Nevizade Kitchen+bar
40 m away · 1954 Yonge St · Toronto-St. Paul's
Approved 3 Jun 2026
Opening this block
Home · Toronto-St. Paul's · Imperial St
21 Imperial St · Toronto-St. Paul's. Within 1 km.
Licences since July 2025. The date is when the city approved it, not the opening day.
40 m away · 1954 Yonge St · Toronto-St. Paul's
Approved 3 Jun 2026
71 m away · 1967 Yonge St · Toronto-St. Paul's
Approved 5 Sep 2025
83 m away · 1920 Yonge St · Toronto-St. Paul's
Approved 31 Oct 2026
87 m away · 1975 Yonge St · Toronto-St. Paul's
Approved 10 Oct 2026
182 m away · 1901 Yonge St · Toronto-St. Paul's
Approved 1 Dec 2025
182 m away · 2013 Yonge St · Toronto-St. Paul's
Approved 22 Apr 2026
187 m away · 3 Glebe Rd E · Toronto-St. Paul's
Approved 20 Sep 2025
204 m away · 2019 Yonge St · Toronto-St. Paul's
Approved 12 May 2026
213 m away · 2046 Yonge St · Toronto-St. Paul's
Approved 22 Jan 2026
228 m away · 1881 Yonge St · Toronto-St. Paul's
Approved 1 Mar 2026
236 m away · 22 Balliol St · Toronto-St. Paul's
Approved 24 Dec 2025
240 m away · 2033 Yonge St · Toronto-St. Paul's
Approved 19 Aug 2026
266 m away · 2066 Yonge St · Toronto-St. Paul's
Approved 15 Jul 2026
280 m away · 1867 Yonge St · Toronto-St. Paul's
Approved 19 Feb 2026
290 m away · 2082 Yonge St · Toronto-St. Paul's
Approved 8 Jul 2026
293 m away · 2057 Yonge St · Toronto-St. Paul's
Approved 21 May 2026
330 m away · 5 Manor Rd E · Toronto-St. Paul's
Approved 13 Mar 2026
394 m away · 2095 Yonge St · Toronto-St. Paul's
Approved 28 Nov 2025
463 m away · 2144 Yonge St · Toronto-St. Paul's
Approved 20 Jul 2026
468 m away · 2131 Yonge St · Toronto-St. Paul's
Approved 24 Jun 2026
483 m away · 2156 Yonge St · Toronto-St. Paul's
Approved 12 May 2026
575 m away · 2180 Yonge St · Toronto-St. Paul's
Approved 2 Oct 2026
617 m away · 2171 Yonge St · Toronto-St. Paul's
Approved 18 Aug 2026
691 m away · 230 Merton St · Toronto-St. Paul's
Approved 25 Aug 2025
The city has allowed these. Work may not have started. The permits in this area list 567 homes.
83 m away · 1920 Yonge St · Toronto-St. Paul's
Approved 20 Apr 2026
Proposal for interior alterations to existing office space - UNIT 500
85 m away · 1951 Yonge St · Toronto-St. Paul's
Approved 21 May 2026
Shoring and excavation for remediation purposes
120 m away · 52 Imperial St · Toronto-St. Paul's
Approved 21 Jan 2025
1 new home · Haddington Developments Inc
The permit lists 1 homes.
REV 01 - Revision for 1 - washroom added in lower basement level.2 - increased size of mech. space in attic.3 - ground floor FFE was slightly raised. All other floor heights are unchanged.4 - grading plan has been…
137 m away · 1995 Yonge St · Toronto-St. Paul's
Approved 20 Mar 2026
Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.
173 m away · 19 Colin Ave · Toronto-St. Paul's
Approved 9 Oct 2025
1 new home · Sierra Custom Homes
The permit lists 1 homes.
Proposal to demolish existing dwelling and construct a new 2 storey dwelling.
361 m away · 88 Colin Ave · Toronto-St. Paul's
Approved 1 Jun 2026
1 new home · Georgina Myers
The permit lists 1 homes.
To construct a new single family dwelling
364 m away · 30 Merton St · Toronto-St. Paul's
Approved 6 Oct 2025
322 new homes
The permit lists 322 homes.
37 storey mixed use building containing commercial uses on the ground floor, 322 dwelling units, two level mechanical penthouse, indoor and outdoor amenity areas and three levels of underground parking.
364 m away · 30 Merton St · Toronto-St. Paul's
Approved 16 Mar 2026
Revision 01: Proposal to revision transformer room and elevator level - see letters for details37 storey mixed use building containing commercial uses on the ground floor, 322 dwelling units, two level mechanical…
379 m away · 12 Cuthbert Cres · Toronto-St. Paul's
Approved 20 May 2025
2 new homes
The permit lists 2 homes.
Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH
470 m away · 2150 Yonge St · Toronto-St. Paul's
Approved 3 Sep 2026
Revision 1: Revision to the building permit illustrating the pre-fire and post-repair ceiling height at the base of the basement staircaseProposed fire damage repairs. Scope includes removal and replacement of gypsum,…
475 m away · 111 Merton St · Toronto-St. Paul's
Approved 17 Jun 2026
Proposed Garage repairs
512 m away · 140 Merton St · Toronto-St. Paul's
Approved 18 Jun 2026
Rev 01: Revision to Architectural floor assemblies, Structural and Heritage Drawings.Interior/Exterior alteration for retained heritage component of existing building
512 m away · 140 Merton St · Toronto-St. Paul's
Approved 22 Jul 2026
Part Permit - The Indigenous organization, the Missanabie Cree First Nation, will be developing the site at 140 Merton Street, dedicating the project to housing options for Indigenous elders and other seniors.It will…
512 m away · 11 Oswald Cres · Toronto-St. Paul's
Approved 11 Sep 2026
2 new homes · 16230288 Canada Inc
The permit lists 2 homes.
TO CONSTRUCT A NEW TWO STOREY DUPLEX
531 m away · 154 Davisville Ave · Toronto-St. Paul's
Approved 26 Nov 2025
Proposal to construct new 1 storey garden suite with basement
536 m away · 38 Kilbarry Rd · Toronto-St. Paul's
Approved 6 Oct 2026
1 new home
The permit lists 1 homes.
Proposed converting existing garage to garden suite.
579 m away · 2161 Yonge St · Toronto-St. Paul's
Approved 22 Jul 2025
31 new homes
The permit lists 31 homes.
REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA
583 m away · 131 Hillsdale Ave E · Toronto-St. Paul's
Approved 23 Jul 2026
Nikan Sharif-zadeh
REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…
685 m away · 2191 Yonge St · Toronto-St. Paul's
Approved 1 May 2026
Proposal for interior alterations to first floor and third floor amenities area
685 m away · 102 Highbourne Rd · Toronto-St. Paul's
Approved 18 Feb 2026
REVISION - changes to the architectural drawings are bubbled for referenceProposed New Single Family Dwelling Three-Storey Detached House. Existing SFD Detached House will be demolished.
717 m away · 47 Duggan Ave · Toronto-St. Paul's
Approved 8 Jun 2026
1 new home
The permit lists 1 homes.
Conversion of existing rear yard ancillary building to garden suite.
730 m away · 12 Walmsley Blvd · Toronto-St. Paul's
Approved 15 Apr 2026
1 new home
The permit lists 1 homes.
Rev 01 - 2nd unit in basement and a change from a metal structure to an all-wood structure.Proposal to demolish existing and construct a new 3 storey single family dwelling.
731 m away · 2200 Yonge St · Toronto-St. Paul's
Approved 27 May 2026
Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage
741 m away · 38 Walmsley Blvd · Toronto-St. Paul's
Approved 16 Jul 2026
2 new homes · Madeline Louise Cole
The permit lists 2 homes.
NEW 3 STOREY SFD W/ SECOND SUITE, NEW COVERED FRONT PORCH AND REAR DECK.SEE ALSO 26 178464 DEM and 26 152683 ZAP
The city has allowed these buildings to come down. They may still be standing.
0 m away · 21 Imperial St · Toronto-St. Paul's
Approved 23 Oct 2026
Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.
15 m away · 25 Imperial St · Toronto-St. Paul's
Approved 23 Oct 2026
Proposed demolition of the existing 5-storey commercial building.
361 m away · 88 Colin Ave · Toronto-St. Paul's
Approved 2 Jun 2026
Rl Urban Innovations Inc
Proposal to demolish existing single family dwelling.
512 m away · 140 Merton St · Toronto-St. Paul's
Approved 16 Mar 2026
The proposed development involves the demolition of the existing building and parking lot, and the construction of a 28-storey mixed use building with underground parking, outdoor amenity spaces, pedestrian walkways, a…
512 m away · 11 Oswald Cres · Toronto-St. Paul's
Approved 17 Sep 2026
Hirman Architect Inc
TO CONSTRUCT A NEW TWO STOREY DUPLEX
588 m away · 180 Merton St · Toronto-St. Paul's
Approved 4 Jun 2026
Proposed demolition of row of townhouses/buildings to accommodate proposed project for 45-storey mixed-use residential building - Re: 170/180 Merton St
619 m away · 60 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey dwelling for City Parkland Dedication
621 m away · 62 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
624 m away · 64 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
627 m away · 66 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
629 m away · 68 Soudan Ave · Toronto-St. Paul's
Approved 22 Jan 2025
Demolish the existing two storey semi-detached dwelling for City Parkland Dedication
741 m away · 38 Walmsley Blvd · Toronto-St. Paul's
Approved 16 Oct 2026
Madeline Louise Cole
Proposal to demolish the existing 2 storey SFD-detached dwelling.
817 m away · 295 Balliol St · Toronto-St. Paul's
Approved 7 Mar 2025
Demolish an existing 2-storey semi-detached building on the lands municipally known as 293-295 Balliol Street. The lands will be later improved with the construction of a residential apartment building as noted in the…
853 m away · 17 Henning Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
856 m away · 19 Henning Ave · Eglinton-Lawrence
Approved 10 Apr 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
866 m away · 21 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
870 m away · 23 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
874 m away · 25 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
877 m away · 27 Henning Ave · Eglinton-Lawrence
Approved 26 May 2025
Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA
885 m away · 29 Henning Ave · Eglinton-Lawrence
Approved 25 Aug 2025
Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.
889 m away · 31 Henning Ave · Eglinton-Lawrence
Approved 25 Aug 2025
Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.
905 m away · 205 Forest Hill Rd · Toronto-St. Paul's
Approved 13 May 2026
PROPOSAL TO DEMOLISH EXISTING DETACHED SFD AND TO CONSTRUCT A NEW DETACHED SFD.
Hours the city has already allowed.
364 m away · 30 Merton St · Toronto-St. Paul's
Allowed 2 Jul 2026 – 31 Dec 2026
Hours 7:00 a.m.–11:59 p.m.
Skygrid Construction Inc.
512 m away · 140 Merton St · Toronto-St. Paul's
Allowed 17 Nov 2026 – 17 May 2027
Hours 7:00 a.m.–11:59 p.m.
Ellisdon Residential Inc.
575 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 10 Jul 2026 – 31 Oct 2026
Hours 7:00 p.m.–11:00 p.m.
Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.
Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.
Ellisdon Corporation
575 m away · 2180 Yonge St · Toronto-St. Paul's
Allowed 1 Nov 2026 – 30 Jun 2027
Hours from 7:00 p.m.
Ellisdon Corporation
903 m away · 8 Brownlow Ave · Toronto-St. Paul's
Allowed 1 May 2026 – 30 Oct 2026
Hours 7:00 a.m.–12:30 a.m.
Soudan-brownlow Properties
On the city's calendar. Check before you go.
933 m away · 200 Eglinton Ave W · Eglinton-Lawrence
On 21 Nov 2026
Free
Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle
Add to calendarSomeone has asked the city for a change. Nothing here is a decision.
0 m away · 21 Imperial St · Toronto-St. Paul's
Asked 8 Oct 2021
Under Review
Site Plan Application for a 19-storey mixed-use building containing 228 residential dwelling units, 56 square metres of ground floor retail space, and two levels of underground parking. Two ground level units will have expanded home occupation (live/work) permissions.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
23 m away · 1962 Yonge St · Toronto-St. Paul's
Asked 27 Feb 2026
Under Review
Zoning By-law Amendment for a 45-storey mixed-use building. The building will contain 379 residential units, 9 of which are rental replacement units, with commercial at grade.
You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
62 m away · 1984 Yonge St · Toronto-St. Paul's
Asked 22 Dec 2016
NOAC Issued
Site Plan Approval for a mixed-use building: 9 storeys, retail at-grade, 1032 square metres of non-residential (office) gross floor area, and 20 rental dwelling units. Two surface car-parking spaces are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
85 m away · 1951 Yonge St · Toronto-St. Paul's
Asked 1 Aug 2023
NOAC Issued
Proposed 38 and 45 storey towers, plus MPH, totaling 59,998.22 sq.m. residential GFA and 5,873.08 sq.m. non-residential for an FSI of 11.47. 818 units are proposed and 336 parking spaces.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
122 m away · 1910 Yonge St · Toronto-St. Paul's
Asked 5 Nov 2021
Under Review
Zoning By-law Amendment application to facilitate the redevelopment of the site for a mixed-use building comprised of two towers having heights of 53 and 48-storeys, inclusive of a 10-storey podium. The proposed non-residential gross floor area is 15,796.29 square metres, and the proposed residential gross floor area…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
122 m away · 1910 Yonge St · Toronto-St. Paul's
Asked 5 Nov 2021
Under Review
Draft Plan of Subdivision for 1 block.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
161 m away · 2010 Yonge St · Toronto-St. Paul's
Asked 8 Nov 2021
Appeal Received
Zoning By-law amendment for a 14-storey mixed-use building having a non-residential gross floor area of 1,453 square metres, and a residential gross floor area of 21,757 square metres. 274 residential units are proposed.
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
Write Kai Zhou · [email protected].
226 m away · 2050 Yonge St · Toronto-St. Paul's
Asked 8 Nov 2021
Under Review
2 blocks
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
Write Kai Zhou · [email protected].
226 m away · 2050 Yonge St · Toronto-St. Paul's
Asked 8 Nov 2021
Under Review
Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 2863 square metres, and a residential gross floor area of 15683 square metres. 164 residential units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Kai Zhou · [email protected].
236 m away · 22 Balliol St · Toronto-St. Paul's
Asked 2 Nov 2021
Under Review
Draft Plan of Subdivision for 3 stratified development blocks.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
236 m away · 22 Balliol St · Toronto-St. Paul's
Asked 19 Apr 2022
Under Review
Site Plan Approval for a 40-storey mixed-use building having a non-residential gross floor area of 1111 square metres, and a residential gross floor area of 27,761 square metres. 414 rental residential dwelling units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
239 m away · 33 Davisville Ave · Toronto-St. Paul's
Asked 14 Jun 2022
Under Review
Site Plan Approval for proposed 6-storey (22.5 metre) base building and 33-storey tower element, which will have a total height of 125.0 metres to the top of the roof and 132.0 metres to the top of the mechanical penthouse. The building will contain total of 526 residential dwelling units and 30,786 square metres of…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
268 m away · 2045 Yonge St · Toronto-St. Paul's
Asked 22 Aug 2022
Under Review
Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
312 m away · 45 Balliol St · Toronto-St. Paul's
Asked 8 Nov 2021
Under Review
Site Plan approval application for a 40-storey residential building having a gross floor area of 34,000 square metres, and containing 477 residential dwelling units.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
312 m away · 45 Balliol St · Toronto-St. Paul's
Asked 8 Nov 2021
Under Review
3 blocks.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
377 m away · 64 Merton St · Toronto-St. Paul's
Asked 22 Apr 2022
Under Review
Site Plan Approval application to permit a 40-storey mixed use building with 505 residential units. One of two existing buidlings on the site would be demolished. Heritage retention is involved.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
380 m away · 50 Merton St · Toronto-St. Paul's
Asked 3 Nov 2021
Under Review
*** Draft plan of condominium for 443 units.There is a concurrent Zoning By-law Amendment application which is currently under review
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
380 m away · 50 Merton St · Toronto-St. Paul's
Asked 31 Aug 2022
Appeal Received
Official Plan Amendment application to permit a 46-storey mixed use building with 581residential units, with site-specific relief from office replacement policy requirements of Yonge-Eglinton Seciondary Plan.Related File: 21 233897 STE 12
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
445 m away · 2128 Yonge St · Toronto-St. Paul's
Asked 28 Oct 2021
Under Review
*** Draft Plan of Condominium for 80 units.
This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.
Write Kai Zhou · [email protected].
462 m away · 155 Balliol St · Toronto-St. Paul's
Asked 14 Oct 2021
Under Review
Draft Plan of Subdivision for 3 lots.
You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.
Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.
462 m away · 155 Balliol St · Toronto-St. Paul's
Asked 14 Oct 2021
NOAC Issued
Site Plan Approval for a 37-storey mixed-use building having a non-residential gross floor area of 137 square metres and a residential gross floor area of 31095square metres. A total of 442 new residential dwelling units are proposed.
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
480 m away · 45 Berwick Ave · Toronto-St. Paul's
Asked 10 Jul 2025
Under Review
The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 158.2 m + MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,641.7 sq. m., which results in a total Floor Space Index (FSI) of 19.1 times the area of the lot. The…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
484 m away · 29 Berwick Ave · Toronto-St. Paul's
Asked 10 Jul 2025
OMB Appeal
The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 162.15 m + 8.0 m MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,588.9 sq. m., which results in a total Floor Space Index (FSI) of 19.07 times the area of the lot.…
This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.
511 m away · 141 Davisville Ave · Toronto-St. Paul's
Asked 22 Jun 2022
Under Review
Proposed 32-storey infill tower. The existing 20-storey. 313-unit rental apartment building currently on site will be retained. The proposed building will include approximately 423 new dwelling units (in a mix of studio, one-bedroom, two-bedroom, and three-bedroom units) across 24,026 square metres of residential…
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.