Being built

The city has allowed these. Work may not have started. The permits in this area list 567 homes.

Multiple Unit Building

1951 Yonge St

68 m away · 1951 Yonge St · Toronto-St. Paul's

Approved 21 May 2026

Shoring and excavation for remediation purposes

Multiple Unit Building

1920 Yonge St

88 m away · 1920 Yonge St · Toronto-St. Paul's

Approved 20 Apr 2026

Proposal for interior alterations to existing office space - UNIT 500

Multiple Unit Building

1995 Yonge St

123 m away · 1995 Yonge St · Toronto-St. Paul's

Approved 20 Mar 2026

Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.

Show 21 moreShow fewer
New house

52 Imperial St

142 m away · 52 Imperial St · Toronto-St. Paul's

Approved 21 Jan 2025

1 new home · Haddington Developments Inc

The permit lists 1 homes.

REV 01 - Revision for 1 - washroom added in lower basement level.2 - increased size of mech. space in attic.3 - ground floor FFE was slightly raised. All other floor heights are unchanged.4 - grading plan has been…

New house

19 Colin Ave

196 m away · 19 Colin Ave · Toronto-St. Paul's

Approved 9 Oct 2025

1 new home · Sierra Custom Homes

The permit lists 1 homes.

Proposal to demolish existing dwelling and construct a new 2 storey dwelling.

New house

12 Cuthbert Cres

357 m away · 12 Cuthbert Cres · Toronto-St. Paul's

Approved 20 May 2025

2 new homes

The permit lists 2 homes.

Proposal to construct a new 2 unit semi detached house - related to 24 193610 BLD 00 NH

Apartment

30 Merton St

359 m away · 30 Merton St · Toronto-St. Paul's

Approved 6 Oct 2025

322 new homes

The permit lists 322 homes.

37 storey mixed use building containing commercial uses on the ground floor, 322 dwelling units, two level mechanical penthouse, indoor and outdoor amenity areas and three levels of underground parking.

Mixed Use/res W Non Res

30 Merton St

359 m away · 30 Merton St · Toronto-St. Paul's

Approved 16 Mar 2026

Revision 01: Proposal to revision transformer room and elevator level - see letters for details37 storey mixed use building containing commercial uses on the ground floor, 322 dwelling units, two level mechanical…

New house

88 Colin Ave

375 m away · 88 Colin Ave · Toronto-St. Paul's

Approved 1 Jun 2026

1 new home · Georgina Myers

The permit lists 1 homes.

To construct a new single family dwelling

Multiple Unit Building

2150 Yonge St

466 m away · 2150 Yonge St · Toronto-St. Paul's

Approved 3 Sep 2026

Revision 1: Revision to the building permit illustrating the pre-fire and post-repair ceiling height at the base of the basement staircaseProposed fire damage repairs. Scope includes removal and replacement of gypsum,…

New house

11 Oswald Cres

491 m away · 11 Oswald Cres · Toronto-St. Paul's

Approved 11 Sep 2026

2 new homes · 16230288 Canada Inc

The permit lists 2 homes.

TO CONSTRUCT A NEW TWO STOREY DUPLEX

Multiple Unit Building

140 Merton St

495 m away · 140 Merton St · Toronto-St. Paul's

Approved 18 Jun 2026

Rev 01: Revision to Architectural floor assemblies, Structural and Heritage Drawings.Interior/Exterior alteration for retained heritage component of existing building

Apartment

140 Merton St

495 m away · 140 Merton St · Toronto-St. Paul's

Approved 22 Jul 2026

Part Permit - The Indigenous organization, the Missanabie Cree First Nation, will be developing the site at 140 Merton Street, dedicating the project to housing options for Indigenous elders and other seniors.It will…

Laneway suite

38 Kilbarry Rd

556 m away · 38 Kilbarry Rd · Toronto-St. Paul's

Approved 6 Oct 2026

1 new home

The permit lists 1 homes.

Proposed converting existing garage to garden suite.

New house

131 Hillsdale Ave E

566 m away · 131 Hillsdale Ave E · Toronto-St. Paul's

Approved 23 Jul 2026

Nikan Sharif-zadeh

REV 02: REVISION TO BASEMENT LAYOUT. MINOR CHANGES TO WALKOUT, MAIN & 2ND FLOOR INDICATED WITH REVISION CLOUDS.Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family…

Apartment

2161 Yonge St

573 m away · 2161 Yonge St · Toronto-St. Paul's

Approved 22 Jul 2025

31 new homes

The permit lists 31 homes.

REVISION - to add 3 additional floorsProposal to construct a new 35 storey mixed use building with 304 dwelling units, office and retail space and 5 levels of underground parking. See also 17 1862503 SA

Multiple Unit Building

2191 Yonge St

679 m away · 2191 Yonge St · Toronto-St. Paul's

Approved 1 May 2026

Proposal for interior alterations to first floor and third floor amenities area

New house

102 Highbourne Rd

706 m away · 102 Highbourne Rd · Toronto-St. Paul's

Approved 18 Feb 2026

REVISION - changes to the architectural drawings are bubbled for referenceProposed New Single Family Dwelling Three-Storey Detached House. Existing SFD Detached House will be demolished.

Multiple Unit Building

2200 Yonge St

728 m away · 2200 Yonge St · Toronto-St. Paul's

Approved 27 May 2026

Proposal for localized asphalt, waterproofing, expansion joint, and concrete repairs at Upper Deck of parking garage

Laneway suite

47 Duggan Ave

728 m away · 47 Duggan Ave · Toronto-St. Paul's

Approved 8 Jun 2026

1 new home

The permit lists 1 homes.

Conversion of existing rear yard ancillary building to garden suite.

New house

12 Walmsley Blvd

738 m away · 12 Walmsley Blvd · Toronto-St. Paul's

Approved 15 Apr 2026

1 new home

The permit lists 1 homes.

Rev 01 - 2nd unit in basement and a change from a metal structure to an all-wood structure.Proposal to demolish existing and construct a new 3 storey single family dwelling.

New house

38 Walmsley Blvd

750 m away · 38 Walmsley Blvd · Toronto-St. Paul's

Approved 16 Jul 2026

2 new homes · Madeline Louise Cole

The permit lists 2 homes.

NEW 3 STOREY SFD W/ SECOND SUITE, NEW COVERED FRONT PORCH AND REAR DECK.SEE ALSO 26 178464 DEM and 26 152683 ZAP

Coming down

The city has allowed these buildings to come down. They may still be standing.

Demolition

21 Imperial St

23 m away · 21 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.

Demolition

25 Imperial St

38 m away · 25 Imperial St · Toronto-St. Paul's

Approved 23 Oct 2026

Proposed demolition of the existing 5-storey commercial building.

Demolition

88 Colin Ave

375 m away · 88 Colin Ave · Toronto-St. Paul's

Approved 2 Jun 2026

Rl Urban Innovations Inc

Proposal to demolish existing single family dwelling.

Show 20 moreShow fewer
Demolition

140 Merton St

495 m away · 140 Merton St · Toronto-St. Paul's

Approved 16 Mar 2026

The proposed development involves the demolition of the existing building and parking lot, and the construction of a 28-storey mixed use building with underground parking, outdoor amenity spaces, pedestrian walkways, a…

Demolition

180 Merton St

571 m away · 180 Merton St · Toronto-St. Paul's

Approved 4 Jun 2026

Proposed demolition of row of townhouses/buildings to accommodate proposed project for 45-storey mixed-use residential building - Re: 170/180 Merton St

Demolition

60 Soudan Ave

608 m away · 60 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey dwelling for City Parkland Dedication

Demolition

62 Soudan Ave

610 m away · 62 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

64 Soudan Ave

613 m away · 64 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

66 Soudan Ave

616 m away · 66 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

68 Soudan Ave

618 m away · 68 Soudan Ave · Toronto-St. Paul's

Approved 22 Jan 2025

Demolish the existing two storey semi-detached dwelling for City Parkland Dedication

Demolition

38 Walmsley Blvd

750 m away · 38 Walmsley Blvd · Toronto-St. Paul's

Approved 16 Oct 2026

Madeline Louise Cole

Proposal to demolish the existing 2 storey SFD-detached dwelling.

Demolition

295 Balliol St

796 m away · 295 Balliol St · Toronto-St. Paul's

Approved 7 Mar 2025

Demolish an existing 2-storey semi-detached building on the lands municipally known as 293-295 Balliol Street. The lands will be later improved with the construction of a residential apartment building as noted in the…

Demolition

17 Henning Ave

855 m away · 17 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

19 Henning Ave

858 m away · 19 Henning Ave · Eglinton-Lawrence

Approved 10 Apr 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

21 Henning Ave

869 m away · 21 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

23 Henning Ave

872 m away · 23 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

25 Henning Ave

877 m away · 25 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

27 Henning Ave

879 m away · 27 Henning Ave · Eglinton-Lawrence

Approved 26 May 2025

Demolition of existing 2 storey brick dwelling. Proposed a 34-story Residential building with two underground parking levels. SPA Application No. 23 179321 NNY 08 SA

Demolition

29 Henning Ave

887 m away · 29 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

31 Henning Ave

891 m away · 31 Henning Ave · Eglinton-Lawrence

Approved 25 Aug 2025

Demolish the existing two storey semi-detached dwelling to accomodate a future redevelopment.

Demolition

205 Forest Hill Rd

927 m away · 205 Forest Hill Rd · Toronto-St. Paul's

Approved 13 May 2026

PROPOSAL TO DEMOLISH EXISTING DETACHED SFD AND TO CONSTRUCT A NEW DETACHED SFD.

Demolition

61 Brownlow Ave

1.0 km away · 61 Brownlow Ave · Toronto-St. Paul's

Approved 24 Sep 2025

Demolishing the townhouse for the construction of a residential apartment building.(61-75 Brownlow Avenue)

Loud nights

Hours the city has already allowed.

Continuous Concrete Pour

30 Merton

359 m away · 30 Merton St · Toronto-St. Paul's

Allowed 2 Jul 2026 – 31 Dec 2026

Hours 7:00 a.m.–11:59 p.m.

Skygrid Construction Inc.

Continuous Concrete Pour

140 Merton Street Development

495 m away · 140 Merton St · Toronto-St. Paul's

Allowed 17 Nov 2026 – 17 May 2027

Hours 7:00 a.m.–11:59 p.m.

Ellisdon Residential Inc.

Construction

Canada Square Office Retrofit

571 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 10 Jul 2026 – 31 Oct 2026

Hours 7:00 p.m.–11:00 p.m.

Setup 8 Jun 2026 – 27 Jun 2026, 7:00 p.m.–11:00 p.m.

Tear down 24 Mar 2027 – 5 Apr 2027, 7:00 p.m.–11:00 p.m.

Ellisdon Corporation

Show 2 moreShow fewer
Construction

Canada Square Office Retrofit

571 m away · 2180 Yonge St · Toronto-St. Paul's

Allowed 1 Nov 2026 – 30 Jun 2027

Hours from 7:00 p.m.

Ellisdon Corporation

Continuous Concrete Pour

8 Brownlow Avenue (northwest Of Brownlow And Souda

885 m away · 8 Brownlow Ave · Toronto-St. Paul's

Allowed 1 May 2026 – 30 Oct 2026

Hours 7:00 a.m.–12:30 a.m.

Soudan-brownlow Properties

Events

On the city's calendar. Check before you go.

Environmental

Seed-to-Habitat Workshop: Hands-on Seed Processing Workshop

941 m away · 200 Eglinton Ave W · Eglinton-Lawrence

On 21 Nov 2026

Free

Designed for participants from the Part 1 webinar, this follow-up free workshop will provide hands-on experience for cle

Add to calendar

Plans you can answer

Someone has asked the city for a change. Nothing here is a decision.

Rezoning

1962 Yonge St

0 m away · 1962 Yonge St · Toronto-St. Paul's

Asked 27 Feb 2026

Under Review

Zoning By-law Amendment for a 45-storey mixed-use building. The building will contain 379 residential units, 9 of which are rental replacement units, with commercial at grade.

How to respond

You can send a written comment to the city planner, and you can ask to speak when this ward's community council hears the rezoning. That council recommends. City Council makes the decision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Cameron Williamson · [email protected].

Site plan

21 Imperial St

23 m away · 21 Imperial St · Toronto-St. Paul's

Asked 8 Oct 2021

Under Review

Site Plan Application for a 19-storey mixed-use building containing 228 residential dwelling units, 56 square metres of ground floor retail space, and two levels of underground parking. Two ground level units will have expanded home occupation (live/work) permissions.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Site plan

1984 Yonge St

55 m away · 1984 Yonge St · Toronto-St. Paul's

Asked 22 Dec 2016

NOAC Issued

Site Plan Approval for a mixed-use building: 9 storeys, retail at-grade, 1032 square metres of non-residential (office) gross floor area, and 20 rental dwelling units. Two surface car-parking spaces are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Show 21 moreShow fewer
Site plan

1951 Yonge St

68 m away · 1951 Yonge St · Toronto-St. Paul's

Asked 1 Aug 2023

NOAC Issued

Proposed 38 and 45 storey towers, plus MPH, totaling 59,998.22 sq.m. residential GFA and 5,873.08 sq.m. non-residential for an FSI of 11.47. 818 units are proposed and 336 parking spaces.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

1910 Yonge St

124 m away · 1910 Yonge St · Toronto-St. Paul's

Asked 5 Nov 2021

Under Review

Zoning By-law Amendment application to facilitate the redevelopment of the site for a mixed-use building comprised of two towers having heights of 53 and 48-storeys, inclusive of a 10-storey podium. The proposed non-residential gross floor area is 15,796.29 square metres, and the proposed residential gross floor area…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Subdivision

1910 Yonge St

124 m away · 1910 Yonge St · Toronto-St. Paul's

Asked 5 Nov 2021

Under Review

Draft Plan of Subdivision for 1 block.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Patrick Miller · [email protected].

Rezoning

2010 Yonge St

156 m away · 2010 Yonge St · Toronto-St. Paul's

Asked 8 Nov 2021

Appeal Received

Zoning By-law amendment for a 14-storey mixed-use building having a non-residential gross floor area of 1,453 square metres, and a residential gross floor area of 21,757 square metres. 274 residential units are proposed.

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Kai Zhou · [email protected].

Subdivision

2050 Yonge St

222 m away · 2050 Yonge St · Toronto-St. Paul's

Asked 8 Nov 2021

Under Review

2 blocks

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Kai Zhou · [email protected].

Site plan

2050 Yonge St

222 m away · 2050 Yonge St · Toronto-St. Paul's

Asked 8 Nov 2021

Under Review

Site Plan Approval for a 14-storey mixed-use building having a non-residential gross floor area of 2863 square metres, and a residential gross floor area of 15683 square metres. 164 residential units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Kai Zhou · [email protected].

Site plan

33 Davisville Ave

225 m away · 33 Davisville Ave · Toronto-St. Paul's

Asked 14 Jun 2022

Under Review

Site Plan Approval for proposed 6-storey (22.5 metre) base building and 33-storey tower element, which will have a total height of 125.0 metres to the top of the roof and 132.0 metres to the top of the mechanical penthouse. The building will contain total of 526 residential dwelling units and 30,786 square metres of…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Subdivision

22 Balliol St

228 m away · 22 Balliol St · Toronto-St. Paul's

Asked 2 Nov 2021

Under Review

Draft Plan of Subdivision for 3 stratified development blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Site plan

22 Balliol St

228 m away · 22 Balliol St · Toronto-St. Paul's

Asked 19 Apr 2022

Under Review

Site Plan Approval for a 40-storey mixed-use building having a non-residential gross floor area of 1111 square metres, and a residential gross floor area of 27,761 square metres. 414 rental residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].

Site plan

2045 Yonge St

259 m away · 2045 Yonge St · Toronto-St. Paul's

Asked 22 Aug 2022

Under Review

Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Cameron Williamson · [email protected].

Site plan

45 Balliol St

304 m away · 45 Balliol St · Toronto-St. Paul's

Asked 8 Nov 2021

Under Review

Site Plan approval application for a 40-storey residential building having a gross floor area of 34,000 square metres, and containing 477 residential dwelling units.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Subdivision

45 Balliol St

304 m away · 45 Balliol St · Toronto-St. Paul's

Asked 8 Nov 2021

Under Review

3 blocks.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Site plan

64 Merton St

368 m away · 64 Merton St · Toronto-St. Paul's

Asked 22 Apr 2022

Under Review

Site Plan Approval application to permit a 40-storey mixed use building with 505 residential units. One of two existing buidlings on the site would be demolished. Heritage retention is involved.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Condominium plan

50 Merton St

373 m away · 50 Merton St · Toronto-St. Paul's

Asked 3 Nov 2021

Under Review

*** Draft plan of condominium for 443 units.There is a concurrent Zoning By-law Amendment application which is currently under review

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Cameron Williamson · [email protected].

Rezoning

50 Merton St

373 m away · 50 Merton St · Toronto-St. Paul's

Asked 31 Aug 2022

Appeal Received

Official Plan Amendment application to permit a 46-storey mixed use building with 581residential units, with site-specific relief from office replacement policy requirements of Yonge-Eglinton Seciondary Plan.Related File: 21 233897 STE 12

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Holli Butrimas · [email protected].

Condominium plan

2128 Yonge St

441 m away · 2128 Yonge St · Toronto-St. Paul's

Asked 28 Oct 2021

Under Review

*** Draft Plan of Condominium for 80 units.

How to respond

This is a condominium plan, usually tied to a rezoning. A written comment goes to the city planner. Height and use are argued on the rezoning, when there is one.

Write Kai Zhou · [email protected].

Subdivision

155 Balliol St

444 m away · 155 Balliol St · Toronto-St. Paul's

Asked 14 Oct 2021

Under Review

Draft Plan of Subdivision for 3 lots.

How to respond

You can send a written comment, and you can ask to speak at community council. City Council decides a plan of subdivision.

Next sitting on the published 2026 schedule: Toronto and East York Community Council, 25 Nov 2026, 9:30 a.m., Committee Room 1, Toronto City Hall.

Write Shane Taylor · [email protected].

Site plan

155 Balliol St

444 m away · 155 Balliol St · Toronto-St. Paul's

Asked 14 Oct 2021

NOAC Issued

Site Plan Approval for a 37-storey mixed-use building having a non-residential gross floor area of 137 square metres and a residential gross floor area of 31095square metres. A total of 442 new residential dwelling units are proposed.

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Shane Taylor · [email protected].

Site plan

45 Berwick Ave

480 m away · 45 Berwick Ave · Toronto-St. Paul's

Asked 10 Jul 2025

Under Review

The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 158.2 m + MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,641.7 sq. m., which results in a total Floor Space Index (FSI) of 19.1 times the area of the lot. The…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Patrick Miller · [email protected].

Rezoning

29 Berwick Ave

482 m away · 29 Berwick Ave · Toronto-St. Paul's

Asked 10 Jul 2025

OMB Appeal

The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 162.15 m + 8.0 m MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,588.9 sq. m., which results in a total Floor Space Index (FSI) of 19.07 times the area of the lot.…

How to respond

This file is at the Ontario Land Tribunal. The next community council sitting is not the hearing.

Write Patrick Miller · [email protected].

Site plan

141 Davisville Ave

490 m away · 141 Davisville Ave · Toronto-St. Paul's

Asked 22 Jun 2022

Under Review

Proposed 32-storey infill tower. The existing 20-storey. 313-unit rental apartment building currently on site will be retained. The proposed building will include approximately 423 new dwelling units (in a mix of studio, one-bedroom, two-bedroom, and three-bedroom units) across 24,026 square metres of residential…

How to respond

Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.

Write Holli Butrimas · [email protected].