Opening this block

Home · Toronto Centre · Carlton St

What's new around 200A Carlton St

200A Carlton St · Toronto Centre. Within 1 km.

New shops

Licences since July 2025. The date is when the city approved it, not the opening day.

Show 21 moreShow fewer

Named on a permit

A permit application that names a shop. It is not a licence and not an opening day.

Permit application

Gerstein Crisis Centre

759 m away · 355 Church St · Toronto Centre

Applied 30 Oct 2026

Not Started

REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

Permit application

Taco Bell

884 m away · 650 Dundas St E · Toronto Centre

Applied 10 Nov 2026

Not Started

REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

Being built

The city has allowed these. Work may not have started. The permits in this area list 740 homes.

4 homes

209 Carlton St

57 m away · 209 Carlton St · Toronto Centre

Approved 2 Feb 2026

4 new homes

The permit lists 4 homes.

Proposal for interior alteration and addition to change the vacant residential semi detached house to a supportive housing (residential and ancillary office) building

Multiple Unit Building

222 Gerrard St E

241 m away · 222 Gerrard St E · Toronto Centre

Approved 16 Jan 2026

Rev 01: changes to add underpinning of basement stair and structural changes due to site conditionsProposal for interior and exterior alterations to construct a new dental clinic on the basement and ground floor and a…

Multiple Unit Building

237 Gerrard St E

267 m away · 237 Gerrard St E · Toronto Centre

Approved 4 Feb 2025

Proposal for administrative party wall permit for work on first, second, and thirdfloor party wall adjacent to work pursuant next door for 24137315 BLD 00 BA (391 ONTARIO ST)

Show 21 moreShow fewer
Apartment

227 Gerrard St E

280 m away · 227 Gerrard St E · Toronto Centre

Approved 27 Oct 2025

116 new homes

The permit lists 116 homes.

Application to construct a seven storey mixed use building with 124 dwelling units, ground floor retail and 2 levels of underground parking garage

1 homes

261 Gerrard St E

283 m away · 261 Gerrard St E · Toronto Centre

Approved 27 Jun 2025

1 new home

The permit lists 1 homes.

Proposal for interior alterations.

Laneway suite

9 Spruce St

294 m away · 9 Spruce St · Toronto Centre

Approved 12 Nov 2026

1 new home

The permit lists 1 homes.

Proposal to construct a new laneway suite (Unit # R)

Multiple Unit Building

549 Parliament St

323 m away · 549 Parliament St · Toronto Centre

Approved 20 Oct 2026

Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator…

Apartment

307 Sherbourne St

335 m away · 307 Sherbourne St · Toronto Centre

Approved 7 Nov 2025

Conditional Permit - Proposal to construct a 18 storey residential apartment building with 223 rental dwelling units and one level of basement.

Apartment

134 Carlton St

415 m away · 134 Carlton St · Toronto Centre

Approved 21 Nov 2025

11 new homes

The permit lists 11 homes.

Creation of 10 new rental units in the basement and one on the ground floor of an existing apartment building.

Student Residence

294 Sherbourne St

419 m away · 294 Sherbourne St · Toronto Centre

Approved 30 Oct 2026

REV 03: Revised sprinkler drawings.REV 02: Revision to permit, changes related to basement level, revised exit sign, added pull station to east door, added enter phone to east door, and added pull station to east door…

Multiple Unit Building

130 Carlton St

481 m away · 130 Carlton St · Toronto Centre

Approved 16 Dec 2025

Proposal to construct new storage room is existing parking spot. Parking spot located in underground parking garage

Laneway suite

66 Amelia St

542 m away · 66 Amelia St · Toronto Centre

Approved 26 Sep 2025

1 new home

The permit lists 1 homes.

Proposal to construct a laneway suite behind existing 4plex.

15 homes

344 Jarvis St

552 m away · 344 Jarvis St · Toronto Centre

Approved 12 Jan 2026

15 new homes · 2459024 Ontario Inc

The permit lists 15 homes.

Proposal to alter the existing two-and-one-half-storey semi-detached rooming house by constructing a 3 storey rear addition; underpinning. 12 new rooms to be added (4 accessible at ground floor)

Multiple Unit Building

461 Sackville St

584 m away · 461 Sackville St · Toronto Centre

Approved 3 Feb 2025

Phase 2: to construct interior alterations for Day Nursery.

Apartment

393 Dundas St E

605 m away · 393 Dundas St E · Toronto Centre

Approved 12 Nov 2026

Conditional Permit - Site Service - Proposing to construct a slab-on-grade, 4-storey plus mechanical penthouse and roof deck, 12 unit affordable housing residential building

Multiple Unit Building

620 Dundas St E

691 m away · 620 Dundas St E · Toronto Centre

Approved 26 Sep 2025

Proposed interior alteration to create a studio space for the Randolph College for the Performing Arts within the Daniels Artworks mixed-use condominium development located in Toronto's Regent Park. (688 Dundas St E is…

Multiple Unit Building

261 Jarvis St

743 m away · 261 Jarvis St · Toronto Centre

Approved 28 Apr 2026

Proposed underground garage isolated repairs

Multiple Unit Building

585 Dundas St E

806 m away · 585 Dundas St E · Toronto Centre

Approved 6 Aug 2026

REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for tenant fit up

Multiple Unit Building

154 Shuter St

856 m away · 154 Shuter St · Toronto Centre

Approved 14 Sep 2026

Proposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes…

Multiple Unit Building

25 Howard St

882 m away · 25 Howard St · Toronto Centre

Approved 28 Jan 2025

Proposed interior alterations to an existing mixed-use building in the first and second floor residential units.

Transit Station,subway, Bus Terminal

150 Sherbourne St

946 m away · 150 Sherbourne St · Toronto Centre

Approved 2 Feb 2026

Conditional Permit - Part Permit - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter

Mixed Use/res W Non Res

241 Church St

946 m away · 241 Church St · Toronto Centre

Approved 6 Oct 2025

Conditional Permit - Drain - Proposal to construct a new 53 storey mixed use building with 591 dwelling units, 4 levels of below grade parking garage and retail on the ground floor. See also 22 195181 DEM and 21 206338…

Apartment

241 Church St

946 m away · 241 Church St · Toronto Centre

Approved 30 Sep 2026

591 new homes

The permit lists 591 homes.

Proposal to construct a new 53 storey mixed use building with 591 dwelling units, 2 levels of below grade parking garage and retail on the ground floor. See also 22 195181 DEM and 21 206338 STE 13 SA

Mixed Use/res W Non Res

611 Sherbourne St

1.0 km away · 611 Sherbourne St · Toronto Centre

Approved 2 Sep 2026

Revision No.3: ADDITION OF DEMISING PARTITION WALL IN RETAIL SHELL SPACE. REPLACES ARCHITECTURAL PAGES A2.01a, A4.03REV : Proposed revision for framing. Proposal to construct a new 53 storey mixed use building with 501…

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

361 Gerrard St E

573 m away · 361 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Demolition

319 Sackville St

582 m away · 319 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

295 Sackville St

629 m away · 295 Sackville St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Show 6 moreShow fewer
Demolition

407 Gerrard St E

647 m away · 407 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

427 Gerrard St E

692 m away · 427 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

415 Gerrard St E

702 m away · 415 Gerrard St E · Toronto Centre

Approved 8 May 2026

Proposal to demolish the existing building and backfill to grade

Demolition

212 Dundas St E

726 m away · 212 Dundas St E · Toronto Centre

Approved 6 Jul 2026

Proposal to demolish the existing 4 storey commercial building with the retention of the exterior street facing facade of the Filmore Hotel building.See 20 151363 STE 13 SA for future proposal.

Demolition

266 Sumach St

728 m away · 266 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for full building demolition and backfill to grade

Demolition

260 Sumach St

740 m away · 260 Sumach St · Toronto Centre

Approved 8 May 2026

Proposal for demolition of existing building and backfill to grade

Loud nights

Hours the city has already allowed.

Construction

Hoem2

403 m away · 300 Sherbourne St · Toronto Centre

Allowed 2 Sep 2026 – 31 Dec 2026

Hours 7:00 a.m.–7:00 p.m.

Reliance Construction Inc.

Amplified And/or Instrument Sound

Long Winter To At Allan Gardens

444 m away · 19 Horticultural Ave · Toronto Centre

Allowed 6 Nov 2026

Hours 6:00 p.m.–12:00 p.m.

Setup 6 Nov 2026, 2:00 p.m.–6:00 p.m.

Tear down 7 Nov 2026, from 1:00 a.m.

Friends Of Allan Gardens

Construction

Tchc Rental Building 4a

496 m away · 325 Gerrard St E · Toronto Centre

Allowed 1 Apr 2026 – 1 Apr 2027

Hours 6:00 a.m.–11:00 p.m.

Metro Toronto Housing Corporation

Show 7 moreShow fewer
Continuous Concrete Pour

Regent Park Tower 4a

496 m away · 325 Gerrard St E · Toronto Centre

Allowed 24 Aug 2026 – 28 Feb 2027

Hours from 6:00 a.m.

Deltera Contracting Inc

Amplified And/or Instrument Sound

October Funfest

691 m away · 620 Dundas St E · Toronto Centre

Allowed 24 Oct 2026

Hours 1:00 p.m.–3:00 p.m.

Setup 24 Oct 2026, 10:00 a.m.–12:59 p.m.

Tear down 24 Oct 2026, 3:01 p.m.–5:00 p.m.

Fred Victor Centre

Amplified And/or Instrument Sound

Halloween On Church

819 m away · 512 Church St · Toronto Centre

Allowed 30 Oct 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:59 p.m., 6:30 p.m.–11:59 p.m.

Setup 30 Oct 2026, 7:00 a.m.–6:30 p.m.

Tear down 31 Oct 2026 – 1 Nov 2026, 11:59 p.m.–6:30 a.m.

Church Wellesley Village Bia

Continuous Concrete Pour

591 Sherbourne

897 m away · 591 Sherbourne St · Toronto Centre

Allowed 5 Aug 2026 – 6 Feb 2027

Hours from 7:00 a.m.

591 Sherbourne Street Limited

Construction

Tmu Student Wellbeing Centre

947 m away · 137 Bond St · Toronto Centre

Allowed 30 Aug 2026 – 31 Dec 2026

Hours 6:00 a.m.–9:00 p.m.

Pomerleau

Construction

Tmu Student Wellbeing Centre

947 m away · 137 Bond St · Toronto Centre

Allowed 5 Oct 2026 – 31 Dec 2026

Hours 6:00 a.m.–11:00 p.m.

Pomerleau

Amplified And/or Instrument Sound

Halloween At The Manor

1.0 km away · 580 Church St · Toronto Centre

Allowed 30 Oct 2026 – 31 Oct 2026

Hours from 7:00 p.m.

Setup 30 Oct 2026, 6:00 p.m.–7:00 p.m.

Tear down 31 Oct 2026, from 2:00 a.m.

Storm Crow Manor Llt

Events

On the city's calendar. Check before you go.

Farmers' Market

Allan Gardens Saturday Farmers' Market

444 m away · 19 Horticultural Ave · Toronto Centre

On 14 Nov 2026 – 6 Feb 2027

Free · Listed days only

Celebrate local food, community, and sustainable agriculture. Discover fresh produce, artisanal products, and small-scal

Event pageAdd to calendar
DanceLive Performances

Immersion Festival

614 m away · 404 Jarvis St · Toronto Centre

On 14 Nov 2026 – 22 Nov 2026

Listed days only

Join us for a celebration of Canadian cultural life for audiences and a sought-after performance and networking opportun

Event pageAdd to calendar
Show 9 moreShow fewer
Arts/ExhibitsMuseum

The possibility of viewing the world differently: Autumn Edition

735 m away · 80 Gerrard St E · Toronto Centre

On 14 Nov 2026 – 28 Nov 2026

Free · Listed days only

A show from curator Deborah Harris, who has gathered artists' works including several drawings by E.J. Gold. Voyage thr

Event pageAdd to calendar
DanceLive Performances

Immersion Festival

789 m away · 504 Jarvis St · Toronto Centre

On 14 Nov 2026 – 22 Nov 2026

Listed days only

Join us for a celebration of Canadian cultural life for audiences and a sought-after performance and networking opportun

Event pageAdd to calendar
Arts/ExhibitsCultural

A Black History of Photography: A Short Introduction with Drew Thompson

807 m away · 80 Gould St · Toronto Centre

On 1 Dec 2026

Free

In this keynote lecture, Dr. Drew Thompson introduces the questions and themes that guide the Black History of Photograp

Event pageAdd to calendar
CampFamily/Children

Meet Your Neighbour at an Early Local Registration Preparation Event

818 m away · 640 Dundas St E · Toronto Centre

On 16 Nov 2026 – 25 Nov 2026

Free · Listed days only

Check out a free recreation centre in person, meet your neighbours if you live nearby and learn more about who is eligib

Event pageAdd to calendar
2SLGBTQ+Live Performances

The Other Reindeer, A Choral Panto Show, Singing Out’s Holiday concert

840 m away · 43 Gerrard St E · Toronto Centre

On 12 Dec 2026

Toronto’s Largest 2SLGBTQQIA+ choir presents a one-of-a-kind choral panto show! When the North Pole’s most famous flye

Event pageAdd to calendar
Arts/ExhibitsCultural

Molly Steels: I Am/Was/Always

1.0 km away · 33 Gould St · Toronto Centre

On 14 Nov 2026 – 5 Dec 2026

Free · Listed days only

The philosopher Diana Prokofyeva considers a photograph to be a phenomenon that exists as a way to avoid death by copyin

Event pageAdd to calendar
Arts/ExhibitsCultural

Tanya Marcuse: Portent

1.0 km away · 33 Gould St · Toronto Centre

On 14 Nov 2026 – 5 Dec 2026

Free · Listed days only

Tanya Marcuse’s multichannel video Portent presents ominous scenes of the natural world: trees swaying in the wind, vapo

Event pageAdd to calendar
Arts/ExhibitsCultural

Richard Avedon: Immortal: Portraits of Aging

1.0 km away · 33 Gould St · Toronto Centre

On 14 Nov 2026 – 5 Dec 2026

Free

For nearly half a century, celebrated American photographer Richard Avedon confronted one of portraiture’s enduring tabo

Event pageAdd to calendar
Arts/ExhibitsTalks

Lasting Letters: An Evening with Frish Brandt & Dr. Samir Sinha

1.0 km away · 33 Gould St · Toronto Centre

On 17 Nov 2026

Free

"Letter midwife" Frish Brandt joins geriatrician Dr. Samir Sinha for a conversation presented in conjunction with Richar

Event pageAdd to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Site plan

383 Sherbourne St

204 m away · 383 Sherbourne St · Toronto Centre

Asked 6 Jul 2023

Appeal Received

The proposal will introduce a 39 storey residential building representing an F.S.I. of 13.58 and lot coverage of 69%. The total GFA will be 20,328 sq. m. incorporating 378 units, and 1,384 sq. m. of indoor and outdoor amenity space.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Rezoning

505 Parliament St

232 m away · 505 Parliament St · Toronto Centre

Asked 17 Mar 2023

OMB Appeal

Zoning By-law Amendment law to permit the development of site for a 10-storey mixed-use building (38.6 metres) with retail at-grade (278 square metres) and 60 dwelling units. The western (Parliament Street) elevation of the existing 1½ storey listed heritage building at 509 Parliament Street is proposed to be…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Site plan

405 Sherbourne St

245 m away · 405 Sherbourne St · Toronto Centre

Asked 9 Mar 2026

Application Received

Site Plan Control Application for a 35-storey (112.6) metre building (excluding mechanical penthouse) 25,069 square metres of residential gross floor area and 388 square metres of non-residential gross floor area and a landscaped mid-block connection between Sherbourne and Bleecker Streets.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Show 21 moreShow fewer
Site plan

213 Gerrard St E

294 m away · 213 Gerrard St E · Toronto Centre

Asked 4 Jul 2025

Under Review

Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Allsun Campbell · [email protected].

Site plan

410 Sherbourne St

313 m away · 410 Sherbourne St · Toronto Centre

Asked 7 Nov 2021

Under Review

Site Plan Approval Application for a 42-storey mixed-use building having a non-residential gross floor area of 240 square metres and a residential gross floor area of 31,273 square metres.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Condominium plan

410 Sherbourne St

313 m away · 410 Sherbourne St · Toronto Centre

Asked 8 Nov 2021

Under Review

*** Proposed Draft Plan of Condominium for a 39-storey mixed-use building containing 456 residential units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

307 Sherbourne St

335 m away · 307 Sherbourne St · Toronto Centre

Asked 21 Aug 2018

NOAC Issued

Site Plan Control application for a 15-storey residential building consisting of 192 residential units with a total gross floor area of 7,853 square metres, 4 parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Jeremy Humphrey · [email protected].

Site plan

306 Gerrard St E

359 m away · 306 Gerrard St E · Toronto Centre

Asked 26 May 2026

Under Review

Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Condominium plan

294 Sherbourne St

419 m away · 294 Sherbourne St · Toronto Centre

Asked 26 Oct 2021

Under Review

*** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Site plan

240 Wellesley St E

474 m away · 240 Wellesley St E · Toronto Centre

Asked 27 Apr 2022

Under Review

Site Plan Approval application to permit three new buildings on the lands, comprising a 47-storey mixed-use building with 5,770 square metres of non-residential uses in the lower floors and 620 dwelling units, a 21-storey building with 300 dwelling units, and a 9-storey building with 65 dwelling units, including 27…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Subdivision

240 Wellesley St E

474 m away · 240 Wellesley St E · Toronto Centre

Asked 30 Sep 2024

Under Review

Draft Plan of Subdivision to establish two development blocks with pedestrian and vehicular connections into and through the subject site. A new public park and publicly-accessible open spaces, framed by the addition of new buildings to be incorporated enhance the pedestrian experience of St. James Town neighbourhood.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Stephan Posikira · [email protected].

Rezoning

325 Gerrard St E

496 m away · 325 Gerrard St E · Toronto Centre

Asked 20 Apr 2022

OMB Appeal

Zoning By-law Amendment application for Phases 4 & 5 of the Regent Park redevelopment. The Phases 4 & 5 lands are generally bounded by Gerrard Street to the north, River Street to the east, Oak Street to the south, and Dreamers Way to the west. The proposal consists of a total gross floor area (GFA) of 320,064 m2…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Katherine Bailey · [email protected].

Site plan

325 Gerrard St E

496 m away · 325 Gerrard St E · Toronto Centre

Asked 13 Jan 2025

NOAC Issued

Building 4A Proposal to construct a 26-storey tower, 10 storey mid-rise podium TCHC social housing building with 271 units, retail at grade along Gerrard Street East, community space on the ground floor and mezzanine, with one level of underground parking.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Abraham Plunkett-Latimer · [email protected].

Rezoning

309 George St

609 m away · 309 George St · Toronto Centre

Asked 15 Oct 2025

Under Review

Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal would replace the existing Seaton House men's shelter. For more information…

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Jeremy Humphrey · [email protected].

Site plan

401 Dundas St E

616 m away · 401 Dundas St E · Toronto Centre

Asked 18 Oct 2021

Under Review

Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 291.6 square metres, and a residential gross floor area of 8518.90 square metres. A total of 137 residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

545 Sherbourne St

626 m away · 545 Sherbourne St · Toronto Centre

Asked 27 Apr 2018

NOAC Issued

Site Plan Control application for a 51-storey mixed use building with a GFA of 35,000 sq. m with 499 sq. m of retail space and 511 residential units, and the total number of rental units on the Block is 2057 units, of which 24 are rental replacement units (and therefore not market). The overall FSI is 7.38.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Site plan

295 Jarvis St

655 m away · 295 Jarvis St · Toronto Centre

Asked 15 Nov 2022

Under Review

Proposal to facilitate the redevelopment of the site with a 60-storey residential building with a 9-storey podium along Jarvis Street. Overall, the proposal consists of a total of 44,530 square metres of gross floor area. The proposed building will contain a total of 618 dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Site plan

218 Dundas St E

687 m away · 218 Dundas St E · Toronto Centre

Asked 28 Sep 2021

Under Review

Site Plan Approval application for a 44-storey mixed-use building comprised of 32,829 square metres of gross floor area including 542 residential dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Condominium plan

218 Dundas St E

687 m away · 218 Dundas St E · Toronto Centre

Asked 25 Oct 2021

Under Review

*** Draft Plan of Condominium for 495 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Hector Alonso · [email protected].

Rezoning

114 Maitland St

687 m away · 114 Maitland St · Toronto Centre

Asked 3 Jul 2025

OMB Appeal

Combined Official Plan & Zoning By-law Amendment for a 56-storey mixed-use building. The proposed building contains a total of 579 dwelling units, of which 36 are rental replacement units, and a total of approximately 4,739 square metres of institutional space for the Garry Hurvitz Centre for Community Mental Health…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Tiffany Ly · [email protected].

Site plan

201 Sherbourne St

689 m away · 201 Sherbourne St · Toronto Centre

Asked 30 Dec 2024

Under Review

Site Plan application to permit two tall buildings (39- and 40-storeys), containing 693 new residential dwelling units, 525 square metres of non-residential space, and a new public park.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Katherine Bailey · [email protected].

Site plan

239 Dundas St E

704 m away · 239 Dundas St E · Toronto Centre

Asked 18 Mar 2022

Under Review

Site Plan Approval application to facilitate the redevelopment of the site for a 49-storey mixed-use building having a non-residential gross floor area of 198.40 square metres, and a residential gross floor area of 41,363.20 square metres. 678 residential dwelling units are proposed, of which, 8 are rental replacement…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Stephan Posikira · [email protected].

Site plan

110 Maitland St

710 m away · 110 Maitland St · Toronto Centre

Asked 22 Sep 2025

Under Review

Site Plan Approval for a 56-storey mixed-use building. The proposed building contains a total of 579 dwelling units, of which 36 are rental replacement units, and a total of approximately 4,739 square metres of institutional space for the Sick Kids Centre for Community Mental Health located in 440 Jarvis Street.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Tiffany Ly · [email protected].

Site plan

214 Sherbourne St

721 m away · 214 Sherbourne St · Toronto Centre

Asked 16 Sep 2022

Under Review

Site Plan Control application to construct a 47-storey tower with a 6-storey prodium containing 66 parking spaces in two levels of below grade parking, 619 dwelling units and a total gross floor area of 41,195.99 square metres, including 481 square metres of community space. The proposal will retain in-situ the…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Derek Waltho · [email protected].