m.

Setup 30 Oct 2026, 7:00 a.m.–6:30 p.m.

Tear down 31 Oct 2026 – 1 Nov 2026, 11:59 p.m.–6:30 a.m.

Church Wellesley Village Bia

Show 14 moreShow fewer
Construction

Tchc Rental Building 4a

692 m away · 325 Gerrard St E · Toronto Centre

Allowed 1 Apr 2026 – 1 Apr 2027

Hours 6:00 a.m.–11:00 p.m.

Metro Toronto Housing Corporation

Continuous Concrete Pour

Regent Park Tower 4a

692 m away · 325 Gerrard St E · Toronto Centre

Allowed 24 Aug 2026 – 28 Feb 2027

Hours from 6:00 a.m.

Deltera Contracting Inc

Amplified And/or Instrument Sound

Halloween At The Manor

760 m away · 580 Church St · Toronto Centre

Allowed 30 Oct 2026 – 31 Oct 2026

Hours from 7:00 p.m.

Setup 30 Oct 2026, 6:00 p.m.–7:00 p.m.

Tear down 31 Oct 2026, from 2:00 a.m.

Storm Crow Manor Llt

Continuous Concrete Pour

591 Sherbourne

808 m away · 591 Sherbourne St · Toronto Centre

Allowed 5 Aug 2026 – 6 Feb 2027

Hours from 7:00 a.m.

591 Sherbourne Street Limited

Construction

Tmu Student Wellbeing Centre

823 m away · 137 Bond St · Toronto Centre

Allowed 30 Aug 2026 – 31 Dec 2026

Hours 6:00 a.m.–9:00 p.m.

Pomerleau

Construction

Tmu Student Wellbeing Centre

823 m away · 137 Bond St · Toronto Centre

Allowed 5 Oct 2026 – 31 Dec 2026

Hours 6:00 a.m.–11:00 p.m.

Pomerleau

Amplified And/or Instrument Sound

October Funfest

889 m away · 620 Dundas St E · Toronto Centre

Allowed 24 Oct 2026

Hours 1:00 p.m.–3:00 p.m.

Setup 24 Oct 2026, 10:00 a.m.–12:59 p.m.

Tear down 24 Oct 2026, 3:01 p.m.–5:00 p.m.

Fred Victor Centre

Other

Oil-filling Transformer Unit

889 m away · 83 Charles St E · Toronto Centre

Allowed 26 Oct 2026 – 9 Nov 2026

Hours from 11:59 p.m.

Hydro One Networks Inc.

Construction

Charles Transformer Station

889 m away · 83 Charles St E · Toronto Centre

Allowed 12 Nov 2026 – 3 Dec 2026

Hours from 11:59 p.m.

Hydro One Networks Inc.

Amplified And/or Instrument Sound

November 5th Walk-out For Education

895 m away · 25 Gould St · Toronto Centre

Allowed 5 Nov 2026

Hours 12:00 p.m.–3:00 p.m.

Setup 5 Nov 2026, 11:30 p.m.–12:00 p.m.

Tear down 5 Nov 2026, 3:00 p.m.–3:30 p.m.

Ryerson Students' Union

Amplified And/or Instrument Sound

Catrinas Festival Canada

903 m away · 444 Yonge St · University-Rosedale

Allowed 24 Oct 2026 – 25 Oct 2026

Hours 11:00 a.m.–6:00 p.m.

Setup 24 Oct 2026, 8:00 a.m.–11:00 a.m.

Tear down 25 Oct 2026, 6:00 p.m.–10:00 p.m.

Gaucha Argentina Love For Humanity

Amplified And/or Instrument Sound

Howl-o-ween

903 m away · 444 Yonge St · University-Rosedale

Allowed 24 Oct 2026

Hours 11:00 a.m.–4:00 p.m.

Setup 24 Oct 2026, 9:00 a.m.–11:00 a.m.

Tear down 24 Oct 2026, 4:00 p.m.–6:00 p.m.

Downtown Yonge Bia

Amplified And/or Instrument Sound

Barbara Ann Scott Ice Trail Celebration

903 m away · 444 Yonge St · University-Rosedale

Allowed 5 Dec 2026

Hours 2:00 p.m.–6:00 p.m.

Setup 5 Dec 2026, 12:00 p.m.–2:00 p.m.

Tear down 5 Dec 2026, 6:00 p.m.–8:00 p.m.

Downtown Yonge Bia

Construction

Concord Sky

904 m away · 389 Yonge St · Toronto Centre

Allowed 1 Oct 2026 – 31 Oct 2026

Hours 6:00 a.m.–7:00 a.m., 7:00 a.m.–9:00 a.m.

Concord Properties Developments Corp

Events

On the city's calendar. Check before you go.

Farmers' Market

Allan Gardens Saturday Farmers' Market

317 m away · 19 Horticultural Ave · Toronto Centre

On 14 Nov 2026 – 6 Feb 2027

Free · Listed days only

Celebrate local food, community, and sustainable agriculture. Discover fresh produce, artisanal products, and small-scal

Event pageAdd to calendar
DanceLive Performances

Immersion Festival

410 m away · 404 Jarvis St · Toronto Centre

On 14 Nov 2026 – 22 Nov 2026

Listed days only

Join us for a celebration of Canadian cultural life for audiences and a sought-after performance and networking opportun

Event pageAdd to calendar
Show 12 moreShow fewer
Arts/ExhibitsMuseum

The possibility of viewing the world differently: Autumn Edition

584 m away · 80 Gerrard St E · Toronto Centre

On 14 Nov 2026 – 28 Nov 2026

Free · Listed days only

A show from curator Deborah Harris, who has gathered artists' works including several drawings by E.J. Gold. Voyage thr

Event pageAdd to calendar
DanceLive Performances

Immersion Festival

612 m away · 504 Jarvis St · Toronto Centre

On 14 Nov 2026 – 22 Nov 2026

Listed days only

Join us for a celebration of Canadian cultural life for audiences and a sought-after performance and networking opportun

Event pageAdd to calendar
2SLGBTQ+Live Performances

The Other Reindeer, A Choral Panto Show, Singing Out’s Holiday concert

687 m away · 43 Gerrard St E · Toronto Centre

On 12 Dec 2026

Toronto’s Largest 2SLGBTQQIA+ choir presents a one-of-a-kind choral panto show! When the North Pole’s most famous flye

Event pageAdd to calendar
Arts/ExhibitsCultural

A Black History of Photography: A Short Introduction with Drew Thompson

695 m away · 80 Gould St · Toronto Centre

On 1 Dec 2026

Free

In this keynote lecture, Dr. Drew Thompson introduces the questions and themes that guide the Black History of Photograp

Event pageAdd to calendar
DanceNightlife

The Toronto Burlesque Festival

812 m away · 12 Alexander St · Toronto Centre

On 14 Nov 2026 – 15 Nov 2026

Inviting you into REVERIE, a world beyond the ordinary. With four distinct shows of bold artistry, glamour, fantasy and

Event pageAdd to calendar
Food/CulinaryHistory

Taste of Downtown Yonge Beverage Tour

818 m away · 475 Yonge St · Toronto Centre

On 15 Nov 2026 – 20 Dec 2026

Listed days only

Six drinks. Local cafés, tea shops, bakeries and neighbourhood hot spots. 90 minutes of discovery. Explore Downtown Yon

Add to calendar
Arts/ExhibitsCultural

Molly Steels: I Am/Was/Always

862 m away · 33 Gould St · Toronto Centre

On 14 Nov 2026 – 5 Dec 2026

Free · Listed days only

The philosopher Diana Prokofyeva considers a photograph to be a phenomenon that exists as a way to avoid death by copyin

Event pageAdd to calendar
Arts/ExhibitsCultural

Tanya Marcuse: Portent

862 m away · 33 Gould St · Toronto Centre

On 14 Nov 2026 – 5 Dec 2026

Free · Listed days only

Tanya Marcuse’s multichannel video Portent presents ominous scenes of the natural world: trees swaying in the wind, vapo

Event pageAdd to calendar
Arts/ExhibitsCultural

Richard Avedon: Immortal: Portraits of Aging

862 m away · 33 Gould St · Toronto Centre

On 14 Nov 2026 – 5 Dec 2026

Free

For nearly half a century, celebrated American photographer Richard Avedon confronted one of portraiture’s enduring tabo

Event pageAdd to calendar
Arts/ExhibitsTalks

Lasting Letters: An Evening with Frish Brandt & Dr. Samir Sinha

862 m away · 33 Gould St · Toronto Centre

On 17 Nov 2026

Free

"Letter midwife" Frish Brandt joins geriatrician Dr. Samir Sinha for a conversation presented in conjunction with Richar

Event pageAdd to calendar
Food/CulinaryRun/Walk

Taste of Downtown Yonge Fall Flavours: Walking Food Tour

877 m away · 407 Yonge St · Toronto Centre

On 19 Nov 2026 – 26 Nov 2026

Listed days only

Fall Flavours is a seasonal one-hour food tour designed especially for people who work in and around the neighbourhood.

Add to calendar
Arts/ExhibitsCultural

Symposium: A Black History of Photography

883 m away · 122 Bond St · Toronto Centre

On 1 Dec 2026

Free

Join us for a day of talks by international scholars and artists examining photography through the lens of Black history

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

383 Sherbourne St

0 m away · 383 Sherbourne St · Toronto Centre

Asked 6 Jul 2023

Appeal Received

The proposal will introduce a 39 storey residential building representing an F.S.I. of 13.58 and lot coverage of 69%. The total GFA will be 20,328 sq. m. incorporating 378 units, and 1,384 sq. m. of indoor and outdoor amenity space.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Site plan

405 Sherbourne St

76 m away · 405 Sherbourne St · Toronto Centre

Asked 9 Mar 2026

Application Received

Site Plan Control Application for a 35-storey (112.6) metre building (excluding mechanical penthouse) 25,069 square metres of residential gross floor area and 388 square metres of non-residential gross floor area and a landscaped mid-block connection between Sherbourne and Bleecker Streets.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Site plan

410 Sherbourne St

127 m away · 410 Sherbourne St · Toronto Centre

Asked 7 Nov 2021

Under Review

Site Plan Approval Application for a 42-storey mixed-use building having a non-residential gross floor area of 240 square metres and a residential gross floor area of 31,273 square metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Show 21 moreShow fewer
Condominium plan

410 Sherbourne St

127 m away · 410 Sherbourne St · Toronto Centre

Asked 8 Nov 2021

Under Review

*** Proposed Draft Plan of Condominium for a 39-storey mixed-use building containing 456 residential units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

307 Sherbourne St

340 m away · 307 Sherbourne St · Toronto Centre

Asked 21 Aug 2018

NOAC Issued

Site Plan Control application for a 15-storey residential building consisting of 192 residential units with a total gross floor area of 7,853 square metres, 4 parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Site plan

213 Gerrard St E

342 m away · 213 Gerrard St E · Toronto Centre

Asked 4 Jul 2025

Under Review

Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Condominium plan

294 Sherbourne St

410 m away · 294 Sherbourne St · Toronto Centre

Asked 26 Oct 2021

Under Review

*** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Rezoning

505 Parliament St

419 m away · 505 Parliament St · Toronto Centre

Asked 17 Mar 2023

OMB Appeal

Zoning By-law Amendment law to permit the development of site for a 10-storey mixed-use building (38.6 metres) with retail at-grade (278 square metres) and 60 dwelling units. The western (Parliament Street) elevation of the existing 1½ storey listed heritage building at 509 Parliament Street is proposed to be…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Site plan

240 Wellesley St E

467 m away · 240 Wellesley St E · Toronto Centre

Asked 27 Apr 2022

Under Review

Site Plan Approval application to permit three new buildings on the lands, comprising a 47-storey mixed-use building with 5,770 square metres of non-residential uses in the lower floors and 620 dwelling units, a 21-storey building with 300 dwelling units, and a 9-storey building with 65 dwelling units, including 27…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Subdivision

240 Wellesley St E

467 m away · 240 Wellesley St E · Toronto Centre

Asked 30 Sep 2024

Under Review

Draft Plan of Subdivision to establish two development blocks with pedestrian and vehicular connections into and through the subject site. A new public park and publicly-accessible open spaces, framed by the addition of new buildings to be incorporated enhance the pedestrian experience of St. James Town neighbourhood.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Stephan Posikira · [email protected].

Rezoning

114 Maitland St

487 m away · 114 Maitland St · Toronto Centre

Asked 3 Jul 2025

OMB Appeal

Combined Official Plan & Zoning By-law Amendment for a 56-storey mixed-use building. The proposed building contains a total of 579 dwelling units, of which 36 are rental replacement units, and a total of approximately 4,739 square metres of institutional space for the Garry Hurvitz Centre for Community Mental Health…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Site plan

110 Maitland St

511 m away · 110 Maitland St · Toronto Centre

Asked 22 Sep 2025

Under Review

Site Plan Approval for a 56-storey mixed-use building. The proposed building contains a total of 579 dwelling units, of which 36 are rental replacement units, and a total of approximately 4,739 square metres of institutional space for the Sick Kids Centre for Community Mental Health located in 440 Jarvis Street.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

545 Sherbourne St

532 m away · 545 Sherbourne St · Toronto Centre

Asked 27 Apr 2018

NOAC Issued

Site Plan Control application for a 51-storey mixed use building with a GFA of 35,000 sq. m with 499 sq. m of retail space and 511 residential units, and the total number of rental units on the Block is 2057 units, of which 24 are rental replacement units (and therefore not market). The overall FSI is 7.38.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Site plan

306 Gerrard St E

551 m away · 306 Gerrard St E · Toronto Centre

Asked 26 May 2026

Under Review

Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Rezoning

309 George St

553 m away · 309 George St · Toronto Centre

Asked 15 Oct 2025

Under Review

Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal would replace the existing Seaton House men's shelter. For more information…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Site plan

295 Jarvis St

581 m away · 295 Jarvis St · Toronto Centre

Asked 15 Nov 2022

Under Review

Proposal to facilitate the redevelopment of the site with a 60-storey residential building with a 9-storey podium along Jarvis Street. Overall, the proposal consists of a total of 44,530 square metres of gross floor area. The proposed building will contain a total of 618 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Site plan

506 Church St

614 m away · 506 Church St · Toronto Centre

Asked 13 Apr 2021

Appeal Received

A 14-storey mixed-use building having a residential gross floor area of 12,008 square metres, and a non-residential gross floor area of 810 square metres. A total of 160 residential dwelling units and 31 below grade parking spaces are proposed. A portion of the existing building at 508 and 510 Gerrard Street East will…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Condominium plan

506 Church St

614 m away · 506 Church St · Toronto Centre

Asked 13 Oct 2021

Under Review

*** Draft Plan of Condominium for 197 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Rezoning

506 Church St

614 m away · 506 Church St · Toronto Centre

Asked 15 Oct 2024

Appeal Received

Combined Official Plan Amendment and Zoning By-law Amendement to construct a 48 storey mixed use building and restoration to the heritage protected properties at 508-510 Church St. Approximately 4390 square metres of non-residential space. A community space is proposed with 574 dwelling units above.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Site plan

516 Church St

617 m away · 516 Church St · Toronto Centre

Asked 9 Dec 2024

OMB Appeal

Site Plan Approval for a 48 storey mixed use building and restoration to the heritage protected properties at 508-510 Church St. Approximately 4390 square metres of non-residential space. A community space is proposed with 574 dwelling units above.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Site plan

79 Granby St

618 m away · 79 Granby St · Toronto Centre

Asked 5 Feb 2023

Under Review

Application for Site Plan Control Approval for a proposed 33-storey mixed-use building.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

2 Earl St

624 m away · 2 Earl St · Toronto Centre

Asked 23 Sep 2024

Under Review

Site Plan Application to permit a 63-storey residential building including a total of 50,580.8 square metres of residential gross floor area which will result in a total of 730 total dwelling units.The proposal includes two (2) residential visitor parking spaces and zero (0) residential spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Rezoning

75 McGill St

642 m away · 75 McGill St · Toronto Centre

Asked 8 Nov 2022

Appeal Received

Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that existing student residence being demolished to accommodate the…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Derek Waltho · [email protected].

Rezoning

118 Earl Pl

644 m away · 118 Earl Pl · Toronto Centre

Asked 4 Aug 2022

Appeal Received

Proposed 58-storey residential building containing 818 dwelling units (including 31 rental replacement units) and 96.8 square metres of retail space on the ground floor.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Abraham Plunkett-Latimer · [email protected].